il. S. Department of the Interior OMB Control Number: 1014-0016 Bureau of Safety and Environmental Enforcement (BSEE) OMB Approval Expires: August 31.2018 ASSIGNMENT OF FEDERAL OCS PIPELINE RIGHT-OF-WAY GRANT Part A; Assignment Legal description of the Pipeline Right-of-Way Grant being assigned (Please include Segment Number and any accessory information): OCS-G 22476, A 200-foot wide Right-of-way to operate and maintain an 8 5/8 X 12 3/4-inch pipe-in-pipe pipeline (SN's 13386 & 13387) Western Pipeline. 16.51 miles in length, to transport bulk oil in the 8 5/8-inch pipeline and circulate 30% glycol heating fluid in the annulus from Subsea Manifold in Block 129, Mississippi Canyon Area, through Blocks 85, 84, 40, 41, in Mississippi Canyon Area, through Blocks 1003. 959, 915, 916 to A-Marlin TLP in Block 915, Viosca Knoll Area, with associated Electro/Hydraulic Umbilical (SN 13388). 16.20 miles length, from A-Marlin TLP in Block 915. Viosca Knoll Area, through Blocks 959, 1003 in Viosca Knoll Area, through Blocks 41, 40, 84, 85 in Mississippi Canyon Area to Subsea Manifold in Block 129, in Mississippi Canyon Area; one 6 7/8-inch Electro-Hydraulic Umbilical (SN 16085), 14.03 miles in length, from Well No. 5 in Block 85. Mississippi Canyon Area, through Block 41 in Mississippi Canyon Area and Blocks 1003, 959 to A-Marlin TLP in Block 915. Viosca Knoll Area; one 5 5/8-inch Electro/Hydraulic Umbilical (SN 16086), 2.52 miles in length, from D5 Well in Block 129, to Block 85, D6 Well, all in Mississippi Canyon Area; and one electro/hydraulic umbilical (SN 19420), 15.20 miles (80,250 feet) in length from Platform A in Block 915. through Blocks 959. and 1003 in Viosca Knoll Area, through Blocks 41, 40, and 84 to a SUTA in Block 85, all in Mississippi Canyon area. Assignor(s) does hereby sell, assign, transfer, and convey unto Assignee(s) the following undivided right, title and interest: Insert name and Company number of each Assignor and Assignee. Assignor(s): Percentage Interest Conveyed Freeport-McMoRan Exploration & Production LLC (03263) 1 QQO /O Assignee(s): Bureau of Safely ond twonmenlal Enforced Percentage Interest Received Anadarko US Offshore LLC (02219) R E C E I V E D 100% JAN 112017 Office of Field Operations Pipeline Section ^ I Exhibit "A," which sets forth other provisions between Assignor(s) and Assignee(s), is attached to and made a part of this assignment. For BSEE Use only - Do Not Type Below This Line UNITED STATES OF AMERICA This Assignment of Federal OCS Pipeline Right-of-Way Grant has beenfiledas of the date stamped on this document and hereby approved by the Bureau of Safety and Environmental Enforcement on the date By M(v/ ^Llftfk chief, Pipeline Section F E B 1 7 2017 ^uthorizW Official for BSEE Title Approval Date Paperwork Reduction Act of 1995 (PRA) Statement: The PRA (44 U.S.C. 3501 et seg.) requires us to inform you that we collect this information to use in the adjudication process involved in leasing and lease operations. BSEE uses the information to track ownership of leases in the Federal OCS. Responses are required to obtain or retain a benefit (43 U.S.C. 1334). Proprietary data are covered under 30 CFR 250.197. An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB Control Number. Public reporting burden of this form is estimated to average 30 minutes per response, including the time for reviewing instructions, gathering and maintaining data, and completing and reviewing the form. Direct comments regarding the burden estimate, or any other aspect of this form, to the BSEE Information Collection Clearance Officer, 381 Elden Street, Hemdon, VA 20170. BSEE FORM BSEE-0149 (August 2015 - Supersedes all previous versions ofthis form which may not be used). Page 1 of 2

Transcript of By M(v ^Llftf/ k chief, Pipeline Section ^uthorizW ... · By M(v ^Llftf/ k chief, Pipeline Section...

Page 1: By M(v ^Llftf/ k chief, Pipeline Section ^uthorizW ... · By M(v ^Llftf/ k chief, Pipeline Section FEB 1 7 2017 ^uthorizW Official for BSEE Title Approval Date Paperwork Reduction

i l . S. Department of the Interior OMB Control Number: 1014-0016 Bureau of Safety and Environmental Enforcement (BSEE) OMB Approval Expires: August 31.2018

ASSIGNMENT OF FEDERAL OCS PIPELINE RIGHT-OF-WAY GRANT

Part A; Assignment

Legal description of the Pipeline Right-of-Way Grant being assigned (Please include Segment Number and any accessory information): OCS-G 22476, A 200-foot wide Right-of-way to operate and maintain an 8 5/8 X 12 3/4-inch pipe-in-pipe pipeline (SN's 13386 & 13387) Western Pipeline. 16.51 miles in length, to transport bulk oil in the 8 5/8-inch pipeline and circulate 30% glycol heating fluid in the annulus from Subsea Manifold in Block 129, Mississippi Canyon Area, through Blocks 85, 84, 40, 41, in Mississippi Canyon Area, through Blocks 1003. 959, 915, 916 to A-Marlin TLP in Block 915, Viosca Knoll Area, with associated Electro/Hydraulic Umbilical (SN 13388). 16.20 miles length, from A-Marlin TLP in Block 915. Viosca Knoll Area, through Blocks 959, 1003 in Viosca Knoll Area, through Blocks 41, 40, 84, 85 in Mississippi Canyon Area to Subsea Manifold in Block 129, in Mississippi Canyon Area; one 6 7/8-inch Electro-Hydraulic Umbilical (SN 16085), 14.03 miles in length, from Well No. 5 in Block 85. Mississippi Canyon Area, through Block 41 in Mississippi Canyon Area and Blocks 1003, 959 to A-Marlin TLP in Block 915. Viosca Knoll Area; one 5 5/8-inch Electro/Hydraulic Umbilical (SN 16086), 2.52 miles in length, from D5 Well in Block 129, to Block 85, D6 Well, all in Mississippi Canyon Area; and one electro/hydraulic umbilical (SN 19420), 15.20 miles (80,250 feet) in length from Platform A in Block 915. through Blocks 959. and 1003 in Viosca Knoll Area, through Blocks 41, 40, and 84 to a SUTA in Block 85, all in Mississippi Canyon area.

Assignor(s) does hereby sell, assign, transfer, and convey unto Assignee(s) the following undivided right, title and interest:

Insert name and Company number of each Assignor and Assignee.

Assignor(s): Percentage Interest Conveyed

Freeport-McMoRan Exploration & Production LLC (03263) 1QQO /O

Assignee(s): Bureau of Safely ond twonmenlal Enforced Percentage Interest Received

Anadarko US Offshore LLC (02219) R E C E I V E D 100%

JAN 112017

Office of Field Operations Pipeline Section

^ I Exhibit "A," which sets forth other provisions between Assignor(s) and Assignee(s), is attached to and made a part of this assignment.

For BSEE Use only - Do Not Type Below This Line UNITED STATES OF AMERICA

This Assignment of Federal OCS Pipeline Right-of-Way Grant has been filed as of the date stamped on this document and hereby approved by the Bureau of Safety and Environmental Enforcement on the date

By M ( v / ^ L l f t f k chief, Pipeline Section F E B 1 7 2 0 1 7

^uthorizW Official for BSEE Title Approval Date

Paperwork Reduction Act of 1995 (PRA) Statement: The PRA (44 U.S.C. 3501 et seg.) requires us to inform you that we collect this information to use in the adjudication process involved in leasing and lease operations. BSEE uses the information to track ownership of leases in the Federal OCS. Responses are required to obtain or retain a benefit (43 U.S.C. 1334). Proprietary data are covered under 30 CFR 250.197. An agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB Control Number. Public reporting burden of this form is estimated to average 30 minutes per response, including the time for reviewing instructions, gathering and maintaining data, and completing and reviewing the form. Direct comments regarding the burden estimate, or any other aspect of this form, to the BSEE Information Collection Clearance Officer, 381 Elden Street, Hemdon, VA 20170.

B S E E FORM BSEE-0149 (August 2015 - Supersedes all previous versions ofthis form which may not be used). Page 1 of 2

Page 2: By M(v ^Llftf/ k chief, Pipeline Section ^uthorizW ... · By M(v ^Llftf/ k chief, Pipeline Section FEB 1 7 2017 ^uthorizW Official for BSEE Title Approval Date Paperwork Reduction

Part B - Cert i f icat ion and Acceptance

I. Assignor(s) certifies it is the owner o f the interest in the above-described Federal OCS Pipeline Right-of-Way Grant that is hereby assigned to the Assignee(s) specified above.

2. DEBARIMENT C O M P L I A N C E ; Assignee shall comply with the Department o f the Interior's nonprocurement debarment and suspension regulations as required by Subpart B of 2 CFR Part 1400 and shall communicate the requirement to comply with these regulations to persons with whom it does business related to this record title interest assignment by including this term in its contracts and transactions.

3. E O U A L OPPORTUNITY A N D A F F I R M A T I V E A C T I O N C O M P L I A N C E C E R T I F I C A T I O N : Assignor(s) and Assignee(s) certify that they are in full compliance with Equal Opportunity Executive Order 11246, as amended, and the implementing regulations at 41 CFR 60-01 - Obligations o f Contractors and Subcontractors; and 41 CFR 60-2 - Affirmative Action Programs. These requirements are for the purpose of preventing discrimination against persons on the basis of race, color, religion, sex, or national origin. These regulations have specific performance requirements.

4. Assignee's execution o f this assignment constitutes acceptance of all applicable terms, conditions, stipulations and restrictions pertaining to the right-of-way grant described herein. Applicable terms and conditions include, but are not limited to, an obligation to conduct all operations in accordance with 30 CFR 250 and 550, Subpart J and to furnish and maintain such bond(s) as may be required by the Lessor pursuant to regulations at 30 CFR 556. This assignment is subject to the Outer Continental Shelf Lands Act o f August 7, 1953, 67 Stat. 462; 43 U.S.C. 1331 etseq., as amended (the "Ac t " ) , and Assignee(s) is subject to, and must fully comply with, all applicable regulations now or to be issued under the Act. Notwithstanding any agreement between the Assignor(s) and Assignee(s), the parties' liability to the Bureau ofSafety and Environmental Enforcement is governed by 30 CFR 250.

This Assignment of Federal OCS Pipeline Right-of-Way Grant wi l l be made effective between the parties hereto as o f August 1.2016 , upon approval by the Bureau ofSafety and Environmental Enforcement, United States Department o f the

Interior.

This instrument may be executed in any number of counterparts, each o f which wi l l be deemed an original instrument, but all o f which together wi l l constitute but one and the same instrument provided. However, this instrument and any other counterpart hereof, wi l l not be binding unless and until executed by all o f the parties, and wi l l not be accepted by the Bureau ofSafety and Environmental Enforcement unless all counterparts are filed simultaneously.

I certify that the statements made herein by the undersigned are true, complete, correct to the best o f my knowledge and belief, and are made in good faith.

Title 18 U.S.C. Sec. 1001 makes it a crime for any person knowingly and wi l l fu l ly to make to any Department or agency o f the United States any false, fictitious or fraudulent statements or representations as to any matter within its jurisdiction.

ASSIGNOR F r e e p o r t . M c M o R a n Exploration & ASSIGNOR

/Productionize (Q3263)

By: y i ~ / * J / J By:

loy Execution hate Execution Date

Name: Mafk D. Kidder I W > / Name: T i t l e : / c e President / C ' T ' T i t l e :

ASSIGNEE Anadarko US Offshore LLC (02219) ASSIGNEE

By: L v » ' l ^ y — By: Name: Frank D.Meyer ^ Name:

T i t l e : Agent and Attorney-in-Fact T i t l e :

Execution Date Execution Date

Attach Notary Acknowledgement (not mandatory)

B S E E FORM BSEE-0149 (August 2015 - Supersedes all previous versions ofthis form which may not be used). Page 2 of 2

Page 3: By M(v ^Llftf/ k chief, Pipeline Section ^uthorizW ... · By M(v ^Llftf/ k chief, Pipeline Section FEB 1 7 2017 ^uthorizW Official for BSEE Title Approval Date Paperwork Reduction

133% ANADARKO US OFFSHORE LLC

January 6, 2017

1201 LAKE ROBBINS DRIVE • THE WOODLANDS, TEXAS 77380

P.O. Box 1330 • HOUSTON. TEXAS 77251-1330

OVERNIGHT MAIL-UPS Mr. Michael Saucier

Regional Supervisor

Bureau of Safety and Environmental Enforcement

1201 Elmwood Park Blvd

New Orleans LA 70123-2394

US Offshore LLC

Bureau o( Safety d EovinHinttirtal Umm (KEE)

R E C E I V E D JAN 112017

RE: Pipeline ROW Assignments and Confirmations of ROW Operatorship Office Of Field Operations Pipeline Section

Dear Mr. Saucier:

Please find enclosed with this letter triplicate originals of the documents identified below.

PROSPECT BLOCK ROW NO. INSTRUMENT PARTIES DESCRIPTION

Marlin VK914 OCS-G 28983 Pipeline Right of

Way Assignment

FMEP and AUO Segment Nos. 12757,

12758 and 12759

Marlin VK914 OCS-G 28983 Confirm ROW

Operator Letter

AUO designates

APC

Segment Nos. 12757,

12758 and 12759

Marlin VK915 OCS-G 19681 Pipeline Right of

Way Assignment

FMEP and AUO Segment No. 11765

Marlin VK915 OCS-G 19681 Confirm ROW

Operator Letter

AUO designates

APC

Segment No. 11765

Marlin VK915 OCS-G 19682 Pipeline Right of

Way Assignment

FMEP and AUO Segment No. 11766

Marlin VK915 OCS-G 19682 Confirm ROW

Operator Letter

AUO designates

APC

Segment No. 11766

Horn Mountain

MC127 OCS-G 22472 Pipeline Right of Way Assignment

FMEP and AUO Segment No. 1335,9

Horn

Mountain

MC127 OCS-G 22472 Confirm ROW

Operator Letter

AUO designates

APC

Segment No. 13359

Horn

Mountain

MC127 OCS-G 22473 Pipeline Right of

Way Assignment FMEP and AUO Segment No. 13360

Horn

Mountain

MC127 OCS-G 22473 Confirm ROW

Operator Letter

AUO designates

APC

Segment No. 13360

King MC129 OCS-G 22476 Pipeline Right of

Way Assignment

FMEP and AUO Segment Nos. 13386,

13387, 13388, 16085,

16086 and 19420 King MC129 OCS-G 22476 Confirm ROW

Operator Letter AUO designates APC

Segment Nos. 13386, 13387, 13388, 16085, 16086 and 19420

King VK915 OCS-G 22475 Pipeline Right of

Way Assignment FMEP and AUO Segment Nos. 13384,

13385 and 13884 King VK915 OCS-G 22475 Confirm ROW

Operator Letter AUO designates

APC Segment Nos. 13384,

13385 and 13884

A SUBSIDIARY O F ANADARKO PETROLEUM CORPORATION