South Florida Water Management District 3301 Gun Club Road West Palm Beach, Florida 33406 C-51 Canal Sediment Trap Lake Worth Lagoon Hydrographic Survey Report July 11, 2013

Transcript of C-51 Canal Sediment Trap - Palm Beach County,...

South Florida Water Management District

3301 Gun Club Road West Palm Beach, Florida 33406

C-51 Canal Sediment Trap Lake Worth Lagoon Hydrographic Survey Report

July 11, 2013

C-51 Canal Sediment Trap July 11, 2013

South Florida Water Management District

2

Table of Contents Background ..................................................................................................................................... 3

Location Map .................................................................................................................................. 4

Methodology ................................................................................................................................... 5

Surveyor’s Notes ..................................................................................................................... 5

Field Work ............................................................................................................................... 6

Data Processing ....................................................................................................................... 7

Results ............................................................................................................................................. 8

Conclusion ..................................................................................................................................... 11

Certification................................................................................................................................... 11

Appendix ....................................................................................................................................... 12

Photos ........................................................................................................................................... 13

References:

• Sea Diversified, Inc. surveys done in 2007, 2008, 2009, and 2010 (provided by Palm Beach

County)

• Sea Diversified, Inc. report completed April 25, 2011

• SFWMD survey completed July 8, 2013

CD Includes:

• Report Copy

• Survey Drawing

• AutoCAD eTransmit file

• Field Notes

• Photographs

C-51 Canal Sediment Trap July 11, 2013

South Florida Water Management District

3

Background The C-51 Canal Sediment Management Project began in January of 2006, a collaboration between the

South Florida Water Management District (SFWMD), Palm Beach County Department of Environmental

Resources Management (PBC), and the City of West Palm Beach, to construct and monitor a sediment

trap on a yearly basis. Construction was completed in July 2007.

Sea Diversified, Inc. (SDI) was contracted by PBC to perform hydrographic surveys from 2007-2010. The

original survey conducted in 2007 reached from Forest Hill Blvd. to the S-155 Water Control Structure.

In 2008 this area was extended from Congress Ave. to S-155. This extension was requested to obtain a

better awareness of erosion and accretion occurring in the sediment trap. By conducting these surveys

on a yearly basis PBC and SFWMD would like to define if maintenance for the sediment trap is required.

Hydrographic surveys done by SDI:

2007 – Original baseline survey between Forest Hill Blvd. and S-155

2008 – Project extended to be between Congress Ave. and S-155

2009 – Congress Ave. to S-155

2010 – Congress Ave. to S-155

SDI performed an in-depth analysis comparing the surveys to the 2007/2008 baseline. Part of SDI’s

investigation includes examining if there was a correlation between the amount of discharge at S-155 to

erosion and accretion along C-51. By examining DBHYDRO data SDI determined that erosion and

accretion could have a connection to the amount of water being discharged from S-155. SDI

recommended that monitoring surveys continue to help in understanding the movement of sediments

through the C-51 Canal.

No surveys were performed in 2011 or 2012 for this project. In May 2013 PBC approached SFWMD to

continue the monitoring of the sediment trap. It is understood that not having surveys for 2011/2012

will make it impossible to correlate any erosion or accretion to any particular rain event or dry period.

This will however, be able to aid in showing if a maintenance dredging schedule should be done for the

sediment trap or if the trap does not accumulate enough sediment to warrant a maintenance cycle.

C-51 Canal Sediment Trap July 11, 2013

South Florida Water Management District

4

Location Map For the 2007 survey, the area only encompassed from Forest Hill Blvd. to S-155. Starting in 2008 the

survey area covers the east side of Congress Ave. to the west side of S-155 to evaluate possible

sediment sources.

To maintain consistency with the report done by SDI the project is broken into four segments.

Reach A: Congress Ave. – Summit Blvd.

Reach B: Summit Blvd. – Forest Hill Blvd.

Reach C: Forest Hill Blvd. – Interstate 95

Reach D: Interstate 95 – S-155 Structure

A

B

C

D

Cong

ress

Ave

.

Summit Blvd.

N

C-51 Canal Sediment Trap July 11, 2013

South Florida Water Management District

5

Methodology The hydrographic survey meets the applicable minimum technical standards for surveys in Florida

Administrative Code 5J-17.051 set forth by the Florida Board of Surveyors and Mappers pursuant to

section 472.027 Florida State Statutes.

Surveyor’s Notes 1. The purpose of this hydrographic survey is to establish elevations of C-51 Canal from Congress

Ave. to S-155 located in Sections 4, 5, 8, 9, 15, 16, & 17, Township 44 South, Range 43 East; Palm Beach County, Florida.

2. All measurements herein are in U.S. Survey Feet and decimal thereof, unless otherwise specified.

3. The bottom depths were collected using an Odom HydroTrac echo sounder in conjunction with

a 200 KHz transducer and a laptop computer operating HyPack 2013.

4. This survey report is not valid without the signature and the original raised seal of a Florida Licensed Surveyor and Mapper.

5. Additions or deletions to this survey report by any other than the signing party (or parties) is

prohibited without written consent of the signing party (or parties).

6. Date of last field work: June 27, 2013.

7. The coordinates, bearings, and distances refer to the Florida State Coordinate System, Transverse Mercator Projection, Florida East Zone, North American Datum of 1983 (NAD 83). Coordinates were obtained with a Trimble SPS351 DGPS Receiver providing sub-meter precision.

8. Elevations shown hereon refer to the North American Vertical Datum of 1988 (NAVD88). To

convert to NGVD29 add +1.52’. Conversion calculated using CORPSCON Ver. 6.0.1

9. The vertical control points are as follows: FCE3521 USACOE brass disk set in top of a 10” round concrete cylinder, from the Southwest corner of the fence surrounding the parking lot of the S-155 building on the North side of the S-155 structure, go North along the West fence line 25 feet ±, thence West 5 feet ± to bench mark, stamped “FCE3521 1971”. Elevation (NAVD88) = 15.030’ SUMMIT 10 Palm Beach County aluminum disk set in the Northwest corner of a concrete bridge over C-51 Canal at Summit Blvd., stamped “SUM – 10” Elevation (NAVD88) = 16.901’

10. No boundary survey was performed as part of this survey.

C-51 Canal Sediment Trap July 11, 2013

South Florida Water Management District

6

11. Underground utilities were not located as part of this survey.

12. The aerial imagery shown hereon is the 2011 Palm Beach County quarter foot pixel resolution. It is shown for informational purposes only and is not part of this survey.

13. The C-51 Canal centerline stationing, created by SFWMD, is for reference only.

14. Surveys done by Sea Diversified, Inc. (2007, 2008, 2009, and 2010) in NGVD 29 were converted to NAVD 88 by using the conversion factor in Note 8.

Field Work This hydrographic survey was performed by SFWMD surveyors on June 17-20, 27, 2013. Field notes are

located in the field book “MISC FB 6R”.

For this survey the water surface elevations were

established by placing a hub at a known elevation in the

canal by using the benchmarks described in Note 9. The

hubs were placed at the intersection of C-51 and Summit

Blvd. as well as at S-155 and were checked throughout the

day to maintain an accurate value for the change in water

surface elevation.

Depths were collected using a side mounted 200 KHz transducer connected to an Odom HydroTrac echo

sounder. The echo sounder was calibrated using a check sounding at the beginning and end of each

work day. To do this calibration a 25’ fiberglass rod was used to determine the water depth and then

the echo sounder was adjusted to verify the

soundings were correct. Horizontal location was

obtained using a Trimble SPS351 DGPS Receiver

which provided sub-meter precision, ideal for marine

surveying. The GPS and echo sounder were

connected to a laptop running HYPACK 2013.

Hub placed at Summit Blvd.

Odom HydroTrac during cross sections

C-51 Canal Sediment Trap July 11, 2013

South Florida Water Management District

7

To maintain similarities with the surveys completed by Sea Diversified Inc. the cross section work was

located at approximately fifty (50) feet, along lines previously run by SDI and were obtained as close to

the bank as feasible. Obstacles such as aquatic vegetation, docks, and irrigation pipes effected the

extents of many of the cross sections. Three (3) profile lines were also acquired to benefit the survey,

with the addition of two (2) more located inside of the sediment trap to increase coverage in the wider

segment of C-51.

Data Processing Before loading the files into AutoCAD, the raw data files were processed using standard SFWMD

techniques. Tide files were created for each day to change the depths into NAVD 88 elevations. Each

raw file was then examined to remove any errant data collection points. Once each raw file was edited

using HYPACK’s Single Beam Editor, a sorted file was created selecting an edited sounding every five (5)

feet. The five (5) feet distance is the typical SFWMD sorted distance used to create surfaces in CAD. The

sorted data files were then exported

into an YXZ file. The surveys done by

Sea Diversified, Inc. were obtained in a

XYZ NGVD 29 format and were

converted into NAVD 88 using the

value shown in Note 8; no other

editing was done to SDI’s data.

Typical data collection lines shown in HYPACK (color by depth)

Typical cross section before editing

C-51 Canal Sediment Trap July 11, 2013

South Florida Water Management District

8

Results The sediment trap was constructed to minimize the amount of material flowing into the Lake Worth

Lagoon. The purpose of surveying this area on a yearly basis was to determine if a maintenance

schedule needed to be implemented to aid the sediment trap process. Sea Diversified, Inc. conducted

surveys from 2007 to 2010 and determined the volumetric change (Erosion / Accretion) by conducting

surface-to-surface comparisons in AutoCAD.

With the SFWMD data collected in June of 2013 it was then possible to compare the elevation change

over the project period. Cross sections were placed at approximately 500 feet intervals (or where

appropriate) along C-51. The intervals were shortened to 100 feet inside of the sediment trap to convey

a better representation of variations between the five (5) years.

The extents of the project were expanded in 2008 to include more of the C-51 Canal (north from

sediment trap) to discover where any material was originating. From Congress Ave. to the northern

extents of the sediment trap and from I-95 to S-155 the cross sectional data showed slight change in

elevation over the project duration (left figure). This is illustrated on the cross section sheets of the

survey accompanying this report “C-51 CANAL SEDIMENT TRAP”. The sediment trap, unlike the rest of

the project, showed significant increase in material from 2007 to 2013 (right figure).

C-51 Canal Sediment Trap July 11, 2013

South Florida Water Management District

9

A volume calculation was done for the sediment trap only because of the minor changes in the cross

section elevations for the remainder of the C-51 Canal survey. The comparison can be clearly seen on

the “2007 AND 2013 VOLUME CALCULATIONS” page of the survey. As shown in the surface comparison

and cross section views, the majority of material build up is located along the West and South of the

sediment trap. The amount of erosion/accretion is shown in the following table:

DBHYDRO data was compiled to decide if the flow rate throughout C-51 had any effect on the amount of

material build up in the sediment trap. By doing so it could be possible to attribute erosion and

accretion to the flow rate of S-155 over the years. For the SFWMD survey there are two (2) years where

no survey was completed. As shown in the table below, the flow rate during 2011 and 2012 were at

complete opposite ends of the spectrum. During 2011 the lowest amount of cubic feet per second (cfs)

was discharged over the study period, while 2012 had an active hurricane season and with the amount

of water brought by storms such as Tropical Storm Isaac, S-155 saw greatly increased flow rates.

(A larger graph appears in the appendix.)

Volume Summary Erosion

Cubic Yards Accretion

Cubic Yards Net

Cubic Yards

4,257 29,779 25,522

Spike attributed to Tropical Storm Isaac

C-51 Canal Sediment Trap July 11, 2013

South Florida Water Management District

10

With the gap in data collection it cannot be shown how a dry or rainy season directly affects the

sediment trap. By examining the cross sections it appears to show a constant increase in material build

up, regardless of the flow rate of S-155. Excluding the change from 2007-2008, which saw the greatest

increase in sediment, there seems to be a trend of increased material at approximately 1 foot per year

inside the sediment trap. In Reach C the first year saw an increase of 10,478 cubic yards of accretion

and an increase of 2,800 – 3,200 cubic yards per year from 2008 – 2013.

Average Accretion for Reach C Years 2007 – 2008 2008 – 2010 2010 – 2013

Total (CY) 10,478 6,401 8,643 Average / Year 10,478 3,200 2,881

Cross section showing elevation trend

3 year gap

C-51 Canal Sediment Trap July 11, 2013

South Florida Water Management District

11

Conclusion The purpose of this survey was to determine if a maintenance schedule needed to be implemented to

maintain the effectiveness of the sediment trap. An attempt was also made to correlate the flow rate of

S-155 to material build up. By comparing the results from multiple surveys this shows that the sediment

trap is indeed collecting sediment brought through C-51. This build up appears to increase, regardless of

the cfs being discharged through S-155, at a pace of approximately 1 foot in elevation change or 2,800 –

3,200 cubic yards of accretion per year.

Certification This survey report was prepared for:

Rod Braun Principal Scientist South Florida Water Management District 3301 Gun Club Road West Palm Beach, FL 33406

Unless it bears the signature and the original raised seal of the Florida Licensed Surveyor and Mapper,

this report is for informational purposes only and is not valid.

I hereby certify that this hydrographic survey was made under my responsible charge and meets the

applicable minimum technical standards for surveys as set forth by the Florida Board of Land Surveyors

in Chapter 5J-17.051, Florida Administrative Code, pursuant to Section 472.027, Florida State Statues.

Richard E Barnes, Jr. Date Professional Surveyor and Mapper Florida Certificate No. 5173

C-51 Canal Sediment Trap July 11, 2013

South Florida Water Management District

12

Appendix S-155 Flow Rate

C-51 Canal Sediment Trap July 11, 2013

South Florida Water Management District

13

Photos Discharge from S-155

Aquatic vegetation and tree overhang

C-51 Canal Sediment Trap July 11, 2013

South Florida Water Management District

14

Aquatic vegetation

C-51 (looking south to Forest Hill Blvd.)

C-51 Canal Sediment Trap July 11, 2013

South Florida Water Management District

15

Debris along Reach D

S-155 headwater