    ContentsContents

    1. Introduction

    2. Preliminary Data & Site Analysis

    3. Guideline for Heritage Site

    4. Proposed Development Concept Plan

    5. Preliminary Land Acquisition Cost

    6. Conclusion

  • 8/8/2019 Bukit Cina Development Plan

    3/34

    INTRODUCTION

    Kampung Bukit Cina

    situated within the BandarHilir of Melaka Tengah

    District.

    Situated within WorldHeritage Site - Buffer Zone.

    The proposed area covers

    an area of 44.15 arces.

  • 8/8/2019 Bukit Cina Development Plan

    4/34

    Goal Proposed development concept for the world heritage site

    and a more systematic for variety of activities. Proposes the provision of community facilities and sites to

    improve the economy in Bukit China.

    Objective

    Identifying clearly existing issues, constraints and potentials of

    the study site,

    Improving function and value of the proposed land uses,

    Generates greater convenience for the sites users,

    Enhancing and beautifying of the current settings, Controlling and managing negative environmental and social

    impacts, and

    Reduced construction, operation and maintenance costs.

  • 8/8/2019 Bukit Cina Development Plan

    5/34

    Area Potentials

    Research scope

    will covers all

    sectors in the

    study area.

    The boundary of the site study is JalanTemenggong, Jalan Munshi Abdullah and Jalan

    Bendahara

  • 8/8/2019 Bukit Cina Development Plan

    6/34

    Development Context

    Importance of development

    the area is located in buffer zone for the world heritagesite.

    Close to the main tourist areas at the City AFamosa To ensure the area is safe and comfortable for

    community and tourist.

    Regeneration approach

    Urban regeneration is a complex combination of

    social, economic, planning, construction and

    management activities.

  • 8/8/2019 Bukit Cina Development Plan

    7/34

    Results of S.W.O.TAnalysisSTRENGTHS

    1. The location of the study area create potential in developing a new commercialarea

    2. It can be one of historical area because there linear with the perigi Hang Li Po

    3. There is an existing accessibility in supporting a new development

    4. majority of the building use at the ground level are commercial based activities.

    5. majority of the building use at the ground level are commercial based activities.

    6. Have services road along Jalan Munsyi Abdullah.7. Cover public bus route.

    8. Main access to tourism center on Jalan Laksamana.

    9. It is use as inner road for vehicle to move from Jalan Munsyi Abdullah-Jalan

    Temenggong.

    10. Existing piping system along main road.

    11. A strong culture12. Dominant trees

    13. Location

    14. Activities support

  • 8/8/2019 Bukit Cina Development Plan

    8/34

    Results of S.W.O.TAnalysis cont.WEAKNESSES

    1. There is a plot ratio restriction in doing a development in the study area2. This area become as black area that encourage crime and social problem.

    3. The land ownership of the area would make it harder to develop the area

    4. Buildings are built about 50 60 years ago.

    5. Improper taxi stand.

    6. No pedestrian makes people to walk on the street especially from Jalan Temenggong junction

    to bus stop.

    7. On-street parking on both side lead to traffic congestion.8. Minimum pedestrian linkage more on shop houses corridor.

    9. Narrow road especially towards Jalan Temenggong.

    10. On-street parking on both side of road.

    11. Conflict between commercial use and residential use contribute to traffic congestion.

    12. Piping system in residential area were not proper

    13. Electricity system are old

    14. No individual septic maintenance.15. Domestic waste are clogging drainage system

    16. Waste management are not efficient.

    17. Lack of open space for the community

    18. Discontinous linkages

    19. Lack of hard landscape study area

  • 8/8/2019 Bukit Cina Development Plan

    9/34

    Results of S.W.O.TAnalysis cont.OPPORTUNITIES

    1. Development of commercial activities because demand at site area are high dueto the development pressure especially at adjacent area.

    2. Can become other attractive site to tourist.

    3. Possible access to Kg. Bukit Cina

    4. To cover side drain as pedestrian.

    5. Enhancing pedestrian walkways.

    6. Upgrading as one of potential access to Kg. Bukit Cina.7. Upgrading from 2 lane to 3 lane.

    8. Possible acces to Kg. Bukit Cina.

    9. Expand inlined with development growth

    10. Promote green intelligent technology for new infrastructure development

    11. Green lung

    12. Transitional space13. Lost Space

    14. Poor User security

  • 8/8/2019 Bukit Cina Development Plan

    10/34

    Results of S.W.O.TAnalysis cont.THREATS

    1. Illegal activities make land use chaos2. Dangerous junction between Jalan Munsyi Abdullah-Jalan Bukit Cina and Jalan

    Puteri Hang Li Po.

    3. Illegal parking create traffic congesion.

    4. Narrow road contribute to traffic congestion and this road are used by bus.

    5. Shading area

    6. Imageability7. Lost Space

  • 8/8/2019 Bukit Cina Development Plan

    11/34

    Guideline ForHeritage Site

    There are three main guidelines used in the

    Bandar Hilir, Malacca to preserve their historicalarea:

    1. Planning guidelines

    2. Preservation guidelines

    3. Specific guidelines

  • 8/8/2019 Bukit Cina Development Plan

    12/34

    Planning guidelines - described as functions of Malacca

    town, land use, buildings use, ownership status, andothers.

    Preservation guidelines - to control the development or

    appearance of building in the city centre of Malacca

    Specific guidelines - give particular emphasis to certainplaces. Each area has its own guidelines and different

    from other areas.

    E.g the guidelines used for Jalan Bunga Raya is different

    Lorong Hang Jebat.

  • 8/8/2019 Bukit Cina Development Plan

    13/34

    Proposed

    DevelopmentConcept Plan

  • 8/8/2019 Bukit Cina Development Plan

    14/34

    Proposal Statement

    Proposed plan ofKg Bukit Cina developed in order to

    clarify vision, mission and values to assist in the effort todevelop a stronger identity.

    Serve as a tool to guide the state government, local

    authorities and the local community for the area

    developments intentions and direction.

    Having a new town image and beautiful city park are

    immense resources for a small community.

  • 8/8/2019 Bukit Cina Development Plan

    15/34

    Reason ForOpting The Design Concept

    1. Local planning policy - visioning the policies done and

    accepted by the state government concentrating onresolving essential aspect;

    - improving visual quality and physical facilities,

    - retaining multi racial culture, and

    - strengthening the management of the area.

    2. Vacant spaces and buildings improvement

    - Old buildings poses significant architectural and activities

    from previous time.- Transform vacant spaces into functional and lively spaces

    for the local and its surroundings.

  • 8/8/2019 Bukit Cina Development Plan

    16/34

    Reason ForOpting The Design Concept cont.

    3. Location- the area located adjacent to the main road from

    Ayer Keroh to Town Center making easily to access. Being at

    the center of the Bandar Hilir; giving it an advantage for it to

    become as a hub to surrounding area especially interest places

    and tourist hot spot.

    4. Creating new image Integrated development combining the

    old and new element to ensure its existence and follows the

    current trend thus becoming more vibrant and livable living

    environment.

  • 8/8/2019 Bukit Cina Development Plan

    17/34

    Conceptual Plan.

  • 8/8/2019 Bukit Cina Development Plan

    18/34

  • 8/8/2019 Bukit Cina Development Plan

    19/34

  • 8/8/2019 Bukit Cina Development Plan

    20/34

  • 8/8/2019 Bukit Cina Development Plan

    21/34

  • 8/8/2019 Bukit Cina Development Plan

    22/34

  • 8/8/2019 Bukit Cina Development Plan

    23/34

  • 8/8/2019 Bukit Cina Development Plan

    24/34

  • 8/8/2019 Bukit Cina Development Plan

    25/34

  • 8/8/2019 Bukit Cina Development Plan

    26/34

    Goals

    Kg Bukit Cina being identify to become community-friendly

    perspective, safe and healthy environment, and recreationalactivities as the most important attributes of this area.

    The potential strength of any community can be measured by the

    belief in its goals for the future.

    This has to be worked together to establish objectives to be

    completed in order to meet the following goals:

  • 8/8/2019 Bukit Cina Development Plan

    27/34

    Goals cont.

    Tourism Bandar Hilir has become a hot spot for tourists, and

    Kg Bukit Cina is working to identify itself as a destination point.

    Community Park The area will be planted over 100 trees, Public

    Square, playground equipment and restrooms will be installed by

    2012.

    Main Street Renovation - To attract new business and maintain

    their existing businesses, Kg Bukit Cina has started a Main Street

    Renovation Project.

  • 8/8/2019 Bukit Cina Development Plan

    28/34

    Water, Sewer and Street Improvements Work will be done to

    maintain and improve the streets, water and sewer facilities in KgBukit Cina.

    Housing As the community continues to attract new business,

    the need for quality and affordable housing increases.

    Community Center A Community Complex

    to be established in the newer addition

    providing a public library and computer

    lab for Kg Bukit Cina citizens.

    Goals cont.

  • 8/8/2019 Bukit Cina Development Plan

    29/34

    Outdoor Theater Working within the Main Street theme and

    the small town attractions for tourists and residents.

    Motel To meet the needs of and folks coming home for

    class/family reunions; and, as the communitys manufacturing

    and retail businesses grow

    Goals cont.

  • 8/8/2019 Bukit Cina Development Plan

    30/34

    Recommendations

    The following recommendations are made for ensuring the goals

    and objectives as outlined in the Kg Bukit Cina Strategic Plan areachieved.

    - Increase community awareness of the importance of planning

    and implementation of the Kg Bukit Cinas short-term and

    long-term goals.

    - Ensure that information and education, regarding federal,

    state and local incentive programs, are communicated

    at all possible levels so that all who live in Kg Bukit Cina mayhave the same opportunities.

  • 8/8/2019 Bukit Cina Development Plan

    31/34

    Recommendations cont.

    - Encourage current businesses to learn about expansion

    income available for technology-related improvements andemployee training programs.

    - Educate new members to the community on the contents of

    the Strategic Plan and invite them to volunteer which will bring

    new life and energy to existing committees.

    - Encourage an environment within the town ofKg Bukit Cina

    where new ideas and brainstorming are part

    of the daily conversation.

  • 8/8/2019 Bukit Cina Development Plan

    32/34

    Recommendations cont.

    - Educate new members to the community on the contents of

    the Strategic Plan and invite them to volunteer which will bringnew life and energy to existing committees.

    - Encourage an environment within the town ofKg Bukit Cina

    where new ideas and brainstorming are part

    of the daily conversation.

  • 8/8/2019 Bukit Cina Development Plan

    33/34

    Description Conceptual Estimated

    Cost

    Estimated Pre-Development Cost RM 19,480,000.00

    Preliminary Land Acquisition Cost RM 25,324,000.00

    Estimated Financial Cost RM 90,000,000.00

    Estimated Construction Cost RM 194,800,000.00

    Estimated Project Management

    Cost

    RM 19,480,000.00

    TOTALTOTAL RM 349,084,000.00

    Conceptual Development Cost Estimation

  • 8/8/2019 Bukit Cina Development Plan

    34/34

    Conclusion

    Regeneration concept is a approach to givesome benefit in more aspects like economy,

    social, environment and culture.

    study is importance to several stakeholders

    like MBMB, PERZIM and other because they

    have better approaches for development plan

    in the buffer zone.