TRAINING SUPPORT PACKAGE (TSP) 09/25/98 62G1@BCL@2401F34C C-1 TSP Number/Title PFN: 051- 62G1-C02 Set Up a 150-T PH Cr usher Pl ant Effective Date Supersedes TSP(s)  All previous TSPs and LPs on this subject dated prior to 10 January 1997 TSP User United States Army Engineer School Fort Leo nard Wood, MO 65473-5000 Proponent U.S. Army Engineer School Directorate of Training and Doctrine Development Fort Leonard Wood, MO 65473-5000 Comments/ Recommendations Send comments and recommendations directly to: Commandant  ATTN: ATSE-TD United States Army Engineer School Fort Leonard Wood, MO 65473-5000 Foreign Disclosure Restrictions This product has been reviewed by the product developers in coordination with the Fort Leonard Wood foreign disclosure authority . This product is releasab le to military students from foreign countries on a case-by-case basis.

Transcript of C02F

7/27/2019 C02F

http://slidepdf.com/reader/full/c02f 1/3

TRAINING SUPPORT PACKAGE (TSP)

09/25/9862G1@BCL@2401F34C

C-1

TSP

Number/Title

PFN: 051-62G1-C02 Set Up a 150-TPH Crusher Plant

Effective Date

Supersedes TSP(s)  All previous TSPs and LPs on this subject dated prior to 10 January 1997

TSP User  United States Army Engineer SchoolFort Leonard Wood, MO 65473-5000

Proponent U.S. Army Engineer SchoolDirectorate of Training and Doctrine DevelopmentFort Leonard Wood, MO 65473-5000

Comments/

Recommendations

Send comments and recommendations directly to:Commandant ATTN: ATSE-TDUnited States Army Engineer SchoolFort Leonard Wood, MO 65473-5000

Foreign Disclosure

Restrictions

This product has been reviewed by the product developers in coordination with theFort Leonard Wood foreign disclosure authority. This product is releasable to militarystudents from foreign countries on a case-by-case basis.

7/27/2019 C02F

http://slidepdf.com/reader/full/c02f 2/3

TRAINING SUPPORT PACKAGE (TSP)

09/25/9862G1@BCL@2401F34C

C-2

Preface

Purpose To provide 62G skill level one soldiers the skills and knowledge required to set up a150-TPH crusher plant

Task Number: 051-251-XXXX

Task Title: Set Up a 150-TPH Crusher Plant

Condition: Given a 150-TPH crusher plant, job specifications, TM 5-331C*TM 5-332, TM 5-3820-255-14&P, TM 5-3820-256-14&P,TM 5-3820-257-14&P, TM 5-3820-258-14&P,TM 5-3820-259-14&P, TM 5-3820-260-14&P,

TM 5-3820-261-14&P, TM 5-3820-262-14&P,TM 5-3820-263-14&P, a general mechanic's tool kit, a ¾” driveset with sockets, an 18” pipe wrench, a 24” adjustable wrench, a12” ruler, replacement screens, a cone and jaw adjustmentpump, a grease gun, petroleum, oil, lubricants, penetrating oil,rags, appropriate maintenance forms, an equipment recordsfolder, coveralls, safety boots, goggles, gloves, hearingprotection, a hard hat, paper, and a pencil

Standards: Identify the setup procedures and calibrate a 150-TPH crusher plant in accordance with (IAW) job specifications, TM 5-331C,*TM 5-332, TM 5-3820-255-14&P, TM 5-3820-256-14&P,TM 5-3820-257-14&P, TM 5-3820-258-14&P,TM 5-3820-259-14&P, TM 5-3820-260-14&P,

TM 5-3820-261-14&P, TM 5-3820-262-14&P, andTM 5-3820-263-14&P, without damage to equipment or theenvironment and without injury to personnel.

*This reference is currently being revised as a Field Manual

7/27/2019 C02F

http://slidepdf.com/reader/full/c02f 3/3

TRAINING SUPPORT PACKAGE (TSP)

09/25/9862G1@BCL@2401F34C

C-3

This TSP

ContainsTABLE OF CONTENTS

Page

Preface C-2

Lesson Plan Section I - Administrative Data C-I-1

Section II - Introduction C-II-1

Terminal Learning Objective C-II-2

Section III - Presentation

 A - Identify Setup Procedures for a 150-TPH Crusher Plant

C-III-A1

B - Calibrate a 150-TPH Crusher Plant C-III-B1

Section IV - Summary C-IV-1

Section V - Student Evaluation C-V-1

 Appendixes Section VI - Appendixes C-VI-1 A - Viewgraph Transparency (VGT)

MastersC-VI-A1

B - Practical Exercises and Solutions C-VI-B1

C - Test and Test Solutions C-VI-C1