Bureau of Public Transportation

Transportation Strategy Board

PresentationMay 19, 2010

James P. RedekerBureau Chief, Public Transportation

1

Bureau of Public Transportation

MISSION STATEMENT

The mission of the Bureau of Public Transportation is to develop, maintain, and operate a system that provides for the safe, efficient and sustainable movement of people and goods.

2

STRATEGIC OBJECTIVES

• Maintain existing systems at a state of good repair and enhance system safety and security

• Improve efficiency and effectiveness of transit service delivery

• Expand services to capture a greater share of existing markets and address specific new markets

Bureau of Public Transportation

3

BUREAU PROFILE• Unique service delivery model in

Connecticut• ~50% of ConnDOT annual operating

budget• Key role of public transit on

Connecticut economy, air quality, energy conservation, mobility

Bureau of Public Transportation

4

Bureau of Public Transportation

LARGE SERVICE ORGANIZATIONExpenses and Subsidy• Bus and ADA

– $189M in annual operating expenses; $135M CTDOT Subsidy• For Rail

– $380M in annual operating expenses; $88M CTDOT Subsidy

Ridership (annual)• Bus and ADA - 38,200,000 passenger trips• Rail trips – 37,700,000 passenger trips

Ownership• 300 rail vehicles and 1000 buses and paratransit vehicles• New Haven Line (in CT) and 3 branch lines; 6 Freight lines

5

Bureau of Public Transportation

SYSTEM PROFILE

6

Public Bus Services

7

Statewide Bus System Profile

Total Bus Transit System (CTTRANSIT, Express Bus, Transit Districts, ADA, Dial-a-Ride and Shuttle Services)

•Annual Passenger Trips – 38,200,000•Annual Revenues - $39,000,000•Annual Subsidy and non-Subsidy Expenses - $189,000,000•Total Annual Subsidy - $141,000,000•CDOT Share of Annual Subsidy - $135,000,000•Average Subsidy/Passenger - $3.52

Subsidy/Passenger by Service Type•Urban -$3.09•Express Bus - $3.83•Rural - $7.63•ADA Services - $28.35

8

Commuter Rail Services

New Haven Line and three Branch Lines

•35 Stations

•37 Million Annual Trips

Shore Line East

•8 Stations

•560,000 Annual Trips

9

Rail Passenger System Profile

•New Haven Line•Weekday Trains – 289•Saturday-178 trains / Sunday-148 trains•Annual Passenger Trips - 37,000,000•Annual Revenues - $253,000,000•Annual Expenses - $360,000,000•Total Annual Subsidy - $107,000,000•CDOT Share of Annual Subsidy - $70,400,000•Subsidy/Passenger - $1.90

•Shore Line East •Weekday Trains -23 (Monday-Thursday), 25 Friday•Saturday 16 trains / Sunday 16 trains •Annual Passenger Trips – 590,000•Annual Revenues - $2,200,000•Annual Expenses - $19,900,000•Total Annual Subsidy - $17,700,000•Subsidy/Passenger - $30.00

10

Rail Freight Service

11

Rail Freight System Profile

• Over 50,000 carloads (four million tons) originate or terminate annually in Connecticut

•Eight Rail Freight Carriers in Connecticut

•ConnDOT’s Rail Freight Initiatives•Gross Receipts Tax Exemption Program•Rail Preservation and Improvement Program•Relay track materials from passenger lines•Acquisition of abandoned rights of way

12

Bureau of Public Transportation

FUNDING THE SYSTEM

13

Bureau of Public Transportation

FUNDING SOURCES

• Annual Federal Transit Administration (FTA) Formula Funds

• State provides the non-federal share for most rail and bus capital improvements

• Annual State Bond Authorization

• Special Authorizations

• Other funding sources (e.g., FRA, ARRA)

14

ARRA – Economic Stimulus(Total for Bus and Rail Transit =

$152M)BUS• Statewide Bus Replacement Procurement

Program (purchase includes up to 106 Hybrid buses) - $70M

• Norwalk Transit District Pulse Point Safety and Security Improvements - $1.5M

• Windham Transit District Bus Storage Canopies - $270K

• Statewide Park and Ride Lot Improvements - $2M

• Bus Engine Repowering - Greater Bridgeport Transit - $2.8M

15

ARRA – Economic Stimulus(Total for Bus and Rail Transit =

$152M)RAIL• Danbury Branch Signalization and

Centralized Traffic Control (CTC) - $31M• New Haven Yard Component Change-Out

(CCO) Maintenance Shop for new M8 rail cars - $30M

• New Haven Line (NHL) Station Improvements - $10M

• Branford Station Parking Lot - $5M

16

• Annual Public Transportation Capital Program

$140 M to $160 M per fiscal year

» State: $40M Bonding

» Federal: Grown to $100 MM in Formula Funds

» Federal Discretionary Varies Year-to-Year

• An additional $1.2 Billion is programmed over the next 10 years - based on forecasted availability, not needs

• Additional federal funding likely to be limited

• Use of CMAQ funds (”flexing”)

Bureau Capital Issues

17

Bureau of Public Transportation

CAPITAL NEEDS

18

Bureau of Public TransportationMajor Capital Improvements• New Britain-Hartford Busway

• CTTRANSIT Fleet Replacement• CTTRANSIT New Haven Division

Maintenance Facility• M-8 Rail Car Procurement• New Haven Maintenance Facility Complex• New Haven Line Catenary Replacement• Railroad Movable Bridge Rehabilitation and

Replacement

19

Bureau of Public Transportation

CAPITAL NEEDSBUS

20

Capital Issues:Bus Rolling Stock

• Fleet Replacements– 1000+ vehicles; 600+ full-size buses– 1/4 already overdue for replacement– Cost: $200 million - just for buses– Timeliness of replacement based on

availability of funds

• New and Expanded Services– Job Access; Commuter Connections; TSB

Services; Service Initiative

• Replacement of lost seating capacity

21

Capital Issues:Bus Facilities

• New and Updated Facilities– $150 million for New Haven;

Waterbury; Needs in Torrington, Windham, Norwalk (expansion), SEAT

22

Bus Capital Issues:New Services and Gaps

• Amenities - ITS; Shelters• New Technologies

– Radios/GPS/AVL– Fareboxes/Smart Cards– Clean Fuels and Environmental Quality

• Bus Rapid Transit– A new style of service

• New Britain-Hartford BRT in Final Design• Route 1 BRT Norwalk to Stamford – in Planning

Stage23

24

• Joint study: ConnDOT, CRCOG, CCRPA, Towns

• I-84 Corridor West of Hartford including Arterial Roadways, Neighborhoods, Rail Lines

• Alternatives Studied– Commuter Rail– Light Rail– Bus Rapid Transit– High-Occupancy Vehicle Lanes– Highway Widening

• Joint study: ConnDOT, CRCOG, CCRPA, Towns

• I-84 Corridor West of Hartford including Arterial Roadways, Neighborhoods, Rail Lines

• Alternatives Studied– Commuter Rail– Light Rail– Bus Rapid Transit– High-Occupancy Vehicle Lanes– Highway Widening

New Britain – Hartford Busway Major Investment Study (July 1999)

24

25

Busway -- Key Project Elements:Travel Time Savings/ Quality of ServiceBusway -- Key Project Elements:Travel Time Savings/ Quality of Service

• Travel Time Savings and Reliability - Separate guideway – “Like Rail”

• Flexibility - Different service styles (shuttle, collector, express, feeder); Ease of Adding New Services and Extensions

• One-seat ride• Convenience – Improved Frequency, Level Boarding• Quality of Service

– Stations with amenities– ITS – Intelligent Transportation Systems

• Real-time passenger information• Signal Preference• CCTV• Proof-of-Payment Fare Collection

• Travel Time Savings and Reliability - Separate guideway – “Like Rail”

• Flexibility - Different service styles (shuttle, collector, express, feeder); Ease of Adding New Services and Extensions

• One-seat ride• Convenience – Improved Frequency, Level Boarding• Quality of Service

– Stations with amenities– ITS – Intelligent Transportation Systems

• Real-time passenger information• Signal Preference• CCTV• Proof-of-Payment Fare Collection

25

26

27

Bureau of Public Transportation

CAPITAL NEEDSRAIL

28

State Rail Plan

• Plan horizon 2010-2030• Current condition of rail system in

Connecticut – passenger and freight• Recommend strategies for

responsible system growth and interconnectivity

• Identify constraints and needs• Enhance regional mobility

29

Bureau of Public Transportation

• Rolling Stock (both NHL and SLE)– M8 cars– 300 purchased with option for 80

additional cars

30

M8 Electric Multiple Unit

31

Bureau of Public Transportation

– Infrastructure (New Haven Line in CT owned by CTDOT) (SLE cost sharing)• Track• Bridges• Signal (PTC)

32

Saga Moveable Bridge

33

Moveable Bridge Rehabilitation Program

• Walk and Saga bridges $450M (includes catenary replacement)– Currently in design phase, $393M

programmed for construction

• Devon and Cos Cob bridges $1B– Currently in engineering, feasibility

and economic analysis study – Construction funds not programmed

34

Fairfield Metro Station

35

West Haven Station

36

New Haven – Harford –

Springfield

NYC

NYC – Boston (Inland Route)• NYC – New Haven• New Haven – Springfield• Springfield – Boston

NYC - MA - VT - MontrealKnowledge Corridor proposal +

Vermonter or Montrealer

• NYC – New Haven• New Haven – Springfield• extensions north of Springfield

• Greenfield, MA• Bellows Falls or White River Jct, VT

• Montreal

Both depend on increased capacity for NHHS section.

Hartford

Springfield

Boston

New Haven

Montreal

aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa

NHHS projectlimits

37

Bureau of Public Transportation

STAFFING

38

Bureau of Public Transportation Organization

Chart

Bureau Chief Chief of Public Transportation

James Redeker

Office of Transit and RidesharePublic Transit Administrator

Michael Sanders

Office of RailPublic Transit Administrator

Eugene Colonese

40

Office of Transit and RidesharePublic Transit Administrator

Program Design and ProjectImplementationTransit Manager

Transit Development andSupport Services

Transit Manager

Contract Services& Support

Marketing and TDM

Regulatory & Compliance

CommunityAdvocacy

Bus CapitalProjects

Project Development

Office of Transit & Ridesharing

30 Employees

41

Office of Transit & Ridesharing

• Contract Services and Support• Project Development• Bus Capital Projects• Marketing and Transportation Demand

Management• Community Advocacy• Regulatory and Compliance

42

Office of Rail45 Employees

Office of RailPublic Transit Administrator

Rail Design and Construction

Public Transit Assistant Administrator

Rail OperationsPublic Transit Assistant Administrator

Construction Design Property Administration and Control

Stations & Business Development

Line Property Management

Maintenance of Infrastructure

OperationsMaintenance

Maintenance of Equipment

Communications

Rail Regulatory

Security

43

Office of Rail – Rail Design and Construction

• Office of Intermodal Design and Construction

• Operations• Rail Equipment Maintenance• Infrastructure Maintenance• Property Administration/Control• Security• Regulatory and Compliance

44

Bureau of Public Transportation

CHALLENGES

45

Challenges

• Capital needs vs. resources 2010 - 2014– $3.4B Need– $2.1B Projected – $1.2B Shortfall

• Operating subsidy – $267M annual subsidy in 2010– Inflation, service contract increases

• System Expansion– Rail Yard/M8– NHHS– Shore Line East– Busway– Bus service expansion/ADA growth

• Service delivery • Staff resources, capabilities, succession

46