Building Momentum for Process Improvement: The California Experience Presented by: Beth Rutkowski, MPH, Steve Gallon, Ph.D., and Alex Bruehl, MA 2009 NIATx Summit and SAAS National Conference, August 1, 2009

Transcript of Building Momentum for Process Improvement: The California ...

Page 1: Building Momentum for Process Improvement: The California ...

Building Momentum for Process Improvement: The

California Experience

Presented by:

Beth Rutkowski, MPH, Steve Gallon, Ph.D., and Alex Bruehl, MA

2009 NIATx Summit and SAAS National Conference, August 1, 2009

Page 2: Building Momentum for Process Improvement: The California ...

Workshop Overview

LA County Phase I Process Improvement Pilot Project

CATES Statewide Training Effort LA County Phase II Process Improvement

Pilot Project CA NIATX Coach Pilot Project Local Learning Collaboratives Regional Learning Collaboratives

Page 3: Building Momentum for Process Improvement: The California ...

Key Partners

UCLA Integrated Substance Abuse Programs Pacific Southwest Addiction Technology Transfer Center LA County Alcohol & Drug Program Administration NIATx National Program Office SAMHSA, Center for Substance Abuse Treatment Robert Wood Johnson Foundation County Alcohol and Drug Program Administrators

Association of California

Page 4: Building Momentum for Process Improvement: The California ...

Recipe for Success

Page 5: Building Momentum for Process Improvement: The California ...

Key Ingredients

Start small and demonstrate success Face-to-face learning sessions Individualized technical assistance/coaching Telephone-based technical assistance Data collection, submission, and review Availability of continuing education Change Leader Academy Coach Academy

Page 6: Building Momentum for Process Improvement: The California ...

Important Utensils

Agency Walk-Through Change Team Agency Site Visits Quick Start Road Map Administrative Data Change Project Report Storyboarding Airplane Exercise

Page 7: Building Momentum for Process Improvement: The California ...

“Where it all started…”

Los Angeles County, California

Page 8: Building Momentum for Process Improvement: The California ...

Phase I Los Angeles County Process Improvement Pilot Project

November 2005-September 2006

Page 9: Building Momentum for Process Improvement: The California ...

Participating Agencies

Didi Hirsch CMHC, Via Avanta LA Centers for Alcohol and Drug Abuse Matrix Institute on Addictions (2) Social Model Recovery Systems Southern California Alcohol and Drug

Programs Tarzana Treatment Centers

Page 10: Building Momentum for Process Improvement: The California ...

Phase I Pilot Project Timeline

Nov ‘05

Orientation

Jan ‘06

Kick-Off

Workshop

Pre-Work

Nov ‘05-Jan ‘06

Feb ‘06

Site Visits

Mar ‘06

Monthly

Conference

Calls

Jun ‘06

Mid-Way

Change

Leader

Meeting

Sept ‘06

Completion

Conference

Page 11: Building Momentum for Process Improvement: The California ...

Phase I Aggregate Results

83% reduction in assessment/intake no-shows (2 agencies reporting)

39% increase in 30-day continuation (3 agencies reporting).

Page 12: Building Momentum for Process Improvement: The California ...

California Addiction Training and Education Series

November 2007-May 2009

Page 13: Building Momentum for Process Improvement: The California ...

**1,430 participants

***50 counties

Page 14: Building Momentum for Process Improvement: The California ...

Where Were the Trainings and How Many People Did We Train?

Nov 2007 San Francisco – 154 (18) San Diego – 137 (6) Bakersfield - 129 (10)

May 2008 Redding – 77 (17) Santa Ana – 145 (6) Fresno – 78 (12)

July 2008 San Jose – 341 (1)

Sept 2008 San Rafael - 51 (2)

Oct/Nov 2008 Concord – 114 (12) Rialto – 97 (8) Yuba City – 107 (18)

Page 15: Building Momentum for Process Improvement: The California ...

Sample Agenda

Case study - from an agency’s perspective Process Improvement 101 How to get started Measuring impact of change Promising practices

Page 16: Building Momentum for Process Improvement: The California ...

Monthly Coaching/Follow-Up Conference Call Topics

Month 1: Conducting a Walk-Through Month 2: Collecting Baseline Data Month 3: Establishing a Change Objective Month 4: Creating a Quick Start Road Map Month 5: Conducting a PDSA Change Cycle Month 6: Sustaining Change

Page 17: Building Momentum for Process Improvement: The California ...

Call Participation

60 hour-long conference calls held between Dec 2007 and May 2009 254 people from 35 counties Callers joined an average of 2-3 calls (mean=2.6)

Targeted areas of participation (and implementation)

Page 18: Building Momentum for Process Improvement: The California ...

Target Areas of Call Participation

= 10+ callers

= 5-9 callers

Page 19: Building Momentum for Process Improvement: The California ...

Phase II Los Angeles County Process Improvement Pilot Project

November 2007-October 2008

Page 20: Building Momentum for Process Improvement: The California ...

Participating Agencies

Antelope Valley Rehabilitation Center (2) Behavioral Health Services (2) CA Hispanic Commission on Alcohol and Drug

Abuse (2) Didi Hirsch Community Mental Health Center (2) House of Hope MELA Counseling Services Center SHIELDS for Families Tarzana Treatment Centers (2)

Page 21: Building Momentum for Process Improvement: The California ...

Project Enhancements

Formal application process Greater focus on data More comprehensive data review and feedback 5th Change Leader monthly conference call 2nd Executive Sponsor conference call 12 individualized data coaching calls

Page 22: Building Momentum for Process Improvement: The California ...

6

2.6 2.5

44.3

1.9

4.6

3.5

1.2

6.9

0

1

2

3

4

5

6

7

Basel

ine

Mar

chApril

May

June

July

AugSep Oct

Avg

Day

sWait Time from First Contact to Admission

42% Average Improvement in Wait Time

Page 23: Building Momentum for Process Improvement: The California ...

43.5

2521.2

26.628.4

36.4

28.2

12.7

24.618.6

05

101520253035404550

Basel

ine

Mar

chApril

May

June

July

AugSep Oct

Avg

%

43% Average Improvement in No-Shows

No-Shows

Page 24: Building Momentum for Process Improvement: The California ...

70.677.4

84.8 86.680.5 84.3 87.5 84.6 87

84.1

0102030405060708090

100

Basel

ine

AprilM

ayJu

neJu

lyAug

Sept

Oct

NovAvg

% 19% Average Increase in Session-by-Session Attendance

Session-by-Session Attendance

Page 25: Building Momentum for Process Improvement: The California ...

68.5

73.9

68.9

73.975.1

72.9

70.7

75.172.9

64

66

68

70

72

74

76

Basel

ine

AprilM

ayJu

neJu

lyAug

Sept

Oct

Avg

%

30-Day Continuation

6% Average Improvement in 30-Day Continuation

Page 26: Building Momentum for Process Improvement: The California ...

California NIATx Coach Pilot Project

July 2008-April 2009

Page 27: Building Momentum for Process Improvement: The California ...

Infrastructure Development

Coach Academy Change Leader Academy Building local coaching and change leader

expertise within California – essential for spread to occur

Page 28: Building Momentum for Process Improvement: The California ...

Local Learning Collaboratives

July 2008-Present

Page 29: Building Momentum for Process Improvement: The California ...

“Local” Learning Collaboratives

Page 30: Building Momentum for Process Improvement: The California ...

Regional Learning Collaboratives – California Endowment

April 2009-Present

Page 31: Building Momentum for Process Improvement: The California ...

Target Areas of Call Participation

= 10+ callers

= 5-9 callers

Page 32: Building Momentum for Process Improvement: The California ...
Page 33: Building Momentum for Process Improvement: The California ...

Regional Learning Collaboratives – Like-Size County Structure

6

1 1

5

1

3

2

4

1

3

5

1

2

14

1

8

0%

20%

40%

60%

80%

100%

So Cal(n=8)

CentralValley (n-8)

CapitolRegion(n=12)

Bay Area(n=11)

Nor Cal(n=10)

Large Medium Small MBA*

*MBA = Minimum-Based Allocation (under 90K population)

Page 34: Building Momentum for Process Improvement: The California ...

Regional ACTION Campaign/NIATx Learning Collaboratives

• CA-based ACTION Campaign membership more than doubled from 105 individuals in 82 agencies to 258 individuals from 204 agencies.

• Five day-long kick-off workshops were held in April-May 2009 • 386 treatment providers/administrative staff

• Staff from 156 agencies in 49 counties are now part of one of five collaboratives

Page 35: Building Momentum for Process Improvement: The California ...

“Nine Lessons Learned” Phase I and Phase II Pilot Projects

Page 36: Building Momentum for Process Improvement: The California ...
Page 37: Building Momentum for Process Improvement: The California ...
Page 38: Building Momentum for Process Improvement: The California ...
Page 39: Building Momentum for Process Improvement: The California ...
Page 40: Building Momentum for Process Improvement: The California ...
Page 41: Building Momentum for Process Improvement: The California ...
Page 42: Building Momentum for Process Improvement: The California ...
Page 43: Building Momentum for Process Improvement: The California ...
Page 44: Building Momentum for Process Improvement: The California ...
Page 45: Building Momentum for Process Improvement: The California ...

Strategies for Successful Change Project Implementation

Page 46: Building Momentum for Process Improvement: The California ...

Communicate

Page 47: Building Momentum for Process Improvement: The California ...

Brainstorm Multiple Ideas for Change

Page 48: Building Momentum for Process Improvement: The California ...

Be Creative

Page 49: Building Momentum for Process Improvement: The California ...

Work as a Team

Page 50: Building Momentum for Process Improvement: The California ...

Review Data Regularly!

Page 51: Building Momentum for Process Improvement: The California ...

Celebrate Early Successes

Page 52: Building Momentum for Process Improvement: The California ...

Keys Ingredients for Change Project Success

1. Choose the right Change Leader

2. Establish a clear objective

3. Implement only 1 new change at a time

4. Make sure everyone implements change project as planned

5. Start small

6. Study the results before making modifications

Page 53: Building Momentum for Process Improvement: The California ...

Lack of commitment Inexperience with process improvement tools Failure to define problem and objective clearly Difficulty creating simple measures Lack of familiarity with data graphing Failure to gather outside ideas

Frequent Start-Up Issues

Page 54: Building Momentum for Process Improvement: The California ...

Diagnosing Potential Problems

Management commitment? Agency walk-through? Issues targeted for improvement? Change Leader competency? Appropriate measures? Clear change project plan? Business case? Sustainability plan?

Page 55: Building Momentum for Process Improvement: The California ...

Small Changes, Big Impacts

Small changes make a big difference for both clients and staff

Effective changes do not have to be costly

Page 56: Building Momentum for Process Improvement: The California ...

Sustainability is Possible…

Page 57: Building Momentum for Process Improvement: The California ...
Page 58: Building Momentum for Process Improvement: The California ...

What Does the Future Hold?

Page 59: Building Momentum for Process Improvement: The California ...

• Beth Rutkowski, MPH

• (310) 388-7647; [email protected]

• Steve Gallon, PhD

• (503) 378-3537; [email protected]

• Alex Bruehl, MA

• (626) 299-4502; [email protected]

Thank you for your time!