Business Requirements Documentpayroll.ucop.edu/REL2012/R2052/Campus Pay Cycle Conversion... ·...

63
Page 1 Business Requirements Document SR83831Campus Pay Cycle Conversion (Generic)

Transcript of Business Requirements Documentpayroll.ucop.edu/REL2012/R2052/Campus Pay Cycle Conversion... ·...

  

Page 1  

 

 

Business Requirements Document 

SR83831‐ Campus Pay Cycle Conversion (Generic) 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

Page 2  

 

Document Information 

Document Attributes  Information 

ID  SR83831 ‐ Campus Pay Cycle Conversion (Generic)

Owner   

Author(s)  Maxine Gerber, Beth Burkart

Contributor(s)  Caroline Rider, Susan Whitney 

 

 

 

Revision History 

Version   Issue Date  Name  Changes 

1.0  3/6/12  Beth Burkart  Initial Draft based on ASUCLA version 

       

1.1  3/7/12  Beth Burkart  Added some functional requirements based on the scope/estimate document. Made some updates based on 3/7 meeting. 

1.2  4/25/12  Beth Burkart  Syncing up with other documents. 

1.3  4/27/12  Beth Burkart  Edits based on meetings with Maxine and Deb. 

1.4  5/1/12  Beth Burkart  Maxine and Caroline gave input. Accepting changes. 

1.5  5/22/12  Beth Burkart  Adding requirements from campus meeting. 

1.6  5/23/12  Beth Burkart  Continuing 1.5. 

1.7  5/29/12  Beth Burkart  Continuing requirements 

1.8  5/30/12  Beth Burkart  Continuing requirements 

1.9  6/6/12  Beth Burkart  Accepted changes. Added ASUCLA section. 

1.10  6/7/12  Beth Burkart  Accepted Caroline’s suggestions on ASUCLA section. Updated BRD according to Shaun’s feedback on issues list. 

1.11  6/19/12  Beth Burkart  Updates based on 6/8 meeting with Shaun and Pam. 

1.12  6/20/12  Beth Burkart  Accepted some changes. Prepared ASUCLA part for review. 

1.13  6/22/12  Beth Burkart  Updates to ASUCLA section following 6/21 conference call. 

1.14  6/26/12  Beth Burkart  Updates based on 6/25 meeting with Shaun and Pam. 

1.15  7/10/12  Beth Burkart  Started UCB‐specific attachment. Added to ASUCLA attachment. 

  

Page 3  

1.16  7/11/12  Beth Burkart  Some updates to ASUCLA attachment. 

1.17  7/17/12  Beth Burkart  Updated based on 7/16 meeting. 

1.18  7/18/12  Beth Burkart  Updated functional requirements. 

1.19  7/20/12  Beth Burkart  Updated functional requirements. 

1.20  7/23/12  Beth Burkart  Few updates following 7/23 meeting 

1.21  7/24/12  Beth Burkart  Numbering issues on the functional requirements. 

1.22  7/25/12  Beth Burkart  Minor edits to first part of doc and functional requirements. Re‐worded and reorganized some requirements. 

1.23  7/31/12  Beth Burkart  Made some changes while reviewing with Caroline. 

1.24  8/1/12  Beth Burkart  Document clean‐up for review.

1.25  8/2/12  Beth Burkart  RASCI; added UCSC details from Tamara’s note. 

1.26  8/6/12  Beth Burkart  Updates based on 8/6 BRD review. 

1.27  8/7/12  Beth Burkart  Continued BRD review meeting changes. 

1.28  8/8/12  Beth Burkart  Accepted tracked changes on ASUCLA att. 

1.29  8/9/12  Beth Burkart  Modified the reporting requirements. 

1.30  8/22/12  Beth Burkart  Updated 1.2.3 per Shaun’s suggestion. 

1.31  8/24/12  Beth Burkart  Updates based on review feedback. 

1.32  8/27/12  Beth Burkart  Updated UCSC attachment based on meeting with Tamara. 

1.33  8/28/12  Beth Burkart  Updated UCSC attachment. 

1.34  9/4/12  Beth Burkart  ASUCLA attachment 

1.35  9/5/12  Beth Burkart  Updated UCSC requirements about WOS. 

1.36  9/20/12  Beth Burkart  UCB Attachment. Removed Requirement 46 at UCB’s request. 

1.37  9/24/12  Beth Burkart  UCB Attachment – updates based on 9/20 meeting with UCB. 

1.38  9/24/12  Beth Burkart  UCSC attachment – accepted tracked changes. 

1.39  10/3/12  Beth Burkart  Campus‐specific attachments. (Irvine) 

1.40  10/8/12  Beth Burkart  Campus‐specific attachments (Irvine, Davis, San Diego). Few changes based on QA questions. 

1.41  10/9/12  Beth Burkart  Campus‐specific attachments (San Diego, UCR,SB). Edits with Caroline. 

1.42  10/10/12  Beth Burkart  Updates to attachments with Caroline. Updated 5.12 and R0023 – by agreements are an exception. 

1.43  10/15/12  Beth Burkart  Changed handling of WOS based on advice from Caroline. 

1.44  10/16/12  Beth Burkart  Modified San Diego attachment after meeting. 

  

Page 4  

1.45  10/17/12  Beth Burkart  Irvine attachment 

1.46  10/18/12  Beth Burkart  Santa Barbara attachment. Added SB approvers. 

1.47  10/22/12  Susan Whitney  Irvine attachment. Added approvers and approval dates.  Added comment from Carolyn Murry [cm5]. Davis attachment.  Added approvers. Updates from 10/19 Campus Requirements session. 

1.48  10/23/12  Susan Whitney  Riverside attachment H.  Updates from 10/23 Campus Requirements session.  

1.49  10/26/12  Susan Whitney  Berkeley attachment C.  Updates from 10/25 campus meeting. 

1.50  10/30/12  Susan Whitney  San Diego attachment G.  Updates from UCSD Comments dated 10/23/12.  SD approval. 

1.51  10/31/12  Susan Whitney  Riverside added approvers.

1.52  11/2/12  Beth Burkart  Gabe approved for Riverside. Accepted some tracked changes. 

1.53  11/21/12  Susan Whitney  Berkeley updates: Berkeley approved as of 10/31/12.  Readers and Tutors will not be converted to BW, will stay on MO. 

1.54  11/27/12  Beth Burkart  Modified SB.R0010 per Santa Barbara’s request. Added Grant’s approval of Riverside attachment per Susan’s email of 11/20. 

1.55  12/6/12  Susan Whitney  Davis approved. Santa Barbara approved. 

1.56  12/10/12  Beth Burkart  Accepted changes and removed draft watermark. 

1.57  12/17/12  Beth Burkart  Added Implementation Deadline and SR number. 

 

 

Document Approvals 

Role  Name  Signature  Date 

Functional Lead  Shaun Ruiz  Sent by email  08/20/12 

Functional Lead  Pamela Heintzleman  Sent by email  08/20/12 

PPS Application Lead  Carrie Gatlin  Sent by email  08/19/12 

 

 

  

Page 5  

 

Table of Contents 

1  Overview ........................................................................................................................................................... 6 

2  Product/Solution Scope ................................................................................................................................... 10 

3  Risks ................................................................................................................................................................ 14 

4  Business Services and Processes ...................................................................................................................... 14 

5  Business Rules ................................................................................................................................................. 15 

6  Business Requirements ................................................................................................................................... 17 

7  Non‐Functional Requirements ..................................................................................................................... 3130 

8  External References ..................................................................................................................................... 3130 

9  Attachment A: Campus Pay Cycle Conversions ............................................................................................ 3231 

10  Attachment B: ASUCLA Campus‐Specific Requirements .............................................................................. 3433 

11  Attachment C: UCB Campus‐Specific Requirements .................................................................................... 4140 

12  Attachment D: UCSC Campus‐Specific Requirements .................................................................................. 4645 

13  Attachment E: Irvine Campus‐Specific Requirements .................................................................................. 5150 

14  Attachment F: Davis Campus‐Specific Requirements ................................................................................... 5352 

15  Attachment G: San Diego Campus‐Specific Requirements ........................................................................... 5554 

16  Attachment H: Riverside Campus‐Specific Requirements ............................................................................ 5857 

17  Attachment I: Santa Barbara Campus‐Specific Requirements ...................................................................... 6160 

 

 

  

Page 6  

1 Overview PeopleSoft only supports two pay cycles: monthly (for exempt employees) and biweekly (for non‐

exempt employees). Currently, campuses run a variety of cycles, without a standard configuration. 

Cycles currently in use are MA (Monthly Arrears), SM (Semi‐monthly), MO (monthly) and BW (Biweekly).  

In preparation for conversion to PeopleSoft, locations will standardize to MO and BW. Generally, 

exempt employees will be paid on the MO cycle and non‐exempt employees on the BW cycle. Some 

conversion activities will be required for all locations. Locations may require changes at various levels: 

System‐level changes will be needed if the location is not currently running both MO and BW 

cycles and to eliminate MA and SM cycles. 

Employee appointment‐level changes will be needed to convert the employee appointments to 

the appropriate cycle.  

Each location will need to be examined on an individual basis, as there are various situations. For 

example, all ASUCLA employees are currently paid on the SM cycle. In preparation for the transition to 

the PeopleSoft HCM payroll system, ASUCLA will convert its PPS Semi‐Monthly exempt employees to the 

Monthly payroll cycle and their non‐exempt employees to Biweekly. 

1.1 Background  

1.2 Objectives 

1.2.1   Current Process Control tables (System Calendar, System Parameter, Leave Accrual, GTN, DET, and Federal and State tax) 

at each location may currently reflect only the pay cycles that location is currently running.  

There are currently four different pay schedules UC employees can be assigned: SM, MA, BW and MO. 

Each location runs one or more of these cycles. Even for locations currently running BW and MO, pay 

schedule assignments might not be aligned with the business rules for UC Path. 

Production Jobstreams for each campus reflect the cycles that campus currently runs. 

1.2.2  Proposed Process  System Calendar, System Parameter, Leave Accrual, GTN, DET, and Federal and State tax control 

tables will need to be updated to align with the standard cycles that will be used going forward. 

A process should be developed to convert employee appointments from one cycle to another as 

needed. For example, for locations converting employees from SM to BW, all current SM 

appointments should be ended and new BW appointments created. 

  

Page 7  

Jobstream JCL should be added for each new cycle. 

Jobstream JCL should be removed for each cycle being eliminated. 

1.2.3  Deadline and Timing Information This release is Date Mandated.  The effective dates for the conversion are 01/20/2013 for employees 

moving to the BW pay cycle from the MO, MA, and SM pay cycles, and 02/01/2013 for employees 

moving to the MO pay cycle from the MA.  The employees must be converted after the January 2013 

RX/TX salary increases have been implemented and prior to the computes for the MO, MA, and SM pay 

cycles ending 01/31/2013 and prior to the compute for the BW pay cycle ending 02/02/2013. 

This conversion must be completed before the location begins parallel testing prior to its conversion 

to the PeopleSoft system. Note: a decision has been made that all in‐scope campuses must perform 

their pay cycle conversions by the end of January, 2013. 

It is recommended that the conversion begins with the first biweekly payroll with a pay cycle end 

date in a given month to ensure that deductions are taken correctly, and that the cycle is a B1 cycle 

to reduce negative impacts on leave accruals.   

It is recommended that campuses converting to BW utilize the standard BW schedule that is 

currently used by all BW locations except SF (UCSF uses the alternate BW schedule) 

Generally, the conversion should occur at a time when the old and new cycles have the same (or 

approximately the same) pay period begin dates. Timing considerations will vary depending on each 

location’s situation.  For example, the only cycles which meet those criteria in 2012 are: 

o SM/MO/MA beginning 4/01, BW beginning 4/01 – an exact match, but the BW is a B2 on the 

standard calendar (B1 on the alternative calendar), which may be an issue for leave accrual. 

o SM/MO/MA beginning 9/01, BW beginning 9/02 – a gap of one day (on a weekend), and the 

BW is a B1 on the standard calendar. 

o SM/MO/MA beginning 10/01, BW beginning 9/30.  ‐although not an exact match, 9/29 and 

9/30 are on a weekend, so the overlap should be acceptable.   

1.2.3.1 If the Pay Cycle Begin Dates Do Not Coincide If it is not possible to do the conversion during one of the coinciding cycles, the campus will have 

responsibilities for various decisions and activities related to the overlapping pay cycles. 

Determining which cycle will be "partial" in the case of SM/MO/MA to BW conversion 

When the biweekly and semi‐monthly or monthly pay period begin dates do not coincide, then there 

will be days which are part of both pay periods. One of the overlapping cycles must be designated as 

"partial", ie. it will not include the overlapping days. Things to consider in this decision are: 

  

Page 8  

Employees will receive a smaller paycheck in one cycle and may have to wait a longer time for the next check than usual, depending on the calendar. 

The first Biweekly cycle must not end in the same month as the last semi‐monthly cycle, or the results will be unpredictable and require significant manual adjustment. 

There may be more leave accrual issues if the partial is a Biweekly; see below. 

Campuses that have a lot of movement of employees between MO or MA and Biweekly positions may have additional insight.  

Entry of Time for Positive Time Employees 

Time for the overlapping days must be entered only into the complete cycle, not into the partial cycle. 

 

Modifying Appointments and Distributions for Exception Time Employees 

The end‐date of exception time distributions must be set based on the ending and beginning of the full 

and partial cycles, so that there are no overlapping days in an employee's appointments and 

distributions.  (The end and begin dates for all employees must be set so there’s no overlap, but it will 

be more of an issue for incorrect pay if it’s not done that way with exception time employees.) 

 

Deduction Processing Issue 

Deduction processing may be disrupted, especially for deductions that are taken either completely or in 

part/half from the first BW pay period that ends in a month (and note that the first BW isn’t necessarily 

the B1 – what matters for deduction purposes is that it’s the BW ending on or before the 14th). 

If earnings are too small in an employee’s first BW compute, deductions may suspend and be taken on the next BW compute. 

 Leave Accrual Issue 

In the "partial" pay cycle, employees who should be eligible for leave accrual may not be because of 

hours worked thresholds. Some bargaining units may have a requirement that the employee must have 

worked 50% of the pay period hours to be eligible to accrue leave. Their leave accrual may need to be 

adjusted via leave accrual pay transactions. (Testing is needed to confirm this assumption.) 

 

 A one‐time program could be developed to report on employees who did not receive leave accrual, but 

the entry of the adjustments will be the campus' responsibility. For example, for the SM/MO/MA to BW 

conversion: 

Leave accrual occurs only on a B2 cycle, and is based on hours for the B2 and the prior B1. (Note that the B2 may or may not be the second BW pay period that ends in a month – what matters for leave accrual purposes is that it is called the B2 cycle). 

If the partial cycle is a B1, there may be fewer threshold issues. 

If the partial cycle is a B2, there may be more threshold issues. 

If the partial cycle is SM/MO/MA, there may be fewer threshold issues. 

1.2.4  Appointment/Distribution Considerations The conversion process should consider the following items when ending the current appointments and 

distributions and creating the new appointments and distributions.  In general, the new appointments 

  

Page 9  

and distributions will be copied from the current appointments and distributions.  If the current 

appointment has future distributions, the future distributions must be copied to the new appointment 

and should be end dated in the old appointment.  If the employee has future appointments, the future 

appointments (and the associated distributions) can be changed in place.  All conversions should be 

done in accordance with the salary plans for UCPath. 

When a current appointment/distribution is copied to a new appointment/distribution, the new 

appointment/distribution begin date will be set to the effective date of the conversion, and the 

existing appointment/distribution end date will be set to one day prior. 

The new appointment must have the new pay cycle. 

If the rate will be changing (say, from a monthly rate to an hourly or biweekly rate), the new 

appointment may need a new rate code and the new distributions must have the new rates.  

Note that this applies to by‐agreement rates as well. 

 

1.3  Related Projects & Dependencies  Possible changes to the UCOP Corporate applications, such as CPS. 

Banking systems (ACH) 

Campus general ledger 

Campus HRIS 

Other campus systems and reporting 

1.4 Stakeholders  

Acronym  Description  Role 

*  Authorize  Has ultimate signing authority for any changes to the document

R  Responsible  Responsible for creating this document

A  Accountable Accountable for accuracy of this document (e.g. project manager)

S  Supports Provides supporting services in the production of this document

C  Consulted Provides input 

I  Informed Must be informed of any changes

 

 

Name  Position  * R A S C I

Randy Wilson  Project sponsor  X X

  

Page 10  

Carrie Gatlin  Project owner          X  X 

Stacey Johnson  Project participant      X       

Bob Franks  Project participant          X  X 

Mary Ann Gohl  Project participant          X  X 

Christopher Scott  Project participant          X  X 

Bea Deering  Project manager          X  X 

Deb Hill  Project manager            X 

Shaun Ruiz  Functional Lead  X    X  X  X  X 

Caroline Rider  Sr. Analyst      X    X  X 

Maxine Gerber  Sr. Analyst      X    X  X 

Beth Burkart  Business Analyst    X        X 

Pamela Heintzleman  Functional Lead  X    X  X  X  X 

 

1.5 Glossary  Term  Description 

UCOP  University of California Office of the President 

ITS  Information Technology Services 

MO  Monthly 

MA  Monthly Arrears 

SM  Semi‐Monthly 

BW  Biweekly 

Biweekly Rate  This is a per‐pay period rate; the amount the employee would be paid every two weeks. For example, some medical centers have exempt employees with a Biweekly rate. 

Conversion Effective Date 

The “effective date” of the pay cycle conversion. This will be used to determine if an appointment or distribution is current, future or expired.  

Current  Current appointments and distributions have a begin date that is before the conversion effective date and an end date that is on or after the conversion effective date.  

Future  Future appointments and distributions have a begin date that is on or after the conversion effective date.  

Expired  Expired appointments and distributions have an end date that is before the conversion effective date 

 

2 Product/Solution Scope 

2.1 Included in Scope 

See Attachment A for list of campuses and pay cycles 

  

Page 11  

PPS Changes 

Campuses in scope: 

Davis 

San Diego 

Irvine 

Riverside 

Santa Cruz 

Santa Barbara 

ASUCLA 

Berkeley  

Employee appointments that currently have a schedule of MA or MO are in scope for the system‐wide 

one‐time appointment pay cycle conversion process. Since they are in scope, they will be examined to 

see if they meet the criteria for pay cycle conversion. 

BW non‐exempt appointments that do not currently have an hourly rate may be in scope (to be 

evaluated for each campus). 

Current and Future appointments and distributions are in scope. 

All employee status codes are in scope. 

 

2.2 Excluded from Scope  Updates to local and corporate interfaces and systems 

The following campuses are out of scope, since they have already embarked on their own 

conversions: 

o UCLA 

o UCOP 

o UC Merced 

o UCSF 

  

Page 12  

Past/expired appointments and distributions are outside the scope of the one‐time process. 

Exempt salaried employee appointments that currently have a schedule of BW are outside the scope of 

the one‐time conversion process. 

The system‐wide generic one‐time process will not address existing SM employee appointments. The 

only campuses currently running SM cycles are UCB and ASUCLA. UCB plans to do their conversions in 

their HRIS and ASUCLA will have a custom one‐time process, since their conversion needs are different.  

2.3 Assumptions & Constraints 1. It is essential that all campuses convert to the two recommended pay cycles prior to parallel 

testing with PeopleSoft. 

2. One goal of this pay cycle conversion effort is to align employee appointment and distribution 

data as closely as possible with how the employees will be set up in PeopleSoft, in order to 

minimize disruption to the employees and make parallel testing smoother.   

3. It is recommended that pay cycle conversions (e.g., from MA to BW) be completed during one of 

the windows during which the payroll cycles coincide.  

4. Every employee in the EDB with a pay cycle of SM or MA should be examined. All of their 

current and future appointments (and current and future distributions) must be converted to 

either MO or BW. (Note: SM applies to ASUCLA and UCB, which will have unique one‐time 

processes.) 

5. Every employee in the EDB with a pay cycle of MO should be examined. Some employees’ 

current and future appointments (and current and future distributions) should be converted to 

BW as applicable, based on the business rules. 

6. Since the one‐time process will not be sensitive to employee status, even separated employees 

will be examined. This will capture rehired employees with future hire date and future 

appointments that may need to be converted. 

7. The one‐time process should round up every time a new rate is calculated, so as not to 

disadvantage the employee. These calculations and rounding rules would be applied when a 

monthly rate involving a non‐step‐based title is converted to an hourly rate or vice versa.  

8. The one‐time conversion process should not convert time reporting codes (positive, exception 

time designation). This is being addressed with local modifications. 

9. Extensive QA and UAT will be needed to ensure that table updates and one‐time conversions 

are accurate.  

10. The project team should consult with UCOP Human Resources regarding personnel policy. 

  

Page 13  

11. Communication with the labor unions must be done in a timely manner to avoid grievances. The 

project team will coordinate with the campus to verify. 

12. Sufficient communication and training must be provided to employees and the payroll office. 

The project team will coordinate with the campus to verify. 

13. The project team will coordinate with UCOP corporate systems, such as CPS, to ensure that any 

required changes are completed. 

14. This BRD does not address the specific requirements for changes to local or corporate systems. 

15. Requirements may be different if PPS is not the source of record for appointment and 

distribution data. Some campuses (e.g., UCB) may enter appointments and distributions in an 

HCM (PeopleSoft Human Capital Management). If this is the case, the appointment‐level 

changes will be done on the HCM side. The HRIS will then generate EDB update transactions for 

PPS. 

16. The local HRIS must be able to handle any new monthly and biweekly pay cycle(s). The project 

team will coordinate with the campus to verify. 

17. The local general ledger system must be able to process Biweekly financial accruals. The project 

team will coordinate with the campus to verify. 

18. All local reporting must be reviewed for impact. The project team will coordinate with the 

campus to address any issues with campus systems and reporting. 

19. The campus must update and re‐issue processing calendars. 

20. Health and Welfare deductions for employees on Biweekly must be split across the first two 

Biweekly cycles in the month. 

21. Conversion should take into account the fact that campuses have various practices with regard 

to flat dollar amounts/by agreements/stipends. Some put these distributions under the primary 

appointment, so an appointment can contain distributions for REG and flat dollar amounts. 

Others may create a separate appointment, e.g., for a Stipend. These flat dollar amounts should 

be converted according to the conversion rules for regular distributions. 

22. Shift differential rate conversions should follow the same rules as regular rate conversions. 

  

Page 14  

2.4 Outstanding Items  

ID  Description

2.4.1   

3 Risks  All pay transactions that have been scheduled for a future cycle (e.g. MA) would be flushed if 

that cycle type were removed from PPS. 

o Steps should be taken to avoid scheduling of pay transactions on cycles that are being 

eliminated after a specific date (dependent on conversion timing) 

o Steps should be taken to avoid setting up new appointments in the EDB on cycles that 

are being eliminated after a specific date (dependent on conversion timing)  

Incorrect conversion or inappropriate timing could result in incorrect or no pay to the employee. 

 

4 Business Services and Processes n/a 

  

Page 15  

5 Business Rules UC Process Standard Pay Cycles document 

5.1  SM and MA pay cycles will be eliminated. All employees on SM and MA cycles must be 

converted to either MO or BW (the two standard pay cycles).  

5.2  Employees with all medical center appointments should be bypassed by the conversion 

process. 

5.3  Some employees may have a mix of medical center and non‐medical center 

appointments. The non‐medical center appointment(s) can be converted to BW if 

appropriate.  

However, the non‐medical center appointment(s) should not be converted to MO. If, 

according to the business rules, it should be converted to MO, this condition should be 

reported and the pay cycle should not be converted. 

5.4  Some employees may have a mix of campus and medical center distributions under a 

single appointment. This condition should be reported and pay cycle conversion should 

not occur. 

5.5  All non‐exempt SM, MA or MO employee appointments will be converted to BW.   

5.6  All non‐exempt appointments being converted to BW should have an hourly rate. This 

may require some rate conversions. 

Exception: a BYA non‐exempt appointment is an exception; monthly by‐agreement 

rates that are being converted to BW will be converted to a biweekly amount, not an 

hourly amount. 

5.7  Monthly Exempt (MO, MA) hourly‐rated employees should be converted to BW hourly. 

5.8  All SM or MA academic appointments (except readers and tutors) should be converted 

to MO. 

5.9  Exempt SM or MA campus (not med center) non‐academic employees who are not

hourly‐rated should be converted to the MO pay schedule.  

(Note that the SM cycle is run only at UCB and ASUCLA. Neither will utilize the system‐

wide one‐time process.) 

5.10  Employees converted to the MO cycle by the one‐time process must not have an 

hourly rate.  

  

Page 16  

5.11  An employee who holds both a non‐exempt and an exempt position, e.g., staff non‐

exempt plus lecturer, will be handled manually and should not be modified by the 

automated pay cycle conversion one‐time process. 

Possible exception: If the exempt appointment is BW (e.g., a reader or a tutor) then the 

process should go ahead and convert the non‐exempt appointment to BW. 

5.12  Existing BW non‐exempt employees that do not have an hourly rate should be 

converted to an hourly rate. Note: By Agreement is an exception to this business rule. 

5.13  Existing BW salaried exempt employees should not be converted by the one‐time 

process.  

5.14  Existing BW reader and tutor appointments should not be converted.  

5.15  Existing SM or MA hourly reader and tutor appointments will be converted to BW.  

5.16  Existing MO readers and tutors should be reported and NOT converted. It is up to the 

campuses to decide how MO readers and tutors should be handled. 

5.17  The FLSA code on the appointment (EDB2005) will determine if an employee’s 

appointment is exempt or non‐exempt.  

5.18  WOS appointments with pay schedules other than MO, BW or blank should be 

converted to a blank pay schedule. 

5.19  Some appointments may contain both “without salary” distributions and paying 

distributions. If this kind of appointment is being converted, ALL distributions must be 

converted.  

5.20  Approach for pay rate conversion (Step‐based titles): 

For step‐based appointments, the program will search the PPS Title Code Table for a 

match on the existing rate. If a match is found, the program will select the appropriate 

hourly, monthly, or biweekly rate for the step. If no match is found on the TCT, the 

employee appointment and distribution data will be recorded on an exception report 

for follow up. The program will not convert this record. 

5.21  Approach for pay rate conversion (Grade/Open‐range titles): 

In cases where the distribution pay rate must be converted, the program will calculate 

by agreement amounts per defined business rules. In addition, the program will 

calculate distribution hourly rates and pay period amounts for appointments where 

the Title Code (TC/sub‐location/TUC/REP) is grade or open‐range based. 

  

Page 17  

 

5.22  To convert monthly rate (MO or MA) to hourly for non‐step‐based titles: monthly 

salary X 12 divided by 2088. Always round up. 

Example: If a $3000 monthly rate is converted to hourly: 3000 * 12 / 2088 = 17.2413, 

which should be rounded to 17.25. 

5.23  To convert BW to hourly for non‐step‐based titles: BW salary divided by 80 

Example of BW rate to hourly rate:  

BW rate of $4,333.15 / 80 = hourly rate of $54.1700 (54.1643 rounded up) 

5.24  To convert hourly to MO for non‐step‐based titles: hourly rate X 2088 divided by 12 

Example of Hourly rate to monthly rate where only two significant digits on the hourly 

rate: 

hourly rate of $21.2300 X 2088 / 12 = $3694.02 

Hourly rate to monthly rate (in case there happened to be more than two significant 

digits on the hourly rate):  

hourly rate of $21.1615 X 2088 / 12 = $3,682.11 (rounded up from 3682.101) 

5.25  To convert monthly to BW for non‐step‐based titles: monthly rate X 12, divided by 26. 

Always round up. Example of Monthly by agreement to BW by agreement (or regular 

rate):  

monthly of $5,000.00 X 12 / 26 = $2,307.70 (rounded up from 2307.6923) 

5.26  Always round up when calculating a new rate for non‐step‐based titles.

Always round to two decimals for hourly and BW. Monthly rates: rounded to two 

decimals, and rounded up. 

6 Business Requirements  

6.1 User Requirements  Campuses need to be able to use the one‐time process to convert different populations 

separately. 

  

Page 18  

Campuses want to see a list of the employees who are being converted, by home department. 

The “1800” report will not meet their needs. 

Campuses need to be able to specify a “conversion effective date” when they run the one‐time 

process. 

Pay cycle conversion plans must minimize rework and interruption to the current pay cycles. 

Campuses have a variety of ways of defining “medical center” and the one‐time process must 

accommodate this. 

 

6.2 Functional Requirements Req ID  Requirement Type  Requirement Description  Priority 

[L/M/H] Comments 

R0001  One‐Time Process  Develop a one‐time process that can be used by all in‐scope sites (excluding UCB and ASUCLA) to convert appointments to the standard schedules of BW and MO.   For example, existing current MA appointments should be ended and new monthly (MO) or Biweekly (BW) appointments should be created.   Some existing non‐exempt employees will need to convert from MO to BW, based on the business rules. 

H    

R0002  One‐time Process  The one‐time process should generate transactions that will be used to update the EDB. 

H

R0003  One‐time Process  The one‐time process should be able to be run multiple times as needed to meet each location’s business needs.  

H  Campuses should be able to group employees by current pay cycle and other attributes.  

R0004  One‐time Process  The one‐time process should be able to convert the pay cycles of specific populations that can be identified using PPS attributes. 

H  Need input from campuses on what groupings they need. 

R0005  One‐time process  The campus should be able to specify at runtime a “conversion effective 

H   

  

Page 19  

Req ID  Requirement Type  Requirement Description  Priority [L/M/H] 

Comments 

date” for the particular run. 

R0006  One‐time process  Conversion of current, future, and expired appointments and distributions should be handled in different ways.  

H See Glossary for definitions of current, future, and expired. 

R0007  One‐time process  When a population is converted, all current and future appointments and their distributions should be examined to see if they meet the criteria for pay cycle conversion. 

H

R0008  One‐time process  The one‐time process should ignore expired appointments and distributions  

H  Bypass them; do not convert them. 

R0009  One‐time Process  Future appointments can be converted in place rather than being replicated.   Changes to future appointments may include: 

appointment‐level pay schedule 

rate code (as needed)  

distribution‐level rate for the associated distributions (as needed) 

H

R0010  One‐time Process  Appointments with APPOINTMENT WITHOUT SALARY INDICATOR (EDB2028) = “Y” should be examined to see if conversion is needed.   “Without salary” appointments containing only “without salary” distributions should be ignored and not converted. 

“Without Salary” distributions are identified by a list of specific DOS codes: o WOS o others 

H Note that there is also an employee level WOS indicator. The one‐time process should NOT include any logic regarding the employee‐level WOS indicator. Instead, it should examine the appointments.  

R0011  One‐time Process  WOS appointments with pay 

schedules other than MO, BW or blank 

should be converted to a blank pay 

H   

  

Page 20  

Req ID  Requirement Type  Requirement Description  Priority [L/M/H] 

Comments 

schedule. 

R0012  One‐time Process  Non‐exempt campus MA appointments should be converted to BW.   (Campus implies non‐medical center)   

H  Includes current and future appointments.  Appointment‐level FLSA EDB2005 = “0” indicates non‐exempt 

R0013  One‐time Process  Monthly (MA, MO) exempt employees with an hourly rate should be converted to BW. 

H   

R0014  One‐time Process  MA campus (non‐medical center) appointments for the following population should be converted to MO:  

Non‐academic exempt salaried appointment, defined as: o Appointment‐level FLSA 

EDB2005 = “1” o Personnel program EDB2007 

NOT = “A” o Rate code not “H” 

 

H  Includes current and future appointments 

R0015  One‐time Process  MA campus (non‐medical center) appointments for the following population should be converted to MO:  

Academic appointment that is NOT a reader and NOT a tutor  o Academic appointment is 

defined as Personnel program EDB2007 = “A” 

o Can be exempt or non‐exempt (has any appointment‐level FLSA code)  

  

 

H  Includes current and future appointments.   There is a need to identify ahead of time the academic personnel going from MA to MO. Academic Personnel will need to know.  Readers and tutors are in the following title 

  

Page 21  

Req ID  Requirement Type  Requirement Description  Priority [L/M/H] 

Comments 

codes:  Reader title codes:  2850, 2851, 2854, 2855, 2500, and 2520.   Tutor title codes:  2860, 2861, 2862, 2863, 2510, and 2521.   Remedial Tutor title codes:  2270, 2271, 2272, 2273, 2280, 2288, 2289, and 2290. 

R0016  One‐time Process  MA Readers and tutors should be 

converted to BW, regardless of their 

FLSA (exempt/non‐exempt) status.  

Title codes for readers and tutors: 

Reader title codes:  2850, 2851, 

2854, 2855, 2500, and 2520.  

Tutor title codes:  2860, 2861, 

2862, 2863, 2510, and 2521.     

Remedial Tutor title code:  2270, 

2271, 2272, 2273, 2280, 2288, 

2289, and 2290. 

H  Readers and tutors are an exception.   They should be BW because they are hourly‐rated, even though they are considered FLSA exempt.  

R0017  One‐time Process  Readers and tutors who are currently on MO should be reported and should NOT be converted. 

H   

R0018  One‐time Process  MO non‐exempt campusappointments should be converted to BW. (Campus implies non‐medical center)   

H Includes current and future appointments.  Appointment‐level FLSA 

  

Page 22  

Req ID  Requirement Type  Requirement Description  Priority [L/M/H] 

Comments 

  

EDB2005 = “0” indicates non‐exempt 

R0019  One‐time Process  Employees with ONLY medical center 

appointments should be bypassed by 

the one‐time process. 

Note that the only in‐scope campuses 

with medical centers are Davis, Irvine 

and San Diego. 

H  Campuses define med center in various ways. Need to be able to vary this by campus.  

Irvine uses fund number 63000 funds 

 Davis has H in FAU location code – H for hospital funding.  

San Diego uses local Fund range 63000A‐639999.  

R0020  One‐time Process  For employees with appointments 

both at the medical center and the 

campus: 

If the business rules indicate that 

their non‐medical center 

appointment(s) should be 

converted to BW, then this 

conversion should be done 

If the business rules indicate that 

their non‐medical center 

appointment(s) should be 

converted to MO, then this should 

be reported and NO conversion 

should take place. 

H Their non‐medical center appointment(s) should NOT be converted to MO.  It can be converted to BW because then all of their appointments would be consistent. 

R0021  One‐time Process  Appointments with distributions at 

both campus and medical center who 

H   

  

Page 23  

Req ID  Requirement Type  Requirement Description  Priority [L/M/H] 

Comments 

are not already BW should be 

reported and not converted. 

R0022  One‐time Process  All non‐exempt appointments converted to BW must have an hourly rate.    Exception: a BYA non‐exempt appointment is an exception; monthly by‐agreement rates that are being converted to BW will be converted to a biweekly amount, not an hourly amount. 

H   

R0023  One‐time Process  BW non‐exempt employees who do 

not already have an hourly rate should 

be converted to an hourly rate.  

Note: This does not apply to by 

agreement. The one‐time process 

should not convert any by agreement 

to hourly. 

H  Currently on BW 

R0024  One‐time Process  BW Reader and Tutor appointments 

should be bypassed and not 

converted.  

H  Currently on BW. 

R0025  One‐time Process  Rate conversion strategy:  The process should calculate distribution hourly rates and pay period amounts for appointments where the Title Code (TC/sub‐location/TUC/REP) is grade or open‐range based or if it is a by agreement amount or a shift differential. 

 

H   

R0026  One‐time Process  For step‐based appointments, the process should search the PPS Title Code Table for a match on the existing rate.  

If a match is found, the process should select the appropriate hourly, monthly, or biweekly rate for the step.  

H   

  

Page 24  

Req ID  Requirement Type  Requirement Description  Priority [L/M/H] 

Comments 

If no match is found on the TCT, the employee appointment and distribution data will be recorded on an exception report for follow up. The process will not convert this record. 

R0027  One‐time Process  When new rates must be calculated during conversion, calculations should be performed according to the Business rules section. 

H   

R0028  One‐time Process  The one‐time process should not touch the existing BW salaried exempt population. 

H   

R0029  One‐time Process  When an appointment is converted from MA to MO:  

The rate code and the distribution‐level rate should not require any changes. 

 

H   

R0030  One‐time Process  When a current appointment is converted to a new pay schedule, the appointment should be replicated to a new appointment before that current appointment is ended.   The new appointment should be given an appointment number that is not already in use for that employee. 

H   

R0031  One‐time Process  Exception: An employee with more than four current appointments that need to be converted should not be handled by the automated one‐time process. Instead, they should appear on a report so the conversion can be processed manually. 

H  The exception is due to the limit of nine appointments per employee. 

R0032  One‐time Process  When a current appointment is converted: 

The end date of the original (existing) appointment should be changed to one day prior to the 

H  Copy existing appointment to a new appointment, and end the 

  

Page 25  

Req ID  Requirement Type  Requirement Description  Priority [L/M/H] 

Comments 

conversion effective date.

The begin date of the new appointment should equal the conversion effective date. 

The end date of the new appointment should equal the end date of the original (existing) appointment. 

existing appointment. 

R0033  One‐time Process  When a current appointment is converted, all of its current and future distributions should be copied to the new appointment and then ended.   Distribution numbers should be created in sequence with the new Appointment (e.g. new Appt. = 30, new Dist. = 31). 

H   

R0034  One‐time Process  When ending a current distribution on an existing appointment:  

The end date should be one day before the conversion effective date.  

 

H   

R0035  One‐time Process  When ending a future distribution on an existing appointment:  The future distribution should be ended one day prior to the effective date of the conversion, just as the current distribution is. 

H   

R0036  One‐time Process  When a current distribution is copied to a new appointment:  

Its begin date should be the conversion effective date. The end date from the original distribution should be retained.  

H   

R0037  One‐time Process  When a future distribution is copied to a new appointment:  The distribution begin and end dates should be retained when the distribution is copied to the new 

H   

  

Page 26  

Req ID  Requirement Type  Requirement Description  Priority [L/M/H] 

Comments 

distribution. 

R0038  One‐time Process  Future appointments should be handled as follows:  The pay schedule should be updated in place, according to the conversion rules stated in these requirements.   Rate code and distribution rates should be converted as needed. 

H Future appointments can be changed in place rather than being copied to another appointment. 

R0039  One‐time Process  Employees with both exempt and non‐exempt appointments should not be modified by the one‐time process. They will be handled manually.  Exception: if the exempt appointment is (or will be) BW (e.g., reader or tutor), the one‐time process should convert the non‐exempt appointment to BW. 

H   

R0040  One‐time Process  The one‐time process should not change the time reporting code associated with an appointment – positive, exception. 

H  Being addressed with local modifications. 

R0041  One‐time Process  If pay cycle conversions result in an employee with both current and/or future BW and MO appointments, the pay cycle conversion should not be handled by the one‐time process. Instead, they should appear on a report so the conversion can be processed manually. 

H   

R0042  One‐Time Process  Employees who are not separated but have no active appointments (current or future) should appear on a report or tab‐delimited file. 

H   

R0043  One‐time Process  When an appointment is replicated for the purpose of pay cycle conversion, expired distributions should not be replicated. They should remain under the original appointment.  

H   

R0044  One‐Time Process  The one‐time process should produce a report of the employees who are being converted by the one‐time 

H   

  

Page 27  

Req ID  Requirement Type  Requirement Description  Priority [L/M/H] 

Comments 

process. The report should be sorted by home department. This report must be created before the transactions are processed. It can be issued as a tab‐delimited file.  The report should flag employees who, after the one‐time process, have an hourly rate and an exception time reporting code.  The report should also flag Academic employee conversions if the employee has a combination of academic and non‐academic appointments.    Report should contain the following fields: 

Employee ID 

Employee Name (EDB 0105) 

Home Department Number (EDB 0114)  

Translated department name from the Home Department Table 

Employee Status Code (EDB0144) 

Appointment Number (EDB 2001) ‐ Original 

Appointment begin date – original 

Appointment end date ‐ original 

Primary Pay Schedule (EDB 0152) (for reference) 

APPOINTMENT PAY SCHEDULE CODE (EDB2016) ‐ Original 

Title Code (EDB 2006) 

Appointment FLSA code (EDB2005) 

Title code FLSA (from TCT) 

Appointment Rate Code (EDB 2015) ‐ Original 

Time Reporting Code (EDB 2017) ‐ Original 

Fixed/Variable indicator (EDB 

  

Page 28  

Req ID  Requirement Type  Requirement Description  Priority [L/M/H] 

Comments 

2013) 

Distribution number – Original 

Distribution begin date – original 

Distribution end date ‐ original 

Distribution Pay Rate (EDB2055) – Original 

DOS code (EDB2056) 

Appointment Number (EDB 2001) ‐ new 

Appointment begin date – new 

Appointment end date ‐ new 

APPOINTMENT PAY SCHEDULE CODE (EDB2016) ‐ New 

Appointment Rate Code (EDB 2015) ‐ New 

Distribution number – New 

Distribution begin date – new 

Distribution end date ‐ new 

Distribution Pay Rate (EDB2055) – New 

Flags for various conditions (TBD)  

R0045  One time process  Turnaround reporting will be needed for all flat type payments 

H   

R0046  (UCB Only MA Process) 

UCB’s existing MA process should be replaced temporarily with a new standalone MA process. Currently the MA and S2 are tied together in a single process.  

H  Removed requirement because UCB no longer plans to do a phased approach. 

R0047  Control Table Updates 

Control table update transactions should be developed for the Leave Accrual Table  

Leave Accrual tables must be set 

up properly for the new cycles. 

 

H  If new cycles are being added or removed. 

R0048  Control Table Updates 

Control table update transactions should be developed for the System Calendar Table.  

For locations not currently running 

H  If new cycles are being added or removed.  Hosted Applications 

  

Page 29  

Req ID  Requirement Type  Requirement Description  Priority [L/M/H] 

Comments 

the Biweekly cycle, this schedule 

should be added to the system 

calendar.  

For locations not currently running 

the Monthly cycle, this schedule 

should be added to the system 

calendar.  

Semi‐monthly and MA schedules 

should be removed from the 

system calendar. 

 

should coordinate with each location to review their system calendar. Some campuses do their own table maintenance but have requested review by HA. 

R0049  Control Table Updates 

Control table update transactions should be developed for the System Parameter Table  

Some system parameters (eg. 15, 

17, 30, 118, 120, 164, 236, 238, 

239, 241) are specific to Biweekly 

or Monthly pay cycles. These 

should be reviewed and modified 

if they’re not set correctly. 

 

H  If new cycles are being added or removed. 

R0050  Control Table Updates 

Control table update transactions should be developed for the GTN Table  

All GTNs must be set up correctly 

for the appropriate pay cycles. 

Some deductions (GTNs) are 

configured to be taken only on 

specified pay cycles. These must 

be reviewed and modified if 

necessary to reflect the new pay 

schedule. 

 

H If new cycles are being added or removed, or if there will standardization regarding when deductions are taken. 

R0051  Control Table Updates 

Control table update transactions should be developed for the Federal 

H If new cycles are being added or 

  

Page 30  

Req ID  Requirement Type  Requirement Description  Priority [L/M/H] 

Comments 

and State Tax Tables 

State and Federal tax tables 

should be reviewed and modified 

if the biweekly and monthly tables 

have not been implemented. Note 

that all tax tables have already 

been implemented for all hosted 

campuses. 

 

removed.

R0052  Control Table Updates 

Control table update transactions should be developed for the Data Element Table (DET)  

may need to remove SM/MA as 

valid for appointment pay 

schedules.  

 

H  If MA or SM cycles are being removed 

R0053  Jobstreams  JCL must be created for the production jobstreams for each new pay cycle being implemented.  

As needed, set up Biweekly and 

monthly production jobstreams 

where they do not already exist.  

 

H  If new cycles are being added  

R0054  Jobstreams  Remove obsolete productions jobstreams 

H  If cycles are being removed. 

R0055  Banking  Coordinate banking arrangements. There will be a new ACH file coming from PPS for each new cycle. 

H  Per Shaun, this is coordinated by Banking Services, and they need a schedule of when all the conversions will take place. 

R0056  Testing  Provide test files for local and corporate systems as requested. 

H  As requested by individual campuses.  

  

Page 31  

 

6.3 Reporting Requirements n/a 

7 Non­Functional Requirements n/a 

8 External References n/a 

 

  

Page 32  

9 Attachment A: Campus Pay Cycle Conversions   Existing Cycles at each Location   

Campus  SM  MA  BW  MO Actions

UCB (1)  X  X    X  add BW 

convert all MA employees  

convert all SM employees  

convert some MO employees  

eliminate SM 

eliminate MA 

UCD (3)      X  X  convert some MO employees  

convert some BW 

employees 

UCR (5)    X    X  add BW 

convert all MA employees 

convert some MO 

employees  

eliminate MA 

UCSD (6)      X  X convert some MO employees  

convert some BW 

employees 

UCSC (7)    X    X  add BW 

convert all MA employees 

convert some MO 

employees  

eliminate MA 

UCSB (8)    X    X add BW 

convert some MO 

employees 

convert all MA 

employees  

  

Page 33  

eliminate MA 

UCI (9)      X  X  convert some MO employees  

convert some BW 

employees 

Hastings 

(H) 

  X    X  No conversion planned at this time 

ASUCLA 

(A) 

X      add MO 

add BW 

convert all SM employees  

eliminate SM 

 

  

Page 34  

10 Attachment B: ASUCLA Campus­Specific Requirements  Approvals for ASUCLA Campus‐Specific Requirements 

Role  Name  Date

ASUCLA representative  Sally Amato‐Rogers  6/21/12 via conference call Revisions  approved 8/8/12 

ASUCLA representative  Sadie Ringgold  6/21/12 via conference call Revisions  approved 8/8/12 

ASUCLA representative  Kamran Mehdian  6/21/12 via conference call Revisions  approved 8/8/12 

ASUCLA representative  Linda Schmidt  6/21/12 via conference call Revisions  approved 8/8/12 

 

Currently, all ASUCLA employees are paid semi‐monthly. Their appointments are all defined with a pay 

schedule of “SM”, and no other pay cycles are defined in their system calendar. 

As part of Wave 1 of the UC Path project, ASUCLA’s payroll will be run on the PeopleSoft HCM Payroll 

system. PeopleSoft’s system supports only Monthly and Biweekly payroll cycles. It does not support a 

Semi‐Monthly cycle. ASUCLA will convert its PPS Semi‐Monthly exempt employees to the Monthly 

payroll cycle and their non‐exempt employees to Biweekly in preparation for the PeopleSoft conversion.  

ASUCLA plans to convert their exempt staff to the MO cycle through their HRIS system, without 

UCOP assistance. (exempt employees = out of scope) 

ASUCLA plans to handle by agreement appointments through their HRIS system, outside of this 

one‐time process. 

ASUCLA would like UCOP to develop a PPS process to convert their non‐exempt employees from 

SM to BW. 

  

Page 35  

ASUCLA will not use the “generic” one‐time pay cycle conversion process that is being 

developed for the other campuses because they want to use a different (simpler) approach. 

Generic BRD requirements related to the one‐time conversion process do not apply to ASUCLA. 

Other requirements in the generic BRD do apply to ASUCLA (e.g., control table updates, job 

streams, etc.). This BRD attachment covers only the one‐time process.   

ASUCLA is planning to offer vacation buyouts to employees, and will use the existing TRM code, 

since the new VPB DOS code will not be ready in time. 

ASUCLA plans to let the system do the BW financial accruals and then they can strip them out if 

they don’t need them. 

The ASUCLA approach for the non‐exempt appointments will be as follows:  

o Do not end existing appointments (or create new appointments). 

o Do change the APPOINTMENT PAY SCHEDULE CODE‐EDB2016 on active appointments of 

non‐exempt employees from SM to BW. 

o ASUCLA has indicated that, since their non‐exempt employees currently have an hourly 

rate, no rate conversion will be needed. 

o No changes to the distributions will be needed; changes are required only at the 

appointment level. 

 

Functional Requirements for ASUCLA‐specific one‐time process: 

 

Req ID  Requirement Type  Requirement Description Priority [L/M/H] 

Comments

AS.R0001  One‐Time Process  Develop a one‐time process that can be used by ASUCLA to convert non‐exempt appointments from SM to the standard BW schedule.   

H   

AS.R0002  One‐time Process  This one‐time process should convert only non‐exempt appointments.    Note that ASUCLA has asked that this process convert all 

H Non‐exempt is defined as APPOINTMENT FLSA STATUS INDICATOR EDB2005 = 0.   

  

Page 36  

appointments with a RATE CODE of ‘H’. 

Conversion of exempt and by‐agreement appointments will be handled by the campus outside of this one‐time process (in their HRIS system). 

AS.R0003  One‐time Process  The one‐time process should generate batch EDB update transactions.  

H   

AS.R0004  One‐time Process  The one‐time process should convert all non‐exempt employees at the same time. 

H   

AS.R0005  One‐time Process  The one‐time process should use RATE CODE = H to identify the appointments to be converted. 

H   

AS.R0006  One‐time process   The campus should be able to specify at runtime a “conversion effective date” for the particular run. This “conversion effective date” will be used to classify appointments as expired vs. current or future. 

H   

AS.R0007  One‐time process  Only current and future appointments are in scope for this one‐time process.   The one‐time process should examine current and future appointments to see if they meet the criteria for pay cycle conversion.  

Current appointments have a begin date that is before the conversion effective date and an end date that is on or after the conversion effective date. 

Future appointments 

H Expired appointments are out of scope and should be ignored by the one‐time process. 

  

Page 37  

have a begin date that is on or after the conversion effective date. 

Expired appointments have an end date that is before the conversion effective date  

AS.R0008  One‐time Process  For all current and future appointments that meet all of the following criteria: 

APPOINTMENT PAY SCHEDULE CODE EDB2016 = SM 

APPOINTMENT RATE CODE‐EDB2015= H 

 Create a batch transaction to change the APPOINTMENT PAY SCHEDULE CODE‐EDB (EDB2016) to “BW” and the A/D/C code (EDB2022) to “C”.   

H  Rate code H should be enough to identify the SM population to convert.   Only the pay schedule code and A/D/C code will be updated; no other appointment‐level data will be modified. 

AS.R0009  One‐time Process  Distribution‐level data should not be modified by the one‐time process. 

H   

AS.R0010  One‐time Process  Employees whose pay cycle conversions result in both current and/or future BW and MO appointments should appear on a report so they can be addressed by the campus.  This report would need to be run after all conversions are complete, including this one‐time process for the non‐exempt population and any conversions ASUCLA plans to perform on their exempt population. 

H Since the one‐time process will not be able to identify these employees, they will need to be identified through other means (possibly a DB2 query after the fact.  We do not expect to see a mix of exempt and non‐exempt appointments but the campus will need to address the by‐agreements. 

AS.R0011  One‐Time Process  Employees with no active  H   Include 

  

Page 38  

appointments (current or future) should appear on a report or tab‐delimited file. 

employment status on this report. 

AS.R0012  One‐time Process  As appointments are converted, the one‐time process will not need to take into consideration the DOS codes or other attributes in the distributions. 

H   

AS.R0013  One‐Time Process  The PPP1800 Database Audit Register report, along with the exception reports mentioned in these requirements will be sufficient to meet ASUCLA’s reporting needs.   

H

AS.R0014  Other Requirements 

See generic BRD for other requirements not related to appointment conversion.  

Generic BRD one‐time process requirements do not apply to ASUCLA. 

Generic BRD Control Table updates, including GTN schedule codes, DO apply to ASUCLA. 

Generic BRD Job Stream requirements DO apply to ASUCLA. 

 

H  Re: system calendar, the importance of choosing the correct timing was stressed in the conference call.  All GTNs should be reviewed. 

AS.R0015  Testing  Full cycle testing will be needed.  GL interface testing will be needed.  Timesheet testing will be needed. 

   

AS.R0016  Banking  It was determined in the 6/21/12 conference call that the banking requirement in the generic BRD does not apply to ASUCLA. It was determined that the pay cycle conversion will NOT 

  The structure of the ACH file is not changing, only the frequency. 

  

Page 39  

impact ASUCLA’s banking.  ASUCLA uses a different bank (BofA). There is no fixed schedule, no calendar. They can send the file any time and the bank confirms receipt. The same bank is used for paper checks and direct deposit.  

AS.R0017  Biweekly Accruals  ASUCLA will not use the 

automatic accruals.  To avoid 

program modification, the 

default 10‐day accruals will 

be used, and will be removed 

from the resulting GL 

transaction file prior to 

processing by ASUCLA’s GL. 

H   

AS.R0018  System Parameters  System Parameter 164 – the parameter value should remain “2,” so no BW accruals will occur at Fiscal Year End. 

H  

This parameter deals with reversal of BW accruals at fiscal year end. It is currently set to “2.”  This is not needed when go live but is needed by fiscal year end. Fiscal year end starts August 1. (For 2012 it starts July 29 – it varies.) 

AS.R0019  System Parameters  ASUCLA value for PRM 015 (Net Pay $ Warning – MO)  $10,000 

H   

AS.R0020  System Parameters  ASUCLA value for PRM 017 (Net Pay $ Warning – BW)  $2,000 

H   

  

Page 40  

AS.R0021  System Parameters  ASUCLA value for PRM  030 must be set to 2 for BW (Tax‐Offcyc 1=SM 2=BW) 

H   

AS.R0022  Fiscal Year End Processing 

Are other changes required for fiscal year end processing? ASUCLA’s fiscal year is August 1 – July 31, which is different from the rest of UC (which is July 1‐June 30)   Note: this issue was examined and it was decided that no further action is needed at this time. 

H   

 

  

Page 41  

11 Attachment C: UCB Campus­Specific Requirements Approvals for UCB Campus‐Specific Requirements 

Role  Name  Date 

Payroll Functional SME  Crystal Parkinson  10/31/12

Controller  Delphine Regalia  10/31/12 

Project Manager  Aaron Andersen   

Payroll Contractor  Candice Murphy  10/31/12 

 

UCB currently runs the SM, MA, MO and a supplemental XX cycle. They will need to add the BW cycle, 

convert the SM and MA employees to a BW cycle if hourly‐rated or non‐exempt, or MO for salaried 

exempt, and eliminate the SM and MA cycles.  Monthly (MO) hourly‐rated or non‐exempt employees 

should be converted to BW hourly. 

UCB anticipates transitioning non‐exempt employees beginning with the January 20th Bi‐weekly cycle.  

Converted employees will receive partial January pay on the SM, MA, and MO pay periods for January 

1st – 19th  

Benefits are currently deducted from the paycheck on the 1st for MO employees and 8th for SM and MA 

employees.   

Non‐exempt employees on a MO pay cycle will have full February benefits premiums deducted 

from the February 1st paycheck.   

MA employees will have full February benefits premiums deducted from the February 8th 

paycheck.   

However semi‐monthly employees that normally have February benefits premium deducted 

from the 8th check will have benefits deducted from the January 23rd paycheck in order to 

accommodate the bi‐weekly conversion.  SM GTNs will need to be modified (change GTN from 

S2 to S1) in order to accommodate the temporary SM benefit deduction change.   

Benefits will begin splitting for all non‐exempts on the February 13th paycheck. 

After the January end of the month SM and MA compute, the SM and MA pay cycles will be eliminated.  Exempt readers and tutors will be converted to bi‐weekly. 

Reader - 2850C, 2851C, 2500C

Tutor - 2860C, 2861C, 2500C, 2851C, 2500C

NOTE: FLSA status of Readers and Tutors is under discussion.   Assumptions: 

  

Page 42  

UCB will do all pay cycle conversions in their HCM front end, rather than in PPS, so they will not 

utilize the one‐time process developed by UCOP. 

UCB will configure its time and attendance front end as needed to support the BW cycle and 

remove support for the SM cycle and MA cycle. 

SM, MA, and applicable non‐exempt MO employees will be transitioned at the same time. 

SM and BW cannot co‐exist at a campus. 

Exempt salaried MA employees will be moved to the MO pay cycle. 

Parameter values will need to be modified. 

GTNs for deductions need to be scheduled correctly for people in BW. These need to be 

reviewed.  

Since UCB is adding the BW cycle, their expense distribution process now has the possibility of 

BW financial accruals.  

Vacation payouts will be used at UCB. Timing of the payout needs to be determined by UCB. 

There is a dependency on the VPB DOS code project (SR83705). Loans will also be utilized at 

UCB.  Comp‐time will also be available to cash out up to 80 hours.  Vacation, comp‐time, and or 

loan will be paid on January 16th 2013. 

UCB will need to work with Payroll, GL, and data warehouse teams to make sure they are 

prepared with regard to impacts to local interfaces. They are concerned about vendor interfaces 

– ADP pay card, BART deductions, etc. 

Leave usage is currently reported on the SM cycle at Berkeley. UCB will modify current practice 

to submit leave usage on employees’ primary cycle with their regular hours worked. This data 

will come from their time keeping system. 

Berkeley is currently using leave accrual tables. Factored leave will need to be used for the 

employees on BW. It appears that the GS bargaining unit uses factor accrual, but they have a 

distinct set of factors.  All non‐GS employees moving to BW will need to use the standard leave 

accrual factors. Non‐academic monthly employees will be converted to factor leave accrual at a 

later date. 

Pay production calendars will need to be modified. 

 Risks:  

  

Page 43  

UCB is also going through changes in their financial system (BAIRS reporting) and data 

warehouse at the same time. In addition, they are in the process of rolling out Kronos (new 

timekeeping system). There are more employees going to positive time, so they need this 

automation. 

Availability of testing resources on the campus side, due to other concurrent projects. 

Testing considerations: UCB wants to know what we recommend in terms of testing (what to test and 

time to allow) so this can be factored into the schedule. A meeting will be scheduled with the QA 

supervisor to explore this matter. 

Functional Requirements:  

Req ID  Requirement Type  Requirement Description  Priority [L/M/H] 

Comments 

B.R0001  Cycles  The SM and MA cycles should be eliminated and a new BW cycle should be established.  SM and MA employees will all be converted at the same time.  JCL will be created for the production job streams for the new Biweekly pay cycle being implemented. 

H   

B.R0002  Cycles  UCOP will need to build a process to replace Berkeley’s current MA cycle and also review and modify Berkeley’s local module in reporting that assures only one active pay cycle at a time. 

H   

B.R0003  Cycles  MA employees will be converted at the same time as the SM employees and applicable MO employees. 

H   

B.R0004  Parameters  Determine the specific parameter values. including BW financial accrual. 

H  Fiscal year‐end options 

10 work day vs. 14 calendar day accruals 

B.R0005  GTN  Review GTN table values and  H Assumption: 

  

Page 44  

update as needed.  During the transition period, GTN deductions will not be taken from 1st bi‐weekly cycle.  Full deductions will be taken from 2nd bi‐weekly cycle and split deductions will begin with the 3rd bi‐weekly cycle. 

Health and Welfare deductions to be split across the first two BW cycles.       

B.R0006  Factored Leave  UCB must convert to using factored leave for BW.   Berkeley’s time and attendance handles the accruals, which are later reconciled to PPS. 

H  Leave will now be reported on the employees’ primary pay cycle.  The factors must be set up in the leave accrual tables. 

B.R0007  Other Requirements 

See generic BRD for other requirements not related to appointment conversion.  

Generic BRD one‐time process requirements do not apply to UCB. 

Generic BRD Control Table updates DO apply to UCB. 

Generic BRD Job Stream requirements DO apply to UCB. 

 

H   

B.R0008  Testing  Testing requirements for UCB: 

Test data in HR system and the feed to the Payroll system 

GTN setup 

Timekeeping batch feed

Review reporting 

Test output into BAIRS reporting (financial system) 

H   

  

Page 45  

B.R0009  Banking  What are the issues for UCB? TBD 

   

 

  

Page 46  

12 Attachment D: UCSC Campus­Specific Requirements Approvals for UCSC Campus‐Specific Requirements 

Role  Name  Date 

Project Manager  Tamara Santos  

 

TS 08/31/12

Payroll Functional SME  Abby Tromblee   AT 08/31/12 

Staff HR Functional SME  Dee Steele  DS 08/31/12 

Academic Personnel Functional SME 

Christine Imai 

 

CI 08/31/12

PPS application Technical SME 

Doug Patten  

 

DP 08/31/12

 

UCSC is currently running the MA and MO cycles. They will: 

add the BW cycle 

convert all non‐exempt MO to BW  

convert all MA to another cycle: 

o Non‐exempt should be converted to BW 

o Exempt readers and tutors should be converted to BW 

o MA population includes the following non‐academic exempt groups: 

Physician Diplomats (title 0770).  There are 9 on the MA cycle, some same title 

codes on the MO.  The MAs are on call and report hours.   For Title code 0770: 

Variables should be converted to BW by the one‐time process. Fixed should 

stay MO. (Two separate pay groups in PeopleSoft. This will be the same job 

code.) 

Exempt By agreement MA (including coaches with title codes 4006 and 4007) 

should be converted to MO by the one‐time process.  

eliminate the MA cycle 

Santa Cruz has a population of Academic Monthly Variable employees, who are all exempt. Based on 

the business rules, it is expected that these employees will not be touched by the one‐time process. 

  

Page 47  

Special programming should not be required to exclude them. However, testing should be performed 

to ensure that they are not converted. The members of this population are described below. 

Academic monthly variables, all exempt: 

1. Readers/Tutors on the MO cycle (because they have another MO position) – about 25 

employees 

2. 3622    ASST LIBRARIAN‐TEMP STATUS – 4 employees 

a. Should stay on the MO cycle.  Moving to BW means contract negotiations. 

b. Exclude title code 3622 from conversion 

3. 3320    ASSISTANT SPECIALIST – 2 employees 

4. 3220    ASST RES ‐‐‐‐‐ ‐ FISCAL YEAR – 1 employee 

5. 3300    SPECIALIST – 1 employee 

6. 3802    ___ RECALL – 2 employees 

a. Continue on monthly cycle 

7. 3570    TEACHER‐UNIV.EXT.‐CONTRACT YR. (BYA) – 2 employees 

a. SC has lots of these instructors, but most are set up fixed currently. However pay varies 

for all of them.  Systemwide APDs are reviewing as well. 

Additional compensation associated with Primary Pay appts/dist, with a ‘B’ rate code. Must insure that 

BYA‐type DOS codes will follow primary appt pay cycle.  The alternative would be all distributions per 

employee would show on exception report and need to be hand‐coded.  This would represent a 

significant resource impact ‐ which departments would be responsible for hand‐coding (HR, Payroll, 

depts). 

WOS data conversion logic:  If ‘W’ time code, convert to blank. 

Conversion planned for: January 20, 2013 

Santa Cruz may be able to convert all employee populations at the same time; this will depend on the 

outcome of collective bargaining. Some represented employees may need to be converted separately. 

UCSC will convert PPS data using the generic one‐time process. They do not anticipate needing to do 

any time code changes. 

Req ID  Requirement Type  Requirement Description  Priority [L/M/H] 

Comments 

  

Page 48  

SC.R0001  Cycles  The MA cycle should be eliminated and a new BW cycle should be established. JCL will be created for the production job streams for the new Biweekly pay cycle being implemented. 

H   

SC.R0002  Parameters  What are the specific parameter values?  BW financial accrual? 

H Campus parameter values are documented in the project information on SharePoint. 

SC.R0003  GTN  Review GTN table values and update as needed. 

H  Assumption: Health and Welfare deductions to be split across the first two BW cycles.    

SC.R0004  Factored Leave  UCSC must convert to using factored leave accrual for all non‐academic employees.   Need a more precise definition. All non‐academic employees would mean all employees with Program/Type of A/5 would not be converted to factor leave. Does this represent what was decided? 

H  Leave Accrual Tables must be updated. 

SC.R0005  One‐time appointment conversion process 

UCSC will use the generic one‐time process for converting appointment pay cycles. 

H  See generic portion of the BRD. 

SC.R0006  Campus‐Specific one‐time requirements 

For Physician Diplomats (title code 0770):  Variables (Fixed/Variable 

H  The MAs are on call and report hours.    

  

Page 49  

Indicator EDB2013 = “V”) should be converted to BW.  Fixed (Fixed/Variable Indicator EDB2013 = “F”) should remain MO.  

There are 9 employees on the MA cycle, some same title codes on the MO.   

SC.R0007  Campus‐Specific one‐time requirements 

Exempt by agreement MA employees should be converted to MO.   This includes Coaches (title codes 4006 and 4007), who are BYA.  

H   

SC.R0008  Campus‐Specific one‐time requirements 

WOS requirements: All employees with Time 

Reporting Code 

(EDB2017) =  ‘W’ should 

be converted to blank 

H   

SC.R0009  Campus‐Specific one‐time requirements 

It is important that BYA‐type DOS codes follow the primary appointment pay cycle.    Shift Differential and Perquisite, on a separate appointment, should be converted like the primary appointment.   

H  Additional compensation associated with Primary Pay appts/dist, that has a ‘B’ rate code.  Too labor intensive to handle these cases manually  

SC.R0010  Control Tables   Generic BRD Control Table updates DO apply to UCSC.  

H  See generic portion of the BRD. 

SC.R0011  Job Stream  Generic BRD Job Stream requirements DO apply to UCSC.  

H See generic portion of the BRD. 

SC.R0012  Testing  UCSC requires a test plan from UCOP.  See section on “Academic 

monthly variables, all 

exempt” above. Testing 

H   

  

Page 50  

should be performed to 

make sure that the 

population described 

under “Academic Monthly 

Variables” is not converted 

by the one‐time process. 

SC.R0013  Banking  What are the issues for UCSC? 

H  Scheduling considerations 

SC.R0014  Reporting  UCSC needs to receive reports that show all records that will be converted.   They also need exception reports showing records not updated/failed in batch. (Conversion exceptions will be reported by the one‐time process; EDB update failures will be included in the normal EDB update reports.  These report versions should be able to be run more than once so they can be used for review following manual entry and clean up cycles. 

H Need more details.  Reporting needs are TBD 

 

  

Page 51  

13 Attachment E: Irvine Campus­Specific Requirements Approvals for Irvine Campus‐Specific Requirements 

Role  Name  Date 

Payroll Systems Mgr.  Roberta Nardico  10/15/2012

Programmer Analyst  Grace Ong  

10/19/2012 

Compensation Mgr.  Carolyn Murry  

10/18/2012 

 

Irvine is currently running the BW and MO cycles. They are not using either SM or MA cycles.  

Assumptions: 

The generic one‐time pay cycle conversion program rules apply. 

UC Irvine is already running exclusively the BW and MO cycles, so no changes to their 

cycles/JCL/job streams should be required. 

Parameters should already be set up, since they are already running the BW cycle. 

Control Table changes should be limited to the GTN table updates described below.  

There should be no need to make any changes to banking arrangements. 

Irvine does not intend to perform TCT cleanup activities prior to conversion. They will address any issues as they occur. occur. 

 

Some SAS (Stipends) and SDF DOS codes may be grouped with REG time under the same 

appointment, with rate code A. (Some SDF distributions are set up as hourly, some as a flat 

amount.) When such an appointment is converted to BW/Hourly, the flat dollar amount 

distributions will need to be fixed. Irvine noted that, unless there is a rule that works for all the 

locations, these can be fixed manually.  

 

Open items: 

Current TRS (time reporting system) uses time code “Z” for BW and “R” for monthly.   What will 

PS require? Note: this item is closed. Irvine has a local modification to address this. 

 

Req ID  Requirement Type  Requirement Description  Priority  Comments 

Comment [cm1]: Irvine will be converting monthly rates in TCS to hourly rates for non exempt titles.

  

Page 52  

[L/M/H] 

I.R0001  Control Table/GTN  Review GTN table values and update as needed.   Irvine to discuss with Hosted Applications team about the timing of the table updates. 

H  Assumption: Health and Welfare deductions to be split across the first two BW cycles.    

I.R0002  Factored Leave  No updates to the leave accrual tables appear to be needed.  

H   

I.R0003  One‐time appointment conversion process 

UCI will use the generic one‐time process for converting appointment pay cycles.  

H  See generic portion of the BRD. 

I.R0004  Testing  There are no known 

specific testing 

requirements at this time.  

Hosted Applications can 

run a roster for Irvine if 

needed. 

H  Irvine noted that employees moving from MO to BW will retain their existing time reporting code. 

 

 

  

Page 53  

14 Attachment F: Davis Campus­Specific Requirements Approvals for Davis Campus‐Specific Requirements 

Role  Name  Date 

HR Approver  Irene Horgan‐Thompson  12/6/12

Payroll Approver  Penny L. Knutson  12/6/12 

IET Approver  Linda Durst  12/6/12 

     

     

 

Davis is currently running the BW and MO cycles. They are not using either SM or MA cycles.  

Assumptions: 

The generic one‐time pay cycle conversion program rules apply. 

UC Davis is already running exclusively the BW and MO cycles, so no changes to their 

cycles/JCL/job streams should be required. 

Parameters should already be set up, since they are already running the BW cycle. 

Control Table changes should be limited to the GTN table updates described below.  

There should be no need to make any changes to banking arrangements 

Discussion items: 

Davis indicated in the checklist that any employee moving from MO to BW will have to 

change(?) the time code if R for exception to Z for positive. This may need to be handled locally 

as it is not currently included in the generic one‐time process. (Options being considered) 

Generic one‐time process requirements state that the FLSA code on the appointment (EDB2005) 

will determine if an employee’s appointment is exempt or non‐exempt. Davis has indicated in 

the checklist that title code FLSA should be used. UCOP recommendation: Davis should clean up 

FLSA codes on EDB prior to conversion. 

The checklist asked “is there a need to consider the DOS code in the distributions when 

converting employee data?” Davis indicated “Yes, depending upon the coding.” Need to clarify 

this with the campus. 

Local issues with GL (regarding BW financial accruals), reporting and other local systems (such as 

time entry) TBD. Discuss with the campus. 

  

Page 54  

Req ID  Requirement Type  Requirement Description  Priority [L/M/H] 

Comments 

D.R0001  Control Table/GTN  Review GTN table values and update as needed.  

H Assumption: Health and Welfare deductions to be split across the first two BW cycles.    

D.R0002  Factored Leave  Are all non‐academic employees at UCD already using factored leave accrual?  Yes   

H   

D.R0003  One‐time appointment conversion process 

UCD will use the generic one‐time process for converting appointment pay cycles.  

H  See generic portion of the BRD. 

D.R0004  Campus‐Specific one‐time requirements 

Any issues regarding specific employee populations at Davis?  Employees moving from MO to BW will have to change the time code if R for exception to Z for positive  Title Code 9995 with DOS codes OFR and OFN.   

H   

D.R0005  Testing  Does Davis have any 

specific testing 

requirements?  

None 

H   

 

  

Page 55  

15 Attachment G: San Diego Campus­Specific Requirements Approvals for San Diego Campus‐Specific Requirements 

Role  Name  Date 

Assoc Dir P/R  Cruz, Nini  10/23/12

Assoc Dir P/R  Rodriguez, Paul   10/23/12 

Director/Payroll  Trinidad, Pearl  10/23/12 

 

UCSD is currently running the BW and MO cycles. They are not using either SM or MA cycles.  

Assumptions: 

The generic one‐time pay cycle conversion process rules will be applied. 

UC San Diego is already running exclusively the BW and MO cycles, so no changes to their 

cycles/JCL/job streams should be required. However, San Diego notes that the population 

moving from MO to BW is large, around 5100, and is concerned about the impact that volume 

might have on the processing. Technical issues may arise. 

Parameters should already be set up, since they are already running the BW cycle. 

Control Table changes should be limited to the GTN table updates described below. Note: need 

more clarity on exactly which flat‐rate deductions should be split between the first two BW 

cycles: Health and Welfare, or all.  

There should be no need to make any changes to banking arrangements 

Discussion items: 

UCSD currently does not use PPS for leave accrual – they have an external leave system which 

does not appear to use factor accrual. San Diego plans to revise their external system. 

BW should remain BW at the Medical Center regardless of FLSA status. Note: this should not be 

an issue, as the generic one‐time process will not convert BW employees to another pay cycle. 

 By Agreement conversions: Some By Agreement distributions are embedded in rate code A 

appointments. By Agreement cannot move as an hourly rate. If the rest of the appointment is 

being converted, should the By Agreement portion be moved into a BW By Agreement 

appointment? SD to do research to see if By Agreement group needs to move to BW.  SD reports 

that the projected target population includes 247 employees having by‐agreement distributions 

under the same appointments with non‐by‐agreement distributions, while there are 194 

employees having by‐agreements only under appointments, noting that some of both categories 

may belong to the other.  Decision pending as to how the mixed cases are to be handled. 

  

Page 56  

SD has repurposed the Time Reporting Code in PPS, and instead uses part of the FAU to indicate 

positive vs. exception time reporting. SD to discuss internally how this “salary sub” issue should 

be handled for conversion purposes, and report results back to UCOP.   See SD.R0006.San Diego 

is concerned about how the rule to round up when converting rates will impact future range 

adjustments (Rounding the rate in the EDB will cause a mismatch with the TCT data.) 

 

Req ID  Requirement Type  Requirement Description  Priority [L/M/H] 

Comments 

SD.R0001  Control Table/GTN  Review GTN table values and update as needed.  

H Assumption: Health and Welfare deductions to be split across the first two BW cycles.  UCOP to verify which flat dollar deductions will be split.  

SD.R0002  Factored Leave  San Diego does not use standard leave accrual tables and will modify their current application. 

H   

SD.R0003  One‐time appointment conversion process 

UCSD will use the generic one‐time process for converting appointment pay cycles.  

H  See generic portion of the BRD. 

SD.R0004  Campus‐Specific one‐time requirements 

San Diego wants to ensure that the medical center employees will not be converted. This should not be an issue, because the one‐time will not convert any existing BW to MO. 

H   

SD.R0005  Testing  San Diego would like to 

begin testing as early as 

possible, even if it is just 

with a beta version of the 

code.  

There is some concern 

about certain populations 

H   

  

Page 57  

who have a large number 

of distributions.  

San Diego is wondering if 

there will be a “machine‐

readable” file they can use 

to produce delete 

transactions if necessary. 

Request to run UCSD local 

program PPL703 (at UCOP) 

and make available all of its 

four usual extract files and 

all report images for 

download to UCSD. 

SD.R0006  Time Reporting  UCSD requires that the ‘Sub-Account’ sub-field of our FAU (column 30 of 30 – single numeric-only, values restricted to 0-3) be converted from ‘1’ to ‘2’. UCSD asks that this conversion be added as a local modification to the UCSD instance of the conversion program.  

H San Diego decided they did not need this local modification. 

SD.R0007  Conversion of RGS DOS Code 

UCSD requires that the without-salary local DOS code ‘RGS’ be handled in all respects as if it were ‘REG’ during the conversion.

  Added as a One‐Time Process Change Request.  Request must be reviewed for approval. 

 

 

  

Page 58  

16 Attachment H: Riverside Campus­Specific Requirements Approvals for Riverside Campus‐Specific Requirements 

Role  Name  Date 

Payroll Director  Gabe Nwandu  11/2/12

Payroll Supervisor  Grant Christensen  11/26/12 

     

     

     

 

Riverside is currently running the MA and MO cycles.  

Assumptions: 

BW cycle will be added. 

Entire MA population will be converted to another cycle. 

Some MO employees will be converted to BW 

MA cycle will be eliminated 

Riverside noted in checklist to flag as exception: 

o Hourly rate to monthly rate (note: this should not be an issue, we do not plan to do this 

conversion) 

o By agreement conversions (discuss) 

UCR would like to use Title Code FLSA to differentiate exempt vs. nonexempt. UCOP 

recommendation: Riverside should clean up FLSA codes on EDB prior to conversion. 

UCR indicated that local issues under discussion include the Time and Attendance system. (Note 

in project plan, may be hosted aps implications.) 

 

Req ID  Requirement Type  Requirement Description  Priority [L/M/H] 

Comments 

R.R0001  Cycles  The MA cycle should be eliminated and a new BW cycle should be established. JCL will be created for the 

H   

  

Page 59  

production job streams for the new Biweekly pay cycle being implemented. 

R.R0002  Parameters  What are the specific parameter values? Determine specific parameter values for Expense Distribution Parameter. BW financial accrual? Yes. 

H   

R.R0003  GTN  Review GTN table values and update as needed. 

H  Assumption: Health and Welfare deductions to be split across the first two BW cycles.  

R.R0004  Factored Leave  Is UCR already using factored leave accrual for all non‐academic employees? Most likely will need to update leave accrual tables. Not currently using factored leave accruals. 

H Leave Accrual Tables must be updated? Yes. 

R.R0005  One‐time appointment conversion process 

UCR will use the generic one‐time process for converting appointment pay cycles. 

H  See generic portion of the BRD. 

R.R0006  Campus‐Specific one‐time requirements 

Convert PPS Time Code from R to Z. 

  Handled with a local modification. 

R.R0007  Control Tables  Generic BRD Control Table updates DO apply to UCR.  

H  See generic portion of the BRD. 

R.R0008  Job Stream  Generic BRD Job Stream requirements DO apply to UCR.  

H  See generic portion of the BRD. 

R.R0009  Testing  Any special testing 

considerations? 

G/L 

H   

R.R0010  Banking  What are the issues for UCR?  None 

H Scheduling considerations 

  

Page 60  

R.R0011  Reporting  Any special reporting needs? No 

H  Update UPAY 503 

 

 

  

Page 61  

17 Attachment I: Santa Barbara Campus­Specific Requirements Approvals for Santa Barbara Campus‐Specific Requirements 

Role  Name  Date 

  Tricia Hiemstra  12/6/12

  Jim Corkill  12/6/12 

  Sona Baboolal  12/6/12 

  Jo Ann Stark  12/6/12 

 

Santa Barbara is currently running the MA and MO cycles. 

  Assumptions: 

BW cycle will be added. 

Entire MA population will be converted to another cycle. 

Some MO employees will be converted to BW 

MA cycle will be eliminated 

Santa Barbara has indicated that, if the conversion process encounters an employee with 

multiple appointments that would resolve to both BW and MO, these employees should go to 

BW. They noted that this is not a large population, and these employees can be handled 

manually by the campus. 

 

Discussion items: 

Confirm generic one‐time process handling of the readers and tutors will have the expected 

result for UCSB. Generally, readers and tutors will be converted to BW by the one‐time process, 

so should be OK. SB’s MA readers and tutors will be converted to BW. Discussion deferred, 

because handling of readers and tutors is still in flux. 

By agreement conversions: Santa Barbara to examine their data and determine how these 

should be handled.  

Time codes: SB indicated on checklist “All FLSA Non Exempt employees who are currently 

Exception Time R will have to be changed to Time Code Z Positive Pay.” Note: this is not 

currently being handled by the one‐time process. (Options being considered) Santa Barbara 

plans Kronos rollout by March 2013. They are looking at options for handling time reporting for 

this population in the interim.  

  

Page 62  

Santa Barbara noted that they are not currently using the time roster to report leave usage, but 

may need to begin doing this for the BW population. Title code FLSA should be used to rather 

than appointment FLSA. UCOP recommendation: SB should clean up FLSA codes on EDB prior to 

conversion. Only 5 employees are out of sync in terms of the FLSA on the appointment and on 

the title code. UCOP has provided the list of employees to Santa Barbara.  

 

Req ID  Requirement Type  Requirement Description Priority [L/M/H] 

Comments

SB.R0001  Cycles  The MA cycle should be eliminated and a new BW cycle should be established. JCL will be created for the production job streams for the new Biweekly pay cycle being implemented. 

H   

SB.R0002  Parameters  What are the specific parameter values?  BW financial accrual? 

H   

SB.R0003  GTN  Review GTN table values and update as needed.  Setting up GTN split across BW cycles in advance should be timed with the conversion and UCOP program support. 

H  Assumption: Health and Welfare deductions to be split across the first two BW cycles.  

SB.R0004  Factored Leave  Leave accrual table updates will be needed.  

H   

SB.R0005  One‐time appointment conversion process 

UCSB will use the generic one‐time process for converting appointment pay cycles. 

H  See generic portion of the BRD. 

SB.R0006  Campus‐Specific one‐time requirements 

Time Code: All FLSA Non Exempt employees who are currently Exception Time R will have to be changed to Time Code Z Positive Pay.  SB also notes usage of a time code "A." SB will review their time codes by 

H  Options being considered. 

  

Page 63  

reporting from data warehouse. 

SB.R0007  Control Tables  Generic BRD Control Table updates DO apply to UCSB.  

H See generic portion of the BRD. 

SB.R0008  Job Stream  Generic BRD Job Stream requirements DO apply to UCSB.  

H  See generic portion of the BRD. 

SB.R0009  Testing  Testing: SB requires testing 

for by agreement and 

perquisites.  

H   

SB.R0010  Banking  SB has some concerns around prenoting. 95% of Direct Deposits are Prenoted, only a few extreme cases are not prenoted.  SB may have some concerns around credit union deductions. 

H  Scheduling considerations 

SB.R0011  Reporting  No special reporting needs have been identified at this time. 

H