April 18, 2007 eu:a eppstein uhen architects 1 Supplemental Drawings p r e s e n t a t i o n

Transcript of CA : Supplemental Dwgs

Page 1: CA : Supplemental Dwgs

April 18, 2007 eu:a eppstein uhen architects 1

Supplemental Drawings

p r e s e n t a t i o n

Page 2: CA : Supplemental Dwgs

April 18, 2007 eu:a eppstein uhen architects 2

Presentation Outline

Supplemental Drawings

ADT Process

Revit Demonstration

Construction Bulletins

Page 3: CA : Supplemental Dwgs

April 18, 2007 eu:a eppstein uhen architects 3

Supplemental Drawings

Supplemental Drawings:

The graphic deliverable to identify revisions.

Included with front-end documentation which describes the revision.

Revisions:

Modifications, clarifications, or interpretations made to the Construction Documents

Bidding Phase:

Addendum

Construction Administration:

Construction Bulletin (CB)

Page 4: CA : Supplemental Dwgs

April 18, 2007 eu:a eppstein uhen architects 4

Revision Work Flow

Const Docs Bidding Construction

Incorporated in

ContractGC &

Subs

ADDENDUMDESIGN

TEAMCB

CONTRACT

Change Order

Page 5: CA : Supplemental Dwgs

April 18, 2007 eu:a eppstein uhen architects 5

Supplemental Drawings

Sheet Formats

8.5” x 11”

TB - CA 8.5 x 11 (Landscape)

TB - CA 8.5 x 11 (Portrait)

11” x 17”

TB - CA 11 x 17 (Landscape)

TB - CA 11 x 17 (Portrait)

Page 6: CA : Supplemental Dwgs

April 18, 2007 eu:a eppstein uhen architects 6

Sheet Formats

Page 7: CA : Supplemental Dwgs

April 18, 2007 eu:a eppstein uhen architects 7

Supplemental Sheet Info

Construction Set

or

Bid Set #1

MM/DD/YY

e.g. 04/18/07

Per Vision

Page 8: CA : Supplemental Dwgs

April 18, 2007 eu:a eppstein uhen architects 8

Supplemental Sheet Info

Acme Warehouse

1234 Main Street

Anywhere, WI

54321

Page 9: CA : Supplemental Dwgs

April 18, 2007 eu:a eppstein uhen architects 9

Supplemental Sheet Info

Abbreviation + Number

Construction Bulletin CB #000

Addendum ADD #00

Request for Information RFI #000

Page 10: CA : Supplemental Dwgs

April 18, 2007 eu:a eppstein uhen architects 10

Supplemental Sheet Info

Date of Revision

Different from “ISSUANCE DATE”

Date of CB or Addendum or RFI

Page 11: CA : Supplemental Dwgs

April 18, 2007 eu:a eppstein uhen architects 11

Supplemental Sheet Info

Axxx : Sheet Number

•A105 5th Flr Plan

•A200 Exterior Elevations

X01 : Consecutive Revision

•X01 1st Revision

•X15 15th Revision

Page 12: CA : Supplemental Dwgs

April 18, 2007 eu:a eppstein uhen architects 12

Nomenclature: Supplemental Dwgs

CD sheet + Dash + X suffix + (2) Sequential NumbersA0000-X00 A1001-X01

A00-X00 A201-X13

A0-X00 A5-X02

Naming convention:Modifications :

a. Construction Bulletin CB #000

b. Construction Change Directive CCD #000

c. Proposal Request PR #000

Clarificationsa. Addendum ADD #00

b. Architectural Supplemental Information ASI #000

c. Field Directives FD #000

Interpretations

a. Request for Information RFI #000

Page 13: CA : Supplemental Dwgs

April 18, 2007 eu:a eppstein uhen architects 13

Supplemental Dwgs

Architectural Examples G103-X11 11th revision to sheet G103 - First Floor Life Safety Plan

A101-X01 1st revision to sheet A101 - First Floor Plan

A1021-X03 3rd revision to sheet A1021 - Twenty-First Floor Plan

A501-X29 29th revision to sheet A501 - Exterior Plan Details

Consultant Examples Would follow this same naming convention:

S103-X06 6th revision to sheet S103 - Third Floor Framing Plan

E101-X01 1st revision to sheet E101 - First Floor Electrical Plan

H1021-X03 3rd revision to sheet A1021 - Twenty-First Floor HVAC Plan

P105-X11 11th revision to sheet P105 - Fifth Floor Plumbing Plan

Page 14: CA : Supplemental Dwgs

April 18, 2007 eu:a eppstein uhen architects 14

ADT Process

Cloud the revision in the MS (model space) of the source

drawing (plan, elevation, section, etc) on layer A-Anno-Revs

Open the sheet affected (GXXX.dwg, AXXX.dwg, etc)

Copy view from the “Main” Sheet tab into a Supplemental

Sheets’ tab.

Resize the view to fit the page.

Print Supplemental Sheet to PDF (AXXX-00.pdf)

Save to 00000-00\Documents\CA\Construction Bulletins

Once CB’s itemized proposal has been received & accepted:

Bluebeam Staple all associated PDF’s into a single PDF (CB-000)

Copy Supplemental Drawing PDF’s (only!) into:

Record Documents\Contract Drawings\Supplemental Dwgs

Page 15: CA : Supplemental Dwgs

April 18, 2007 eu:a eppstein uhen architects 15

Revit Demonstration

Page 16: CA : Supplemental Dwgs

April 18, 2007 eu:a eppstein uhen architects 16

Conclusion

Questions???