“Sea Power to the Hands of Our Sailors”
DISTRIBUTION STATEMENT A: Approved for Public Release by NAVSEA PAO 25FEB2016
Building and Modernizing Relevant Warships for Force Deployment Speed to Capability Speed to Capacity
Speed to Relevancy
Nilo Maniquis
PEO IWS – Future Ship Systems and Integration
March 28, 2018
DISTRIBUTION STATEMENT A: Approved for Public Release by NAVSEA PAO 25FEB2016 2
Future Force Objective
• Threat-based
capabilities
• Flexible, networked
and distributed force
• Logistically
manageable
• Disparity in
capabilities
• Limited in force
deployment
• Logistically
challenged CU
RR
EN
T S
TAT
E
FU
TU
RE
STA
TE
DEVELOPMENT INSTALLATION UPGRADE DEPLOYMENT
DISTRIBUTION STATEMENT A: Approved for Public Release by NAVSEA PAO 25FEB2016 3
Speed to Capacity Force Level Upgrades Prior to Deployment
Maintenance, repair, and combat system upgrades occur during CNO industrial availabilities.
Maintenance and repair still occur as required Force Level CS
upgrades via
modularity pier side
Battlegroup with
latest capabilities
Battlegroup with
capability disparity
DEVELOPMENT INSTALLATION UPGRADE DEPLOYMENT
TRADITIONAL AVAILABILITIES
FUTURE AVAILABILITIES
DISTRIBUTION STATEMENT A: Approved for Public Release by NAVSEA PAO 25FEB2016 4
Speed to Capability Modular Compartments
Traditional Compartments 55 work DAYS for entire space, 10 foundation installation trades required
Modular Compartments <10 work HOURS for entire space, 5 foundation installation trades required
DEVELOPMENT INSTALLATION UPGRADE DEPLOYMENT
CSLO Delivery
Potential 97.7% Reduction
MIR
Launch Lay Keel Start Fab Assembly Outfitting CSLO Delivery
• Mechanical
• Welder
• Firewatch
• Painter
• QA Rep
• Ship Fitter
• Fitter Helper
• Riggers
• Pipe Fitter
• Sheet Metal
Foundation Installation Trades Required
• Mechanical
• Welder
• Firewatch
• Painter
• Assembly
Foundation Installation Trades Required
55 WORK DAYS
10 WORK HOURS
SYSTEM SHIP
SHIP
SYSTEM
DISTRIBUTION STATEMENT A: Approved for Public Release by NAVSEA PAO 25FEB2016
Speed to Capability Component Based System Upgrades
Requirements Components
Selection Rack
Integration Build to Print Rack
Qualifications FAT
Rack Production
Fielding
Requirements Components
Selection Fielding
SHIP SYSTEM Traditional Development
Component Based Development
DEVELOPMENT INSTALLATION UPGRADE DEPLOYMENT 5
Long technical insertion development time.
UP TO 9 YEARS
LESS THAN 2 YEAR
Common Ship Integrated Enclosures (CSIE) and COTS components
will shorten technical insertion development time, improve combat
system support system, and increase ship survivability.
SHIP SYSTEM
SHIP SYSTEM
SHIP SYSTEM
DISTRIBUTION STATEMENT A: Approved for Public Release by NAVSEA PAO 25FEB2016
Force Deployment Approach
6
OUTPACING THE THREAT
Threat identified CS integration Rapid reconfiguration with CSIE and
modularity
2018 2022
Integrated battlegroup With latest capabilities
CS identified
Threat identified CS integration Rapid reconfiguration with CSIE and
modularity
2020 2024
Integrated battlegroup With latest capabilities
CS identified
Threat identified CS integration Rapid reconfiguration with CSIE and
modularity
2022 2026
Integrated battlegroup With latest capabilities
CS identified
DEVELOPMENT INSTALLATION UPGRADE DEPLOYMENT
DISTRIBUTION STATEMENT A: Approved for Public Release by NAVSEA PAO 25FEB2016
Backup
7
DEVELOPMENT INSTALLATION UPGRADE DEPLOYMENT
Unlocking combat system development
Standard Modular Compartment Rapid reconfiguration
Allocated Component to ship
Integrated Enclosure No rack integration/qualification needed
FU
TU
RE
STA
TE
U
pgra
de in
wee
ks
Plug latest
CS into CSIE
Plug latest
CS into CSIE
Plug latest
CS into CSIE
CU
RR
EN
T S
TAT
E
Upg
rade
in y
ears