C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control...

40

Transcript of C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control...

Page 1: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.
suzannesteab
Text Box
C/007/0033 #4511
Page 2: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.
Page 3: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.
Page 4: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Crusher Building

Motor controls, switchgear, and associated electrical controls for crusher, screen, Conv "T" drive, reclaim vent fan, scale, magnet, metal detector, water pump, and area lighting

Stacker Area (Control Room Located On Transfer Structure)

Motor controls, switchgear, and associated electrical controls for Conv "Y" drive, conveyor "S" drive, stacker propelling drive, water pump, office building, mobile equipment servicing station and area lighting

Reclaim Area (Control Room Located Near Tunnel Exit On West Side of Conv "R")Motor controls, switchgear, and associated electrical controls for Conv "RT" drive, all storage pile activators, hydraulic power pack drives (for gate actuation), reclaim sensor scale, gate position feedback controls, methane monitors, and area lighting (including reclaim tunnel) Loadout Area (Electrical Controls Located In Operators Control Room)

Motor controls, switchgear, and associated electrical controls for Conv "R" drive (4,160 V), batch weighing system, sampling system, car spotter, and area lighting

Electrical Class

All motors, starters, switchgear, and controls can be Class II, Div. II, even in the reclaim tunnel. However, 2 each methane monitors are to be installed in the reclaim tunnel and 1 each in the truck dump which will deactivate all electrics in the tunnel if methane is detected. Lighting in the tunnels must meet Class I, Div. I requirements.

Office Trailer A 40’x10’ office and change room trailer will be placed on the west side of the facility. See Plate 1 Water Tanks

2 ea., 10,000 gal., treated for culinary, 35 hp centrifugal pump, enclosed tankside pump houses

5-27 Tank Location

- At crusher building to serve crusher building and truck dump - At office building (culinary usage)

Area of Operations

Page 5: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Proposed Permit Area The proposed permit area is located within BLM right-of-way U-48027 and is shown on Plates 1 and 1A. Surface Area to be Disturbed

The permit area has been previously impacted by mining and loading. The entire permit area at Wildcat has been used for loading and coal storage previously. The total existing surface area disturbed is 75.67 acres excluding the ASCA Areas and Utah Railway Tracks. Facilities are indicated on Plate 1. The disturbed area boundary has been modified to include additional area to the east of the main stockpile (radial stacker) in order to accommodate the cleanup of wind-blown fines as required by Division Order DO-04. Additional details regarding this cleanup plan can be found in Appendix P. Life of Project The life of the project has been estimated at 30 years. Schedule of Construction, Mine Development,Mining, and Reclamation All surface facilities have been constructed for the Wildcat Loadout, Reclamation efforts, including, but not limited to, backfilling, grading, topsoil replacement, and revegetation, of all land that is disturbed by surface operations shall occur as contemporaneously as practicable with mining operations. Upon the conclusion of loading activities, the scheduled reclamation phase will begin immediately. Please refer to Part F of this Chapter re Reclamation. Cessation of Operations Temporary IPA will inform the division if it intends to cease operations for a period of more than thirty days. This notice will include information on any activities which may continue while the facility is not in use (water monitoring, etc.).

5-28 Permanent Upon permanent cessation of operations, IPA will reclaim all affected areas according to its’ approved MRP and return the land to its’ pre-mining conditions. Wildcat Operations Exploration and Development Drill Sites Shallow holes for bedrock determination were drilled for foundation studies. Please see Appendix C.

Page 6: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Blasting No blasting will occur at this facility. Water Supply Water is trucked into the facility by a local contractor and stored in 2 – 10,000 gallon storage tanks. One tank is used to supply culinary water to the bathhouse facilities and the other tank provides water for dust suppression for the preparation and loading operations. There is no on-site development of surface or underground water for this facility. There are no wells. Power Supply and Communication Facilities Power and communications were pre-existing at this location. Andalex tapped the 46 KV powerline serving Beaver Creek Coal Company’s mines and via an onsite substation, distributing 4160, 440, 220, and 110 V lines throughout the facility. Landscaping All disturbed areas are relatively flat, and vegetative cover has been promptly re-established to stabilize erosion. Signs, Markers, Fences, and Gates Signs of a uniform design, showing the company name, business address, and telephone number as well as the identification number of the current regulatory program permit authorizing the underground mining activities, have been placed at all access points to the permit area. These signs have been placed to be easily seen, are made of a durable material, and conform to local laws and regulations. The topsoil storage area is clearly marked.

5-29

expensive. The following is a list of structures which will be brought down and removed either complete or as scrap/salvage.

1. 14 x 60 Scale House Trailer 2. Truck Scales 3. Substation 4. Truck Dump (west side)* 5. Crushing Plant (west side)* 6. Radial Stacker (west side)* 7. Reclaim Tunnel (west side) 8. Loadout Conveyor (west side)* 9. Control Building (west side) 10. Truck Dump & Reclaim (2 each) 11. Conveyor T 12. Crusher and Screening Plant 13. Lump Coal Belt 14. Stoker Radial Stacker 15. Conveyor Y, Y-1

Page 7: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

16. Main Radial Stacker (2 each) 17. Loadout Reclaim Tunnel, port supports, 18. Conveyor R 19. Loadout Tower 20. Miscellaneous (Guard Rails, Office,

Water Tanks, Motor Control Centers) 21. Powerline 22. 40' x 40' Shop Building and foundation * Portable

23. 40’ x 10’ Office Trailer

The next step will be to remove any coal remaining on the various storage areas. This will not amount to a large volume of material and it will either be hauled to an approved storage area off-site or it will be disposed of within the loadout permit area by burial. This will include the coal refuse pile currently stored at Wildcat. The refuse pile will be flattened and buried according to the reclamation plan regarding coal mine refuse.

Once the coal has been removed, then the recontouring and regrading portion will commence. It is anticipated that the structure removal will take approximately one year to complete so at this point, we would be into the reclamation about thirteen months. The first step in the recontouring and regrading would be the removal of the culverts. They have been left in until this point so the disturbed area would drain properly. The recontouring would primarily involve the primary and secondary roads, the loadout pad, and the coal stockpile areas. The undisturbed diversion west of the facility would become permanent at this point and would be capable of

5-56

as established by the Division. (See Appendix B) This bond is based on detailed calculations provided by the Division. A copy of the calculations are also included in Appendix B. Wildcat Loadout Facility

Restoration to the pre-mining land use will require: PHASE I: A. Removal of Structures:

1. 14 x 60 Scale House Trailer and Truck Scales 2. Substation 3. Truck Dump (west side) 4. Crushing Plant (west side)* 5. Radial Stacker (west side)* 6. Reclaim Tunnel (west side)

Page 8: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

7. Loadout Conveyor (west side)* 8. Control Building (west side) 9. Truck Dump & Reclaim 10. Conveyor T 11. Crusher and Screening Plant 12. Lump Coal Belt 13. Stoker Radial Stacker 14. Conveyor Y 15. Main Radial Stacker 16. Loadout Reclaim Tunnel, port supports, 17. Conveyor R 18. Loadout Tower 19. Miscellaneous (Guard Rails, Office,

Water and Mag. Tanks, Motor Control Centers) 20. Powerline 21. 40" x 40" Shop 22. 40’ 10’ Office Trailer

Total * Portable

B. Cleanup Coal Piles:

1. Radial Stacker 2. Stoker, Lump 3. Mine Run and Lump 4. West Side Stoker 5. West Side Storage Pad

C. Recontouring and Regrading:

5-63

Page 9: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Wildcat Loadout C/007/033 Bond Amount Rev. January 2014

Direct CostsSubtotal Demolition and Grading $174,640Subtotal Backfilling and Grading $304,438Subtotal Revegetation $270,936Subtotal Direct Costs $750,014

Indirect CostsMob/Demob $75,001 10.0%Contingency $37,501 5.0%Engineering Redesign $18,750 2.5%Main Office Expense $51,001 6.8%Project Management Fee $18,750 2.5%Subtotal Indirect Costs $201,004 26.8%

Total Cost $951,017

Escalation Factor 0.015Number of Years 5Escalation $73,498

Reclamation Cost. $1,024,515

Bond Amount (round to nearest $1,000)in 2019 dollars $1,025,000

Page 10: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Cost Factors

Means Number Material Unit Cost Units02 41 16.13 0100 Mixture of types, average 0.3 CFConcrete Demo1 Concrete Demolition 10.22 CY31 23 16.42 1600 Front End Loader 3 CY 1.32 CY31 23 23.30 0320 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip 7.48 CY02 41 16.17 4200 On Site Disposal 8.65 CYCity Sanitation Price City Sanitation 2 CY02 41 16.13 0012 Steel Bld. Large 0.27 CY

Utility Pole 196 EA02 41 13.33 0800 Guard Rail 12.13 LF02 41 13.60 1700 Chain link, posts & fabric remove only 2.98 LF23 05 05.10 3600 Mechanical equipment heavy 765 Ton31 23 16.42 0260 Backhoe, hydraulic Bulk Bank Measure 1.42 CY31 23 16.13 3080 Backfill trench Minimal Haul 2 1/4 CY 1.77 CY02 65 10.30 0120 6000 gal. to 8000 gal.tank 865 EA02 65 10.30 1026 6000 gal. to 8000 gal.tank 880 EA02 65 10.30 0130 9000 gal. to 12000 gal. tank 1295 EA02 65 10.30 1029 9000 gal. to 12000 gal. tank 1050 EAReveg005 23.56 MSFC007/0331 1380.73 ACReveg007 66.24 Ton01 54 33 4360 D9R Semi-U EROPS (9-25) (2H2007) 19900.0001 54 33 4360 Hourly Cost 136.6501 54 33 4870 988 G EROPS (9-35) (2nd2007) 2005 21900.0001 54 33 4870 Hourly Cost 155.7501 54 33 3600 627 G Scraper 25600.0001 54 33 3600 Hourly Cost 237.1001 54 33 6950 6,000 Gal H2O Truck Diesel 7000.0001 54 33 6950 Hourly Cost 89.8001 54 33 7200 Pick-up Truck 4x4 1 Ton 660.0001 54 33 7200 Hourly Cost 15.55

Forman Average Outside 38.65Labor 36.65Heavy Equip. Operator (Heavy) 48.90Heavy Equip. Operator (Med) 48.90

Page 11: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Loading Bin 01 1069Scales 02 6710Substation 03 3506Truck Dump West 04 2916Crushing Plant West 05 954Radial Stacker West 06 3168Reclaim Tunnel West 07 7022Loadout Conveyor West 08 1382Control Building West 09 1164Truck Dump Reclaim 10 3240Conveyor 11 1332Crusher Screen Plant 12 9305Lump Coal Belt 13 373Stoker radial Stacker 14 2930Conveyor 15 2844Main Radial Stacker 16 17139Loadout Reclaim 17 11520Loadout Tower 18 25768Office 19 4809Powerline 20 4900Shop 21 10692Guardrail 22 12130Culverts 23 1967Miscellaneous 24 6175Truck Dump New 25 3240Conveyor New 26 1188Radial Stacker 27 16436Conveyor 28 10759Office Trailer 29 To be sold

174640

Page 12: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberLoading Bin 01Structure's Demolition Cost Steel Bld. Large 02 41 16.13 0012 0.3 CY 15 15 12 FT 2700 CF 810Structure's Vol. DemolishedRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 810

Equipment's Disposal CostDismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal CostsSubtotal

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 CY 30 18 1 FT 20 CY 0Concrete's Vol. Demolished 1.3Loading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 26 CY 34Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip 31 23 23.30 0320 CY 26 CY 0Disposal Costs On Site Disposal 8.65 CY 26 CY 225Subtotal 259

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal

Total 1069

Page 13: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberScales 02Structure's Demolition Cost Mixture of types, average 02 41 16.13 0100 0.3 CF 14 60 8 FT 6720 CF 2016Structure's Vol. Demolished 0.35 87 CYRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel Drive 87 CY 174Disposal Cost Non Steel City Sanitation City Sanitation Price 2 CYSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 2190

Structure's Demolition CostStructure's Vol. Demolished Steel Bld. Large 02 41 16.13 0012 0.27 CF 14 60 8 FT 6720 CF 1814Rubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 1814

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 10.22 CY 14 70 0.5 FT 18 CY 185Concrete's Vol. Demolished 1.3 24 CYLoading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 24 CY 31Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip31 23 23.30 0320 7.48 CY 24 CY 176Disposal Costs On Site Disposal 8.65 CY 24 CY 204Subtotal 597

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 10.22 CY 10 12 0.25 FT 1 CY 11Concrete's Vol. Demolished 1.3 1 CYLoading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 1 CY 2Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip31 23 23.30 0320 7.48 CY 1 CY 11Disposal Costs On Site Disposal 8.65 CY 1 CY 12Subtotal 37

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 10.22 CY 340 20 0.25 FT 63 CY 643Concrete's Vol. Demolished 1.3 82 CYLoading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 82 CY 108Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip31 23 23.30 0320 7.48 CY 82 CY 612Disposal Costs On Site Disposal 8.65 CY 82 CY 708Subtotal 2072

Total 6710

Page 14: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberSubstation 03Structure's Demolition Cost Mechanical equipment heavy 23 05 05.10 3600 765 Ton 3 Ton 3 Ton 2295Structure's Vol. DemolishedRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 2295

Equipment's Disposal CostDismantling Cost Chain link, posts & fabric remove only 02 41 13.60 1700 2.98 LF 250 LF 250 LF 745Equipment's Vol. DemolishedLoading CostsTransport CostsDisposal CostsSubtotal 745

Equipment's Disposal CostDismantling Cost Utility Pole 0 EA 13 EA 13 EA 0Equipment's Vol. DemolishedLoading CostsTransport CostsDisposal CostsSubtotal 0

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 10.22 CY 25 15 0.5 FT 7 CY 71Concrete's Vol. Demolished 1.3 9 CYLoading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 9 CY 12Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip31 23 23.30 0320 7.48 CY 9 CY 68Disposal Costs On Site Disposal 8.65 CY 9 CY 78Subtotal 229

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 10.22 CY 26 15 0.5 FT 7 CY 74Concrete's Vol. Demolished 1.3 9 CYLoading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 9 CY 12Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip31 23 23.30 0320 7.48 CY 9 CY 70Disposal Costs On Site Disposal 8.65 CY 9 CY 81Subtotal 238

Total 3506

Page 15: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberTruck Dump West 04Structure's Demolition Cost Steel Bld. Large 02 41 16.13 0012 0.27 CF 40 14 15 FT 8400 CF 2268Structure's Vol. DemolishedRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 2268

Equipment's Disposal CostDismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal CostsSubtotal

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 CY 50 CY 50 0Concrete's Vol. Demolished 1.3 65Loading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 65 86Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip31 23 23.30 0320 CY 65 0Disposal Costs On Site Disposal 8.65 CY 65 562Subtotal 648

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal

Total 2916

Page 16: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberCrushing Plant West 05Structure's Demolition Cost Steel Bld. Large 02 41 16.13 0012 0.27 CF 20 15 10 FT 3000 CF 810Structure's Vol. DemolishedRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 810

Equipment's Disposal CostDismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal CostsSubtotal

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 CY 20 15 1 FT 11 0Concrete's Vol. Demolished 1.3 14Loading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 14 19Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip 31 23 23.30 0320 CY 14 0Disposal Costs On Site Disposal 8.65 CY 14 125Subtotal 144

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal

Total 954

Page 17: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberRadial Stacker West 06Structure's Demolition Cost Steel Bld. Large 02 41 16.13 0012 0.27 CF 150 8 8 FT 9600 CF 2592Structure's Vol. DemolishedRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 2592

Equipment's Disposal CostDismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal CostsSubtotal

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 CY 150 8 1 FT 44 CY 0Concrete's Vol. Demolished 1.3 58 CYLoading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 58 CY 76Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip 31 23 23.30 0320 CY 58 CY 0Disposal Costs On Site Disposal 8.65 CY 58 CY 500Subtotal 576

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal

Total 3168

Page 18: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberReclaim Tunnel West 07Structure's Demolition Cost Steel Bld. Large 02 41 16.13 0012 0.27 CF 190 14 8 FT 21280 CF 5746Structure's Vol. DemolishedRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 5746

Equipment's Disposal CostDismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal CostsSubtotal

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 CY 190 14 1 FT 99 CY 0Concrete's Vol. Demolished 1.3 128 CYLoading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 128 CY 169Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip 31 23 23.30 0320 CY 128 CY 0Disposal Costs On Site Disposal 8.65 CY 128 CY 1108Subtotal 1277

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal

Total 7022

Page 19: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberLoadout Conveyor West 08Structure's Demolition Cost Steel Bld. Large 02 41 16.13 0012 0.27 CF 320 4 4 FT 5120 1382Structure's Vol. DemolishedRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 1382

Equipment's Disposal CostDismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal CostsSubtotal

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal

Total 1382

Page 20: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberControl Building West 09Structure's Demolition Cost Steel Bld. Large 02 41 16.13 0012 0.27 CF 30 15 8 FT 3600 CF 972Structure's Vol. DemolishedRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 972

Equipment's Disposal CostDismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal CostsSubtotal

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 CY 40 20 0.5 FT 15 CY 0Concrete's Vol. Demolished 1.3 19 CYLoading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 19 CY 25Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip 31 23 23.30 0320 CY 19 CY 0Disposal Costs On Site Disposal 8.65 CY 19 CY 167Subtotal 192

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal

Total 1164

Page 21: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberTruck Dump Reclaim 10Structure's Demolition Cost Steel Bld. Large 02 41 16.13 0012 0.27 CF 40 14 15 FT 8400 CF 2268Structure's Vol. DemolishedRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 2268

Equipment's Disposal CostDismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal CostsSubtotal

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 CY 75 CY 75 CY 0Concrete's Vol. Demolished 1.3 98 CYLoading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 98 CY 129Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip 31 23 23.30 0320 CY 98 CY 0Disposal Costs On Site Disposal 8.65 CY 98 CY 843Subtotal 972

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal

Total 3240

Page 22: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberConveyor 11Structure's Demolition Cost Steel Bld. Large 02 41 16.13 0012 0.27 CF 250 4 4 FT 4000 CF 1080Structure's Vol. DemolishedRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 1080

Equipment's Disposal CostDismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal CostsSubtotal

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 CY 15 35 1 FT 19 CY 0Concrete's Vol. Demolished 1.3 25 CYLoading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 25 CY 33Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip 31 23 23.30 0320 CY 25 CY 0Disposal Costs On Site Disposal 8.65 CY 25 CY 219Subtotal 252

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal

Total 1332

Page 23: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberCrusher Screen Plant 12Structure's Demolition Cost Steel Bld. Large 02 41 16.13 0012 0.27 CF 44 20 15 FT 13200 CF 3564Structure's Vol. DemolishedRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 3564

Structure's Demolition Cost Steel Bld. Large 02 41 16.13 0012 0.27 CF 35 30 8 FT 8400 CF 2268Structure's Vol. DemolishedRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 2268

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 10.22 CY 57 50 1 FT 106 CY 1079Concrete's Vol. Demolished 1.3 137 CYLoading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 137 CY 181Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip 31 23 23.30 0320 7.48 CY 137 CY 1026Disposal Costs On Site Disposal 8.65 CY 137 CY 1187Subtotal 3473

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal

Total 9305

Page 24: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberLump Coal Belt 13Structure's Demolition Cost Steel Bld. Large 02 41 16.13 0012 0.27 CF 100 3 3 FT 900 CF 243Structure's Vol. DemolishedRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 243

Equipment's Disposal CostDismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal CostsSubtotal

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 CY 10 CY 10 CY 0Concrete's Vol. Demolished 1.3 13 CYLoading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 13 CY 17Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip 31 23 23.30 0320 CY 13 CY 0Disposal Costs On Site Disposal 8.65 CY 13 CY 112Subtotal 130

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal

Total 373

Page 25: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberStoker radial Stacker 14Structure's Demolition Cost Steel Bld. Large 02 41 16.13 0012 0.27 CF 100 10 10 FT 10000 CF 2700Structure's Vol. DemolishedRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 2700

Equipment's Disposal CostDismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal CostsSubtotal

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 CY 60 8 1 FT 18 CY 0Concrete's Vol. Demolished 1.3 23 CYLoading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 23 CY 31Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip 31 23 23.30 0320 CY 23 CY 0Disposal Costs On Site Disposal 8.65 CY 23 CY 200Subtotal 230

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal

Total 2930

Page 26: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberConveyor 15Structure's Demolition Cost Steel Bld. Large 02 41 16.13 0012 0.27 CF 600 4 4 FT 9600 CF 2592Structure's Vol. DemolishedRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 2592

Equipment's Disposal CostDismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal CostsSubtotal

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 CY 35 15 1 FT 19 CY 0Concrete's Vol. Demolished 1.3 25 CYLoading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 25 CY 33Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip 31 23 23.30 0320 CY 25 CY 0Disposal Costs On Site Disposal 8.65 CY 25 CY 219Subtotal 252

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal

Total 2844

Page 27: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberMain Radial Stacker 16Structure's Demolition Cost Steel Bld. Large 02 41 16.13 0012 0.27 CF 260 15 15 FT 58500 CF 15795Structure's Vol. DemolishedRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 15795

Equipment's Disposal CostDismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal CostsSubtotal

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 CY 280 10 1 FT 104 CY 0Concrete's Vol. Demolished 1.3 135 CYLoading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 135 CY 178Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip 31 23 23.30 0320 CY 135 CY 0Disposal Costs On Site Disposal 8.65 CY 135 CY 1166Subtotal 1344

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal

Total 17139

Page 28: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberLoadout Reclaim 17Structure's Demolition Cost Steel Bld. Large 02 41 16.13 0012 0.27 CF 750 4 8 FT 24000 CF 6480Structure's Vol. DemolishedRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 6480

Equipment's Disposal CostDismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal CostsSubtotal

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 CY 750 14 1 FT 389 CY 0Concrete's Vol. Demolished 1.3 506 CYLoading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 506 CY 667Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip 31 23 23.30 0320 CY 506 CY 0Disposal Costs On Site Disposal 8.65 CY 506 CY 4373Subtotal 5040

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal

Total 11520

Page 29: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Nimber Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberLoadout Tower 18Structure's Demolition Cost Steel Bld. Large 02 41 16.13 0012 0.27 CF 35 40 60 FT 84000 CF 22680Structure's Vol. DemolishedRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 22680

Equipment's Disposal CostDismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal CostsSubtotal

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 CY 12 8 1 FT 4 CY 0Concrete's Vol. Demolished 1.3 5 CYLoading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 5 CY 6Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip 31 23 23.30 0320 CY 5 CY 0Disposal Costs On Site Disposal 8.65 CY 5 CY 40Subtotal 46

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 10.22 CY 12 8 1 FT 4 CY 36Concrete's Vol. Demolished 1.3 5 CYLoading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 5 CY 6Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip 31 23 23.30 0320 7.48 CY 5 CY 35Disposal Costs On Site Disposal 8.65 CY 5 CY 40Subtotal 117

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 10.22 CY 40 60 1 FT 89 CY 908Concrete's Vol. Demolished 1.3 116 CYLoading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 116 CY 153Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip 31 23 23.30 0320 7.48 CY 116 CY 864Disposal Costs On Site Disposal 8.65 CY 116 CY 1000Subtotal 2925

Total 25768

Page 30: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberOffice 19Structure's Demolition Cost Steel Bld. Large 02 41 16.13 0012 0.27 CF 40 30 8 FT 9600 CF 2592Structure's Vol. Demolished 0.35 124 CYRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non Steel City Sanitation City Sanitation Price 2 CY 124 CY 249Steel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 2841

Equipment's Disposal CostDismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal CostsSubtotal

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 CY 66 30 0.5 FT 37 CY 0Concrete's Vol. Demolished 1.3 48 CYLoading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 48 CY 63Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip31 23 23.30 0320 CY 48 CY 0Disposal Costs On Site Disposal 8.65 CY 48 CY 412Subtotal 475

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 10.22 CY 70 35 0.5 FT 45 CY 464Concrete's Vol. Demolished 1.3 59 CYLoading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 59 CY 78Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip31 23 23.30 0320 7.48 CY 59 CY 441Disposal Costs On Site Disposal 8.65 CY 59 CY 510Subtotal 1493

Total 4809

Page 31: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberPowerline 20Structure's Demolition Cost Utility Pole 0 196 EA 25 EA 25 EA 4900Structure's Vol. DemolishedRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 4900

Equipment's Disposal CostDismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal CostsSubtotal

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal

Total 4900

Page 32: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberShop 21 Structure's Demolition Cost Steel Bld. Large 02 41 16.13 0012 0.27 CF 40 45 20 FT 36000 CF 9720Structure's Vol. DemolishedRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 9720

Equipment's Disposal CostDismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal CostsSubtotal

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 CY 45 45 1 FT 75 CY 0Concrete's Vol. Demolished 1.3 98 CYLoading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 98 CY 129Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip 31 23 23.30 0320 CY 98 CY 0Disposal Costs On Site Disposal 8.65 CY 98 CY 843Subtotal 972

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal

Total 10692

Page 33: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberGuardrail 22Structure's Demolition Cost Guard Rail 02 41 13.33 0800 12.13 LF 1000 FT 1000 FT 12130Structure's Vol. DemolishedRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 12130

Equipment's Disposal CostDismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal CostsSubtotal

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal

Total 12130

Page 34: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberCulverts 23Excavate Culvert 12" Backhoe, hydraulic Bulk Bank Measure 31 23 16.42 0260 1.42 CY 650 1 2 FT 48 CY 68Backfill Culvert 12" Backfill trench Minimal Haul 2 1/4 CY 31 23 16.13 3080 1.77 CY 650 1 2 FT 48 CY 85Excavate Culvert 15" Backhoe, hydraulic Bulk Bank Measure 31 23 16.42 0260 1.42 CY 400 1.3 2.6 FT 50 CY 71Backfill Culvert 15" Backfill trench Minimal Haul 2 1/4 CY 31 23 16.13 3080 1.77 CY 400 1.3 2.6 FT 50 CY 89Excavate Culvert 18" Backhoe, hydraulic Bulk Bank Measure 31 23 16.42 0260 1.42 CY 310 1.5 3 FT 52 CY 73Backfill Culvert 18" Backfill trench Minimal Haul 2 1/4 CY 31 23 16.13 3080 1.77 CY 310 1.5 3 FT 52 CY 91Excavate Culvert 24" Backhoe, hydraulic Bulk Bank Measure 31 23 16.42 0260 1.42 CY 1440 2 4 FT 427 CY 606Backfill Culvert 24" Backfill trench Minimal Haul 2 1/4 CY 31 23 16.13 3080 1.77 CY 1440 2 4 FT 427 CY 755Excavate Culvert 36" Backhoe, hydraulic Bulk Bank Measure 31 23 16.42 0260 1.42 CY 60 3 6 FT 40 CY 57Backfill Culvert 36" Backfill trench Minimal Haul 2 1/4 CY 31 23 16.13 3080 1.77 CY 60 3 6 FT 40 CY 71

Subtotal 1967

Equipment's Disposal CostDismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal CostsSubtotal

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal

Total 1967

Page 35: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberMiscellaneous 24Structure's Demolition CostStructure's Vol. DemolishedRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotalWater TankEquipment's Disposal Cost 6000 gal. to 8000 gal.tank 02 65 10.30 0120 865 EA 8000 GAL 1 EA 865Dismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal Costs 9000 gal. to 12000 gal. tank 02 65 10.30 1029 1050 EA 8000 GAL 1 EA 1050Subtotal 1915Water TankEquipment's Disposal Cost 6000 gal. to 8000 gal.tank 02 65 10.30 0120 865 EA 6000 GAL 1 EA 865Dismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal Costs 9000 gal. to 12000 gal. tank 02 65 10.30 1029 1050 EA 6000 GAL 1 EA 1050Subtotal 1915Water TankEquipment's Disposal Cost 9000 gal. to 12000 gal. tank 02 65 10.30 0130 1295 EA 10000 GAL 1 EA 1295Dismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal Costs 9000 gal. to 12000 gal. tank 02 65 10.30 1029 1050 EA 10000 GAL 1 EA 1050Subtotal 2345

Total 6175

Page 36: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberTruck Dump New 25Structure's Demolition Cost Steel Bld. Large 02 41 16.13 0012 0.27 CF 40 14 15 FT 8400 CF 2268Structure's Vol. DemolishedRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 2268

Equipment's Disposal CostDismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal CostsSubtotal

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 CY 75 CY 75 CY 0Concrete's Vol. Demolished 1.3 98 CYLoading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 98 CY 129Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip 31 23 23.30 0320 CY 98 CY 0Disposal Costs On Site Disposal 8.65 CY 98 CY 843Subtotal 972

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal

Total 3240

Page 37: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberConveyor New 26Structure's Demolition Cost Steel Bld. Large 02 41 16.13 0012 0.27 CF 250 4 4 FT 4000 CF 1080Structure's Vol. DemolishedRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 1080

Equipment's Disposal CostDismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal CostsSubtotal

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 CY 15 15 1 FT 8 CY 0Concrete's Vol. Demolished 1.3 11 CYLoading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 11 CY 14Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip 31 23 23.30 0320 CY 11 CY 0Disposal Costs On Site Disposal 8.65 CY 11 CY 94Subtotal 108

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal

Total 1188

Page 38: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberRadial Stacker 27Structure's Demolition Cost Steel Bld. Large 02 41 16.13 0012 0.27 CF 250 15 15 FT 56250 CF 15188Structure's Vol. DemolishedRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 15188

Equipment's Disposal CostDismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal CostsSubtotal

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 CY 260 10 1 FT 96 CY 0Concrete's Vol. Demolished 1.3 125 CYLoading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 125 CY 165Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip 31 23 23.30 0320 CY 125 CY 0Disposal Costs On Site Disposal 8.65 CY 125 CY 1083Subtotal 1248

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal

Total 16436

Page 39: C/007/0033 #4511 · magnet, metal detector, water pump, and area lighting Stacker Area (Control Room Located On Transfer Structure) ... Wildcat Loadout C/007/033 Bond Amount Rev.

Description Materials Means Unit Unit Length Width Height Diameter Area Volume Weight Density Time Number Unit Swell Quantity Unit CostRef. Task Reference Cost Factor

NumberConveyor 28Structure's Demolition Cost Steel Bld. Large 02 41 16.13 0012 0.3 CF 1250 7 4 FT 35000 CF 10500Structure's Vol. DemolishedRubble's Weight (exclude steel)Truck's CapacityHaulageTransportation Cost Non Steel TruckTransportation Cost Non Steel DriveDisposal Cost Non SteelSteel's WeightTruck's CapacityHaulageTransportation Cost Steel TruckTransportation Cost Steel DriveDisposal Cost steelSubtotal 10500

Equipment's Disposal CostDismantling CostEquipment's Vol. DemolishedLoading CostsTransport CostsDisposal CostsSubtotal

Concrete DemolitionDemolition Cost Concrete Demolition Concrete Demo1 CY 20 CY 20 CY 0Concrete's Vol. Demolished 1.3 26 CYLoading Cost Front End Loader 3 CY 31 23 16.42 1600 1.32 CY 26 CY 34Transportation Cost 12 Cy (16 Ton) dump Truck 1/2 mi. rod. Trip 31 23 23.30 0320 CY 26 CY 0Disposal Costs On Site Disposal 8.65 CY 26 CY 225Subtotal 259

Concrete DemolitionDemolition CostConcrete's Vol. DemolishedLoading CostTransportation CostDisposal CostsSubtotal