Accurate Management Reports on 1me, every 1me -‐ why your project deserves more than Excel
Richard Jebb Technical Director, PCF Ltd
![Page 2: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/2.jpg)
Contents
• Introduc:on to PCF • The Challenge of Project Repor:ng • Spreadsheets – the “obvious” solu:on
– Errors and Risks • QEI Management Repor:ng
– Example Reports and Case Studies
![Page 3: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/3.jpg)
Introduc:on to PCF
• Founded in 1982 • Based in Hemel Hempstead • Specialists in graphical repor:ng for projects • Customers include:
![Page 4: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/4.jpg)
The Challenge of Project Repor:ng
• Your organisa:on/customer has a standard set of reports in a predefined format
• Your project management tools cannot produce them – Data comes from mul:ple sources – Need to create specific charts/graphics
• There is acute :me pressure to deliver
![Page 5: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/5.jpg)
What Usually Happens Next
![Page 6: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/6.jpg)
Why Choose a Spreadsheet?
• Familiarity – available on every desktop • Easy to import/paste in data • Built in char:ng and graphics func:ons • Bypasses the IT department
![Page 7: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/7.jpg)
Is This Wise?
• With Excel on every desktop, on the surface it would seem like anyone can build a spreadsheet. And yet just because someone knows how to use Word, we don’t automa:cally assume they are a good writer.
• The task of developing the spreadsheet o]en goes to the person with the most relevant domain knowledge, rather than coding exper:se
![Page 8: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/8.jpg)
Error Rates • Large body of research now exists • Over 80% of all spreadsheets contain errors • Typical cell error rate (CER) is roughly 1% • Inspec:on of spreadsheets by experienced users picks up roughly 50% of errors
• The structure of spreadsheets makes it easy to create errors, and hard to iden1fy them
References: hdp://www.strategy-‐at-‐risk.com/2009/03/03/the-‐risk-‐of-‐spreadsheet-‐errors/ A Cri&cal Review of the Literature on Spreadsheet Errors Powell et al. , Tuck School of Business 2008 Errors in Opera&onal Spreadsheets Powell et al. , Tuck School of Business 2009
![Page 9: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/9.jpg)
Error Cascades
Wrong Result: CER = 0.87% Poor Prac:ce: CER = 1.79%
![Page 10: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/10.jpg)
Error Checking is Hard...
![Page 11: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/11.jpg)
Spreadsheet Risks • Easy to mix data and logic -‐ makes debugging difficult • O]en created by staff with no formal programming training • Model may never have been validated with test case data • Logic within model (or how to use the model itself) may not
be documented • No control on integrity of data once extracted from source(s) • Spreadsheet is o]en "owned" by an individual, rather than
the organisa:on
![Page 12: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/12.jpg)
Other Issues
• Data is dead – just numbers, with no associated structure
• Transferring/formalng data at each period end can take a long :me
• Need to decide repor:ng :me unit in advance for :me scaled data (eg weeks, months)
![Page 13: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/13.jpg)
Things to Consider • Was a requirements document ever issued? • Where did the model come from (e.g. wriden for this project,
copied from another project, downloaded from the web?) • Has the model ever been formally tested? • Is there any documenta:on? • What risk assessment has been performed – what would be
the consequence of – Delivering incorrect results? – The “owner” moving elsewhere?
![Page 14: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/14.jpg)
What are the Alterna:ves?
• CAD System ? • Visio ? • Write your own ? • ...or QEI Management Repor:ng
![Page 15: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/15.jpg)
QEI Product Architecture
QEI Environment
Database
Model Data tasks breakdown structures resources logic work patterns
Vector/Raster Graphics maps plans symbols
HP-GL, DXF JPEG, BMP, GIF, …
MPX, ASCII, CSV, DBF, ODBC
model
views
Application standard processes custom processes
User Interaction
links
3rd Party Application data
data
clipboard, HTML, JPG, EMF, SVG, XML
Published Data views/tables resource loads entire database
Standard Views Structure (eg WBS) PERT network Gantt Chart Resource histogram Calendar Earned Value Tables
Custom Views Time Chainage BoxCharts DrillDown User Defined
![Page 16: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/16.jpg)
How Does It Work?
• Data is imported via a wizard to create a snapshot model of the live project
• Mul:ple projects can be imported into a single QEI database
• Reports are built as graphical views linked to the data model
• Allows data from mul:ple sources to be combined into single set of reports
![Page 17: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/17.jpg)
What Data Is Stored?
• WBS, Tasks and Logic • Calendars • Resources • Cost Rates • Baseline Data
It is also possible to create alternate breakdown structures for repor:ng purposes
![Page 18: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/18.jpg)
Resources
• Values can be displayed as quan::es or costs • Values can be calculated for any single resource, a group of resources, or all resources
• Curves can be computed for any point in any breakdown structure
• Costs can be calculated from mul:ple :me varying sets of rate data
• Time varying availability values can be displayed
![Page 19: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/19.jpg)
Key Benefits
• Process can be automated via macros • PMO retains control of repor:ng • Data model allows for “what if” modelling:
– Schedule slippage – Varying resource availabili:es – Varying resource rates
• Allows integra:on of data from mul:ple sources into a single en:ty
![Page 20: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/20.jpg)
Task Reports
![Page 21: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/21.jpg)
Resource Reports
![Page 22: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/22.jpg)
Earned Value Reports
![Page 23: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/23.jpg)
Custom Reports/Visualisa:ons BLOS Link
CONOP 2
SummaryDetail
BLOS Link
Scenario 2001
COMSAT
P13 CDL Wideband
C4I NWCP6 NBDL Wideband
C4I NWC
AP22 C4ISR
GS Ground C4ISR Gnd Control
AP20 C4ISR
Ground C4I BMSOps Centre
SATCOM Band UHF and Ku
Sat Gnd Terminal
P7 TAC Gnd Comms
Sat Gnd Terminal
P7 TAC Gnd Comms
P9 TacticalComms
BLOS SATCOM
P6 NBDL Dedicated Sensor Link
C4I NWC
GS Ground C4ISR
AP23 UAV C4ISR
![Page 24: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/24.jpg)
Case Studies
![Page 25: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/25.jpg)
Example 1 (Defence Contractor)
• 35,000 tasks spread over 600 projects and 200 departments
• Monthly 250 page report pack took PMO 3 days to prepare
• Use of QEI reduced report produc:on :me by 80% and introduced EV graphics for all projects
![Page 26: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/26.jpg)
Example 2 (Aircra] Manufacturer)
• Used QEI to visualise aircra] build configura:on, generate per-‐shi] ac:vity charts and assess impact of new orders on capacity
• Customer quotes: – "for the first &me we are able to fully visualise what our staff are achieving on a shiB by shiB basis"
– "once we had built the QEI model we could adjust the sequence of opera&ons, significantly improving our assembly &mes -‐ in some cases by up to 60%"
![Page 27: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/27.jpg)
Example 3 (Water Company JV)
• 140 projects, £250m total budget • Budgets, progess and actuals were all originally in separate Excel spreadsheets used to record subcontractor data
• Unable to determine programme performance or generate :mely reports
• Now produce EV and performance reports in QEI direct from single spreadsheet – full period end import takes approximately 15 minutes
![Page 28: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/28.jpg)
Example 4 (Interna:onal Airline)
• Significant percentage of fleet approaching 10 year overhaul, each aircra] out of service for a month plus labour costs of £1m+
• Exis:ng inhouse systems unable to predict when checks would fall due
• QEI was used to predict dates/costs of work based on flying paderns and various maintenance scenarios, to iden:fy most cost-‐effec:ve solu:on
![Page 29: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/29.jpg)
Thank You
• Any Ques:ons?
• If you are interested in learning more about QEI Management Repor:ng, please come and talk to us on our stand today, or check out our website at hdp://www.pcfltd.co.uk
![Page 30: C5 PCE 2012 Presentation - Project Controls Expo PCE... · QEIProductArchitecture(Published Data JPEG, BMP, QEI Environment Database Model Data tasks breakdown structures resources](https://reader030.fdocuments.us/reader030/viewer/2022020316/5b5a17da7f8b9aa30c8b5a26/html5/thumbnails/30.jpg)
References • Google for "prevalence of errors in excel spreadsheets" • hdp://www.burns-‐stat.com/pages/Tutor/spreadsheet_addic:on.html • hdp://www.eusprig.org/horror-‐stories.htm • hdp://www.f1f9.com/the-‐problem • hdp://www.strategy-‐at-‐risk.com/2009/03/03/the-‐risk-‐of-‐spreadsheet-‐
errors/ • hdp://www.ion.icaew.com/itcounts/23601