Metropolitan School District of
Washington Township
Building Upon Excellence: The
District Strategic Plan For
Washington Township Schools
Presented to the Board of Education,
December 3, 2007
School Board Study Session, December, 20072
Revisiting of Our Vision and
Mission
• Our Vision: Superior Schools in a
Supportive Community
• Our Mission is to build the mind and
character of every student by teaching the
academic, creative, and social skills
needed to achieve excellence.
School Board Study Session, December, 20073
A Quick Overview of the Process
• Our initial Goal was toearn Districtaccreditation throughthe North CentralAssociation/AdvanceED Process
• We formed a large,broad-based committeewith representativesfrom each school andthe constituency groupsin the community.
Teachers, administrators,parents, and communitymembers met for morethan a year
June 5, 2006
August 30, 2006
October 4, 2006
November 1, 2006
December 6, 2006
February 7, 2007
March 1, 2007
May 2, 2007
June 6, 2007
December 5, 2007
School Board Study Session, December, 20074
The Initial Phase
• April 18 – Parent Council• April 20 – CEC Staff• April 25 – Foundation
Board Meeting• April 26 – Fox Hill PTO• April 30 – Eastwood MS• May 1 – Foundation
Retiree Group• May 7 – Middle School
Staff (Distance learning)
• May 7 – Westlane MS• May 8 – Elementary Staff
(Distance learning)• May 8 – Northview MS• May 29 – St. Luke’s
Methodist Church• May 31 – Light of the
World Christian Church
During the initial phase we conducted meetings to
present the challenges and to listen to our
community.
School Board Study Session, December, 20075
We Identified Four
Broad Themes During the Process
• The importance of excellence in our academic
program
• The need to build the capacity of all
stakeholders to support our children
• The need to reach out to and stay connected
with our community
• The need to efficiently and effectively manage
our resources and facilities
School Board Study Session, December, 20076
Meetings and Forums to Communicate and
Gather Feedback on the Draft Plan• October 16: Eastwood Middle School - Public Forum
• November 1: Westlane Middle School - Public Forum
• November 7: Northview Middle School - Public Forum
• November12: North Central PTO
• November 14: Presentation to Board of Education of the Plansfor Goals 1-3
• November 15: Harcourt Staff
• November 15: Fox Hill ES PTO
• November 19: Harcourt ES PTO
• December 3:School Board Study Session
• December 12, 7:00 PM - Regular School Board Meeting
This does not include countless hours of subcommittee meetingsin each area
School Board Study Session, December, 20077
The Plan You See Tonight
• Is the direct result of the conversation and
work done in the community
• Is designed to support our vision and mission
• Will result in supporting and expanding the
tradition of excellence in Washington
Township Schools
• Is a living document that will evolve over the
years
School Board Study Session, December, 20078
Goal 1: Education Program
To increase achievement for every student by
implementing effective educational programs
and practices; strengthening curriculum,
instruction, and assessment; eliminating
achievement gaps; increasing language
proficiency of English Language Learners; and
ensuring equity of program opportunities and
access to all students.
School Board Study Session, December, 20079
1.1 Implementing effective educational
programs and practices
• Define “educational program” and develop criteriafor effective educational programs.
• Evaluate program effectiveness, using a standardizedformat and consistent information to be included.
• Monitor and report on program effectiveness at allschool levels. Once programs are identified assuccessful, work for district-wide implementation.Discontinue unsuccessful programs.
• Use consistent tools for program evaluation and datacollection and analysis, and develop consistentreporting tools for the District’s StrategicImprovement Plan. Develop ways to share studentdata between elementary and middle schools andbetween middle school and high school.
School Board Study Session, December, 200710
1.1 Implementing effective educational
programs and practices (cont.)
• Identify technology and technological tools that areeffective and integrate these tools consistentlythroughout the district.
• Incorporate professional development and evaluationwith implementation of new practices and initiatives.
• Align, articulate, and standardize programmingamong the middle schools to ensure the successfulacademic and social transition of those students to thehigh school (NCA District AccreditationRecommendation)
School Board Study Session, December, 200711
1.2 Strengthening curriculum, instruction, and
assessment
• Develop priority indicators, common formativeassessments and benchmark assessments K – 12 in allcore curricular areas.
• Develop and implement a three tier model of academicand behavior supports.
• Improve transition of students between levels throughongoing collaboration focusing on Pre-K to K, 5thgrade – 6th grade, and 8th grade – 9th grade.
School Board Study Session, December, 200712
1.3 Eliminating achievement gaps
• Examine early childhood opportunities and possible expansionof pre-school programs, if funding is available.
• Develop and implement a three-tier model of supports andinterventions in reading/language arts and mathematics, K – 12
• Implement inquiry-based instructional methodology at all levelsto help develop full potential of all students and raise allchildren to higher levels.
• Provide extended learning opportunities before, during andafter school, if funding is available.
• Examine the achievement gap, and research potential gap-reducing programs especially in Algebra I, Biology, and English10 (Core 40 Tests).
• Increase parental collaboration in efforts to reduce theachievement gap.
• Expand organizational/study-skill based practices.
School Board Study Session, December, 200713
1.4 Increasing language proficiency of
English Language Learners (ELL)
• Increase community understanding and support for English as aNew Language throughout the District.
• Provide print and technology resources in multiple languagesfor classroom instruction and media center access.
• Encourage and expand opportunities for parental collaborationin student programming including the provision of translatorsand materials and resources in native languages.
• Provide a continuum of ENL services and curriculumdevelopment Pre-K – 12th grade.
• Develop a professional development plan that expandseducational and cultural strategies for working with ENLstudents and families.
School Board Study Session, December, 200714
1.5 Providing equity of program
opportunities and access to all students
• Develop a report on the under-representation of ethnic
minority, language minority, and socioeconomic groups in
programming opportunities.
• Increase participation of under-represented students into
appropriate program options.
• Ensure consistency and availability of access to programs
addressing the achievement gap.
• Develop district-wide communication and education on
available programming opportunities and options.
• Develop tools that foster parental education and awareness of
programs.
• Continue the powerful practices embedded in the cohort model
of academic support.
School Board Study Session, December, 200715
Goal 2: Building Capacity
To develop the capacity of district
stakeholders (parents, staff, educators,
community, and students) to increase
student achievement.
School Board Study Session, December, 200716
2.1 Expand community partnerships that
support student and school success
• Each school will have at least one successful
partnership
• Develop guidelines of partnership
• Sustain partnership over three years
• Assess and celebrate annually
School Board Study Session, December, 200717
2.2 Enhance leadership capacity of district
• Expand opportunities for all personnel to
participate in a variety of roles/relationships
• Increase participation of staff
• Support leadership development
• Assess and celebrate annually
School Board Study Session, December, 200718
2.3 Improve structure and process for
parent participation
• Redefine parent participation at all levels, reflecting
the diversity of our community by utilizing the PT3
(Parents and Teachers Talking Together) Process
• Increase understanding of the roles of parents
• Develop a plan for increasing parent participation at
each school
• Expand parent leadership within the district
• Assess and celebrate annually
School Board Study Session, December, 200719
2.4 Expand student leadership at all levels
• Assess leadership opportunities
• Identify strengths and weaknesses
• Develop school-wide plans for
increasing student leadership
• Assess and celebrate annually
School Board Study Session, December, 200720
Goal 3: Community
To develop and disseminate a
consistent and informative
message about the excellence of
Washington Township Schools
(MSDWT)
School Board Study Session, December, 200721
3.1 Marketing/promotional component of
MSDWT
• Define marketing program for MSDWT
• Work with district marketing/public relations
director and outside consultants/companies to
develop marketing/public relations plan
• Identify roles and responsibilities
• Determine responsibility for enforcement of
standards, oversight/upkeep of content
School Board Study Session, December, 200722
3.2 Website improvement
• Work with the director of technology and thetechnology strategic committee to develop aplan for website improvement Create webdesign/content committee or group todetermine standards
• Determine reasonable and viable plan forongoing improvement, including budgetaryestimates for plan
• Review other school district sites for qualityideas
• Determine responsibility for enforcement ofstandards, oversight/upkeep of content
School Board Study Session, December, 200723
3.3 Development of written/visual
materials for promotional and informational
purposes
Determine reasonable and viable plan for
materials development, including
budgetary estimates for plan
Review other school districts for quality
ideas
Determine responsibility for enforcement
of standards, oversight/upkeep of content
School Board Study Session, December, 200724
Goal 4:
Facilities and Resources
In order to support the educational
mission and vision of the MSD of
Washington Township, we will
develop a plan to effectively and
efficiently use district facilities and
resources.
School Board Study Session, December, 200725
4.1:Operate fewer facilities in order to achieve a
more efficient operation while maintaining and
enhancing educational excellence: Close Harcourt
Elementary School at the end of 2007-08.
• Potential General Fund Impact -$500,000 - $650,000 annually
• Potential Capital Project FundImpact - $200,000 annually
We are asking for approval of thisspecific action during the adoptionof the plan on December 12.
School Board Study Session, December, 200726
4.1:Operate fewer facilities in order to achieve a more
efficient operation while maintaining and enhancing
educational excellence: Close Wyandotte Early Childhood
Center at the end of 2007-08.
• Potential General Fund Impact - $140,000 annually
• Potential Capital Project Fund Impact - $120,000
annually
• Allisonville and John Strange kindergarten students
attend at John Strange until the east side buildings
can be reconfigured and refurbished
We are asking for approval of this specific
action during the adoption of the plan on
December 12.
School Board Study Session, December, 200727
4.2: Complete the Work Included in the
$30 Million Compromise Bond Issue
Already approved for sale after January 2008,the Bond Issue includes:Roof Replacement and HVAC Replacement for Various
Schools - $24,600,000
Other Projects (Locker rooms, stadium lighting, convertingexisting pool space, stadium plaza paving, renovating thepress box, etc.) - $5,400,000
Use this bond issue to supplement the overall scope of theplan.
The planning part of this process must beginin early 2008. School Board approval willbe required for any specific project.
School Board Study Session, December, 200728
Details of the Current
Compromise Agreement
The Total Bond Approval is $50
Million
School Board Study Session, December, 200729
5B
$20 Million Bond Issue - Phase 1
• North Central natatorium - under construction
• North Central building automation system - inplanning stage
• North Central roof - complete
• East and west stadium renovation - complete
• East and west stadium restrooms - deferred tophase 2
• Stadium artificial turf - complete
• Miscellaneous site work and soft costs
School Board Study Session, December, 200730
5B
$30 Million Bond Issue - Phase 2
• Work must start as soon as possible.
• Work will be completed to obtain the best
value for the investment based on the future
needs of the school district and the spirit of
the Compromise Facility Agreement.
• $30 million may not be enough to complete
identified phase 2 work - estimates
completed in 2005
School Board Study Session, December, 200731
Phase 2 Construction Projects
Roof projects - $11.42 million - Begins with selected schools
Allisonville, Crooked Creek, Harcourt, John Strange, Nora, Spring Mill, Northview,North Central, J. E. Light Career Center
HVAC projects - $13.22 million - Begins with selected schoolsAllisonville, Crooked Creek, Harcourt, John Strange, Nora, Spring Mill, Northview
Other projects - $5.36 million• Construct locker rooms
• Renovate stadium lighting
• Renovate press box
• Renovate stadium entrance
Begins early spring 2009 - Convert existing pool to usable space
School Board Study Session, December, 200732
Scope of State Approval
• Maximum bonding capacity - $50 million.
• Lease term cannot exceed 24 years.
• Term began when first issue closed: 12-28-06
• Term cannot go beyond 12-28-30
• Maximum 1 year lease payment - $4,215,000
• Current average lease payment is $1,522,000.
• Current lease payment schedule for first $20
million has final payment due on 7-15-26.
School Board Study Session, December, 200733
Scope of State Approval (cont.)• Projects are mentioned but not in specific detail.
• General estimates for project costs are mentioned.
• Cannot add new projects but we do not have to complete allprojects mentioned.
• The cost of a project can be more or less than the amountestimated.
• The remaining $30 million in bonds that is approved can be soldanytime.
– Do not have to be sold all at once, but there are additional costs.
– We are still bound by the 12-28-30 date as a final payment andthe combined lease payment for the original $20 million andany subsequent debt service payments for all or part of the $30million can not exceed the maximum annual lease payment of$4,215,000.
• This is significant because if interest rates rise and we wait toolong to sell the $30 million, we may not be able to sell all $30million and keep our annual payment under the maximum.
School Board Study Session, December, 200734
4.3: Develop a multi-phase, long term plan to
renovate, update and expand school buildings
in the district.
• Reconfigure the district to two middle schools, areplacement on the west side and a total renovation andexpansion on the east side.
• Renovate Allisonville, Crooked Creek, Fox Hill,Greenbriar, John Strange, Nora, Spring Mill, and Hilltop
• Invest in specific programming needs at JELCC andNCHS
The planning for this process should start in early 2008.School Board approval will be required for any specificaction.
School Board Study Session, December, 200735
Summary of Building Needs
Allisonville Elementary School - built 1960• HVAC, roof, secured entry, keyless entry, sprinkler system, ADA
compliance, enlarge student cafeteria, and renovate office and clinic, and generalbuilding renovation
Crooked Creek Elementary School - built 1984• HVAC, roof, secured entry, keyless entry, ADA compliance, close open
classrooms, renovate restrooms, renovate office and clinic, and general buildingrenovation
Fox Hill Elementary School - built 1991• HVAC, roof, secured entry, intruder locks, ADA compliance, renovate office
and clinic, renovate restrooms, and general building renovation
Greenbriar Elementary School - built 1968• Roof, secured entry, intruder locks, keyless entry ADA compliance, air
condition kitchen, renovate office and clinic, and general building renovation
School Board Study Session, December, 200736
Summary of Building NeedsJohn Strange Elementary School - built in 1976
• HVAC, roof, secured entry, keyless entry, ADAcompliance, close open classrooms, renovate office and clinic,air condition kitchen, create LGI, and general buildingrenovation
Nora Elementary School - built in 1963
• HVAC, roof, secured entry, keyless entry, sprinklersystem, ADA compliance, close open classrooms, renovaterestrooms, renovate office and clinic, enlarge music room, andgeneral building renovation
Spring Mill Elementary School - build in 1959
• HVAC, roof, secured entry, keyless entry, intruder locks,sprinkler system, ADA compliance, renovate office and clinic,create LGI, and general building renovation
School Board Study Session, December, 200737
Building Needs
Eastwood Middle School - built 1956
• Roof, secured entry, keyless entry, ADA compliance,sprinkler system, renovate restrooms, renovate office andclinic, and general building renovation
Northview Middle School - built 1956
• HVAC, roof, secured entry, keyless entry, intruder locks,sprinkler system, and ADA compliance, and general
building renovation
Westlane Middle School - built 1956
• Roof, secured entry, ADA compliance, sprinkler system,and general building renovation
School Board Study Session, December, 200738
6.B. A MODEL FOR SCHEDULING ADDITIONS AND RENOVATIONS TO SCHOOL BUILDINGS
2006 YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8 YEAR 9
ELEMENTARY 1 $13
ELEMENTARY 2 $13
ELEMENTARY 3 $13
ELEMENTARY 4 $13
ELEMENTARY 5 $13
ELEMENTARY 6 $13
ELEMENTARY 7 $13
MIDDLE SCHOOL 1 $46
MIDDLE SCHOOL 2 $46
TOTAL $72 $72 $39
IMPACT ON TAX RATE:
Assumes 2% increase in AV
Assumes 2007 AV @ $6,000,000,000 5,558,349,400$ 6,367,248,000$ 6,494,592,960$ 6,624,484,819$ 6,756,974,516$ 6,892,114,006$ 7,029,956,286$ 7,170,555,412$ 7,313,966,520$ 7,460,245,850$
Estimated annual debt service:
Phase 1 $72 million 5,646,317$ 5,646,317$ 5,646,317$ 5,646,317$ 5,646,317$ 5,646,317$ 5,646,317$ 5,646,317$
Phase 2 $72 million 5,736,418$ 5,736,418$ 5,736,418$ 5,736,418$ 5,736,418$
Phase 3 $39 million 3,172,991$ 3,172,991$
G. O. Bond 1,050,000$ 1,050,000$ 1,050,000$ 1,050,000$ 1,050,000$ 1,050,000$ 1,050,000$ 1,050,000$ 1,050,000$
North Central issue-oldBuilding Corp new - $20,000,000 1,439,344$ 1,450,544$ 1,460,144$ 1,468,144$ 1,479,544$ 1,489,044$ 1,501,744$ 1,517,444$ 1,525,944$ Building Corp. new - $30,000,000 2,290,642$ 2,290,642$ 2,290,642$ 2,290,642$ 2,290,642$ 2,290,642$ 2,290,642$ 2,290,642$ 2,290,642$
Estimated annual total debt service payment 3,423,943$ 4,229,986$ 9,637,503$ 9,647,103$ 9,655,103$ 15,102,921$ 15,112,421$ 15,125,121$ 18,113,812$ 18,122,312$
Estimated tax rate needed to service debt: 0.0616$ 0.0664$ 0.1484$ 0.1456$ 0.1429$ 0.2191$ 0.2150$ 0.2109$ 0.2477$ 0.2429$
Taxes - homestead with a Net AV of $200,000 105$ 113$ 252$ 248$ 243$ 373$ 365$ 359$ 421$ 413$ Taxes - homestead with a Net AV of $400,000 209$ 226$ 505$ 495$ 486$ 745$ 731$ 717$ 842$ 826$ Taxes - homestead with a Net AV of $600,000 314$ 339$ 757$ 743$ 729$ 1,118$ 1,096$ 1,076$ 1,263$ 1,239$
Assumptions: Assumptions:
Average cost to renovate/expand one elementary school is $13,000,000. Excise, FIT, CVET estimates for year: YEAR 1 550,000$
Average cost to renovate/expand/build one middle school is $46,000,000. YEARS 2 - 4 800,000$
Assessed Value is estimated to increase by 2% annually. YEARS 5 - 7 1,100,000$
Interest rates on bonds: Phase 1 - 4.75% YEARS 8 - 9 1,300,000$
Phase 2 - 5.00%Phase 3 - 5.25% Estimated Homestead credit of 15% applied to tax calculation.
School Board Study Session, December, 200739
4.4: Develop a Plan to Create a
Revenue Stream from Our Surplus
Property
• This plan will be long term and take advantage of
timing in the real estate market.
• We will work with our current users and paid
consultants to develop a plan.
• The revenue stream may come as the result of
interest on invested proceeds from a sale or the
result of leasing or usage fees.
This study is already in process. School Board
approval will be required for any specific action.
School Board Study Session, December, 200740
4.5: Develop A Plan To Renew
The 2003 Referendum in 2010
• The need for the Referendum still exists.
• We must revisit and reconsider the design,scope, and conditions of the currentreferendum to assure the original intent.
• The 2010 Referendum will be tax rate neutral.
This must be the focus of ongoing study andplanning. The specific decision to place thereferendum on the ballot will be made by theSchool Board.
School Board Study Session, December, 200741
What if the Referendum is Not Renewed?
• The Referendum will be supporting the GeneralFund (GF) by an estimated $5.8 million in 2010.
• The GF budget will have to be cut by $5.8million. A reduction of 8-9%.
• This reduction will have to be accomplished bymaking dramatic cuts to staff at all levels since91% of GF expenditures is for wages andbenefits.
• If cuts are made according to how therevenue is currently spent, that could mean areduction in staff of 55 – 65 teachers, 11 – 15administrators, and 21 – 25 classifiedworkers.
School Board Study Session, December, 200742
More Referendum Detail
• The Referendum is vitally important as it helps
the district with the ongoing challenge to
provide competitive salaries and benefits.
• 87.2% of Referendum revenue is for wages
and benefits.
• The Referendum passed in 2003 because of a
broad-based, grassroots effort. It will require
the same type of effort in 2010.
School Board Study Session, December, 200743
4.6:Using the Strategic Planning
Process to Focus Our Actions
The strategic plan must be a dynamic
entity in the district that
– Assures continuous improvement in all
areas
– Directs effective resource management
– Keeps us focused on our mission and
vision in turbulent times
School Board Study Session, December, 200744
This is our opportunity to build upon the
excellence of Washington Township Schools
and our community by redefining,
recommitting, and aligning our efforts.
“When the history of America is finallywritten, the system of public educationthat this blessed land has developedwill be recognized as the continuingsource of its greatness.” - Charles B.Feibleman, 1956