Build in Quality with Kanban
Dr. Michael Ballé
![Page 2: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/2.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
Agile development?
Start lean
![Page 3: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/3.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
Purpose
Agile
Agile software development is a group of software development methods based on iterative and incremental development, where requirements and solutions evolve through collaboration between self-organizing, cross-functional teams.
From Wikipedia
Lean
Lean is a series or related activities aimed at improving safety, quality, flexibility and productivity through eliminating waste by involving all people all the time in problem solving.
From Taiichi Ohno
![Page 4: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/4.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
Lean & agile
LEAN DELIVERY
AGILE HUMAN INTERFACE
UX
TEAMWORK
CO-CONSTRUCTION
![Page 5: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/5.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
Leap of faith
Agile
• Individuals and interactions over processes and tools
• Working software over comprehensive documentation
• Customer collaboration over contract negotiation
• Responding to change over following a plan
Lean
In order to develop products, first you have to develop people
![Page 6: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/6.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
Built-in-quality
Quality at every step
Quality of customer experience
![Page 7: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/7.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
Built-in quality
Quality of customer experience
I can judge OK vs. NOK on the spot, I can move to the
next step with certainty,
I can be confident
Make every customer
smile, every day on every
product
![Page 8: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/8.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
What is the problem?
Start lean
![Page 9: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/9.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
Voice of customers
![Page 10: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/10.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
Kanban?
1. Visualize workflow
2. Limit work-in-progress
3. Measure and Manage Flow
4. Make process policies explicit
5. Use models to recognize improvement opportunities
![Page 11: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/11.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
And burn-down charts?
• Work through that backlog!
• Make progress visible
• Check progress against predictions
• Cut the scope? Extend the schedule?
![Page 12: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/12.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
Let’s think lean
Are we making the right product?
Are we developing people the right way?
![Page 13: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/13.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
Don’t argue with one-piece-flow
• Only one task at a time!
• Because of down-time, here, you can see three slots = two too many
• Task by task is the only way to really focus on QUALITY
![Page 14: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/14.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
Visual management is about learning from seeing problems, not scheduling
• Engineers used to keep projects on their desk,
• Now in the kanban board, one-piece-flow
• It’s an anti-boss technique to avoid asking for miracles
• It doesn’t solve capacity or flow issues
![Page 15: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/15.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
Develop people by solving problems one-by-one together
Formulate problems
Study countermeasures
Seek root
cause
Visualize activities
![Page 16: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/16.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
Lead-time control: ask ‘why?’
PLANNED ACHIEVED CORRECTLY ON TIME LATE FAILED
![Page 17: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/17.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
Backlog control: ask ‘why?’
• The parking lot holds the backlog – it’s a stock
• Items are picked as needed
• This is where capacity issues appear
![Page 18: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/18.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
Formulate problems
• Specify problems (one per day)
• What did we stumble on?
• What is the immediate cause?
• What can we do to fix it quickly?
• What is the possible root cause?
![Page 19: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/19.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
Learning to see!!!
![Page 20: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/20.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
Write standards
• At code level
• NOT procedures
• But detailed ways to do specific jobs
• With specific tricks of the trade
![Page 21: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/21.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
Teach standards
• Identify core coding tasks each person does every day
• Define a team way of doing so
• Teach every person
• Challenge and improve
![Page 22: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/22.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
Hansei
• Once the code is delivered and accepted
• Was it really what they wanted?
• Are they pleased with it when they use it
• What did we get right? What did we miss?
?
![Page 23: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/23.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
Understanding value
• Software = product
• What are customers preferences?
• How good are we at satisfying these preferences?
• What technical choices do we need to challenge?
![Page 24: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/24.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
Tech innovation
Before • Human Interface developed in
house
• Vision and machine control and interfaces seen as one block
• No make/buy architecture
After • Vision separated from machine
control
• Framework Human Interface is Pharma standard, to be purchased
• Make/buy architecture
![Page 25: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/25.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
Not easy! Managers must be teachers
• Must be able to envisage ideal situation
• And to identify waste
• To come up with kaizen ideas together
• And experiment quickly with the team
• In a worksite willing to accept changes
• So we develop the kaizen spirit, every one, every day
What does the world look like from up here?
![Page 26: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/26.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
The CEO must master lean leadership
![Page 27: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/27.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
Lean lessons
STRATEGY STRUCTURE SYSTEMS
+ CONTINUOUS IMPROVEMENT
INITIATIVE
LEAN TOOLS
IMPROVE:
SAFETY QUALITY FLEXIBILITY
PRODUCTIVITY
LEAN TOOLS to involve EVERY
ONE EVERY DAY
STRATEGY ORGANIZATION
SYSTEMS
![Page 28: Built in Quality by Michael Ballé - Lean IT Summit 2013](https://reader034.fdocuments.us/reader034/viewer/2022051611/54b495184a7959f2738b45e4/html5/thumbnails/28.jpg)
© Copyright Institut Lean France. Textes et illustrations tous droits réservés
Thank you, any questions?