By Add more muscle to your crew while reducing man-hours! ® EFFORTLESS LASER GUIDED RAKING.
-
Upload
janiya-peardon -
Category
Documents
-
view
213 -
download
0
Transcript of By Add more muscle to your crew while reducing man-hours! ® EFFORTLESS LASER GUIDED RAKING.
by
Add more muscle to your crewwhile reducing man-hours!
®
EFFORTLESSLASER GUIDED RAKING
S.O.D. Driving into position
1-Man Raking Crew
With 1 individual, rake more concrete in less time with no manual labor
S.O.D. Driving into position
No more physical effort raking concrete
Pushes or pulls large piles of concrete effortlessly
S.O.D. Driving into position
Plow maintains an even height of concrete
Grade is constantly maintained by laser, even on sloped pours.
Why should you consider a PowerRake®?
Yesterday you were raking concrete this way...Yesterday you were raking concrete this way...
• Hard, physical, work
• Especially in stiff slump concrete
• Requires plenty of strong men
• Labor intensive • Prone to injury and Work Comp claims
Tomorrow you could be raking concrete this way...Tomorrow you could be raking concrete this way...
• Effortless
• Much FASTER
• Much FLATTER due to laser accuracy • Significantly FEWER men and man-hours
• Virtually eliminate jobsite injuries
• Better EFFICIENCY improves PROFITS
One Man Riding on Machinedoes the work of a whole raking crew, regardless of slump!
S.O.D. Driving into position
- Quick Set Up
- Easy Operation
- Fast Learning Curve
- Faster Productivity
- Reduces Fatigue and Injuries
- Reduce Labor by 2-3 men or more
- Increased Floor Levelness Quality
- Quick Tear Down and Cleaning
FEATURES
Weight: Ground Pressure Data: 1060 lbs / 477 kg Skinny – 16.6 psi / 114 kPA Hi Floats – 2.8 psi / 19.5 kPA
Features:
- Dual Receiver Grade Control
- 18 hp twin cylinder gas engine
- High torque 4 wheel hydraulic drive with 30% faster top speed
- Articulated hydraulic steering
- Plow maintains grade via laser beam while pushing or pulling
- Spectra-Trimble SSR receivers with 1/16” internal grade adjustment
- Quick disconnect blade
- Optional sub-grade blade
- 11½” ground clearance
- Skinny tires standard High flotation tires optional
®
-3
S.O.D. Driving into position
Control Panel
PowerRake® Comparison
High Speed, 30% increase
Improves the Quality of ALL Screeding Methods
- Hand Screeding,
- Vibra Strikes®,
- Magic Screeds®,
- Truss Screeds,
- CopperHeads®,
- Laser Screeds®.
PowerRake® Preparing Sand Base
PowerRake® Preparing Stone Base
with Laser Screed®
with CopperHead®
on Tubes & Rebar
with Mini-Screed™
PowerRake® on Mesh
PowerRake® on Decks
S.O.D. Driving into position
Problems with spreading concrete… - Concrete, by its nature is heavy (1 cubic foot weights approx. 148 pounds).
- Repetitive, awkward, high force motions may eventually lead to lower back, shoulder, or wrist fatigue, pain, and / or injury.
SAFETY CONCERNS
The PowerRake® virtually eliminates all injuries, tripping, or falls related to raking concrete.
How does good body position affect productivity? - Working in a neutral body position is less tiring, less fatiguing, and safer.
- Less tired workers means more productivity.
- 5% increase in productivity equals 24 minutes per 8 hr day, yields 50% more profitability *
* Scott Humrickhouse, Director of FMIAs referenced by NIOSH Body Positioning Tip Sheet sponsored by CPWR, produced by Build It Smart, LSHFNA, LIUNA, AGC of
Washington, Univ. of Washington, Western Washington Cement Masons Training Program and the StewartPrezant Ergonomics Group.
Financing Programs AvailableCall: (906) 482-7252 www.somero.com
PowerRake-3™ $ 51,300
Spare Parts Kit, Manuals, included
Initial On-Site Training included
Destination $ 1,625
$ 52,925
Options Essential Accessories $ 1,622
Hi-Flotation Tires, Lift Harness
Convenient Accessories $ 2,430Tripod, Column Clamp, L-500 non-sloping Laser transmitter
GL-422 Dual Slope Laser $ 3,035
Note: additional training trips cost extra
Pricing shown is in US dollars and subject to change
Monthly Payments* Start At
$ 1,029
With first & last down, 60 months, 10% buy out
®
-3
Every PowerRake®-3 Optional Accessories Includes: Available:
18 hp Robin America Gas Engine Hi-Flotation Tires Spectra-Trimble SSR Laser Receivers Lifting Harness Spare Parts Kit Tripod Operator and Parts Manual Column Clamp On-Site Operator Training Laser Transmitter
1 or 2 year warranty extensions
Standard and Optional Equipment
Total peace of mind for 1 – 3 years Protect against unexpected repair costs Further complement your original factory warranty Reduce the risk and associated costs of
parts and labor Incorporate the Max Protection Plan into your financing to minimize out of pocket expense
Coverage details:
Standard 1-year manufacturer’s warranty, plus Extended warranty – additional 1 or 2 years on same components and labor
Excludes routine maintenance, physical damage, hauling or rental, and wear items such as tires, batteries, filters, lube, etc. Repairs are performed at your location by a qualified Somero Customer Service Representative Must be purchased before original factory warranty expires Applicable to the CopperHead XD-3™ and PowerRake-3™ only
Return On Investment
Conventional Method• 15,000 sq. ft.
• 10 men
• 6 hrs to place
• Quality varies
• Production varies
• Finishing time varies
• 60 total man hours @ $30/hr
• Labor Cost = $1,800
Non-Union
Labor Savings
$ 750
Before
PowerRake Method• 15,000 sq. ft.
• 7 men
• 5 hrs to place
• Consistent Quality
• Improved Production
• Decreased Finishing time
• 35 total man hours @ $30/hr
• Labor Cost = $ 1,050
After
Typical ROI
177 %with 36 uses per year
and financed for 5-years
Return On Investment
Conventional Method• 15,000 sq. ft.
• 10 men
• 6 hrs to place
• Quality varies
• Production varies
• Finishing time varies
• 60 total man hours @ $48/hr
• Labor Cost = $2,880
Union
Labor Savings
$ 1,200
Before
PowerRake Method• 15,000 sq. ft.
• 7 men
• 5 hrs to place
• Consistent Quality
• Improved Production
• Decreased Finishing time
• 35 total man hours @ $48/hr
• Labor Cost = $ 1,680
After
Typical ROI
400 %with 36 uses per year
and financed for 5-years
1. Aggressively expand your revenue opportunities
2. Labor productivity improvements
3. Lower self-performed cost of work in place efficiencies
4. Find and implement improved equipment efficiencies
Sustainability and Profitability
The Economic Reality:What Contractors Should Be Doing Now to Prepare for What’s
Nextby Scott Humrickhouse, Director of FMI
Improvement 8-Hour DayIncrease in Profitability
2% 9.6 minutes 20%
5% 24 minutes 50%
10% 48 minutes 100%
The Labor Productivity Opportunity
4 Keys To Survival
Increase Your Increase Your Competitive Competitive
Advantage in 2010!Advantage in 2010!
Greater Efficiency- Less money spent per square foot screeded- Operator and crew friendly
Increases Productivity- Screed more square feet per hour
Improves Quality- Improved FL numbers
Safer- Fewer injuries
Lowers Operating Costs- Fewer work comp claims- Less lost time- Lower insurance rates
Yields Greater Profitability- ROI’s of 150 - 600% or more