îJf-NATO UNCLASSIFIED f Q
'fil and EXEM PLAlRt - Ö PUBLIC DISCLOSED ~ * *
OR IGINAL : ENGL ISH NA1D 9 rTfMB1
22nd November, 1958 . DOCUMENT C-M ( 557759
COI-TVENTIONAL PROJECTS IN THE FJCOMMENDED 1959 TENTH SLICE PROGRAMME
Report by the Infrastructure Committee
The recommended SHAPE and SACLANT 1959 Slice X Programmes, •..as amended(l) s contain conventional .projects, which, after screening "by the Infrastructure Committee, are, estimated at £1.0*98 million and £6.98 million respectively, or a total of £17.96 million., SHAPE'S programme also contains some £52 millions of projects., belonging to new categories of infrastructure "on which there "is, as yet, no decision regarding their eligibility for M T O common financing.
2. Most of the several hundred conventional projects are , merely increments of projects contained in previously approved Slices. It is considered that action on these and others of the conventional projects should not be delayed pending resolution of the eligibility and the problems relative to the new categories of infrastructure.
3. Accordingly, the Infrastructure Committee, on the basis of the International Staff reports, additional information supplied by host countries and the NATO military, and other relevant information, has screened these conventional projects. The results of this screening are summarised in Annex A and detailed in Annexes B and C for the SHAPE and SACLANT recommended programmes respectively.
Iu The amount of funds'agreed for cost-sharing and still available for programming additional works has not yet been determined. There are also other major financial problèms involving NATO Infrastruct1Ure that require solution. However, in spite of these questions, the Infrastructure Committee considers that the Council is now in a position to- take appropriate action on the conventional projects in.the proposed Slice X. The •Committee has been advised by the host countries and..the NATO military authorities that it is intended that planning or. construc-tion be- initiated on .those -projects either in the remaining'weeks of 1958 or in 1959*
) SHAPE - AG 6100/10/IP-115/58 PROG5 as amended (dated 9th October, 1958) and SACLANT - Sert N-800/l(58) (dated 30th September, 1958)
NATO GECTOSg. •••.i - ' — i i . ii • — - V
DE
CLA
SSIF
IED
- PU
BLI
C D
ISC
LOSU
RE
/ D
ÉC
LASS
IFIÉ
- M
ISE
EN
LE
CT
UR
E P
UB
LIQ
UE
NATO SECRET E E H B H -
® « % r
5. Accordinglythe Infrastructure Committee recommends that the Council:. ' ' • -
(a) note that the Infrastructure Committee has screened the' conventional projects in SHAPE'S and SACLANTfS, recommended 1959 (Slice X) programmes;
(b) note that it is intended that planning or construction "be initiated on those projects in the remaining part of 1958 or in 1959;
(c) authorise the Infrastructure Payments and Progress Committee to authorise commitment of funds on a case-by-case basis on requests submitted by host countries >for those projects - itemised in.Annexes B and C - on which such action is justified by exceptional financial or RiITO military considerations; *
i —
(d) agree to consider final action on these conventional projects when action is taken on the remaining projects
, ,. recommended bv the NATO military authorities in the 1959 (Slice X) NATO infrastructure programmej and
(e) agreed, however, to authorise host countries to proceed forthwith, under the 2 per- cent rule (A C / 4 ( P P ) R / 7 6 S paragraph. 1 ) j with the .planning of projects, as summ-arised in Annex A , with an estimated cost of £17*96 million, and detailed in-Annexes B and C .
(Signed) E.H. MERRILL Chairman.
0 r ..-i : '
DE
CLA
SSIF
IED
- PU
BLI
C D
ISC
LOSU
RE
/ D
ÉC
LASS
IFIÉ
- M
ISE
EN
LE
CT
UR
E P
UB
LIQ
UE
-3-NATO SECRET ANNEX A to C-M( 58)139
1959 TENTH SLICE NATO COMMON INFRASTRUCTURE PROGRAMME (CONVENTIONAL PROJECTS')
PECGEAMME D'INFRASTRUCTURE COMMUNE :- DIXIEME TRANCHE (1959) (PROJETS D1 INFRASTRUCTURE CLASSIQUES)
SHAPE (in £ million) (en milliers de £)
' Country • Pays
Airfield Aerodromes
Air Weapons Training Naval Base Instal- PQD installations Signals oommuni- War Headquarters Totals by country Installations lations : Installations POL cations Quartieis généraux Totaux par pays
Installations d' entrainer Bases navales . Telecommunications de guerre ment aux armes aériennes : • _ _ • " • '
I j Horway 0.085 0 .02C 0.105 i Denmark 0.135 ' 0.135 ]
Netherlands 0,058- 0.030 0.088.
; Belgitoi 0.166 ; ; 0.166 j Luxembourg 0.059 ; : ; 0.059 j
France 1.510 i 1.8C0 ; ; ; OiOllO 3.350
; Germany 1.698 ! L.,V1C- , 0.050 0.020 ! 3.108 : : Italy 0.350 "' ; . : 0.350 ; : Greema : 0.975 0.200 ; 0.520 ; . ' 1 , 6 9 5 Turkey 1.253 0.150 . . 0.500 0J020 ' 1.923 :
' Totals by Category . Totaux par catégorie 6.289
: •1 - — : ...... , , i. . .
1.800 O . I 5 0 1.54.0 I .07O -. 0jl30 10.979 (say 10.980)
SACLANT . ,
Country Pays
Maritime airfield facilities Naval fleet facilities Communications facilities War Headquarters Totals by country i Installations pour aerodromes . Installations maritimes Telecommunications : Quartiers généraux de . Totaux par pays
maritimes , guerre :
Norway 0.91 I 0,01 ; . O .92 Portugal 0.04 ; I 0.04 United Kingdom 3.80 0.09 : 1.20 ; 5.09
- France 0.16 0.77 ; i ! • 0.93
; Totals by Category Totaux par catégorie 1.11 4.57 0.10 1.20 • 6.98
- V
TOTAL TENTH SLICK ÎOIAL DE LA TRANCHE X SHAPE £10,98 millions SACLANT £ 6.98 millions 1
£17.96 millions
DE
CLA
SSIF
IED
- PU
BLI
C D
ISC
LOSU
RE
/ D
ÉC
LASS
IFIÉ
- M
ISE
EN
LE
CT
UR
E P
UB
LIQ
UE
LIST OF PROJECTS pICOMMjffiEDPO_R_ INCLUSION IN SHAPE'S 1959 • "TEM1H'SLICE NATO"'COIMÖW m^jiSTRUCTUEÊ PROGRAMME
NATO SECRET B to '
C-M'(58)139
I Ul i
Name of project
TACTICAL AIRI'IELDS Country: NORYWJ Bardufoss Sqn i^d^ ïï/M
Gardermoen ïï/M Eygge W/M Torp Sqn
Country: DM^ARK Aalborg ïï/M ICarup W/M Slcrydstrup ïï/M Tirstrup San
Vaerloso Sqn
Physical description
t-
I XD1 ArrestorGearvi^(Singleset)
: Provision of a small connecting taxitrack (137 m. j by 12 m. ) from the alert apron to a 430 m. runway ; extension at .the v/estern ©nd of the runway. ; Arrestor Gears (double set) (l) I Arrestor Gears ( " " ) (l) i Arrestor Gears ( " " ) (l)
TOlViL NOWAY •
j Additional arnmo storage (2) Additional ammo storage (2) Additional ammo storage (2) Mobile facilities (3) Arrcstor gear (single set) (l) Additional ammo storage (2)
Total Tirstrup IArrestor gear (single set) (l) ! Additional ammo storage (2) j . Total Vaerlose
Vandel Sqn Mobile facilities (3) Arrestor gear (single set)(l) ! Additional ammo storage (2) ! Total Vandel I TOTAL. PSiMARK...
(1)(2)(3)see appendix to annex,notes 1,2,and 3.
Cost estimate j Estimated ; Remarks (£s million) period for |
completion
.045
.010
.003
.010
.002
.045
.010
.004
.010
.015
.020
.020
.020
.085
.002
.002
.002
.058
*012
. ,135„._ ....
Mar 59 , Sep 59
Mar 59
Jun 60 u 11
Il it Il it
M Il Il Il
Il Il Il ' Il
DE
CLA
SSIF
IED
- PU
BLI
C D
ISC
LOSU
RE
/ D
ÉC
LASS
IFIÉ
- M
ISE
EN
LE
CT
UR
E P
UB
LIQ
UE
Name of project
TACTICAL Aim 'igr.IS (cont'd Ooyntry: NlCTHiiiRLANDS Eindhoven W/M G-ilzc-Rigen Sqn Lceuvyarden ïï/M Soesterberg V//M Tvventhe W/M Venray (De Peel) Sqn
Physical description
Country: BEITTIUM J Bcauveohain 7//M cp Bertrix Sqn
Bierset W/M Brustem W/M Chievres W/î;î Plorennos W.Aî IQein-Brogel W/M Koksijde ïï/M Melsbroek ïï/M
St. Hubert Son
Additional ammo storage (2) Additional amino sto3?age (2) Additional ammo storage (2)
1 Additional ammo storage (2) Additional ammo storage (2) Mobile facilities (3)
TOTAL METHEKLANDS
(1)(2)(3) see appendix to
Additional ammo storage (2) Mobile facilities (3) Arrestor gear (single set) (!) .Additional ammo storage (2)
Total Bertrix i Additional ammo storage .(2) ! Mditional ammo storage (2) ' Mditional ammo storage (2) ! Additional ammo storage (2) IMditional ammo storage (2) 'Additional ammo storage (2) /irrestor gears (double set) (l) Additional ammo storage (2)
Total Melsbroek Mobile facilities (3) /irrestor gears (single set) (l) ! Additional ammo storage (2) i Total St. Hubert ' • • ' TOTAL BELGIUM annex, notes 1,2,and 3*
t
.045
.oior
.003
,020 • ,004
.045 ,010 .003
HATQ SECRET ANNEX b3O" C^tj58ll39 Estimated period for c onrplet ion
,002 .002 .004 .002 .003-.045 .058
.003
.C58
.004
.004
.004
.003
.004
.004
.024
Juri 60 n n M n it n
Jun 60
n II «
i i »
n n n
Remarks
Cost esti-mates sub-ject to reservation "by ths Netherlands
i CT\ I
NATO SECRET
t
DE
CLA
SSIF
IED
- PU
BLI
C D
ISC
LOSU
RE
/ D
ÉC
LASS
IFIÉ
- M
ISE
EN
LE
CT
UR
E P
UB
LIQ
UE
Marne of project
TACTICAL AIRFIELDS (cont'd) Country; LUXEMBOURG SancLweiler Sqn
Physical description
FRANCE
; Arrestor gear- (single set) (l) , Mobile facilities (3) Additional aiamo storage (2) i ' Total Sandweiler
• TOTAL LUXEMBOURG Country Belfort (Sezanne) YST/M Brienne-Ie-Chateau W/M Broye-lc s-Ba sine s Sqn
! Additional ammo storage (2) IAdditional anano storage (2) j Mobile facilities (3) Additional ammo storage (2) j' V ' Total Broye-les-pesmes . ' Mobile facilities (3) Additional ammo storage (2)
j ' ' Total Gambrai-Niergnies Chalons-sur-Marne (Vatry)¥/M Additional ammo storage (2)
Cambrai-Niergnies Sqn
Chambley W/M Chenneviere; w/M Colmar 1 Damblain Sqn
Et ain Rouvres W/M Evreux W/M
Grostenquin W/M . Laon-Athies Sqn
Laon-Couvron W/M
Additional ammo storage i Additional amo storage (2 ) 'Additional ammo storage (2) -Mobile facilities (3) • I Additional arano storage (2) ! Total Damblain I Additional ammo storage (2) Strengthening of existing runway & taxiway ; to L.C.N.35 Additional ammo storage (2) ^ Mobile facilities (3) !Additional ammo storage (2) j Total Laon-Athies Strengthening of exist.runway to L.C.N.40
NATO SECRET ZJMEX B to" C-L
.010 ' .045 .004
.045
.004
..045 .004
.045 '.004
.045
.004
Estimated period for completion
Jun 60
.059
.059
.004
.004
.049
.049
.004
.004
.004
.004
.049
.004
.350
»002
.049
.245
it n n n n . n n n n n n ti
Jun 60 II »
Remarks
: I
Dec 60 ! Jun 60 j " " Cost est.Subj„to
j reservtn.by France
Itec 60 jCost.est,subj,to . ' :'. . reservtn.by France
(1)(2)(3) See appendix to annex, notes 1, 2 and 3, NATO SECRET
DE
CLA
SSIF
IED
- PU
BLI
C D
ISC
LOSU
RE
/ D
ÉC
LASS
IFIÉ
- M
ISE
EN
LE
CT
UR
E P
UB
LIQ
UE
Name of project
TACTICAL-AIRPIELDS (cont'd!) Country: IBMCE (cont'd) j Lille Lesquin San
Physical description
i CO I
Luneville Son
Lure Sqn
Luxeuil W/M Marville W/M . Merville-Calonne Sqn
Metz W/M IvrLrecoiirt Sqn
Peronne Sqn
Phalsbourg ïï/M
Rocroi San St»Simon (Clastres)Sqn
Cost estimate (£s million).
045 004
; Mobile facilities (3) Additional ammo storage (2)
Total Lille Lesquin ; Mobile facilities (3) Additional ammo storage (2)
Total Luneville Mobile facilities (3) ; Additional ammo storage (2) i • Total Lure • •Additional ammo storage (2) i Additional ammo storage (2) ! Jfobile facilities (3) : Additional, ammo storage (2).
Total Merville-Calonne ; Additional ammo storage (2) !Mobile facilities (3) Additional ammo storage (2-)
Total Mireoourt Mobile facilities (3) Additional ammo storage (2)
Total Peronne Additional ammo storage (2) 'Strengthening of exist.runvvgy & taxiway to L.Ç.N40 .315 S Total Phalsbourg ' Additional ammo storage (2] •'Mobile facilities (3) 'Additional ammo storage I Total St«Simon lAdditional ammo storage (2)
see appendix to annex, notes 2 and 3
.045
.004
..045 .004
045 004
,045 ,004
.045 ,004
,004
045 004
NiiTO SECRET 'AMEX B to" M M À Z ?
Estimated i period for 1 completion ;
Remarks
.049 !
>049
.049 j
.004 j j 004 I '
.049
.004
.049
.049
.319
..004
,049 ,003
Jun 60
ii n n ii
n n n n n n n n
M it n it »
Jun 60 n ii
i 00 I
Cost.est.subjato Dec 60 Jreservtn8Ijy Pranoe
DE
CLA
SSIF
IED
- PU
BLI
C D
ISC
LOSU
RE
/ D
ÉC
LASS
IFIÉ
- M
ISE
EN
LE
CT
UR
E P
UB
LIQ
UE
Name of project
^ûTic/jTIlRFÎMJS' (cont Country; FRANCE (cont.) Toul Rosières F/k Vouziers Y//k Country; GERMANY Ahlhorn Yf/M. Brüggen YiT/k
Y> Buche! W/M Eggebeck S/k Geilenkirchen W/k
)
Giebelstadt Sqn
Hopsten SjAl
Husum S M
Ingolstadt S /ii
Physical description
Additional ammo storage (2) Additional ammo storage (2)
TOTAL IN FRANCE Additional ammo storage (2) Extension of exist, 45m wide runway by 550m to 2990m Arrestor gears (double set) (l) Additional ammo storage (2)
• • ' • Total'Brüggen, Additional ammo storage Additicaaal ammo storage Extension of exist. 45® wide runway by 550m to 2990m •Additional ammo storage (:2)
Total Geilenkirchen Mobile facilities (3) Additional ammo storage (2)
Total Giebelstadt Mobile facilities (3) Arrestor gears
(double set) (l) Additional ammo storage (2)
Total Hopsten Mobile facilities (3) Airrestor gears (double set) (l) Additional ammo storage (2)
Total Husum Mobile facilities (3)
Cost estimate (£s million)
NATO SECRET AJMEX B to OrMC 58)139
f Estimated) Remarks period fori completion!
.180
.020
.003
.170 ,001
.045
.003
.045 .020 .004
.045
.020
.004
.203
.001
.004
.171
.048
.069
.069
.045
T
.004
.004 1,510 .003
Jun 60 n . ti
Jun 60: Dec 60! Jun•60 j
Jun 60 1» it Dec 60 Jun 60
K .
It IL IL It
It It
n tt it it II
tt tt
Dec 60
1 <0 1
DE
CLA
SSIF
IED
- PU
BLI
C D
ISC
LOSU
RE
/ D
ÉC
LASS
IFIÉ
- M
ISE
EN
LE
CT
UR
E P
UB
LIQ
UE
Name of project
TACT IC/Jj AIRFIELDS (cont? Country: GEEMilM (cont) Jaegel Marits
Jever. SfAi Kirchellen S/k
(Lechfeld) i o Laarbruch WVk (GOCH)
Laupheim S/4,1 Leck S/M. •
Neuburg/Donau S/k N®rdholz Marit8
Nörvenich W/k Oldenburg W/M Pferdsfeld Sqn Sollingen W/k Wildenrath ïï/k
Physical desoript ion
Additional facilities as described in para. 16(e), Item 1 of .annex II to part II @f Aß 6lOO/lO/lP-115/58 PROG as amended on 9.10.58 & Addend, II to AC/4-D/995 Additional ammp^storage (2) Mobile facilities (3) Arrestor gears (double set), (l)
Total Kirchellen Additional amnio storage (2) Additional ammo.storage (2) Mobile facilities (3) Arrestor gears (double set) (I) Additional ammo storage (2)
Total Leck Mobile facilities (3) Ammunition storage & additional communications facil. as described in para l6(e),Item 2 & 3 of annex II to part II of AG 6l00/l0/lP«115/58 EROG as amended on 9. IO458 & Addend. II to ACA-D/995. Additional ammo storage (2) Additional ammo storage (2) Mobile facilities (3) Additional ammo storage (2) Extension of exist, 45m wide runway x 550m to 2990m Additional ammo.storage (2)
Total Wildenrath TOTAL GERMANY
Cost estimate! Estimated jRemarks (£s million)
»045 ,020
»045 ,020 ,004
,170 ,003
,156
,004
,065 »003 »004
®069 ®045 «514
.003
.002 ¢045 « 002
.173 1,698
period for completion
Deo 60
Jun 60 Deo 60 Jun. 60
II N II II
Deo 60 Jun 60 n «
Deo 60 n «
Jtin 60 n » Deo 60 Jun 60 Deo 60 Jun 60
(1),(2),(3) see appendix to annex, notes 1,2 and |
DE
CLA
SSIF
IED
- PU
BLI
C D
ISC
LOSU
RE
/ D
ÉC
LASS
IFIÉ
- M
ISE
EN
LE
CT
UR
E P
UB
LIQ
UE
i £ I
Name of project
T l t ä l c E ^ j m m M J oont ' d ) Country: • ITAiLY Aviano W/M Cameri "f/'A Capua San
Catania Marit.
Palconara Sqn
Foggia San (Ortanova)
Ghedi W/M Giolia del Colle Sqn Grossoto ïï/M Piacenza Sqn .
Physical description
Additional ammo storage (2) ! motal Piacenza
Ravenna (San Giorgio Cesenaj Mobile facilities (3) Sqn
Rimini Sqn Villafranca ff/M
Country: GREECE Aigrinion San
Cost estimate (£3 million)
'Mditional ammo storage (2) •Additional ammo storage' (2) [Mobile, facilities (3) Additional ammo storage (2) i Total Capua !Mine component storage. Mine compon.buildings, one [building 450 sa. m» revetted for assembly, the other bldg. 200 sq.m. is -for inert storage & refrigerat-ion of charged batteries-. Mobile facilities (3) Aidditional ammo storage. .(2)
Total.Falconara Mobile facilities (3) . jAdditional ammo storage (2) I Total Foggia [Additional- ammo storage (2) 'Mobile facilities (3) Additional ammo storage (2) jMobile facilities (3)
jAdditional ammo storage- (2) IAdditional ammo storage (2) j TOTAL ITALY I i [Dispersal site as described, in para 20(d),part I, Annex II of AGélOO/lO/lP-115/58 FROG. Such" includes [warehouses (400 m2),mogas storage, motor pool hard-
Estimated period for completion
Remarks
.003 : Jun 60 •
.004 ! Il tt !
.045 [ - Dec. 60 (4)
.004 i Jim 60 (4)
.049 i :.
.045 " 1 "Jul 60
.045 ! Dec 60 (4)
.004 i Jun 60 (4)
.049 ;045. ! Dec 60 (4) .004 Jun 60
.049 ' .003 i Jun 60 .045 ! Dec 60 (4) .004 Jun 60 (4)
.045 Dec 60 (4)
.003 i Jun 60 (4)
.048 j (4) .045 j Dec 60 ' (4)
.003 I Jun'60 ,
.00 3 ! It tT I ".350" I
! .250 Jul 60'
•stand, standby power communications,internal roads, onsite utilities, drainage,fencing . land connecting roads to mam site. (1)(2)(3) see appendix to annex, notes 1,2 and 3 —; -.- . (4) The cost estimates for Mobile facilities in Italy are subject to confirmation by ihe Italian Delegation.
Ï' NATO,. S^CEâï
DE
CLA
SSIF
IED
- PU
BLI
C D
ISC
LOSU
RE
/ D
ÉC
LASS
IFIÉ
- M
ISE
EN
LE
CT
UR
E P
UB
LIQ
UE
Name of project
TACTICAL' AIKTIELDS(cont ' d) Country: GREECE (cont'd) Agrinion Sqn (Cont'd)
AncLravida Sqn Araxos Sqn
Elefsis W/M Megara Sqn
i M rv) I
Preveza Sqn
Souda Bay Marite Sqn
Physical description
! Mobile facilities (3) ,Arrestor gears (double set) (l)
• )
j'Cost estimate :(£s million)
.045
.020 ,004
.045 ,004
,175
.045
.020
.004
.045
.020
.045
,319 .045
.049
.004
.310
.069
C^M(56]T39 !Estimated ^period for completion
Dec n 60
Additional ammo storage (2 ! . , Total Agrinion I Mobile facilities (3) j Mobile facilities (3) -I Additional ammo storage (2) j Total Araxos iAdditional ammo storage (2) 'Dispersal site as described in para 20(d),Part I of annex.II of AG6IOO/IO/IP-II5/58 FR0G,suoh includ es warehouses (400 m2),mogas storage, motor pool hard-stand, standby power communications, internal roads, on-site utilities, drainage, fencing and connecting jroads to main site, IMobile facilities (3) Extension of 2kh0 m(30m wide) runway programmed under Slicc VII by 550 m to 2990m.
Total Megara Mobile facilities (3) Arrestor gears (double set) (l) Additional ammo storage (2)
Total Preveza Mobile facilities (3) jArrestor gears (double set) (l) ICLnes component storage® Two mine comp.bldgs.,one :bldg 450sq.m. revetted for assembly, the other j !bldg 200sq.m. for inert storage & refrigeration of charged batteries!
Total Souda Bay < .110 ;
Jul 60
Deo n 60 n Jun 60
Jul 60
Dec Jul
60 60
Dec 60 U II
Jul 60
Dec M
60
Jul 60
t K i
DE
CLA
SSIF
IED
- PU
BLI
C D
ISC
LOSU
RE
/ D
ÉC
LASS
IFIÉ
- M
ISE
EN
LE
CT
UR
E P
UB
LIQ
UE
Name of project j t
TACTIGAJJ IJ.Tl¥RET;DS (cont »d)j Country: GÏÎEECE (cont'd) !
Physical description
Trikkala Sqn
Country: TURKEY AIchisar San
, Arifiye Sqn
Bandirma W/M ' Batman Sqn
Diyarbakir
Eskesehir Yf/ll Izmir Sqh
Kayseri Sqn
j Mobile facilities (3) j Arrestor gears (double set) (l) j Additional ammo storage (2) : ' Total Trikkala
TOTAL GREECE
Cost estimate (£-s million)
Mobile facilities (3) ' Arrestor gears (single set) (l)
Total Alchisar Mobile facilities (3) \ Arrestor gears (double set) (l)
• Total Arifiye • Additional ammo storage (2) . Mobile facilities (3) !
Arrestor gear (single set) (l) Total Batman j
Additional ammo storage (2) I Avgas storage. Provision of 300 eu.m of Avgas stor- • age together with'a truck fillstand & discharge I point to permit refuelling in connection with mining operations. !
Total Diyarbakir 1
Additional ammo storage (2) Mobile facilities (3) i Arrestor gear (singi set)(l)
Total Izmir Dispersal site as described in para 20(d),Part I,
, Annex II of AG6IOO/IO/LP-II5/58 PROG,such incl. ware-j ; houses (400 m2),mogas storage, motor pool hardstand, : ; standby power coiwnunico.tions, internal roads, on-site; ! fencingand. comecting roads to main sites \
(1)72)(3) see appendix to annex, notes ï,2 and 3.
.045
.020
.004
.045
.010
.045
.020
.045
.010
.002
.005
.045
.010
,225-
.069
.975
.055
.065
.002
.055
.007
.002
.055
firP. W W l Estimated i period for j completion ! I I Dec 60 u n Jul 60
Dec 60 n n
Dec 60 n n
j Jun 60 j Dec 60 i it u
Jun 60 " 59
I Jun 60 i Dec 60 n u i ! Dec 60
utilities, drainjage,
"NATO" SECRET"
I H VH I
DE
CLA
SSIF
IED
- PU
BLI
C D
ISC
LOSU
RE
/ D
ÉC
LASS
IFIÉ
- M
ISE
EN
LE
CT
UR
E P
UB
LIQ
UE
Name of project
TACTICAL" AIRFIELDS (cont(d) Covuitryî TURKEY (cont'd) Kayseri (cont'd)
Physical description
I f
Konya Sqn
Merzifon Sqn
Seyltgazi Sqn
Sivas Sqn
Yenesehir San
Mobile facilities ; .045 Arrestor gears- (double set) (l) ' ; .020 Additional ammo storage (2) ! .004
Total Kayseri ! • .294 Mobilefacilities (3) ' : «045 jArrestor gear (single set) (l) j .010 [Additional ammo storage (2) : .002 ! -Total'Konya ' • .057 !Mobilefacilities (3) • .045 jArrestor gear (single s^t) (I) ; .010 jAdditional ammo storage (2) • .002
-. -Total Merzifon , .057 iDispersal site as described in para 20(d),Part Ï, ; .225 i Annex II of AG6100A°/1P-115/58 PROG, such includes i warehouses (400 m2), mogas storage, motor pool Ihardstand, standby power communications, internal ; roads, on-site utilities, drainage, fencing and ! connecting roads to main site. S I Mobile facilities (3) 1 .045 IArrestor gears (double set) (l) ' .020 I Total Sayitgazi .290 !Mobile facilities (3) j .045 jArrestor gears (double set) (l) ! .020 ! Total Sivas I »065 'Dispersal site as described in para 20 (d) Part I» : »225 Annex II of A&6IOO/IO/IP-II5/5O PROG., such in- i eludes warehouses (400 rn2) mogas storage, motor pool! hardstand, standby power, communications internal roçids, on-site utilities drainage, fencing and connecting rtads
1 to main site. __ _ _
NAJO SECRjiiT .-AKMEX B to om'(58TÎ59 Estimated period for completion
Dec 60 « 11 Jun 60
Dec 60 » »
Jun 60
Dec 60 t t t t
Jun 60
Dec 60
Dec 60
n n « »
"t
DE
CLA
SSIF
IED
- PU
BLI
C D
ISC
LOSU
RE
/ D
ÉC
LASS
IFIÉ
- M
ISE
EN
LE
CT
UR
E P
UB
LIQ
UE
Name of project
TACTICAL /JRFIELDS (cont ' d) Country: . • TURKEY (cont'd) Yenesehir Sqn (cont'd)
Physical description
Arrestor gears (double, set) (l) Additional ammo storage (2) ' ! Total Yenesehir • TCdViL TURKEY
(1)(2)(3) see appendix' to annex,• notes"1,2 and 3-
!
NATO SECRET , ANNEX" B to C-MfcSTl^
Cost estimate | Estimated . Remark (£s million) .period for ;
j completion !
.020 , ! Dec 60
.00k I Jun 60 .2k? i I.253 I .
DE
CLA
SSIF
IED
- PU
BLI
C D
ISC
LOSU
RE
/ D
ÉC
LASS
IFIÉ
- M
ISE
EN
LE
CT
UR
E P
UB
LIQ
UE
NATO. SECIMT IMEX. B to O-M (53)139
AIR WEAPONS TRAINING-Hi STALLATIONS
Country; Prancc
Solenzara
! H -J I
Additional funds required to cover the provision of possible additional facilities which have "been declared by SH/iEE to "be militarily essential for Solenzara Air Weapons Training installations.
1.80 June, i960
Cost estimate to be further screened by International Staff. Reservations by Belgim and Canada pending finalisation of cost estimate. Subject to de termination of eligibility for common financing by Infra-structure Committee.
DE
CLA
SSIF
IED
- PU
BLI
C D
ISC
LOSU
RE
/ D
ÉC
LASS
IFIÉ
- M
ISE
EN
LE
CT
UR
E P
UB
LIQ
UE
NAVAL BJXSE INSTALLATION
Country; Turkey Bosphorous
EEEGLI (Black Sea)
1000 cu.m. POL gasoline storage with connecting pipelines and related facilities for IT3Bs. 800 sq„m. Torpedo storage workshop for storing and servicing torpedoes, 200 sq.m. semi-buried concrete structures for EPB ammunition and related facilities
Total - Bosphorous
200 sq.m. of above-ground structure for servicing torpedoes prior to transfer to submarines. New increment to Slice V authorised project.
Total - Turkey
NAjTO SECRET AJMEX B to C-M (58)1)9.
O4Oif
0a08
0.02
Jme, i960
0,14
0.01
Detail listed in A.CA-D/995, Annex A, Part II
1 H VD I
0.15
DE
CLA
SSIF
IED
- PU
BLI
C D
ISC
LOSU
RE
/ D
ÉC
LASS
IFIÉ
- M
ISE
EN
LE
CT
UR
E P
UB
LIQ
UE
POL INST/JJulTIONS
Country; Germany
Bocholt-Münster pipel ine
Münster-Depot
Country; Greece
Souda Bay - depot
Approximately 100 1cm» extension of exist ing Joch/ Bocholt to Münster 6 - inch pipel ine with related pump s t a t i o n s .
4 tanks of 2,500 cu.m. of which two are for j e t f u e l and two for mogas storage.
Total - Germany
2,500 cu.m, reserve j e t f u e l storage depot
for a i r f i e l d at Souda Bay
0.88
0.4£
1 , 5 4
0.20
June, i960
December, i960.
! ro H I
DE
CLA
SSIF
IED
- PU
BLI
C D
ISC
LOSU
RE
/ D
ÉC
LASS
IFIÉ
- M
ISE
EN
LE
CT
UR
E P
UB
LIQ
UE
Name of Project
SIGNAL COMMUNICATIONS
Country: GERIt1IANY
S e r i a l 1
Country; GREECE
S e r i a l 1 Radio r e l a y •TZERMIADES-AGIOS NIKOLAOS
S e r i a l 2 Radio rela' KALAMA
r e l a y ICHANIA
P h y s i c a l descr ipt ion
C a r r i e r equipment - required to route NATO c i r c u i t s over the n a t i o n a l communications system. Continu-ation of S l i c e IX project
60 ch. system equipped for 6 -voice and 3 Tg channels at Heraklion and Agios Nikolaos - Required to provide c i r c u i t s to the S l i c e V I I I E a r l y Y/arning Radar at Zeros,, as part of the "back-up" connection
120 ch. system equipped for 24 oh. terndnals at Kalmai and Sklopa - 2 re lays at Tàygétos and K y t h i r a • Required as a re-route f a c i l i t y between Crete and Greek, mainland .- to be i n i t i a l l y ëquipped for 24 c i r c u i t s , the ult imate capacity to be determined at the budgetary control stage.
Cost estimate (dSs m i l l i o n )
0.05
0 . 3
0 , 1 4
Estimated period for completion
Dec 60
Dec 60
Dec 60
Remarks
I i\> VjJ I
To be r e -viewed i f SHAEE decides to r e t a i n the t r o -pospheric spur Athens -Crete i n the P. Sc. system
NTTTO SECRET DE
CLA
SSIF
IED
- PU
BLI
C D
ISC
LOSU
RE
/ D
ÉC
LASS
IFIÉ
- M
ISE
EN
LE
CT
UR
E P
UB
LIQ
UE
ANNEX B to C-M(58)13?
Name of project P h y s i c a l d e s c r i p t i o n Q^st estimate (£s m i l l i o n )
Estimated period f o r completion
Remarks
S I G N ^ COMMUNICATIONS (cont) y Country: TURKEY
S e r i a l 1 Radio r e l a y MZ1
1Lii-TYA-S XVAS-ERZINCAN-ERZURTOi
ï
120 channel system equipped throughout for 2 4 - v o i c e + 21+ TG ohs and 1 2 - v o i o e * 1 2 TG on the POL system between Malatya and D i y a r b a k i r - Required on s e c u r i t y grounds to provide a l t e r n a t e means of communications i n E a s t Turkey ( f o r d e t a i l s of c i r c u i t requirements, see document À C / 4 - D / 9 9 5 , pagè 19)® . - •.
0®5 J u l y 6 1
i
\
""s
NATO SECHBT DE
CLA
SSIF
IED
- PU
BLI
C D
ISC
LOSU
RE
/ D
ÉC
LASS
IFIÉ
- M
ISE
EN
LE
CT
UR
E P
UB
LIQ
UE
0-M(58)139
Name of project P h y s i c a l d e s c r i p t i o n
3 T
WAR HEADQUARTERS
Country:;. NORWAY
COMNiWSCANAP . War Headquarters (471)
Country; NETHERLANDS
NORTHAG/2 ATAF V War Headquarters (371)
Country; GREECE
COMEDEAST ' ' War Headquarters (780)
Country; TURKEY
COMEDNOREAST • War Headquarters (980)
Country; PRANCE
COMEDOC Vfer Headquarters
S ingle channel HP r a d i o communication equipment f o r a ir /ground l i n k , inc luding transmitter r e c e i v e r , a e r i a l , keying equipment and t e l e p r i n t e r s - Increment of S l i c e V I I approved COMNA.VSCAP- p r o j e c t
F a c i l i t i e s for accommodating meteoro-l o g i c a l equipment - Increment « f p r o j e c t approved i n previous S l i c e ,
P r o v i s i o n of 2 KW HP t r a n s m i t t e r , one p a i r of d u a l FSK r e c e i v e r s ; . one duplex base t e l e p r i n t e r . Conversion to 2 KW of two 1 . 5 KW t r a n s m i t t e r s approved i n previous S l i c e .
P r o v i s i o n of s i g n a l t e i m i n a l equipment f o r oontrol of maritime a i r c r a f t . Increment of p r o j e c t approved i n previous S l i c e .
Cost estimate j Estimated (£s m i l l i o n ) | period f o r
completion
0.02
.0.03
0.02
0.02
P r o v i s i o n ofterminal equipment for one HFRATT 0 , 0 4 standby c i r c u i t to Nimes-Garons maritime a i r -f i e l d . Conversion to HFRATT of HF-CW terminal équipaient for standby c i r c u i t to ORAN-Lartigue maritime a i r f i e l d . P r o v i s i o n of 2 Ifft-CW t r a n s -m i t t e r s and one HF-CW f o r a ir /ground c i r c u i t s , for ^control of maritime „aircraft. i
Deo 59
Mair 59
J u l 60
Dec 60
J u l 60
Remarks
I n c l u s i o n of War Headquarters p r o j -ects i n the p r o -gramme i s without pre judice to the., f i n a l a c t i o n to be taken b y the Coun- • c i l on the NATO , m i l i t a r y p o l i c y a n ^ Peacetime and '
i Wartime Headquar-t e r s (C-M(58)114) j and on-the new j c r i t e r i a and s t a n -I dards f o r major Wartime Headquar-t e r s ^ C 3 2 / 1 2 (Revised))
DE
CLA
SSIF
IED
- PU
BLI
C D
ISC
LOSU
RE
/ D
ÉC
LASS
IFIÉ
- M
ISE
EN
LE
CT
UR
E P
UB
LIQ
UE
NATO SECRET APPENDIX to ANNEX B te 04/1(58)139
DESCRIPTION OP PROJECTS
The following: descriptions refer to all instances marked note I i note 2 and note 3 in the airfields portion of Part I OfAnnexA9 •
Reference: Annex A, Part I , A i r f i e l d s •
Note ( l ) A r r e s t o r Gear; : / • . . \
P r o v i s i o n of A r r e s t o r Gear at e x i s t i n g NATO t a c t i c a l a i r f i e l d s , planned f o r the deployment of Qet a i r c r a f t u n i t s i n peacetime® This i s a continuât ion, of the programme s t a r t e d i n S l i o e IX8
Note (2) A d d i t i o n a l Angnunition Storage«. j , • _ .
P r o v i s i o n of a d d i t i o n a l protect ion for the covered and b l a s t p r o o f storage provided i n the T a c t i o a l A i r - ^ f i e l d s C r i t e r i a (LOG 6 l 6 l / E - 5 0 0 / 5 5 - R e v i s e d ) a r i s i n g out of the NATO m i l i t a r y requirement for stor ing s p e c i a l type ammunition® Those p r o j e c t s for a d d i t i o n a l protect ion apply only to ammunition storage on which construct ion has n o t . y e t started* The oost est imates.are based on estimated cost of £ 1 0 per sq»ttW at f l o o r area® T h i s cost r e l a t e s t o works a d d i t i o n a l to that p r e v i o u s l y programmed,,
N©te (3) Mobile P a o i l i t i e s s / , ,
P r o v i s i o n of one set of mobile vans ( e x c l u s i v e of prime mover and equipment) required b y T a c t i c a l A i r -s f i e l d s C r i t e r i a (LOG 6l6 l /E -50O/55~Revised) for squadron operations, communications, maintenance and
t e c h n i c a l shops« T h i s i s the f i r s t increment of the requirement to provide a l l a i r f i e l d s with such mobile f a c i l i t i e s , but the present increment has been r e s t r i c t e d to those a i r f i e l d s where no s t a t i c acoommôdation exists®
DE
CLA
SSIF
IED
- PU
BLI
C D
ISC
LOSU
RE
/ D
ÉC
LASS
IFIÉ
- M
ISE
EN
LE
CT
UR
E P
UB
LIQ
UE
SACLANT LIST OF PROJECTS RECOMMENDED FOR INCLUSION I N SACLANT 'S PORTION OF
1959 TMTH SLICE NATO .COMMON INFRASTRUCTURE PROGRAMME
NATO SECRET ANNEX C. to C-M (58)139
Name of project P h y s i c a l d e s c r i p t i o n Cost estimate. (£s m i l l i o n )
Estimated per iod f o r completion
Remarks
•MARITIME AIR .FACILITIES
Country: Norway
Andoya
Oerlandet
B^d^ I
IND
V Country: United Kxngdom
MachrichEuiish
Country: France
.. Lann Bihoué -
Country.: Portugal
Espinho
Montijo
A r r e s t o r Gear ( s i n g l e set)
A i r f i e l d improvement f o r operat ional .use* Strength- , ening of -exist ing runway,- taxiway, t a x i t r a c k s and 1 2 hardstands, p r o v i s i o n of an i n t e r n a l road, f u e l storage, ammunition storage, operations room, com-munications f a c i l i t i e s , AUW shop and other m i s c e l -laneous f a c i l i t i e s .
To provide a d d i t i o n a l ammunition storage of 400 sq.m^ an i n t e r n a l road and an AUW shop.
A r r e s t o r gear (double set) one at each end of the main runway.
A r r e s t o r gear (single s e t ) .
To i n c r e a s e the strength o f 1 2 e x i s t i n g hardstands at Lann B i h o u é . , a i r f i e l d to make them s u i t a b l e f o r use by maritime a i r c r a f t .
Arrestor gear (double s e t ) . One at each end o f main runway.
A r r e s t o r gear (double s e t ) . One at each end of main runway.
0.01 0.82
0. 08
0.02.
0.01 0 . 1 5
0.02
0.02
J u l . i960
Dec. 1 9 6 1
Dec. i960
Dec. I 9 6 I
Dec. 1959
Dec. 1959
Dec.: i960
I r\j (
Advance appro-v a l given by the Counci l 'C-M (58).122; C - R (58) 49)
DE
CLA
SSIF
IED
- PU
BLI
C D
ISC
LOSU
RE
/ D
ÉC
LASS
IFIÉ
- M
ISE
EN
LE
CT
UR
E P
UB
LIQ
UE
(ME (58 )139
Name of project P h y s i c a l d e s c r i p t i o n Cost estimate (£s m i l l i o n ) .
Estimated period for completion
Remarks
NAVAL FLEET FACILITIES
Country: United Kingdom
Loch Ewe POL Depot Self -conta ined • POL depot' i n the Loch Ewe area f o r the storage and handling of 120,000 cu-sm black o i l , 10,000 eu»m j e t f u e l , 5,000 cu»m AVGAS and 5>000 cu®m Diesel- oil.,. Related j e t t y , p i p e l i n e s and other r e l a t e d - f a c i l i t i e s ® , - r 1
3.80
.
1962
i ro f prance
<• ' '
- — -
•
Brest A v i a t i o n PCQj depot Construction of 20,000 eu»m of underground POL stor-age (15 ,000 cvum AVGAS and 5,000 eu»m j e t fuel ) with necessary p i p e l i n e s , j e t t y and pump plants®
0 . 7 7 1962 Cost shared 2/3 NATO 1 / 3 host country. T h i s i s NATO share.
COMMUNICATIONS FACILITIES
Country; Norway . . . . . . • • .
Oslo/Str Ikf ltmet Broadcast Meteorological broadcast f a c i l i t i e s (3 to 5 KW high frequency transmitter , etc®) to be located i n e x i s t -ing NATO Headquarters i n Oslo area®
0 . 0 1 Dec« 1959
•
f
DE
CLA
SSIF
IED
- PU
BLI
C D
ISC
LOSU
RE
/ D
ÉC
LASS
IFIÉ
- M
ISE
EN
LE
CT
UR
E P
UB
LIQ
UE
* •
NATO SECRET ANNEX C t o C-M(58)139
/
Name of Project Physical description Cost estimate (<Cs million)
Estimated period for completion
Remarks
COMMUNICATIONS FACILITIES (cc Country: United Kingdom JOINTCOMNORLANT COMCÉNTER - Modernisation
WAR HEADQUARTERS Country: United Kingdom CENTIANT' War Headquarters
, -i
>ntd. )
Modification and improvement of existing underground COMCENTER (Rosyth) to provide for -installing of terminal equipment for 6 NATO circuits; relocation of existing NATO equipment,' and miscellaneous facilities, j
.
Protected War Headquarters (approximately 4>800 sq.m to serve a staff àpprox, 300 personnel and to : accommodate the NATO CENTLANT Command, project aI,so includes necessary communications facilities» .,- .
0.09^
) 1.20
Dec. 19 0
Dec. 1961 (2)
( 1 ) T h i s cost estimate i s dependent on the f i n a l s e l e c t i o n of the s i t e . (2) See note i n "Remarks" column on page 25.