Transcript of Built-In Self-Test of Global Routing Resources in Virtex-4 FPGAs
North Atlantic Test WorkshopNorth Atlantic Test Workshop 11
BUILT-IN SELF-TEST OF BUILT-IN SELF-TEST OF GLOBAL ROUTING RESOURCES GLOBAL ROUTING RESOURCES
IN VIRTEX-4 FPGASIN VIRTEX-4 FPGASJia Yao, Bobby Dixon, Charles Stroud and Jia Yao, Bobby Dixon, Charles Stroud and
Victor NelsonVictor NelsonDept. of Electrical & Computer EngineeringDept. of Electrical & Computer Engineering
Auburn UniversityAuburn University
North Atlantic Test WorkshopNorth Atlantic Test Workshop 22J. Yao 5/15/08J. Yao 5/15/08 22
Outline of PresentationOutline of Presentation
Motivation and backgroundMotivation and background Virtex-4 global routing resourceVirtex-4 global routing resource Routing BIST ImplementationRouting BIST Implementation
for Virtex-4 FPGAsfor Virtex-4 FPGAs Implementation resultsImplementation results Application to Virtex-5Application to Virtex-5 Summary Summary
North Atlantic Test WorkshopNorth Atlantic Test Workshop 33
Fault Simulation Results
0
10
20
30
40
50
60
70
80
90
100
SingleCounter
Dual Counter Dual Parity Cross-Coupled
Parity
Max LengthCAR
All 150-RuleCAR
Fa
ult
Co
vera
ge
(%
)
w/ ORA w/o ORA
0
10
20
30
40
50
60
70
80
90
100
SingleCounter
Dual Counter Dual Parity Cross-Coupled
Parity
Max LengthCAR
All 150-RuleCAR
Fa
ult
Co
vera
ge
(%
)
Dominant BFs Dominant-AND/OR BFs
8
8
6
18 19
24
Stuck-at FaultStuck-at FaultStuck-at valueStuck-at valueFeedback wires Feedback wires can be considered can be considered under test under test
Bridging FaultBridging FaultBest approachesBest approaches8-bit maximum length 8-bit maximum length
sequence CARsequence CAR cross-coupled paritycross-coupled parity
J. Yao 5/15/08J. Yao 5/15/08
North Atlantic Test WorkshopNorth Atlantic Test Workshop 44
Cross-Coupled Parity Approach
F LUT
G LUT
Podd
Cd1
Cd0
F LUT
G LUT
Peven
Cu1
Cu0Slice 0
Slice 2
Slice 1
Slice 3
TPG (Te)count-up
even parity
TPG (To)count-downodd parity
ORA (Oe)even parity
ORA (Oo)odd parity
2
1
1
2
ORAeven parity
ORAodd parity
G LUT
PoddCu1Cu0
Pass/Fail
G LUT
PevenCd1Cd0
Pass/Fail
Test Pattern SequenceCu1Cu0 Po Cd1Cd0 Pe
00 1 11 001 0 10 110 0 01 111 1 00 0
J. Yao 5/15/08J. Yao 5/15/08
North Atlantic Test WorkshopNorth Atlantic Test Workshop 55
Virtex-4 Global Routing ResourcesCLB
Switch Box
Slices (LUTs & FFs)
PIPs
Double/Hex lines
N/S/E/W
10 wires
BEG, MID, END
Long Lines
Switch Box
N/S 2 BEG 0-9
N/S 2 MID 0-9
N/S 2 END 0-9
slices
Long lines
J. Yao 5/15/08J. Yao 5/15/08
North Atlantic Test WorkshopNorth Atlantic Test Workshop 66
BIST for Double lines (North and South)
Test Pattern SequenceCu1Cu0 Po Cd1Cd0 Pe
00 1 11 001 0 10 110 0 01 111 1 00 0
Pass by 1 CLB into MID
pass by 2 CLBs into END
6 wires under test (2 configs)
12 lines under test in parallel
Alternate TPGs, ORAs position
in adjacent CLBs.
BEG 0-9
MID 0-9
END 0-9
To
Te
Oo
OoOe
Oe
Te
To
Oo
OeOo
Oe
Te
To
Oo
OeOo
Oe
BEG 0-9
MID 0-9
END 0-9
BEG 0-9
MID 0-9
END 0-9
J. Yao 5/15/08J. Yao 5/15/08
North Atlantic Test WorkshopNorth Atlantic Test Workshop 77
Loopbacks
SouthEND-to-BEGConnections
LoopbackConnections
At the edges of array via wires in the opposite
direction till the opposite
edge Example:
north double lines loopback at the top edge
J. Yao 5/15/08J. Yao 5/15/08
North Atlantic Test WorkshopNorth Atlantic Test Workshop 88
BIST for Double lines (East and West)
Involve Non-CLB Columns
END and BEG terminals in east and west directions
are connected
J. Yao 5/15/08J. Yao 5/15/08
North Atlantic Test WorkshopNorth Atlantic Test Workshop 99
Non-CLB Column Double Lines
BIST for Non-CLB Column Double LinesTPGs and ORAs locate in
adjacent CLB columns
Use east/west double
lines to connect adjacent
CLB columns
J. Yao 5/15/08J. Yao 5/15/08
North Atlantic Test WorkshopNorth Atlantic Test Workshop 1010
BIST For Hex Lines
Hex lines architecture pass by 3 CLBs into MID, by 6 CLBs into END
more limitation of connections from hex lines to LUTs MID and END terminals share the same PIPs
BIST for hex linessimilar to double lines more configurations needed
J. Yao 5/15/08J. Yao 5/15/08
North Atlantic Test WorkshopNorth Atlantic Test Workshop 1111
Long Lines Architecture
pass by 24 CLBs 5 wire segments
4 wires under testBi-directional two end points: source or input other three stops: input only
Orthogonal direction is tested simultaneously
i
i+1
i+6
i+7
i+12
i+13
i+18
i+19
i+24
i+25
J. Yao 5/15/08J. Yao 5/15/08
North Atlantic Test WorkshopNorth Atlantic Test Workshop 1212
BIST for Long lines
Oe
Oe
Oe
Oe
Oe
Oe
Oe
Oe
Oe
Oe
Oe
Tcu
Tcu
Tcu
Tcd
Tcd
Tcd
Peven
Cuo
Cu1
Cu2
Peven
CLB i
CLB i+6
CLB i+12
CLB i+18
CLB i+24G LUT
PevenCd0-3
Pass/Fail
F LUT
ORAeven parity
(Oe)
TPG count-upeven parity (Tcu)
TPG count-downeven parity (Tcd)
Cu2 Cu1 Cu0 Peven Cd2 Cd1 Cd0 Peven
0 0 0 0 1 1 1 1
0 0 1 1 1 1 0 0
0 1 0 1 1 0 1 0
0 1 1 0 1 0 0 1
1 0 0 1 0 1 1 0
1 0 1 0 0 1 0 1
1 1 0 0 0 0 1 1
1 1 1 1 0 0 0 0
CLB i+2
CLB i+1
CLB i
CLB i+3
CLB i+4
CLB i+5
J. Yao 5/15/08J. Yao 5/15/08
North Atlantic Test WorkshopNorth Atlantic Test Workshop 1313
Global Routing BIST Configurations
RoutingResource
DirectionTotal
ConfigsN S E W
CLB double lines 2 2 2 2 8
Non-CLB column double lines 2 2 4
CLB hex lines 4 4 2 2 12
Non-CLB column hex lines 2 2 4
CLB long lines * * 1 1 2
Non-CLB column long lines 1 1 2
Total BIST Configurations 32
J. Yao 5/15/08J. Yao 5/15/08
North Atlantic Test WorkshopNorth Atlantic Test Workshop 1414
RAM RAM
DSPMIDDLE
Actual Implementation Results
I/O Cell
J. Yao 5/15/08J. Yao 5/15/08
North Atlantic Test WorkshopNorth Atlantic Test Workshop 1515
Application to Virtex-5Global Routing Resource changed
double lines, pent lines and long lines N/S/E/W BEG, MID, END half as the same, half as “L-shaped” which go in
orthogonal direction as well 3 wires for each pattern in each direction
instead of 10 long lines pass by 18 CLBs, four wires
Our approach is adapted to Virtex-5 test for “L-shaped” double/pent lines
J. Yao 5/15/08J. Yao 5/15/08
North Atlantic Test WorkshopNorth Atlantic Test Workshop 1616
SummaryCross-coupled Parity is the best choice
better fault coverage
the most practical for actual implementation
best choice for Virtex-5
BIST of Virtex-4 routing resources
Program to generate BIST configurations
automatically
modified for V-5
J. Yao 5/15/08J. Yao 5/15/08