Building Excellence IV Capital Levy Projects Under ... · Building Excellence IV Capital Levy...
Transcript of Building Excellence IV Capital Levy Projects Under ... · Building Excellence IV Capital Levy...
July 1, 2016
Building Excellence IV Capital Levy
Projects Under Construction
Project Slide Number
Arbor Heights Elementary School 2
Cascadia Elementary School & Robert Eagle Staff Middle School 14
Genesee Hill Elementary School 29
Hazel Wolf K-8 at Pinehurst 42
Meany Middle School 55
Olympic Hills Elementary School 63
Seattle New World School at TT Minor 74
New Thornton Creek Building 81
Building Excellence IV Capital Levy
Arbor Heights Elementary School
Site: Landscape irrigation and drainage installation ongoing, playground equipment installation in-progress, concrete sidewalks and stairs ongoing.
South Building: Exterior – Sun-shade installation and painting complete. South stair enclosure ongoing. Interior – Acoustical ceiling tile installation complete at third floor. Casework and finish carpentry ongoing. Rubber floor tile and base molding ongoing. Window shade installation ongoing. Mechanical, electrical and plumbing (MEP) fixture installation ongoing. HVAC, plumbing, and electrical installation ongoing at first and third floor mechanical rooms and first floor boiler room.
Arbor: Exterior – Sheet metal flashing and window installation in-progress.
North Building: Exterior – Painting ongoing, sun-shade installation in-progress. Interior – Hardwood floor finishing complete at gymnasium. Window installation complete. Painting ongoing at second and third floor. Casework installation ongoing. Ceramic tile and carpet installation ongoing. MEP fixture installation ongoing.
Arbor Heights Elementary School
Site Plan
July 1, 2015July 10, 2015
Arbor Heights Elementary School
Aerial View from the North
May 31, 2016
Arbor Heights Elementary School
North Building – Northeast Perspective
June 27, 2016
Arbor Heights Elementary School
South Building – Southeast Perspective
June 27, 2016
Arbor Heights Elementary School
Site – Northeast Perspective
June 27, 2016
Arbor Heights Elementary School
South Building – Mechanical Room
June 27, 2016
Arbor Heights Elementary School
South Building – Kindergarten Room
June 27, 2016
Arbor Heights Elementary School
South Building – Special Ed Room
June 27, 2016
Arbor Heights Elementary School
North Building – Library
June 27, 2016
Arbor Heights Elementary School
North Building – Commons
June 27, 2016
Arbor Heights Elementary School
North Building – Gymnasium
June 27, 2016
Building Excellence IV Capital LevyCascadia Elementary School and Robert Eagle Staff Middle School
Site: Maintaining temporary erosion sedimentation control (TESC)
measures.
ES: Exterior - Window installation and prep for cement fiber board
panels installation ongoing. Air barrier complete. Roofing ongoing with
mid-ply nearly complete and cap sheet moving from south to north.
Interior – Gypsum wallboard installation (GWB) ongoing.
MS: Exterior metal stud framing and sheathing ongoing. MEP rough-in
ongoing.
Cascadia Elementary School & Robert Eagle Staff Middle School
Site Plan
Cascadia Elementary School & Robert Eagle Staff Middle School
Zone Map
Middle School Elementary School
Cascadia Elementary School & Robert Eagle Staff Middle School
Aerial View from the South
June 2, 2016
Cascadia Elementary School & Robert Eagle Staff Middle School
Elementary School - Zone 1- Exterior Insulation/Prep for CFB Panels, Looking Northeast
June 21, 2016
Cascadia Elementary School & Robert Eagle Staff Middle School
Elementary School - Zone 1 - Window Installation, Looking Southeast
June 21, 2016
Cascadia Elementary School & Robert Eagle Staff Middle School
Elementary School - Zone 1- Gypsum Wallboard Installation, Classroom
June 21, 2016
Cascadia Elementary School & Robert Eagle Staff Middle School
Elementary School - Zone 2 – Gypsum Wallboard Installation, 1st Floor Admin
June 21, 2016
Cascadia Elementary School & Robert Eagle Staff Middle School
Elementary School - Zone 7 - Exterior of Child Care, Looking Southwest
June 21, 2016
Cascadia Elementary School & Robert Eagle Staff Middle School
Elementary School - Zone 7 - Roofing Installation, Looking West
June 21, 2016
Cascadia Elementary School & Robert Eagle Staff Middle School
Middle School - Zone 1 - Exterior Framing and Sheathing, Looking Northeast
June 21, 2016
Cascadia Elementary School & Robert Eagle Staff Middle School
Middle School - Zones 2 & 3 - Hollow Metal Door Frames, Looking East
June 21, 2016
Cascadia Elementary School & Robert Eagle Staff Middle School
Middle School - Zone 3 - Exterior Framing and Sheathing, Looking Northwest
June 21, 2016
Cascadia Elementary School & Robert Eagle Staff Middle School
Middle School - Zone 9 - Gym, Looking North
June 21, 2016
Cascadia Elementary School & Robert Eagle Staff Middle School
Middle School - Roof, Skylights and Mechanical Penthouses, Looking Northwest
Building Excellence IV Capital Levy
Genesee Hill Elementary School
Site: Landscaping is ongoing at the upper tier of site; continued installation of chain link
fencing at lower and upper tiers.
Area 1: Continued final cleaning; continued programming controls sequencing and
development of graphics.
Area 2: Continued final cleaning; continued programming controls sequencing and
development of graphics.
Area 3: Continued final cleaning; functional testing continued; contractor coordinating
Health Inspection for kitchen; continued programming controls sequencing and
development of graphics; coordinating meeting with SPS, DEL and eWorks to inspect
childcare rooms and coordinate licensing.
Area 4: Continued final cleaning; began functional testing; continued programming
controls sequencing and development of graphics.
Note: Owner mechanical training occurred and SPS furnished cleaning supplies in
preparation for occupancy. Furniture beginning to arrive.
Genesee Hill Elementary School
Site Plan
Genesee Hill Elementary School
Aerial View from the East
Genesee Hill Elementary School
Aerial View from the North
Genesee Hill Elementary School
Aerial View from the East Looking West
Genesee Hill Elementary School
Building's North Elevation - Visitor/Childcare Drop-off Parking Lot, Looking West
Genesee Hill Elementary School
Area 1 - Level 1 - Looking West at Main Corridor
Genesee Hill Elementary School
Area 1 - Level 1 - Typical Kindergarten Room
Genesee Hill Elementary School
Area 1 - Level 2 - Typical Common Teaching Space
Genesee Hill Elementary School
Area 2 - Level 2 - Library Space
Genesee Hill Elementary School
Area 2 - Level 1- Looking North at the Top of Stairs Toward Main Entrance
Genesee Hill Elementary School
Area 2 - Level 1- Looking South Towards Entrance to Area 3 Commons
Genesee Hill Elementary School
Area 3 – Looking From Stage, Through Commons to Area 4 Gymnasium
Building Excellence IV Capital Levy
Hazel Wolf K-8 at Pinehurst
Site: Grading of the courtyard, parking lots, and sidewalks. Final grading of
loading dock area continues. Installation of storm drain line tie-ins complete.
Building A: A1 Exterior - Top deck water proofing continues. Exterior stairs
complete. Interior - Cabinetry complete. Kitchen equipment install ongoing.
Ceiling grid/tile install ongoing. Painting ongoing. Area A2 Interior - Final coats
of paint ongoing at all floors. Grid ceiling complete, ceiling tiles nearly
complete. Commissioning of equipment ongoing. MEP fixtures being installed.
Concrete floors receiving final grinding. Elevator received initial inspections.
Area A3 Exterior - Water proof membrane installation ongoing. Concrete stairs
form work complete. Interior - GWB finishing complete. Painting ongoing.
Building B: Exterior - Roofing complete. Exterior sheeting and air barrier
complete. Interior - Band/choir room painting ongoing. Ceiling installation
ongoing.
Building C: Exterior - Metal siding complete. Interior - Elevator installation
complete. Painting ongoing. Gym wood floor work ongoing. Sound attenuation
and sports equipment installation complete.
Hazel Wolf K-8 at Pinehurst
Site Plan
Hazel Wolf K-8 at Pinehurst
Aerial View from the East
June 16, 2016
Hazel Wolf K-8 at Pinehurst
Areas A1 and C – Exterior Metal Siding Finish
June 23, 2016
Hazel Wolf K-8 at Pinehurst
Area B – Outside Play Area, looking North East
June 23, 2016
Hazel Wolf K-8 at Pinehurst
Site – Loading Dock Final Grades, looking East
June 23, 2016
Hazel Wolf K-8 at Pinehurst
Courtyard – Forming Concrete Walkway, looking Southwest
June 23, 2016
Hazel Wolf K-8 at Pinehurst
Area A1 – Kitchen Finishes
June 23, 2016
Hazel Wolf K-8 at Pinehurst
Area A1 – Library Finishes
June 23, 2016
Hazel Wolf K-8 at Pinehurst
Area A1 – Hydronic Loop Pump Room
June 23, 2016
Hazel Wolf K-8 at Pinehurst
Area A2 – Corridor, Polished Concrete Floor
June 23, 2016
Hazel Wolf K-8 at Pinehurst
Areas B and C – Commons Finishes
June 23, 2016
Hazel Wolf K-8 at Pinehurst
Area C – Gym Floor
June 23, 2016
Building Excellence IV Capital Levy
Meany Middle School
Site: Partial site mobilization.
1954 Classroom Wing: Interior – Window concrete infill is progressing in
Sector 4 and 5. This activity will continue until the end of the month. Wall
framing and installation of shear walls is progressing in Sector 4 and parts
of Sector 5. Plumbing rough-in has started in restrooms. Band and Choir
room concrete cuts complete for receipt of new windows. Insulation at Band
and Choir will complete this week. MEP rough-in progressing and will
continue in sector 4 and 5 for another week. Trenching for MEP rough-in to
continue into next week.
Remainder of building: No work occurring until after Seattle World School
leaves site. Contractor has full access to site not later than July 12, 2016
Meany Middle School
1964 Aerial Photo
July 1, 2015July 10, 2015
1954 Classroom Wing
Meany Middle School
Trenching for Mechanical/Electrical/Plumbing Rough-in
June 24, 2016
Meany Middle School
Trenching and Framing in Science Classrooms
June 24, 2016
Meany Middle School
Mechanical/Plumbing Rough–In at Restrooms
June 24, 2016
Meany Middle School
Shear Wall Framing Progressing in Sector 4
June 24, 2016
Meany Middle School
Typical Partial Demolition at Window Sills
June 24, 2016
Meany Middle School
Mechanical Piping Routing Conflict W/ Existing Conditions
June 24, 2016
Building Excellence IV Capital Levy
Olympic Hills Elementary School
Site: Continued potholing and demo for street improvements.
Monitoring TESC measures ongoing.
Zone A: Framing complete. Brick installation ongoing. MEP rough-in
ongoing.
Zone B: Framing wood walls, 2nd floor. Pouring slab-on-wood-deck.
Zone C: Framing wood walls.
Zone D: Started wood framing.
Olympic Hills Elementary School
Site Plan
Olympic Hills Elementary School
Zone Map
Olympic Hills Elementary School
Aerial View from the West
June 1, 2016
Olympic Hills Elementary School
Zone A - Overhead HVAC Ductwork, 1st Floor Classroom
June 22, 2016
Olympic Hills Elementary School
Zone A - In-Wall MEP Rough-In, 1st Floor Classroom
June 22, 2016
Olympic Hills Elementary School
Zone A - Interior Framing, 2nd Floor
June 22, 2016
Olympic Hills Elementary School
Zone B - Concrete Slab-On-Wood-Deck, 2nd Floor Hallway
June 22, 2016
Olympic Hills Elementary School
Zone B - Framing and Standing Walls, 2nd Floor, Looking South East
June 22, 2016
Olympic Hills Elementary School
Zone C - Framing, Looking Southwest
June 22, 2016
Olympic Hills Elementary School
Zone D - Steel Columns Partially Erected, Looking South
June 22, 2016
Building Excellence IV Capital Levy
Seattle World School at T.T. Minor
Area A – Administration Office, Student Services, Health Clinic and Library: GWB finishing nearing completion. Overhead MEP rough-in work complete. Ceiling grid installation ongoing. Light fixture installation ongoing. Low voltage data installation ongoing. Casework installation ongoing. Finish painting ongoing. ADA stage ramp in progress.
Area B – Multipurpose, Kitchen, Boiler Room: GWB finishing nearing completion. Overhead MEP rough-in work complete. Ceiling grid installation ongoing. Light fixture installation ongoing. Low voltage data installation ongoing. Casework installation ongoing. Finish painting ongoing.
Area C – Classrooms: Painting on going. Air Handling Units being set in place. Ceiling grid installation ongoing, Data cable installation ongoing. Cabinet and casework installation ongoing. Finish floor material installation ongoing.
Site: Work on 18th Street complete.
Seattle World School at T.T. Minor
Site Plan
Area C
Area B
Area A
Area C
Area B
Area A
Seattle World School at T.T. Minor
Site – Seattle City Light Hooking Up Permanent Power
June 28, 2016
Seattle World School at T.T. Minor
Area A – Floor Sealer and Flooring Preparation
June 28, 2016
Seattle World School at T.T. Minor
Area B – Exterior Painting
June 28, 2016
Seattle World School at T.T. Minor
Area C – Window Installation On-Going
June 28, 2016
Seattle World School at T.T. Minor
Site – ADA Ramp Concrete Walls
June 28, 2016
Building Excellence IV Capital Levy
New Thornton Creek Building Site: Finishing subgrade for playfield. Chain link fencing around athletic field
on-going. Poured concrete entry and exit drives for west parking lot. Began landscaping in interior courtyard.
Off-site Improvements: Ongoing pouring of concrete sidewalks, curbs and ADA ramps along NE 80th St. Poured porous pavement on NE 80th St and 40th Ave. NE.
Building A: Roofing over Gym and Childcare on-going. Hardie panel installation on-going. Preparing and painting GWB in Commons, Gym and Childcare. Preparing floor for resilient flooring installation. Placed kitchen tile flooring. Delivered kitchen equipment. Ongoing placement of ductwork and louvers.
Building B: Hardie panel installation on-going. Completed painting on first and second floors classrooms. Completed installation of roller shades and wall panels. Began tackable wall surface installation. HVAC rough-in at mechanical penthouse on-going.
Building C: Ceramic tile installation in bathrooms on-going. Installing casework in classrooms. Completed installation of roller shades and wall panels. Began tackable wall surface installation. Trim of electrical devices on-going.
New Thornton Creek Building
Key Plan
Building C
Building B
Building A
D
New Thornton Creek Building
Aerial View from the West
June 15, 2016
New Thornton Creek Building
Site – Pavement around Dugout at Athletic Field
New Thornton Creek Building
Site – Landscaping in K-1 Courtyard
New Thornton Creek Building
Building A – Loading Dock
New Thornton Creek Building
Building A – Painting Ceilings and Walls in Gym
New Thornton Creek Building
Building A – Painting in Childcare
New Thornton Creek Building
Building A – Kitchen Equipment
New Thornton Creek Building
Building A – Geothermal Piping in Main Mechanical Room
New Thornton Creek Building
Building B – Tackable Surface over Lockers
New Thornton Creek Building
Building B – Whiteboard Installation at Classrooms