CAADP IMPLEMENTATION IN COMESA

21
Presented by: Dr Sam G. Kanyarukiga CAADP Coordinator -COMESA [email protected] The CAADP Investment Programmes Design and Implementation Workshop 20-22 October 2010 Intercontinental Hotel Nairobi, Kenya CAADP IMPLEMENTATION IN COMESA

description

CAADP IMPLEMENTATION IN COMESA. The CAADP Investment Programmes Design and Implementation Workshop 20-22 October 2010 Intercontinental Hotel Nairobi, Kenya. Presented by: Dr Sam G. Kanyarukiga CAADP Coordinator -COMESA [email protected]. OUTLINE OF PRESENTATION. - PowerPoint PPT Presentation

Transcript of CAADP IMPLEMENTATION IN COMESA

Page 1: CAADP IMPLEMENTATION IN COMESA

Presented by: Dr Sam G. Kanyarukiga CAADP Coordinator [email protected]

Presented by: Dr Sam G. Kanyarukiga CAADP Coordinator [email protected]

The CAADP Investment Programmes Design and Implementation Workshop

20-22 October 2010

Intercontinental Hotel Nairobi, Kenya

CAADP IMPLEMENTATION IN COMESA

Page 2: CAADP IMPLEMENTATION IN COMESA

OUTLINE OF PRESENTATION

1. THE COMESA REGION2. THE CAADP IMPLEMENTATION

PROCESS MANAGEMENT LEVELS CAADP PROCESS BENCHMARKS

3. CURRENT STATUS IN COMESA COMPACT SIGNATURES POST-COMPACT STATUS QUALITY OF INVESTMENT PLANS

4. COMESA REGIONAL COMPACT OBJECTIVES OF REGIONAL COMPACT CURRENT STATUS

Page 3: CAADP IMPLEMENTATION IN COMESA

I.

I. THE COMESA REGION

19 Countrie

s400

Million people

19 Countrie

s400

Million people

Page 4: CAADP IMPLEMENTATION IN COMESA

II

CAADP IMPLEMENTATION

PROCESS

Page 5: CAADP IMPLEMENTATION IN COMESA

II.1 Management LevelsAUCNPCARECsCountry-Led and OwnedIn –Country Stakeholders (Country Teams, Private Sector, CSOs, Farmers Organizations), DPs etc.

Page 6: CAADP IMPLEMENTATION IN COMESA

II.2 CAADP Process Benchmarks

COMPACT SIGNATURESLaunchConsultative Process

Stocktaking and Growth Options Analysis

Page 7: CAADP IMPLEMENTATION IN COMESA

II.2 CAADP Process Benchmarks

POST COMPACT PROCESS

a. Investment Programmes

Quality (Alignment, Consistency, Coherence, Pillars)

Expert Inputs Costing Best Practices

Page 8: CAADP IMPLEMENTATION IN COMESA

II.2 CAADP Process Benchmarks

POST COMPACT PROCESSb. Technical Reviews Led by AUC, NPCA,

RECs Independent Experts In-Country

Consultations and Document Review

Technical Review Report

Page 9: CAADP IMPLEMENTATION IN COMESA

II.2 CAADP Process Benchmarks

POST COMPACT PROCESSc. Post-Compact High-Level

Business Meeting Presentation of: o Investment Plans and Budget

by Govto Technical Review Report o Recommendations for

improvement o Roadmap for Improvemento Formulation of Gap Financing

Proposals

Page 10: CAADP IMPLEMENTATION IN COMESA

III

CURRENT STATUS IN COMESA

Page 11: CAADP IMPLEMENTATION IN COMESA

III.1 Compact Signatures COMESA

Rwanda – March 2006 Burundi –August 2009 Ethiopia – August 2008 Swaziland March 2010 Uganda – March 2010 Malawi – April 2010 Kenya – July 2010

Tanzania - July 2010 (EAC)

Page 12: CAADP IMPLEMENTATION IN COMESA

III. 1 Compact Signatures Advanced Countries

Zambia Zimbabwe Seychelles Djibouti Sudan Zimbabwe

Launches DRC Egypt Eritrea

Page 13: CAADP IMPLEMENTATION IN COMESA

III.2 Post Compact StatusTechnical ReviewsRwanda: December 2009Uganda: September 2010Kenya: September 2010Malawi: September 2010Ethiopia: October 2010

Page 14: CAADP IMPLEMENTATION IN COMESA

III.2 Post Compact StatusBusiness Meetings Rwanda: December 2009; gap funding accessed at 80%; USD 50m (GAFSP June 2010)

Uganda: September 2010Kenya: September 2010 NextMalawi: Planned for 13-14 October 2010

Ethiopia: Nov/DecemberTanzania: TR and BM – Nov/Dec 2010

Page 15: CAADP IMPLEMENTATION IN COMESA

III.3 Quality of Investment Plans

At Compact Signature Not refined Not well costed Not fully aligned

At Business Meetings Significant Improvement Experts Inputs Technical Assistance Specialized Agencies

Page 16: CAADP IMPLEMENTATION IN COMESA

III.3 Quality of Investment Plans

General Issues of Investment Plans

Low capacity of In-Country Teams Insufficient Technical Assistance Inadequate Programme Coherence Imbalances between investment

areas and 4 pillars Insufficient consideration of value

chain development Coherence between expenditure

and economic impact and poverty reduction

M&E Framework and implementation modalities

Page 17: CAADP IMPLEMENTATION IN COMESA

III.3 Quality of Investment Plans

Way forward for improved Investment

Programmes:1. Improvement of Quality since

development of Post-Compact Roadmap

2. Room for further improvement3. Focus on Post-Compact

resulting in slow down of progress in countries at Pre-Compact Stage

Page 18: CAADP IMPLEMENTATION IN COMESA

IV

COMESA REGIONAL COMPACT

Page 19: CAADP IMPLEMENTATION IN COMESA

IV.1 Objective of Regional CompactAUC/NEPAD RecommendationAdd value to National CAADP CompactFacilitate investments in areas where

individual countries cannot effectively invest e.g. Trans-boundary and multi –country areas

Increased involvement of private sector, PPPs and development partners

To forge regional cooperation and integration

Page 20: CAADP IMPLEMENTATION IN COMESA

IV.2 Current Status Draft Regional Compact Document is

ready since early SeptemberMajor Areas:

Agriculture Commodities along the Value Chains

Productive Infrastructure for increased productivity, value addition and trade

Institutional and Human Resource Development at all levels (Farmers, Trader, processors etc. )

Next Steps Extension into Tripartite Framework –

COMESA, EAC, SADC

Page 21: CAADP IMPLEMENTATION IN COMESA

Thank you!