Business Risk Case Study Ba31

13
Business Risk Case Studies Ba31 Laying down the framework of a Case study Living Dangerously : Business Risk Management Series

description

This is the begining of a Case Study for the Risk analyses for the product launch for a soft drink brand shows the step by step approach analysis. It is based on predictive analysis of variance in a given Risk . Crossed 9,000+ views on slide share in the year 2009

Transcript of Business Risk Case Study Ba31

Page 1: Business Risk Case Study Ba31

Business Risk Case Studies Ba31 Laying down the framework of a Case study

Living Dangerously : Business Risk Management Series

Page 2: Business Risk Case Study Ba31

• Risk Management is not rocket science

• It is not finding the known, the unknown and the unknowable

• It is not quantifying the limitless

• It is not even, solving the Rubik’s cube

• It is at best complex predictive analytics

• It is a process of investigating, analyzing and breaking up multi-dimensional variables into linear components, and measuring, responding and mitigating the Risks.

De mystifying Risk

Page 3: Business Risk Case Study Ba31

• Risk Management by TCM is not a new Risk theory

• Risk Management by TCM is merely an innovative application of existing theories of risk to reach a desired conclusion.

• Risk management in TCM is done by goal changing.

• What was “Risk” in the classical theory is the “Risk Cause” in TCM

• What was “Risk Effect” in the classical theory is the “Risk” in the TCM

• The goal changing helps in easy measurement and quantification of Risk

• This is because the effect of any action like “price movement”, “supply delay”, “failure of quality” or “incomplete construction” can be easily recorded and measured, while the actions themselves may not be directly measurable.

• Hence Risk in TCM can be recorded and quantified.

Goal changing makes it easy to measure Risk

Page 4: Business Risk Case Study Ba31

• The “Risk Cause” is classified as “Expected” or “Unexpected” in the TCM

• Both “Expected” and “Unexpected” “Risk Cause” results in variance

• Variance is the measure of dispersion, the volatility around the mean value.

• This variance or volatility is the measure of Risk

• Since this variance happens all the time, Risk in TCM is a certainty that must be continuously measured, monitored and controlled.

Risk is the variance or volatility

Page 5: Business Risk Case Study Ba31

• To monitor and control variance or risk, the variable factors, that are likely to influence future behavior or results, are first segregated

• This segregation and data pruning is done to narrow the number of variables to a few relevant predictors based on which the risk response model is formulated on the basis of variance observed and the risk cause identified.

• Such variance based prediction models may be based on a simple linear equation or a complex neural network.

• This model is validated or even revised, periodically based on its Time Cycle Module, which could be one week for projects and once a day or hour for price movements.

• Predictive analytics used for managing risk in TCM is used in the field of marketing, CRM, IT security, engineering, meteorology, and traffic planning.

Identifying relevant predictors is the key

Page 6: Business Risk Case Study Ba31

Risk manager must have vertical knowledge

• Predictive analytics can be complex based on statistical modeling or only checklist driven, both based on user experience

• In either case the predictive analyst must have both user experience and insider knowledge of the vertical

• In both cases the model uses the same core principles of breaking complex variables into simple linear equations, and measuring the mean deviation, investigating the risk cause and planning the risk response

• For example in insurance a customer’s, gender, age, occupation, education, hobbies, and driving record are the relevant predictors that would correctly predict the risk and the value at risk VaR in any insurance policy

Page 7: Business Risk Case Study Ba31

Risk Manager must have authority

• Risk manager must have seniority, experience and authority, and need not be a statistical expert

• Risk management systems must be both dynamic and adaptive and not static. Both models and predictors must be validated regularly.

• Risk management must be treated as a routine activity, not as a one time check, with process interaction on a daily basis.

• Risk management, variance and predictive analysis were used even

before the IT age and discovery of statistical tools by using the first principles, experience and human judgment.

• The case study of the product launch of the soft drink company demonstrates how to risk manage based on first principles.

Page 8: Business Risk Case Study Ba31

Risk management in TCM Case Study includes

Laying down the framework Ba31 Identifying boundary conditions & inputs required for analysis Ba 32 Defining the time period of evaluation & repeatability checks Ba 33 Specifying the qualitative aspects and terms of reference of

acceptable variance Ba 34• Identifying the relevant predictors Ba 35 • Investigating the Risk cause Ba 36• Measuring Risk and determining the Value at Risk Ba 37• Formulating the Risk Response Ba 38• Risk margin and transferring of Risk Ba 39• Mitigating Threat by sacrificing Opportunity Ba 40

Page 9: Business Risk Case Study Ba31

Laying down the framework ( Case Study )

• Case : : Risk Measurement for the product launch of an aerated soft drink• Project Name : Zephyr

• Vertical : FMCG• Domain : Marketing & Advertisement• Deliverable : Brand launch of a new soft drink • Vehicle : Promotional campaign for the launch • Association : Taste association with Brand name• Taste : Tangy, “zyzy” taste at the tip of the tongue • Campaign : A promotional campaign to match the unforgettable zyzy” taste to create the Zephyr USP

Page 10: Business Risk Case Study Ba31

Other Terms of reference

• Product Quality : A fizzy drink blended with a salt that is mildly pungent and tickles (irritates) the skin at the tongue tip for a few minutes. A matching promotional campaign that creates the feel

• Project Cost : Launch cost USD 45 million

• Project Time : To kill point in 20 weeks

• Risk : Insignificant market response

Page 11: Business Risk Case Study Ba31

Complex operational Risk with high Risk impact

• Insignificant market response is a Risk threatening both the scope and the quality constraint of the Project. If the market response is insignificant, both the product and the project would have failed. It is the highest category of Risk in its domain equivalent to a market crash, a grid collapse or a total loss accident claim.

• Insignificant market response is an apparently non-quantify-able risk. It has no direct relation to the variables or the inputs to the project. In the next issue Ba32 in the coming week we will see how this risk is demystified and measured, and how the Risk causes are investigated.

Page 12: Business Risk Case Study Ba31

The sequel

• This slide show is a sequel to our earlier presentation• Living Dangerously : Managing Risks in Business Ba01

It is part of the Business Risk management Series Ba 01…… Others in the pipeline are

• Series on Financial risks : Fa01…Series• Series on Technology risks: Ta01…Series • Series on Career risks: Ca01…Series

Page 13: Business Risk Case Study Ba31

Reference Works

The Project Management Time Cycle – Vol. I TIME CYCLE MODULE: From concept to feasibility ISBN 1440493332 available at Amazon