Bus priority and capacity improvements in Macquarie Park · 2017. 4. 7. · shopping district,...

8
REVIEW OF ENVIRONMENTAL FACTORS Bus priority and capacity improvements in Macquarie Park Transport for NSW and Roads and Maritime Services are proposing a range of improvements to the road network in Macquarie Park to make the journey to and from work and home easier. The proposed road works would improve bus services travelling through the area and make getting around Macquarie Park easier for everyone, whether you are walking or driving to the shops or university. The proposal would support the Sydney’s Bus Future plan and be delivered as part of the Bus Priority Infrastructure Program. Roads and Maritime have detailed these changes in a Review of Environmental Factors (REF) and we invite you to have your say on the proposal by 5pm on Friday 12 May 2017. www.rms.nsw.gov.au/bpp

Transcript of Bus priority and capacity improvements in Macquarie Park · 2017. 4. 7. · shopping district,...

Page 1: Bus priority and capacity improvements in Macquarie Park · 2017. 4. 7. · shopping district, needing long-term bus and road improvements to support the area’s future growth. We

REVIEWOFENVIRONMENTALFACTORS

Bus priority and capacity improvements in Macquarie Park Transport for NSW and Roads and Maritime Services are proposing a range of improvements to the road network in Macquarie Park to make the journey to and from work and home easier. TheproposedroadworkswouldimprovebusservicestravellingthroughtheareaandmakegettingaroundMacquarieParkeasierforeveryone,whetheryouarewalkingordrivingtotheshopsoruniversity.TheproposalwouldsupporttheSydney’sBusFutureplanandbedeliveredaspartoftheBusPriorityInfrastructureProgram.

RoadsandMaritimehavedetailedthesechangesinaReviewofEnvironmentalFactors(REF)andweinviteyoutohaveyoursayontheproposalby5pm on Friday 12 May 2017.

www.rms.nsw.gov.au/bpp

Page 2: Bus priority and capacity improvements in Macquarie Park · 2017. 4. 7. · shopping district, needing long-term bus and road improvements to support the area’s future growth. We

BackgroundMacquarieParkisarapidlygrowingresidential,commercialandshoppingdistrict,needinglong-termbusandroadimprovementstosupportthearea’sfuturegrowth.Weareproposingarangeofroadandintersectionupgradestoimprovethereliabilityandefficiencyofbusservices,whileeasingcongestionandimprovingtrafficflowforallroadusersinthearea.

Weproposetodelivertheworkintwostages:

Stage 1AspartofSydneyMetroNorthwest,theEppingtoChatswoodraillineisscheduledtotemporarilyclosefromlate2018foraboutsevenmonths.Duringthisperiod,theTemporaryTransportPlanwillbeimplementedtoreplacerailwayserviceswithadditionalbuses.Theproposedroadandintersectionupgradeswouldsupporttherunningofbusesandimprovetrafficflowinthearea.Theproposedworkwouldstartaroundmid-2017.

Stage 2OnceSydneyMetroNorthwestopens,theremainderoftheroadandintersectionupgradeswouldbecarriedout.ThisworkwouldprovidelongtermimprovementsandongoingsupportfortwokeycorridorssetoutinSydney’sBusFuture–ParramattatoMacquarieParkviaCarlingfordandEpping,andHurstvilletoMacquarieParkviaBurwood.Theworkwouldalsobenefitotherbusservicesoperatingintheareaandprovideimportantupgradestotheroadnetworktoreducecongestionandimproveaccessforallroadusers.

Wehaveincludedmapstohelpexplaintheproposedwork.

RoadsandMaritimeisseekingyourfeedbackby5pm onFriday 12 May 2017 ontheproposedroadandintersectionupgradeswhichhavebeendetailedintheREFavailableatwww.rms.nsw.gov.au/bpp.

Overall proposalKeyfeaturesoftheproposalinclude:

• upgradingtheintersectionofHerringRoadandEppingRoad

• upgradingtheroundaboutintersectionofHerringRoadandIvanhoePlacetoasignalisedintersection

• adjustingthemedianalongHerringRoad,betweenIvanhoePlaceandWaterlooRoadtoprovidecontinuousbuslanesinbothdirections

• upgradingtheintersectionofHerringRoadandWaterlooRoad

• wideningWaterlooRoadbetweenCottonwoodCrescentandLaneCoveRoadtoprovidecontinuousbuslanesinbothdirections

• upgradingtheintersectionofByfieldStreetandWaterlooRoadtoasignalisedintersection

• upgradingtheroundaboutintersectionofKhartoumRoadandWaterlooRoadtoasignalisedintersection

• upgradingtheroundaboutintersectionofWaterlooRoadandLaneCoveRoad

• extendingtheexistingsouthboundbuslaneonLaneCoveRoad,betweenWaterlooRoadandEppingRoad

• upgradingtheintersectionofLaneCoveRoadandEppingRoad

• extendingtherightturnlanenorthboundonLaneCoveRoadontoEppingRoadeastbound,betweenAllengroveCrescentandLornaAvenue.

Therewouldberemovalofabout150treesandwewouldexploreopportunitiesforreplacementplantings.

Therewouldalsobesomelossofparking.

Formoreinformationabouttheproposedupgradesineachstage,pleaserefertotheREFavailableatwww.rms.nsw.gov.au/bpp.

Key benefits• Providingfaster,efficientandmorereliabletraveltimesthrough

theMacquarieParkareaforbusesandallroadusers

• Improvingpedestriansafetyandaccesswithnewcrossingfacilities

• Providingshort-termsupportfortheadditionalbusesneededforthetemporaryclosureoftheEppingtoChatswoodrailline

• Providinglong-termongoingbenefitsforkeybuscorridorsandlocalbusservicesthroughimprovedandupgradedbuspriorityinfrastructure.

IntersectioninMacquariePark.

Page 3: Bus priority and capacity improvements in Macquarie Park · 2017. 4. 7. · shopping district, needing long-term bus and road improvements to support the area’s future growth. We

Herring Road and Epping Road intersection

Re-alignedleft turn

Dual right turn lanes

Dual right turn lanes

Introduction of second lane

Staged pedestrian crossing

EPPING ROADH

ERR

ING

RO

AD

HER

RIN

G R

OA

D

BOOTH STREET

0 25 50

�N

KEY Buslane

Busstop

Page 4: Bus priority and capacity improvements in Macquarie Park · 2017. 4. 7. · shopping district, needing long-term bus and road improvements to support the area’s future growth. We

Herring Road and Ivanhoe Place intersection

Dedicated right turn into Morling College

Dedicated right turn into Windsor Drive

New signalised intersection

Dedicated right turn into Ivanhoe Place

Signalised pedestrian crossing on all sides of intersection

Kerbside bus lanes

WINDSOR DRIVE

SAUNDERS CLOSEH

ERR

ING

RO

AD

IVANHOE PLACE

MORLING COLLEGE

0 25 50

KEY Buslane

Busstop

�N

Page 5: Bus priority and capacity improvements in Macquarie Park · 2017. 4. 7. · shopping district, needing long-term bus and road improvements to support the area’s future growth. We

Herring Road and Waterloo Road intersection

Waterloo Road, Byfield Street and Khartoum Road intersection

Kerbside bus lanes

Dedicated right turn into Macquarie Centre

Right turn lanes (one for general traffic and one for buses)

Extension of right turn bay

Re-aligned left turn

No right turnWATERLOO ROAD

CO

TTO

NW

OO

D C

RES

CEN

T

LAC

HLA

N A

VEN

UE

HER

RIN

G R

OA

D

0 25 50

MACQUARIE CENTRE

MACQUARIE UNIVERSITY

ROBERT MENZIES COLLEGE

KEY Buslane

Busstop

KEY

Bus lane

Bus stop

Macquarie University

Train Station

�N

�N

Re-aligned left turn

Signalised intersection

Re-aligned left turn

Shared through/ right and dedicated right turn

Shared through/right and dedicated right turn

Signalised intersection

Dedicated right turn

No right turn Dedicated right turn

WATERLOO ROAD

GIFFNOCK AVENUE

KH

AR

TOU

M R

OA

D

BY

FIELD STR

EET

0 25 50

Page 6: Bus priority and capacity improvements in Macquarie Park · 2017. 4. 7. · shopping district, needing long-term bus and road improvements to support the area’s future growth. We

Waterloo Road and Lane Cove Road intersection

Staged pedestrian crossing

New kerbside bus lane

Kerbside bus lanes

Dual right turn

Re-aligned left turn

Three right turn lanes (one being a dedicated bus lane)

Re-aligned left turn

Extended left turn bay

Pedestrian fencing in the median

HYUNDAI DRIVE

WATERLOO ROAD

GIFFNOCK AVENUE

CO

OLIN

GA

STREET

LAN

E C

OV

E R

OA

D

0 25 50

KEY Buslane

Busstop

MacquarieUniversity

TrainStation

Pedestrianfence

�N

Page 7: Bus priority and capacity improvements in Macquarie Park · 2017. 4. 7. · shopping district, needing long-term bus and road improvements to support the area’s future growth. We

Lane Cove Road between Allengrove Crescent and Lorna Avenue

Extension of right turn bay

LAN

E C

OV

E R

OA

D

PAUL STREET

LORNA AVENUE

ALLENGROVE CRESCENT

0 25 50LA

NE

CO

VE

RO

AD

0 25 50

Re-aligned left turn

Bus lane jump start

Dual right turn and one shared right turn

EPPING ROAD

Lane Cove Road and Epping Road (off ramp) intersection

KEY Buslane

Roadbelowoverpass

Busstop

�N

�N

KEY

Busstop

Page 8: Bus priority and capacity improvements in Macquarie Park · 2017. 4. 7. · shopping district, needing long-term bus and road improvements to support the area’s future growth. We

www.rms.nsw.gov.au/bpp

A growing Sydney

WithSydney’spopulationpredictedtoincreasebyaround1.6millionpeopleinthenext20years,Sydneyfacessubstantialgrowth.

That’swhyit’svitaltoensureourroadssupporttransportconnections,movefreight,easecongestion,providemorereliabletraveltimesandcreateasaferroadnetwork.

VisitMySydney.nsw.gov.au

April2017RMS17.148

Have your sayWewelcomeyourwrittensubmissionsabouttheproposedworkby5pm Friday 12 May 2017.

Pleasesendyoursubmissionsto:

Email: [email protected]

Mail: POBox973,ParramattaCBDNSW2124

What happens next?Wewillconsiderallfeedbackandrespondinasubmissionsreport,whichwillbeavailablelaterthisyear.

Wewillcontinuetoliaisewiththecommunitythroughouttheproject.

Contact usForfurtherinformationpleasecontactourSeniorProjectManager,BradHamilton:

Phone:1800575250

Email: [email protected]

Mail: BusPriorityandCapacityImprovementsinMacquarieParkRoadsandMaritimeServicesPOBox973,ParramattaCBDNSW2124

Visit: www.rms.nsw.gov.au/bpp

Ifyouneedhelpunderstandingthisinformation,pleasecontacttheTranslatingandInterpretingServiceon131450andaskthemtocalluson1800575250.