Bulletin insert sponsorships 071514 original
1
You may noced that some drainage work happening in the middle of the campus which is needed before construcon. At a recent Building Commiee meeng progress was made regarding the size of the gym floor, opons for flooring; and, the construcon design of the Porte-cochere. Thanks to all of you for your interest, financial and prayerful support. We connue to move the projects forward. God bless Fr. TOM Pledges - $2,480,000 Cash on Hand - $1,400,414 We would like to give a very special thank you to our Vendors who have supported our parish by contributing to the Capital Campaign through their business. Silver Business Partners ($1,000-$4,999) ERO Maintenance July 12th & 13th
-
Upload
st-jean-vianney-catholic-church -
Category
Documents
-
view
217 -
download
1
description
http://www.stjvchurch.org/uploads/media_items/bulletin-insert-sponsorships-071514.original.pdf
Transcript of Bulletin insert sponsorships 071514 original
You may noticed that some drainage work happening in the middle of the campus which is needed before construction. At a recent Building Committee meeting progress was made regarding the size of the gym floor, options for flooring; and, the construction design of the Porte-cochere. Thanks to all of you for your interest, financial and prayerful support. We continue to move the projects forward. God bless Fr. TOM
Pledges - $2,480,000 Cash on Hand - $1,400,414
We would like to give a very special thank you to our Vendors who have supported our parish by
contributing to the Capital Campaign through their business.
Silver Business Partners ($1,000-$4,999)
ERO Maintenance
July 12th & 13th