Bulletin Vol 2 Issue 1 - entracon.com.au · Volume 2, Issue 1 Lower Yarra River Biodiversity,...

11
www.entracon.com.au the bulletin ENTRACON QUARTERLY UPDATE Volume 2, Issue 1 AUTUMN /WINTER 2011 In this issue… Completed Projects Gisborne Secondary College Stormwater Drainage Upgrade Gisborne, VIC Leopold No1 Sewage Pump Station Installation , Leopold, VIC Painkalac Reservoir Embankment and Spillway Upgrade, Painkalac, VIC Mitchells Run Laurimar Drain, Doreen, VIC Current Projects Blessington St Relief Drain, St Kilda VIC Lower Yarra Biodiversity, Toorak, VIC Peninsula Ave Flood Alleviation, Rye, VIC Reflection Estate Wetland, Taneit, VIC Royal Botanic Gardens Working Wetlands, Melbourne VIC Lower Yarra Biodiversity Project, Toorak, VIC The 'Lower Yarra River Biodiversity Linkages Project' is a ground breaking Stonnington City Council funded project that will increase habitat connectivity, improve water quality and provide recreational and educational opportunities for people to interact with Melbourne's landmark river. Through clever environmental design the project uses materials obtained through sustainable or recyclable sources and is the first in the State to utilise a Hydro- Break Diversion chamber to regulate stormwater inflow. The works involve indigenous riparian revegetation, construction of an ephemeral wetland system, realignment and upgrade of a section of bicycle path, and the construction of a pedestrian boardwalk. An Ephemeral Wetland The Ephemeral Wetland system is designed to capture the stormwater runoff from the surrounding hard surfaces (roads, footpaths etc.) and remove litter, sediment and pollutants such as nitrogen and phosphorous. A gross pollutant trap, sediment pond and the wetland vegetation will retain the pollutants and treat the stormwater prior to it being discharged into the Yarra River. Biodiversity Improvements Native vegetation will be reinstated on the river banks, from Floodplain Riparian Woodland to Plains Grassy Woodland. This, along with the establishment of the wetland area, will enhance the local habitat and encourage native birds and wildlife to the area. Elevated Boardwalks Elevated boardwalks made from recycled material enables users to experience views of the wetlands and the river. Entracon 51 Melverton Drive Hallam VICTORIA 3803 Ph: 03 8786 3700 Fax: 03 8786 3722 Email: [email protected]

Transcript of Bulletin Vol 2 Issue 1 - entracon.com.au · Volume 2, Issue 1 Lower Yarra River Biodiversity,...

Page 1: Bulletin Vol 2 Issue 1 - entracon.com.au · Volume 2, Issue 1 Lower Yarra River Biodiversity, Toorak, VIC Client: City of Stonnington Project Design: Storm Consulting Contract Sum:

www.entracon.com.au

the bulletin

ENTRACON QUARTERLY UPDATE

Volume 2, Issue 1

AUTUMN /WINTER 2011

In this issue…

Completed Projects

Gisborne Secondary College Stormwater Drainage Upgrade Gisborne, VIC Leopold No1 Sewage Pump Station Installation , Leopold, VIC Painkalac Reservoir Embankment and Spillway Upgrade, Painkalac, VIC Mitchells Run Laurimar Drain, Doreen, VIC Current Projects

Blessington St Relief Drain, St Kilda VIC Lower Yarra Biodiversity, Toorak, VIC Peninsula Ave Flood Alleviation, Rye, VIC Reflection Estate Wetland, Taneit, VIC Royal Botanic Gardens Working Wetlands, Melbourne VIC

Lower Yarra Biodiversity Project, Toorak, VIC

The 'Lower Yarra River Biodiversity Linkages Project' is a ground breaking Stonnington City Council funded project that will increase habitat connectivity, improve water quality and provide recreational and educational opportunities for people to interact with Melbourne's landmark river. Through clever environmental design the project uses materials obtained through sustainable or recyclable sources and is the first in the State to utilise a Hydro-Break Diversion chamber to regulate stormwater inflow. The works involve indigenous riparian revegetation, construction of an ephemeral wetland system, realignment and upgrade of a section of bicycle path, and the construction of a pedestrian boardwalk.

An Ephemeral Wetland The Ephemeral Wetland system is designed to capture the stormwater runoff from the surrounding hard surfaces (roads, footpaths etc.) and remove litter, sediment and pollutants such as nitrogen and phosphorous. A gross pollutant trap, sediment pond and the wetland vegetation will retain the pollutants and treat the stormwater prior to it being discharged into the Yarra River.

Biodiversity Improvements Native vegetation will be reinstated on the river banks, from Floodplain Riparian Woodland to Plains Grassy Woodland. This, along with the establishment of the wetland area, will enhance the local habitat and encourage native birds and wildlife to the area.

Elevated Boardwalks Elevated boardwalks made from recycled material enables users to experience views of the wetlands and the river.

Entracon 51 Melverton Drive Hallam VICTORIA 3803

Ph: 03 8786 3700 Fax: 03 8786 3722

Email: [email protected]

Page 2: Bulletin Vol 2 Issue 1 - entracon.com.au · Volume 2, Issue 1 Lower Yarra River Biodiversity, Toorak, VIC Client: City of Stonnington Project Design: Storm Consulting Contract Sum:

www.entracon.com.au

2011 completed projects

Volume 2, Issue 1

Gisborne Secondary College Stormwater Drainage Upgrade, Gisborne, VIC

Client:

Gisborne Secondary College

Project Design:

GHD Matt Vanderpeet

Alexander Van Hall Contract Sum: $0.3M

Works Include

Tree removal and replacement after completion of underground works

Reconstruction of concrete paths and walkways

Construction of new relief drainage

Construction of open earthen swales.

Construction of box culvert crossing

Construction of retaining walls

Removal of paths, kerbs and other existing infrastructure

Miscellaneous landscaping

Key Aspects

Limited access to work areas.

Student and public access, control/management.

Numerous unknown services in work area.

Page 3: Bulletin Vol 2 Issue 1 - entracon.com.au · Volume 2, Issue 1 Lower Yarra River Biodiversity, Toorak, VIC Client: City of Stonnington Project Design: Storm Consulting Contract Sum:

www.entracon.com.au

2011 completed projects

Volume 2, Issue 1

Leopold No1 Sewage Pump Station Installation, Geelong, VIC

Client:

Barwon Water Alliance

Project Design:

Barwon Water Alliance

Contract Sum: $0.365M

Works Include Bulk excavation

Installation of a triple cell class 3 RRJ DN2100 plastiline emergency storage

Plastic Welding undertaken in accordance with Barwon Water’s confined space requirements.

Installation of storage venting system

Key Aspects Rain/runoff/groundwater

management

Ground conditions (greasy back clay)

Limited working/storage area

Managing deliveries

Undertaking of study to safely lift up to 8.5t pipes

Page 4: Bulletin Vol 2 Issue 1 - entracon.com.au · Volume 2, Issue 1 Lower Yarra River Biodiversity, Toorak, VIC Client: City of Stonnington Project Design: Storm Consulting Contract Sum:

www.entracon.com.au

2011 completed projects

Volume 2, Issue 1

Painkalac Reservoir Embankment and Spillway Upgrade, Painkalac, VIC

Works Include Construction of new downstream access road, box culverts and

associated erosion protection Embankment construction and installation of geogrid reinforcement

layer Maintenance of 2.5km single lane access road Construction of standpipe piezometers and top toe drainage system Construction of 2A and 2B filter protection layers including chimney

filter ≈1000m3 of concrete works Construction of new spillway up to 6m high Existing spillway removal and reinstatement Shot creting and rock anchoring of spillway wall Temporary works to protect the embankment and maintain spillway

flow capacity Removal of existing road access bridge

Key Aspects High rainfall zone Co-ordinating delivery of large

box culverts and link slabs Over topping spillway Frequent heavy rainfall events High bush fire risk

Client:

John Hollands/ Barwon Water Alliance

John Hollands Project Team:

Graeme Addison Peter Casey

Bruce Anderson Jason Hoare

Tim Anderson

Project Design:

SKM Craig Johnson

Contract Sum: $2.9M

Page 5: Bulletin Vol 2 Issue 1 - entracon.com.au · Volume 2, Issue 1 Lower Yarra River Biodiversity, Toorak, VIC Client: City of Stonnington Project Design: Storm Consulting Contract Sum:

www.entracon.com.au

2011 completed projects

Volume 2, Issue 1

Mitchells Run Laurimar Drain, Doreen, VIC

Client:

Dacland Management

Project Design:

CPG Leigh Holmes

Contract Sum: $3.2M

Works Include

Construction of wetland

Construction of culvert crossing

Feature rock retaining wall

Stormwater drainage

Concrete paths

Landscaping

Key Aspects

Construction of wetlands in basalt rock

Environmental management (including dust and water runoff) with consideration to abutting existing subdivision

Restricted site conditions and working in conjunction with separate subdivision contractor

Management of water in existing stream and floodway

Page 6: Bulletin Vol 2 Issue 1 - entracon.com.au · Volume 2, Issue 1 Lower Yarra River Biodiversity, Toorak, VIC Client: City of Stonnington Project Design: Storm Consulting Contract Sum:

www.entracon.com.au

2011 current projects

Volume 2, Issue 1

Blessington St Relief Drain, St Kilda, VIC

Client: City of Port Phillip

Project Design:

JDS Civil Designs

Key Aspects

Works undertaken within the high profile area of St Kilda Beach

Construction works undertaken 1m below water table

Working within limited tide times Complex lifting and installation of a

precast headwall constructed onsite by Entracon’s concrete team

Works Include

Site Preparation including cleaning and stripping of base

Sheet piling of temporary bund for protection for works

Construction of twin 600dia relief drain Removal of existing end wall and construction of

a new end wall Modification to an existing junction pit Reinstate rock seawall behind new structure

Page 7: Bulletin Vol 2 Issue 1 - entracon.com.au · Volume 2, Issue 1 Lower Yarra River Biodiversity, Toorak, VIC Client: City of Stonnington Project Design: Storm Consulting Contract Sum:

www.entracon.com.au

2011 current projects

Volume 2, Issue 1

Lower Yarra River Biodiversity, Toorak, VIC

Client:

City of Stonnington

Project Design:

Storm Consulting Contract Sum: $1.1M

Works Include Removal of existing paths and concrete edging Pavement construction with tooberac topping paving and crushed rock

paving Wetlands construction Construction of recycled plastic boardwalk Retaining wall construction consisting of steel columns & sustainably

harvested timbers Landscaping of garden beds and wetlands Pipe jacking under Alexandra Ave to connect into existing Stormwater

line Installation of the first Rocla Hydro-Break diversion chamber in Victoria Installation of CDS GPT Various hard landscaping works

Key Aspects

Significant trees retained to enhance amenity

Majority of all products and materials sourced from sustainable or recyclable sources

Complex traffic management issues associated with pedestrians, cyclists and motor vehicles

Increased environmental controls required working next to Yarra River

Page 8: Bulletin Vol 2 Issue 1 - entracon.com.au · Volume 2, Issue 1 Lower Yarra River Biodiversity, Toorak, VIC Client: City of Stonnington Project Design: Storm Consulting Contract Sum:

www.entracon.com.au

2011 current projects

Volume 2, Issue 1

Peninsula Ave Flood Alleviation, Rye, VIC

Client:

Mornington Peninsula

Shire

Project Design:

GHD Contract Sum: $0.85M

Works Include

Excavation and construction of a new soak pit

Supply and install GPT Supply and installation of

packaged pump station Construction of RRJ rising main Installation of new rainvault

storage tank Installation of new street

drainage Supply and Installation of

Irrigation Pump Station /Truck Filling Station/Bore Pump

Key Aspects

Working with Community and local sporting groups

High groundwater table Traffic Control Existing Services

Page 9: Bulletin Vol 2 Issue 1 - entracon.com.au · Volume 2, Issue 1 Lower Yarra River Biodiversity, Toorak, VIC Client: City of Stonnington Project Design: Storm Consulting Contract Sum:

www.entracon.com.au

2011 current projects

Volume 2, Issue 1

Reflections Estate Wetland, Tarneit, VIC

Client:

National Pacific Properties

Project Design:

CPG

Contract Sum: $3.5M

Works Include Site Clearing and bulk earthworks

Construction of Wetlands and associated drainage pits

Concrete work and fencing

Construction of new box culvert crossing

Landscaping

Key Aspects

Excavation in rock Working within a live

waterway Limited Stockpile space Traffic/Pedestrian

management

Page 10: Bulletin Vol 2 Issue 1 - entracon.com.au · Volume 2, Issue 1 Lower Yarra River Biodiversity, Toorak, VIC Client: City of Stonnington Project Design: Storm Consulting Contract Sum:

www.entracon.com.au

2011 current projects

Volume 2, Issue 1

Royal Botanic Gardens Working Wetlands, Melbourne, VIC

Client: Royal Botanic Gardens

Melbourne

Client Representative/Project Manager:

Stephen Patterson

Project Design:

GHD David Howard

Contract Sum: $2.0M

Works Include

Silt Relocation within gardens Construction of Multiple Feature

Wetlands Approx 1.5km Horizontal Directional

Drilling Approx 200m Micro Tunnelling /

Boring (Pipe jacking) Construction of 3 Pump Stations Installation of 2 number CDS Gross

Pollutant Traps Insitu Concrete Works — Pit

Constructions and Modification

Key Aspects Pedestrian Control/Management

Preservation and protection of Flora and Fauna

Poor Foundations for wetland construction

Silt Management

Limited working area for micro tunnelling

Preservation of Heritage Listed areas and objects

Page 11: Bulletin Vol 2 Issue 1 - entracon.com.au · Volume 2, Issue 1 Lower Yarra River Biodiversity, Toorak, VIC Client: City of Stonnington Project Design: Storm Consulting Contract Sum:

2011 Other News

www.entracon.com.au Volume 2, Issue 1

OH & S and Training Matt Brain obtained his Excavator and Dozer accreditation. Robert Davis, Sam Triantis, Scott Slade obtained their

Trench Shoring Certificate. Troy Hartwick, Clint Hotchin obtained their excavator ticket Kevin Pepyet re-qualified for working in confined spaces.

New to the Fleet

A Komatsu PC450LC-8 will be welcomed on many job sites, easing the increasing demand for excavators.

Welcome

Aaron Mullarvey Labourer

Bill Harris Labourer

Matthew Brain Labourer

Cameron Barber Labourer

Farewell

Ryan Morey