Bureau of Public Transportation
Transportation Strategy Board
PresentationMay 19, 2010
James P. RedekerBureau Chief, Public Transportation
1
Bureau of Public Transportation
MISSION STATEMENT
The mission of the Bureau of Public Transportation is to develop, maintain, and operate a system that provides for the safe, efficient and sustainable movement of people and goods.
2
STRATEGIC OBJECTIVES
• Maintain existing systems at a state of good repair and enhance system safety and security
• Improve efficiency and effectiveness of transit service delivery
• Expand services to capture a greater share of existing markets and address specific new markets
Bureau of Public Transportation
3
BUREAU PROFILE• Unique service delivery model in
Connecticut• ~50% of ConnDOT annual operating
budget• Key role of public transit on
Connecticut economy, air quality, energy conservation, mobility
Bureau of Public Transportation
4
Bureau of Public Transportation
LARGE SERVICE ORGANIZATIONExpenses and Subsidy• Bus and ADA
– $189M in annual operating expenses; $135M CTDOT Subsidy• For Rail
– $380M in annual operating expenses; $88M CTDOT Subsidy
Ridership (annual)• Bus and ADA - 38,200,000 passenger trips• Rail trips – 37,700,000 passenger trips
Ownership• 300 rail vehicles and 1000 buses and paratransit vehicles• New Haven Line (in CT) and 3 branch lines; 6 Freight lines
5
Statewide Bus System Profile
Total Bus Transit System (CTTRANSIT, Express Bus, Transit Districts, ADA, Dial-a-Ride and Shuttle Services)
•Annual Passenger Trips – 38,200,000•Annual Revenues - $39,000,000•Annual Subsidy and non-Subsidy Expenses - $189,000,000•Total Annual Subsidy - $141,000,000•CDOT Share of Annual Subsidy - $135,000,000•Average Subsidy/Passenger - $3.52
Subsidy/Passenger by Service Type•Urban -$3.09•Express Bus - $3.83•Rural - $7.63•ADA Services - $28.35
8
Commuter Rail Services
New Haven Line and three Branch Lines
•35 Stations
•37 Million Annual Trips
Shore Line East
•8 Stations
•560,000 Annual Trips
9
Rail Passenger System Profile
•New Haven Line•Weekday Trains – 289•Saturday-178 trains / Sunday-148 trains•Annual Passenger Trips - 37,000,000•Annual Revenues - $253,000,000•Annual Expenses - $360,000,000•Total Annual Subsidy - $107,000,000•CDOT Share of Annual Subsidy - $70,400,000•Subsidy/Passenger - $1.90
•Shore Line East •Weekday Trains -23 (Monday-Thursday), 25 Friday•Saturday 16 trains / Sunday 16 trains •Annual Passenger Trips – 590,000•Annual Revenues - $2,200,000•Annual Expenses - $19,900,000•Total Annual Subsidy - $17,700,000•Subsidy/Passenger - $30.00
10
Rail Freight System Profile
• Over 50,000 carloads (four million tons) originate or terminate annually in Connecticut
•Eight Rail Freight Carriers in Connecticut
•ConnDOT’s Rail Freight Initiatives•Gross Receipts Tax Exemption Program•Rail Preservation and Improvement Program•Relay track materials from passenger lines•Acquisition of abandoned rights of way
12
Bureau of Public Transportation
FUNDING SOURCES
• Annual Federal Transit Administration (FTA) Formula Funds
• State provides the non-federal share for most rail and bus capital improvements
• Annual State Bond Authorization
• Special Authorizations
• Other funding sources (e.g., FRA, ARRA)
14
ARRA – Economic Stimulus(Total for Bus and Rail Transit =
$152M)BUS• Statewide Bus Replacement Procurement
Program (purchase includes up to 106 Hybrid buses) - $70M
• Norwalk Transit District Pulse Point Safety and Security Improvements - $1.5M
• Windham Transit District Bus Storage Canopies - $270K
• Statewide Park and Ride Lot Improvements - $2M
• Bus Engine Repowering - Greater Bridgeport Transit - $2.8M
15
ARRA – Economic Stimulus(Total for Bus and Rail Transit =
$152M)RAIL• Danbury Branch Signalization and
Centralized Traffic Control (CTC) - $31M• New Haven Yard Component Change-Out
(CCO) Maintenance Shop for new M8 rail cars - $30M
• New Haven Line (NHL) Station Improvements - $10M
• Branford Station Parking Lot - $5M
16
• Annual Public Transportation Capital Program
$140 M to $160 M per fiscal year
» State: $40M Bonding
» Federal: Grown to $100 MM in Formula Funds
» Federal Discretionary Varies Year-to-Year
• An additional $1.2 Billion is programmed over the next 10 years - based on forecasted availability, not needs
• Additional federal funding likely to be limited
• Use of CMAQ funds (”flexing”)
Bureau Capital Issues
17
Bureau of Public TransportationMajor Capital Improvements• New Britain-Hartford Busway
• CTTRANSIT Fleet Replacement• CTTRANSIT New Haven Division
Maintenance Facility• M-8 Rail Car Procurement• New Haven Maintenance Facility Complex• New Haven Line Catenary Replacement• Railroad Movable Bridge Rehabilitation and
Replacement
19
Capital Issues:Bus Rolling Stock
• Fleet Replacements– 1000+ vehicles; 600+ full-size buses– 1/4 already overdue for replacement– Cost: $200 million - just for buses– Timeliness of replacement based on
availability of funds
• New and Expanded Services– Job Access; Commuter Connections; TSB
Services; Service Initiative
• Replacement of lost seating capacity
21
Capital Issues:Bus Facilities
• New and Updated Facilities– $150 million for New Haven;
Waterbury; Needs in Torrington, Windham, Norwalk (expansion), SEAT
22
Bus Capital Issues:New Services and Gaps
• Amenities - ITS; Shelters• New Technologies
– Radios/GPS/AVL– Fareboxes/Smart Cards– Clean Fuels and Environmental Quality
• Bus Rapid Transit– A new style of service
• New Britain-Hartford BRT in Final Design• Route 1 BRT Norwalk to Stamford – in Planning
Stage23
24
• Joint study: ConnDOT, CRCOG, CCRPA, Towns
• I-84 Corridor West of Hartford including Arterial Roadways, Neighborhoods, Rail Lines
• Alternatives Studied– Commuter Rail– Light Rail– Bus Rapid Transit– High-Occupancy Vehicle Lanes– Highway Widening
• Joint study: ConnDOT, CRCOG, CCRPA, Towns
• I-84 Corridor West of Hartford including Arterial Roadways, Neighborhoods, Rail Lines
• Alternatives Studied– Commuter Rail– Light Rail– Bus Rapid Transit– High-Occupancy Vehicle Lanes– Highway Widening
New Britain – Hartford Busway Major Investment Study (July 1999)
24
25
Busway -- Key Project Elements:Travel Time Savings/ Quality of ServiceBusway -- Key Project Elements:Travel Time Savings/ Quality of Service
• Travel Time Savings and Reliability - Separate guideway – “Like Rail”
• Flexibility - Different service styles (shuttle, collector, express, feeder); Ease of Adding New Services and Extensions
• One-seat ride• Convenience – Improved Frequency, Level Boarding• Quality of Service
– Stations with amenities– ITS – Intelligent Transportation Systems
• Real-time passenger information• Signal Preference• CCTV• Proof-of-Payment Fare Collection
• Travel Time Savings and Reliability - Separate guideway – “Like Rail”
• Flexibility - Different service styles (shuttle, collector, express, feeder); Ease of Adding New Services and Extensions
• One-seat ride• Convenience – Improved Frequency, Level Boarding• Quality of Service
– Stations with amenities– ITS – Intelligent Transportation Systems
• Real-time passenger information• Signal Preference• CCTV• Proof-of-Payment Fare Collection
25
State Rail Plan
• Plan horizon 2010-2030• Current condition of rail system in
Connecticut – passenger and freight• Recommend strategies for
responsible system growth and interconnectivity
• Identify constraints and needs• Enhance regional mobility
29
Bureau of Public Transportation
• Rolling Stock (both NHL and SLE)– M8 cars– 300 purchased with option for 80
additional cars
30
Bureau of Public Transportation
– Infrastructure (New Haven Line in CT owned by CTDOT) (SLE cost sharing)• Track• Bridges• Signal (PTC)
32
Moveable Bridge Rehabilitation Program
• Walk and Saga bridges $450M (includes catenary replacement)– Currently in design phase, $393M
programmed for construction
• Devon and Cos Cob bridges $1B– Currently in engineering, feasibility
and economic analysis study – Construction funds not programmed
34
New Haven – Harford –
Springfield
NYC
NYC – Boston (Inland Route)• NYC – New Haven• New Haven – Springfield• Springfield – Boston
NYC - MA - VT - MontrealKnowledge Corridor proposal +
Vermonter or Montrealer
• NYC – New Haven• New Haven – Springfield• extensions north of Springfield
• Greenfield, MA• Bellows Falls or White River Jct, VT
• Montreal
Both depend on increased capacity for NHHS section.
Hartford
Springfield
Boston
New Haven
Montreal
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
NHHS projectlimits
37
Bureau of Public Transportation Organization
Chart
Bureau Chief Chief of Public Transportation
James Redeker
Office of Transit and RidesharePublic Transit Administrator
Michael Sanders
Office of RailPublic Transit Administrator
Eugene Colonese
40
Office of Transit and RidesharePublic Transit Administrator
Program Design and ProjectImplementationTransit Manager
Transit Development andSupport Services
Transit Manager
Contract Services& Support
Marketing and TDM
Regulatory & Compliance
CommunityAdvocacy
Bus CapitalProjects
Project Development
Office of Transit & Ridesharing
30 Employees
41
Office of Transit & Ridesharing
• Contract Services and Support• Project Development• Bus Capital Projects• Marketing and Transportation Demand
Management• Community Advocacy• Regulatory and Compliance
42
Office of Rail45 Employees
Office of RailPublic Transit Administrator
Rail Design and Construction
Public Transit Assistant Administrator
Rail OperationsPublic Transit Assistant Administrator
Construction Design Property Administration and Control
Stations & Business Development
Line Property Management
Maintenance of Infrastructure
OperationsMaintenance
Maintenance of Equipment
Communications
Rail Regulatory
Security
43
Office of Rail – Rail Design and Construction
• Office of Intermodal Design and Construction
• Operations• Rail Equipment Maintenance• Infrastructure Maintenance• Property Administration/Control• Security• Regulatory and Compliance
44
Challenges
• Capital needs vs. resources 2010 - 2014– $3.4B Need– $2.1B Projected – $1.2B Shortfall
• Operating subsidy – $267M annual subsidy in 2010– Inflation, service contract increases
• System Expansion– Rail Yard/M8– NHHS– Shore Line East– Busway– Bus service expansion/ADA growth
• Service delivery • Staff resources, capabilities, succession
46