Page 1: C PL CURRENT INFRAPROJECTS (P) LIMITEDLIGHTING at EOL-DT, Jamnagar GAIL (India) Limited Gujarat 15.99 July 2016 February 2017 SITC Work of 8 Nos. of 82.50 KVA DG Set, 4 Nos. 30 KVA

PLPATH LIGHTERS TO THE NATION

C CURRENT INFRAPROJECTS (P) LIMITEDAn ISO 9001, 14001, 18001, 50001 Certified Company

l EPC PROJECTS

l QUALITY ASSURANCE LAB

l ENERGY AUDIT

Page 2: C PL CURRENT INFRAPROJECTS (P) LIMITEDLIGHTING at EOL-DT, Jamnagar GAIL (India) Limited Gujarat 15.99 July 2016 February 2017 SITC Work of 8 Nos. of 82.50 KVA DG Set, 4 Nos. 30 KVA

DIRECTOR'S DESK

I am delighted to have the opportunity of giving you a brief introduc�on of our

company.

We at Current Infraprojects Pvt. Ltd. (CIPL) group are driven by the desire for client

sa�sfac�on and over the years have carved a niche for ourselves in the EPC and MEP

consultancy industry. We focus on all aspects of a project from design, planning,

procurement through to the execu�on and hand over to ensure complete client

sa�sfac�on.

Our success has been achieved through our flexible approach and diversity of

projects, genera�ng a por�olio that includes work contracts with PSUs such as GAIL

and leading private companies in the construc�on industry such as IL&FS, HG Infra,

Sadbhav, L&T and GRIL. In addi�on, we con�nuously fine-tune our energy,

dedica�on and commitments to meet the demands of growing business.

We have an experienced and mul�-skilled management team which works closely

with the on-site team of engineers, skilled technicians and the client thereby

catering to the changing needs of the site and comple�ng the project within the

designated �me period. At CIPL Group we lay firm emphasis on delivering quality

service and with the establishment of our in-house NABL accredited test lab MEC

Test House, we have further strengthened our commitment to quality.

With above background and work culture, I am certain that we will grow and cross

many more milestones in the coming years.

Thank you for viewing our profile.

Yours sincerely,

Devvrath Singh

B.E.

University of Queensland

Brisbane, Australia

MESSAGE

“Nothing is impossible,

the word itself says

'I'm possible'!”

– Audrey Hepburn

Page 3: C PL CURRENT INFRAPROJECTS (P) LIMITEDLIGHTING at EOL-DT, Jamnagar GAIL (India) Limited Gujarat 15.99 July 2016 February 2017 SITC Work of 8 Nos. of 82.50 KVA DG Set, 4 Nos. 30 KVA

CIPL Group (earlier known as Current Services

Consultants) started in year 2000 in Jaipur, Rajasthan

with a vision to provide quality consultancy services by

keeping in view the advancement in technology &

environmental requirement in current scenario.

With PAN India presence, CIPL gradually diversified

into EPC works and carved a niche for itself in India for

electric Infrastructure development, and project

management with nearly 1 decade of rich and varied

experience in the EPC sector.

Now CIPL is one of the leading service provider in the

field of Mechanical, Electrical and Plumbing EPC in

India and has completed more than 100 projects under

electrical infra EPC primarily in Road & Railway sector.

Our Branch Offices in Different States :

l Udhampur, J&K

l Allahabad, U�ar Pradesh

l Phagwara, Punjab

l Durgapur, West Bengal

l Ranchi, Jharkhand

l Ahmedabad, Gujarat

l Bilaspur, Chha�sgarh

ABOUT US

Page 4: C PL CURRENT INFRAPROJECTS (P) LIMITEDLIGHTING at EOL-DT, Jamnagar GAIL (India) Limited Gujarat 15.99 July 2016 February 2017 SITC Work of 8 Nos. of 82.50 KVA DG Set, 4 Nos. 30 KVA

Passion palace where

employee’s contribute with

pleasure to win total

customer sa�sfac�on.

Global presence in EPC business

with 100% external & internal

customer sa�sfac�on through

quality & value engineering.

l Commitment to deliver products/ services to customers in the best quality and right

quan�ty.

l Commitment to sustainability and to act in an environmentally friendly way.

l Commitment to pursue sound growth and earnings objec�ves and to exercise prudence in

the use of our assets and resources.

l Con�nually reviewing and improving the effec�veness of our “Quality Management

Systems".

l Integrity in all we do.

l Transparency, Accountability and Discipline in our business.

Page 5: C PL CURRENT INFRAPROJECTS (P) LIMITEDLIGHTING at EOL-DT, Jamnagar GAIL (India) Limited Gujarat 15.99 July 2016 February 2017 SITC Work of 8 Nos. of 82.50 KVA DG Set, 4 Nos. 30 KVA

Our hard work has con�nuously been recognized by our esteemed clients and it's our client who speaks about our constant

dedica�on towards our work and na�on.

In a very short span of �me CIPL has grown from a Proprietorship firm to a Private Limited Company catering to client

requirement in different sectors of Electrical EPC and Solar EPC execu�on works. It's a great achievement for us that we have

expended from one state (Rajasthan) to ten states in just 5 years.

In a small tenure, CIPL group has embarked its name in different states of India majorly in Rajasthan, Haryana, U�ar Pradesh,

Punjab, Jammu & Kashmir, West Bengal and Jharkhand with various governments, local bodies & private organiza�ons.

We have completed many EPC projects with pres�gious government and non government organiza�ons.

Milestones &

Achievements

GAIL (India) Ltd. GR Infraprojects Ltd.

Consturctions

CIPL Esteemed Customers

TM

e n t r e p r e n e u r s

TELECOM ELECTRICAL

WATER/SEWER OIL & GAS

Page 6: C PL CURRENT INFRAPROJECTS (P) LIMITEDLIGHTING at EOL-DT, Jamnagar GAIL (India) Limited Gujarat 15.99 July 2016 February 2017 SITC Work of 8 Nos. of 82.50 KVA DG Set, 4 Nos. 30 KVA

Well qualified and experienced professionals across industry having a unique blend of both technical and managerial exper�se

has been the base of sustained growth of our company. Our core team has undergone LTQ (Leadership Through Quality)

Training.

Excellent visioning, contacts and well conversant with local condi�ons, procedures and formali�es at various state

Government, local offices and other authori�es.

We have diversified ourselves in the business of "Third Party Electrical Quality Monitoring" as well.

Our Strategic Business Model works on project planning, quality control, cost-effec�veness and �mely execu�on.

We are cer�fied as ISO 9001-2015, 14001, 18001, 50001 for “Quality Management System”. We are also D & B registered

company (D-U-N-S NUMBER : 87-377-0232).

Human rela�ons are regarded as most significant ingredient of any business. All workers and employees consider themselves

as member of “CIPL Family“and this culture helps us in ge�ng the best contribu�on from each member.

WHY CHOOSE US

Page 7: C PL CURRENT INFRAPROJECTS (P) LIMITEDLIGHTING at EOL-DT, Jamnagar GAIL (India) Limited Gujarat 15.99 July 2016 February 2017 SITC Work of 8 Nos. of 82.50 KVA DG Set, 4 Nos. 30 KVA

SERVICES

We offer variety of services to clients who value quality and efficient workmanship. The scope of our project exper�se includes :

Services

EPC

Contrac�ng

Energy Audi�ng &

Management

Quality

Assurance Lab

Electrical U�lity

Shi�ing work

Water U�lity

Shi�ing work

Highway

Ligh�ng

Page 8: C PL CURRENT INFRAPROJECTS (P) LIMITEDLIGHTING at EOL-DT, Jamnagar GAIL (India) Limited Gujarat 15.99 July 2016 February 2017 SITC Work of 8 Nos. of 82.50 KVA DG Set, 4 Nos. 30 KVA

EPC PROJECTSCOMPLETED

Name of Work Client StateContract Value

(In Lacs)

Month of Start

Month of End

SITC of Ligh�ng Work which includes Ligh�ng at ROBs, Flyovers, Built-Up Area, Toll Plaza, Bus Bays, Truck Terminal andTruck Lay Bye etc. for Harike To FaridkotRoad Project.

G R Infraprojects Limited

Punjab 218.27 March 2017

February 2018

SITC of Ligh�ng Work which includes Ligh�ng at ROBs, Flyovers, Built-Up Area, Toll Plaza, Bus Bays, Truck Terminal and Truck Lay Bye etc. for Faridkot to Bha�nda Road Project.

G R Infraprojects Limited

Punjab 259.39 April2017

February 2018

Design, Supply, Installa�on, Tes�ng and Commissioning of External Electrifica�on of Toll Plaza and Approach Road works atSouth & North Portals of Chenani Nashri Tunnel Project.

IL&FS Transporta�onNetworks Limited

Jammu & Kashmir

191.25 May2016

April2017

Supply, Erec�on, Installa�on, Tes�ng & Commissioning of HIGH MASTLIGHTING at EOL-DT, Jamnagar

GAIL (India) Limited Gujarat 15.99 July2016

February2017

SITC Work of 8 Nos. of 82.50 KVA DG Set, 4 Nos. 30 KVA UPS, HT Tranformer Including HT & LT Installa�on, HT & LT Panels, High Mast Ligh�ng and Street Ligh�ng, Canopy Ligh�ng, Cabling, Earthing and Other Allied Electrical Worksat Toll Plaza at Km 1+148 of Bikaner Bypass

IL&FS Transporta�on Networks Limited

Rajasthan 143.33 June2015

December2015

Electrical U�lity Shi�ing at widening & strengthening of NH-15 to two lanes with paved shoulders from exis�ng km 173/0 to km 249/200 (Suratgarh- Sriganganagar sec�on) in the state of Rajasthan (including stretch of 550 m in the state of Punjab)

G R Infraprojects Limited

Punjab 493.08 September2015

May2017

SITC work of 1 Nos. 82.50 KVA DG Set, 2 Nos.63 KV Transformer including LT Installa�on, LT Panel, Cabling, Earthing and other Allied Electrical works at Toll plaza at Km 101+00 of Hazaribag Ranchi Expressway Ltd.

IL&FS Transporta�on Networks Limited

Jharkhand 30.85 May 2015 December2015

Shi�ing of electrical LT/HT lines at Mustard Research Centre to RUB stretch on Mathura (U.P. Border)- Bharatpur road in Rajasthan under the jurisdic�on of Bharatpur Electricity Services Limited (BESL)

Road Infrastructure Development Company of

Rajasthan Limited

Rajasthan 25.21 April2017

January2018

Supply and Installa�on of 250 KVA 11/0.433 Transformer in CBSE, Ajmer

Central Board of Secondary

Educa�on

Rajasthan 15.56 August2014

September2014

Page 9: C PL CURRENT INFRAPROJECTS (P) LIMITEDLIGHTING at EOL-DT, Jamnagar GAIL (India) Limited Gujarat 15.99 July 2016 February 2017 SITC Work of 8 Nos. of 82.50 KVA DG Set, 4 Nos. 30 KVA

EPC PROJECTSCOMPLETED

Name of Work Client StateMonth of

StartMonth of

End

Shi�ing of 11 KV Electric Lines and Supply, Installa�on, tes�ng & Commissioning of Transformer 11/0.433 KV, 160 KVA at RIICO, Kukas Industrial area, Jaipur.

Rajasthan State Gas Limited

Rajasthan 11.27 February2015

March2015

Shi�ing of 11KV & LT Line at from Mustered Research Centre to Km12 of SH-1 under AEN (A-III), Bharatpur and Shi�ing of 11KV Line at Bharatpur-Mathura Bypass Near Village Gundwa Under AEN (A-III), Bharatpur

Jaipur DISCOM, Bharatpur

Rajasthan 31.60 December2015

February 2016

S/I/C of Voltage Transformer Cap. 1000 KVA, 11KV /433V Transformer in premises of Sri Ganganagar Zila Dugdh Utpadak Sahakari Sang Ltd. Industrial Area Hanumangarh Junc�on

Sri Ganganagar Zila Dugdh Utpadak

Sahakari Sang Ltd.

Rajasthan 12.20 August2017

September2017

Electrifica�on works for underground parking at Hathiwala Park, Udaipur

Road Infrastructure Development Company of

Rajasthan Limited

Rajasthan 91.48 October2015

May2017

Four Laning of Moradabad- Bareilly road sec�on of NH-24, from Km 148 to Km 262 in the state of U�er Pradesh under NHDP Phase – III on DBFOT Basis – Providing and Fixing of Highway Ligh�ng at Moradabad Bareilly Sec�on of NH-24 at Dalpatpur and Maulagarh

IL&FS Transporta�on Networks Limited

U�arPradesh

700.00 January2018

April2018

Contract Value(In Lacs)

Page 10: C PL CURRENT INFRAPROJECTS (P) LIMITEDLIGHTING at EOL-DT, Jamnagar GAIL (India) Limited Gujarat 15.99 July 2016 February 2017 SITC Work of 8 Nos. of 82.50 KVA DG Set, 4 Nos. 30 KVA

EPC PROJECTS

Name of Work

Electrical U�lity Shi�ing work for four laning of Phagwara-Rupnagar sec�on of NH-344A from km0+0002 km. 80+820

Client StateContract Value

(In lacs)Month of

Start

G R Infraprojects Limited

Punjab 1952.08 January2018

SITC & Other associated works including fabrica�on, complete in all respect for construc�on/ Modifica�on/ Reloca�on of Electrical u�lity of 33KV & below Power lines for Dedicated Freight Corridor (Vaitarana – Sachin sec�on of Western DFC Phase-2)

Crea�ve Entrepreneurs

LLP

Gujarat 600.00 January2017

Shi�ing of Electrical U�li�es of design chainagefrom 433.206 km to 496.848 km in Dis�. Dwarka (Gujarat)

G R InfraprojectsLimited

Gujarat 1455.34 September2017

SITC of GI Octagonal Ligh�ng Pole with Led Ligh�ng Fixtures and Feeder Pillar for GAIL New Colony & Old Colony

GAIL (India) Limited Gujarat 14.36 December 2017

Development and Maintenance of Peelibanga-Lakhuwali sec�on of MDR- 103, Sardarshahr- Loonkaransar sec�on of SH- 6A, Churu- Bhaleri Sec�on of SH-69, Sanju-Tarnau Sec�on of SH-60, Roopangarh- Naraina Sec�on of SH-100 and Nagaur- Tarnau- Deedwana- Mukundgarh Sec�on of SH-8, 19, 60, 82-A & 83 Under Design, Build, Operate/ Maintain and Transfer on Annuity Mode

G R Infraprojects Limited

Rajasthan 964.64 March2018

Shi�ing/Reloca�on of 33KV, 11KV & LT Lines , DT's and Electric Poles at Edge of ROW forConstruc�on of Four Lane Road From Allahabad to Partapgarh Under Division-Partapgarh and also Under Sub Division-Soraon

G R Infraprojects Limited

U�arPradesh

1117.39 May2017

Shi�ing of Electrical u�li�es at 6-laning of Handia -Varanasi sec�on of NH-2 from km 713.146 to km 785.544 in the State Of U�ar Pradesh under NHDP Phase-V on Hybrid Annuity Mode in the state of U�ar Pradesh

G R Infraprojects Limited

U�arPradesh

May2017

Under Ground Power U�lity shi�ing of 10 no of charted and 1 no. of uncharted U�lity work in the state of Raiasthan for Western Dedicated Freight Corridor Project (CTP '1)

L&T Construc�on Rajasthan September2016

113.15

Highway Ligh�ng work for six laning of Barwa-Adda-Panagarh sec�on of NH-2 from km 398.240 to km 521.120 in the States of Jharkhand and West Bengal including Panagarh Bypass on DBFOT Pa�ern

IL&FS Transporta�onNetworks Limited

WestBengal

May2016

929.14

2385.22

ONGOING (ELECTRICAL)

Design, supply, installa�on, commissioning and maintenance of Electrical poles, High Mast Light & other electrical items for providing ligh�ng at various loca�ons at project site

H. G. Infra Engineering Ltd.

Rajasthan April2018

300.00

Page 11: C PL CURRENT INFRAPROJECTS (P) LIMITEDLIGHTING at EOL-DT, Jamnagar GAIL (India) Limited Gujarat 15.99 July 2016 February 2017 SITC Work of 8 Nos. of 82.50 KVA DG Set, 4 Nos. 30 KVA

EPC PROJECTS

Name of Work

Shi�ing of PHED U�li�es in Rehabilita�on and Up-grada�on of Pratapgarh to Allahabad sec�on of NH-96 from exis�ng Km. 100+800 to km 135+230 [Design Ch. 100+800 to Ch. 135+500] tofour lane with paved shoulder in state of U�ar Pradesh

Client StateContract Value

(In lacs)Month of

Start

G R Infraprojects Limited

U�arPradesh

140.83 January2018

Shi�ing of PHED U�li�es for 6-laning of Handia -Varanasi sec�on of NH-2 from km 713.146 to km 785.544 in the State Of U�ar Pradesh under NHDP Phase-V on Hybrid Annuity Mode in the state of U�ar Pradesh

G R Infraprojects Limited

U�arPradesh

940.69 January2018

ONGOING (WATER)

Page 12: C PL CURRENT INFRAPROJECTS (P) LIMITEDLIGHTING at EOL-DT, Jamnagar GAIL (India) Limited Gujarat 15.99 July 2016 February 2017 SITC Work of 8 Nos. of 82.50 KVA DG Set, 4 Nos. 30 KVA

MEC TEST HOUSEMEC TEST HOUSEMEC TEST HOUSE

(QUALITY ASSURANCE LAB)

The “MEC Test House” is a NABL Accredited Electrical Quality Assurance Lab to provide excellent and prompt services in the

field of Electrical tes�ng by implemen�ng the management system as per ISO/IEC 17025:2005 and thereby make sure total

customer sa�sfac�on through effec�ve, efficient, reliable, accurate and conforming to na�onal and interna�onal standards

The MEC Test House is well equipped high class tes�ng equipments calibrated from NABL Accredited Lab. We have a team of

Qualified & Experienced Engineers and Trained Technical staffs. This team is working under the guidance of Chartered

Electrical Safety Engineer and Cer�fied Energy Auditor. Customer sa�sfac�on is on top priority for us and we take pride in being

thoroughly professional and reliable in our work & friendly and polite with our service at all �mes.

Our Major Electrical Tes�ng Services MEC Test House provides electrical tes�ng services in three categories basically:-

1. On- Site Tes�ng 2. Off- Site Tes�ng

l Earth Tes�ng· l Tes�ng of Circuit Breaker

l LUX Measurement l Tes�ng of HT & LT Cable

l Relay Tes�ng l Tes�ng of PVC Insulated Wire

l Wire and Cable Insula�on l PVC Conduit Test

Tes�ng l Power System Protec�on Relays

l Wire & Cable Conductor Tes�ng l Transformer Oil Tes�ng

l Switchgear Tes�ng 3. Other Services

l Panel Tes�ng l Post Execu�on Electrical Audit

l Transformer Tes�ng l Cer�fied Energy Audit

l Energy Meter Tes�ng l Cable Fault Locator

l Polarity Test for Switches l DISCOM Power Quality Test

l Tes�ng of Installa�on as per CEA l GPS based Site Survey for Electrical System

Page 13: C PL CURRENT INFRAPROJECTS (P) LIMITEDLIGHTING at EOL-DT, Jamnagar GAIL (India) Limited Gujarat 15.99 July 2016 February 2017 SITC Work of 8 Nos. of 82.50 KVA DG Set, 4 Nos. 30 KVA

We are Equipped With....

MEC Test House is well equipped with high class tes�ng equipments calibrated from NABL Accredited Lab. The list of some

equipments is :-

l Reference Standard Meter

l Tensile Tes�ng Machine

l Universal Oven

l Relay Tes�ng Kit

l Profile Projector

l Hot Set Oven

l Insula�on Tester

l Digital Micrometer

l Power Quality Analyzer

l Thermal Imager Analyzer

l Kelvin Bridge

l Flammability Chamber

l Fully Automa�c Oil BDV Kit

l Digital Light Meter (LUX)

l Digital Earth Resistance Tester

l Digital Earth Clamp Meter

l Ten Delta Set

l Digital GPS Device- eTrex30

l Laser Distance Meter

NABLAccredited Lab

Certificate No. : TC-6481

Page 14: C PL CURRENT INFRAPROJECTS (P) LIMITEDLIGHTING at EOL-DT, Jamnagar GAIL (India) Limited Gujarat 15.99 July 2016 February 2017 SITC Work of 8 Nos. of 82.50 KVA DG Set, 4 Nos. 30 KVA

COMMITMENT TO THE ENVIRONMENTProtec�on of the environment in which we live is vital to the well-being of our community, region and country as a whole. In

order to lessen adverse impacts on the air, water and land, CIPL is commi�ed to the ongoing development of programs to meet

all environmental laws and regula�ons and excellence in environmental control.

Our concern for Mother Nature starts from Head Office. We are proud to announce that our Head Office building- “CIPL

Ambi�ons” has been awarded IGBC Pla�num Ra�ng for green interior.

CIPL Ambi�ons building is totally Self- Dependent building which is based on energy posi�ve, water posi�ve and zero discharge

concepts.

Page 15: C PL CURRENT INFRAPROJECTS (P) LIMITEDLIGHTING at EOL-DT, Jamnagar GAIL (India) Limited Gujarat 15.99 July 2016 February 2017 SITC Work of 8 Nos. of 82.50 KVA DG Set, 4 Nos. 30 KVA

CIPL TEAMCIPL TEAMCIPL TEAM

Individually, we are one drop

Together, we are an ocean

- Ryunosuke Satoro

Page 16: C PL CURRENT INFRAPROJECTS (P) LIMITEDLIGHTING at EOL-DT, Jamnagar GAIL (India) Limited Gujarat 15.99 July 2016 February 2017 SITC Work of 8 Nos. of 82.50 KVA DG Set, 4 Nos. 30 KVA

CURRENT INFRAPROJECTS (P) LIMITEDAn ISO 9001, 14001, 18001, 50001 Certified Company

A- 27, BASANT VIHAR, VAISHALI MARG (WEST), PANCHYAWALA, JAIPUR, RAJASTHAN, INDIA. PIN-302012Phone : +91-141-2988230, 2988231, Mobile : +91-73400 68785

E-mail: [email protected], Website: www.currentinfra.com

PLPATH LIGHTERS TO THE NATION

C

Gujarat : F-204, Sobo Centre, South Bopal, Bopal,Ahmedabad- 380058

Uttar PradeshA-130, Shantipuram,

Phaphamau, Allahabad - 211013

Jharkhand : Near DAV Kapil Dev School,

New AG Colony, Kadru, Ranchi-834002

West Bengal :H. No.-14/16, Bengal Ambuja

Housing, City Centre, Durgapur, Burdhaman - 713216

Punjab : 274, Street 5A,

Friends Colony, Phagwara, Distt.-Kapurthala-144401