Building Confidence Morris & Blunt Ltd

2
Morris & Blunt Ltd Building Confidence 13 Holmes Road, Reading, Berkshire, RG6 7BH Phone: 01189 267373 Email: [email protected] Web: www.morrisandblunt.com PROJECT The extension and refurbishment of: Maidenhead Synagogue Grenfell Lodge Ray Park Road Maidenhead Berkshire SL6 8QX PROJECT PARTICULARS Contract | Maidenhead Synagogue Contract Dates | January 2016 to July 2016 Contract Value | £448,000.00 Client | Maidenhead Synagogue Designer | Sedgman Noble Architects M&E Consultant | VL Designs Structural Engineer | R.J. Austin DESCRIPTION OF WORKS The works comprised of the demolition of the central part of the existing Synagogue building and its reconstruction on a larger footprint. Consequential alterations to building services, drainage and external works. DETAILS The project included asbestos removals, the demolition of part of the existing single storey building & total refurbishment of the remainder. Where the existing part of the building was demolished, the construction of a new area to provide a new Entrance Lobby & Entrance Hall, together with new WC facilities. There was structural work to create two large openings with moveable partition walls which was undertaken to provide greater flexibility of internal spaces in the Prayer & Kiddush Halls. The existing adjacent two storey building remained fully operational during the entire duration of the works, whilst all services were maintained.

Transcript of Building Confidence Morris & Blunt Ltd

Morris & Blunt LtdBuilding Confidence

13 Holmes Road, Reading, Berkshire, RG6 7BH

Phone: 01189 267373 Email: [email protected]

Web: www.morrisandblunt.com P R O J E C T Theextensionandrefurbishmentof:

MaidenheadSynagogueGrenfellLodgeRayParkRoadMaidenheadBerkshireSL68QX

P R O J E C T P A R T I C U L A R S Contract|MaidenheadSynagogueContractDates|January2016toJuly2016ContractValue|£448,000.00Client|MaidenheadSynagogueDesigner|SedgmanNobleArchitectsM&EConsultant|VLDesignsStructuralEngineer|R.J.AustinD E S C R I P T I O N O F W O R K S

TheworkscomprisedofthedemolitionofthecentralpartoftheexistingSynagoguebuildinganditsreconstructiononalargerfootprint.Consequentialalterationstobuildingservices,drainageandexternalworks.

D E T A I L S

Theprojectincludedasbestosremovals,thedemolitionofpartoftheexistingsinglestoreybuilding&totalrefurbishmentoftheremainder.Wheretheexistingpartofthebuildingwasdemolished,theconstructionofanewareatoprovideanewEntranceLobby&EntranceHall,togetherwithnewWCfacilities.

TherewasstructuralworktocreatetwolargeopeningswithmoveablepartitionwallswhichwasundertakentoprovidegreaterflexibilityofinternalspacesinthePrayer&KiddushHalls.Theexistingadjacenttwostoreybuildingremainedfullyoperationalduringtheentiredurationoftheworks,whilstallservicesweremaintained.

Morris & Blunt LtdBuilding Confidence