JUNE 20, 2016 #24 We Build Futures ~ Communities ~ Confidence ~ We Build Your Business The Genuine. The Original. “We’re Not The Best Because We’re the Oldest... We’re The Oldest Because We’re the Best!” Overhead Door Company of Salinas 733 Sanborn Place • Salinas, CA 93901 Salinas (831) 422-3667 • Monterey (831) 375-3667 Fax (831) 422-1061 • Santa Cruz (831) 662-3122 Lic. #529655 Overhead Door Company of Santa Clara Valley 1266 Lawrence Expressway • Sunnyvale, CA 94089 Tel (408) 734-8010 • Fax (408) 734-3728 Lic. #215098 Bidding This Week... Builders Bulletin Our office will be closed from 12:00 - 2:00 the second Tuesday of every month for our Board Meeting. 6/21/16 Marina Airport Beacon 2:00 PM 6/21/16 San Jose Easterbrook Discovery School Asphalt & Pump Station - Moreland School District 2:00 PM 6/21/16 Morgan Hill Walsh Elementary School Sewer And Water Line Replacement- Morgan Hill Unified School District 2:00 PM 6/21/16 San Jose Hester Exterior Building Repairs & Painting - San Jose Unified School District 2:00 PM 6/21/16 Morgan Hill Sobrato High School Athletic Field Fence Installation - Morgan Hill Unified School District 11:00 AM 6/21/16 Campbell Annual Street Maintenance Local Street Sealing 3:00 PM 6/21/16 San Jose Plumbing Services, Maintenance & Repair - All Vta Facilities-Scvta 2:00 PM 6/21/16 Los Altos Parking Plaza Driveway Approach Improvements 2:00 PM 6/21/16 Cupertino Campus Exterior Lighting Phase Iii - Foothill De Anza Community College District 3:00 PM 6/21/16 * Palo Alto Municipal Service Center (Msc) Fuel Station Demolition And Excavation 164103 3:00 PM 6/21/16 * Los Altos Street Resurfacing Ts-0100116 2:00 PM 6/21/16 Cupertino Carpeting At Various Location De Anza College #1768 - Foothill-De Anza College District 1:00 PM 6/21/16 Palo Alto Rfq General Street Services 3:00 PM 6/21/16 Cupertino Pasadena Avenue Public Improvements 2016-13 2:00 PM 6/22/16 Watsonville Main St. Improvements, First St. To East Beach St. 11:00 AM 6/22/16 Menlo Park City Hall Renovation Project Carpet Installation 4:00 PM 6/22/16 Saratoga Vasona Creek Restoration & Habitat Improvement Program 2 West Valley College 1:00 PM 6/22/16 * San Jose Roofing Repairs (Phase I) #31325, San Jose City College (Sjcc) 2:00 PM 6/23/16 * Santa Cruz Twin Lakes Beachfront Improvement Project - East Cliff Drive, 5th Avenue To 7th Avenue 2:00 PM 6/23/16 * Salinas Building 400 Cardiology Clinic & Hvac Mechanical Upgrade 3:00 PM 6/23/16 Paso Robles Meridian Fire Station Apparatus Bay Expansion 3:00 PM 6/23/16 San Luis Obispo Vista Grande Facility Demolition At Cal Poly 2:00 PM 6/23/16 San Jose Pond And Wetland Restoration At Calero County Park 3:00 PM 6/23/16 San Jose Bramhall Restroom - Concession - Storage Building Project 7855 3:00 PM 6/23/16 Palo Alto Rfq For Architectural Services For Expansion Of Ravenswood City School District Child Development Center 4:00 PM 6/24/16 Pacific Grove Rfp For Sanitary Sewers Maintenance Services 2:00 PM 6/24/16 Santa Cruz Louden Nelson Community Center Facility Improvements Project 5:00 PM 6/24/16 Santa Cruz Rfp For Louden Nelson Community Center Facility Improvements 5:00 PM 6/24/16 Pebble Beach French Residence 5:00 PM

Transcript of Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units...

Page 1: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

JUNE 20, 2016 #24

We Build Futures ~ Communities ~ Confidence ~ We Build Your Business

The Genuine. The Original.

“We’re Not The Best Because We’re the Oldest...We’re The Oldest Because We’re the Best!”

Overhead Door Company of Salinas733 Sanborn Place • Salinas, CA 93901

Salinas (831) 422-3667 • Monterey (831) 375-3667Fax (831) 422-1061 • Santa Cruz (831) 662-3122

Lic. #529655

Overhead Door Company of Santa Clara Valley1266 Lawrence Expressway • Sunnyvale, CA 94089

Tel (408) 734-8010 • Fax (408) 734-3728Lic. #215098

Bidding This Week...

Builders Bulletin

Our office will be closed from 12:00 - 2:00

the second Tuesday of every month for our Board Meeting.

Bid Time Project NameLocationBid Date

6/21/16 Marina Airport Beacon2:00 PM

6/21/16 San Jose Easterbrook Discovery School Asphalt & Pump Station - Moreland School District

2:00 PM

6/21/16 Morgan Hill Walsh Elementary School Sewer And Water Line Replacement- Morgan Hill Unified School District

2:00 PM

6/21/16 San Jose Hester Exterior Building Repairs & Painting - San Jose Unified School District

2:00 PM

6/21/16 Morgan Hill Sobrato High School Athletic Field Fence Installation - Morgan Hill Unified School District

11:00 AM

6/21/16 Campbell Annual Street Maintenance Local Street Sealing3:00 PM

6/21/16 San Jose Plumbing Services, Maintenance & Repair - All Vta Facilities-Scvta2:00 PM

6/21/16 Los Altos Parking Plaza Driveway Approach Improvements2:00 PM

6/21/16 Cupertino Campus Exterior Lighting Phase Iii - Foothill De Anza Community College District

3:00 PM

6/21/16* Palo Alto Municipal Service Center (Msc) Fuel Station Demolition And Excavation 164103

3:00 PM

6/21/16* Los Altos Street Resurfacing Ts-01001162:00 PM

6/21/16 Cupertino Carpeting At Various Location De Anza College #1768 - Foothill-De Anza College District

1:00 PM

6/21/16 Palo Alto Rfq General Street Services3:00 PM

6/21/16 Cupertino Pasadena Avenue Public Improvements 2016-132:00 PM

6/22/16 Watsonville Main St. Improvements, First St. To East Beach St.11:00 AM

6/22/16 Menlo Park City Hall Renovation Project Carpet Installation4:00 PM

6/22/16 Saratoga Vasona Creek Restoration & Habitat Improvement Program 2 West Valley College

1:00 PM

6/22/16* San Jose Roofing Repairs (Phase I) #31325, San Jose City College (Sjcc)2:00 PM

6/23/16* Santa Cruz Twin Lakes Beachfront Improvement Project - East Cliff Drive, 5th Avenue To 7th Avenue

2:00 PM

6/23/16* Salinas Building 400 Cardiology Clinic & Hvac Mechanical Upgrade3:00 PM

6/23/16 Paso Robles Meridian Fire Station Apparatus Bay Expansion3:00 PM

6/23/16 San Luis Obispo Vista Grande Facility Demolition At Cal Poly2:00 PM

6/23/16 San Jose Pond And Wetland Restoration At Calero County Park3:00 PM

6/23/16 San Jose Bramhall Restroom - Concession - Storage Building Project 78553:00 PM

6/23/16 Palo Alto Rfq For Architectural Services For Expansion Of Ravenswood City School District Child Development Center

4:00 PM

6/24/16 Pacific Grove Rfp For Sanitary Sewers Maintenance Services 2:00 PM

6/24/16 Santa Cruz Louden Nelson Community Center Facility Improvements Project5:00 PM

6/24/16 Santa Cruz Rfp For Louden Nelson Community Center Facility Improvements5:00 PM

6/24/16 Pebble Beach French Residence5:00 PM

Page 1 of 1

Page 2: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,
Page 3: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

CSLB-Sponsored Bill to Show Citations on All Licenses Moves On The Assembly Business and Profession Committee yesterday unanimously approved a Contractors State License Board-sponsored bill, SB 1209 (Morrell). This measure, which is on the fast track for passage, would require that citations issued against a licensed contractor follow the contractor if he or she is issued another license. Under current law, Business and Professions Code (B&P Code) §7124.6 (e)(1) limits disclosure of a citation only to the license subject to a complaint substantiating that citation. Once that citation is disclosed, B&P Code section 7124.6 does not extend that disclosure to licenses obtained or joined by persons thereafter. Contractors trying to ‘skirt-around the law’ know that if the CSLB issues a citation, they can cancel that license and obtain or join a new license not subject to the complaint disclosure affecting the previous license. Thus, persons aware of this limitation are free to operate under a different entity clear of any disclosure action. According to the CSLB, “this eviscerates the purpose of B&P Code §7124.6 disciplinary action, which is to provide for consumer protection by reporting the activities subjecting individual contractors to discipline.” This bill, which would take effect on January 1, 2017, requires that citations be disclosed from the date of issuance and for five years after the date of compliance if no additional disciplinary actions have been filed against the licensee during the five-year period. If additional disciplinary actions were filed against the licensee during the five-year period, all disciplinary actions are required to be disclosed for as long as the most recent disciplinary action is subject to disclosure under the section. At the end of the specified time period, those citations will no longer be disclosed. (BPC Section 7124.6 (e)(1)) This measure requires that accusations that result in suspension, stayed suspension, or stayed revocation of the contractor's license be disclosed from the date the accusation is filed and for seven years after the accusation has been settled, including the terms and conditions of probation if no additional disciplinary actions have been filed against the licensee during the seven-year period. If additional disciplinary actions were filed against the licensee during the seven-year period, all disciplinary actions will be posted for as long as the most recent disciplinary action is subject to disclosure under this section. At the end of the specified time period, those accusations will no longer be disclosed. (BPC Section 7124.6 (e)(2)).

Remember, Contractors Licensing Center is your one-stop ‘shop’ for ALL of your licensing, incorporation and business needs. Please don’t hesitate to contact us to inquire as to how we may be of assistance to you and your company.

Page 4: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

Projects Out To Bid

Deadline for submission of materials for our Bulletin is end of day Wednesday each week.

Weekly Projects Bidding 6/16/2016

Reasonable care is given in gathering, compiling and furnishing the information contained herein which is obtained from sources believed to bereliable, but the Planroom is not responsible or liable for errors, omissions or inaccuracies.

Name Bid Date Time Contract # EstimateLocationOPR#

Monterey County

Plan Issuer:

Visit

Marina

Class A or C-10. Purchase and installation of a new airport rotating beacon on a new tip-down pole, with contractor designed cast-in-place concrete foundation, and installation of conduit and conductor from the beacon to the electrical vault, complete and insatisfactory condition.Prevailing

6/9 10a @ site, Bldg. 540

16-01487

0

2:00 PM6/21/16

Addenda:AIRPORT BEACON

AIP 3-06-0367-013-2016

Prebid Conf:

non-mandatory

City of Marina [email protected] 831-884-1214 831-384-0425

Bidders:

Plan Issuer:

Salinas $1,500,000 $1,900,000

Class B.Tenant improvements per project plans and specifications for a 5,252 sq. ft. primary care clinic requiring OSHPD 3 compliancecertification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanicalservices; duct assemblies, structural platforms or supporting foundations, and re-configurations of curbs. Prevailing

MAND 5/26 10a @ site - Lobby BLDG 400 1st Floor

16-01399

2

3:00 PM6/23/16

Addenda:BUILDING 400 CARDIOLOGY CLINIC & HVAC MECHANICAL UPGRADE

9600-66/NMC-1012 to

Prebid Conf:

County of Monterey 831-755-4748 831-755-4958

General Contractor Fax: 831-633-3389Office: 831-633-3371Ausonio Incorporated

General Contractor Fax: 831-372-5584Office: 831-372-5580Avila Construction Co.

General Contractor Fax: 831-422-1882Office: 831-422-8213Dilbeck & Sons, Inc.

General Contractor Fax: 831-657-9820Office: 831-657-9805Otto Construction

General Contractor Fax: 831-422-0566Office: 831-422-9696Tombleson Inc

Bidders:

Plan Issuer:

Pebble Beach

Chernus Construction Co. will be building a single family residence in the Monterey area and we are looking for sub contractors for alltrades from rough grading to finish carpentry.The home is 5,250 SF on two floors with a 3 car attached garage. The construction is conventional wood frame and a raised floor. Weexpect construction to start in July 2016.

Please send your bid via E Mail to: [email protected]

Call 858-353-3344 between 8 AM and 6 PM or E Mail at [email protected] for any questions.

16-01514

0

5:00 PM6/24/16

Addenda:FRENCH RESIDENCE

Chernus Construction Co. [email protected] 858-353-3344

Concrete/Masonry Contractor Fax: 213-443-9563Office: 408-605-6861Professional Grade Construction

General Contractor Office: 858-353-3344Chernus Construction Co.

General Contractor Fax: 661-327-5305Office: 661-346-5292Dalian Construction

General Contractor Office: 831-750-9125J. Moreno Construction, Inc.

Plan Issuer:

Pacific Grove

The City of Pacific Grove is seeking proposals from qualified firms to provide maintenance of the City’s sanitary sewer mains andmanholes. The Contractor shall perform sanitary sewer maintenance services to designated areas within the existing City limits asdirected by the Director of Public Works or his/her designee. Sanitary sewer maintenance services include the cleaning andmaintenance of City owned sanitary sewer pipelines and manholes as designated by the City and the regular reporting to the City forthe work completed by the Contractor.

16-01526

0

2:00 PM6/24/16

Addenda:RFP FOR SANITARY SEWERS MAINTENANCE SERVICES

City of Pacific Grove Public Works dgho@cityof pacificgrove.org 831-648-5722 831-375-0627

Page 5: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

Projects Out To Bid

Name Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Salinas

Providing requirements for installation of two American Modular Gen 7 Buildings consisting of approximately 6,720 SF.

PROJECT SUMMARY: INCLUDES ALL GRADING, NEW HARDSCAPE, UNDERGROUND UTILITY ROUTING INCLUDING ATRANSFORMER AND SWITCHBOARD, SITE FENCING, NEW FIRE HYDRANT, NEW CUSTOM WALL BETWEEN UNITS, ANDMINIMAL IRRIGATION MODIFICATIONS. INTERIOR LOW VOLTAGE, POWER, SECURITY, INTRUSION AND FIRE ALARM TOOCCUR AFTER BUILDING PLACEMENT.

*******June 3rd is the mandatory bid walk through. Plans and Spec’s will be available to bidders who come that day.*******

MAND 6/3 @ 10am- site

16-01395

0

2:00 PM6/28/16

Addenda:BOLSA KNOLLS MODULAR UNDERGROUND INSTALLATION

2015-16-2A

Prebid Conf:

Schimmel Project Management-SPM [email protected] 408-223-2395

General Contractor Fax: 408-286-1288Office: 408-286-1299Strawn Construction, Inc

General Contractor Fax: 831-422-0566Office: 831-422-9696Tombleson Inc

Supplier Fax: 831-262-9778Office: 831-262-9778Corix Water Products

Bidders:

Plan Issuer:

Marina

Class A. Demolition and removal of existing concrete medians, curb and gutter, and roadway sections,; Re-configuring the existingroadway, including one new traffic roundabout; Installing new concrete curb and gutter, roadway section as required, sidewalk,driveway and curb ramps; Placing an asphalt concrete overlay over the street sections to remain; Installation of a new pathway;Installation of new landscaping and irrigation; Placement of underground storm drain piping and appurtenances; New striping andpavement markings and traffic signage; and all other related work specified in the plans and specifications. Prevailing

16-01491

0

2:00 PM6/28/16

Addenda:DEL MONTE BLVD. & BEACH RD. IMPROVEMENT PROJECT

City of Marina - Engineering 831-884-1212

General Contractor Fax: 661-327-5305Office: 661-346-5292Dalian Construction

General Contractor Fax: 831-761-1042Office: 831-763-6100Granite Construction

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock

Bidders:

Plan Issuer:

Visit

Monterey

Construction for the removal & replacement of portland cement concrete (PCC) sidewalk, the installation of curb drains, and installationof tree wells with cobblestones. Areas where construction takes place may be located in high pedestrian and/or vehicle traffic areas.

6/14 10a @ 353 Camino El Estero

16-01589

1

2:00 PM6/28/16

Addenda:CITYWIDE SIDEWALK REPAIR

Prebid Conf:

non-mandatory

City of Monterey 831-646-3997 831-646-3921

General Contractor Fax: 661-327-5305Office: 661-346-5292Dalian Construction

Plan Issuer:

Salinas $144,315

The work to be done consists, in general, of delivery and application of asphalt emulsion to various locations around Monterey County(approximately 157,808 total square yards of chip seal).

16-01623

0

3:00 PM6/30/16

Addenda:PROCUREMENT (DELIVERY AND APPLICATION) OF ASPHALT EMULSION FOR THE SEAL COAT FY17

5517

County of Monterey 831-755-4953 831-751-0332

NEW

Plan Issuer:

Salinas

Furnish and deliver screenings to various stockpile locations in Monterey County. Stockpile locations and quantities for each locationare listed in Attachment A of RFQ #5517.If you would like additional information please contact: Jesus Guico, Monterey County Resource Management Agency – Public Works,168 W. Alisal St., 2nd Floor, Salinas, CA 93901, Phone: (831) 796-6090, E-mail: [email protected]

16-01659

0

3:00 PM7/7/16

Addenda:RFQ TO FURNISH AND DELIVER SCREENINGS FOR THE SEAL COAT FY17 PROJECT

5517

County of Monterey 831-755-4953 831-751-0332

NEW

Page 6: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

Projects Out To Bid Name Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Visit

Monterey $1,750,000

Class C12 or Class A. Pavement spot repair of approximately 150,000 SF, crack sealing, placing of approximately 1.0 M SF of slurryseal, associated striping removal and replacement, refreshing of existing painted street markings, traffic control and installation ofnecessary environmental pollution prevention requirements on various streets in the City of Monterey. Prevailing

6/23 11a @ 353 Camino El Estero

16-01643

0

2:00 PM7/12/16

Addenda:CITYWIDE STREET RESURFACING (SLURRY)

Prebid Conf:

non-mandatory

City of Monterey 831-646-3997 831-646-5686

NEW

Plan Issuer:

Monterey

This is an on-call contract, which shall be used to provide the City with a readily available work force for construction, repairs,alterations to existing facilities and emergency work requiring an electrical construction trade as the City deems appropriate. Ingeneral, the work consists of construction, alterations and repair of public improvement projects and miscellaneous associated workrequiring an electrical construction trade. The work shall be located in the City of Monterey, Presidio of Monterey, Naval PostgraduateSchool, Ord Military Community and Camp Roberts.

Project Contact: Elvie CamachoCity of MontereyTel:(831) 646-3783Fax:(831) [email protected]

16-01652

0

2:00 PM7/12/16

Addenda:ON-CALL ELECTRICAL CONTRACTOR FOR CITY AND PMSA PROJECTS

City of Monterey 831-646-3997 831-646-5686

NEW

Plan Issuer:

Monterey $510,000

In general, the work consists of, but is not limited to, furnishing and installing an adaptive traffic control system along the LighthouseAvenue corridor consisting of vehicle detection, including wireless pavement sensors, video detection cameras, equipment in controllercabinets, associated equipment cabling in existing conduits; installing City-furnishedtraffic controller cabinets and controllers; removing and salvaging existing cabinets and foundations, furnishing, installing andintegrating central computers and servers includingall hardware, software, cabling and licenses for a complete adaptive traffic control system.

6/23 @ 10am- 580 Pacific Street, Monterey

16-01657

0

2:00 PM7/12/16

Addenda:LIGHTHOUSE AVENUE ADAPTIVE TRAFFIC SIGNAL CONTROL SYSTEM

Prebid Conf:

City of Monterey-Traffic Engineering Division [email protected] 831-646-3473 831-646-3474

NEW

Plan Issuer:

Fort Hunter Liggett

Subcontractor agrees to furnish in strict accordance with the Contract Documents all labor, materials, equipment, installation, cartage,hoisting, supplies, insurance, equipment, tools & other facilities of every kind & description required for or incidental to the prompt &efficient execution of the following work including the below listed specifications, drawing & details:09 30 00 CERAMIC TILE09 65 00 RESILIENT FLOORING09 68 00 CARPETWork to include but not limited to submittals, Shop Drawings, Installation Drawings, Certifications, adhesives & relating preparationwork, Local/Regional Materials; (LEED) Environmental Data, Warranty & inspections, provide & install all material includingcomponents required for the Wall & floor Ceramic tile, resilient flooring & Carpet.Confirm through an e-mail if interested to submit a bid to: [email protected]

16-01641

0

12:00 PM11/23/16

Addenda:TASS TRAINING CENTER

Bara Infoware [email protected] 925-241-5762 925-829-4107

NEW

Page 7: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

NEW

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Carmel

Notice is hereby given that the Board of Education for the Carmel Unified School District has elected to utilize the alternative biddingprocedures set forth in Public Contract Code section 22032 et seq. and shall develop and maintain a list of qualified contractors,identified according to categories of work, in accordance with the provisions of Public Contract Code section 22034 and criteria that theCalifornia Uniform Cost Accounting Commission promulgates from time to time. Notice is further provided that District is inviting alllicensed contractors to submit the name of their firm to the District for inclusion on the District’s list of qualified bidders for the 2016calendar year.Persons or companies interested in being included on the District’s list of bidders for the 2016 calendar year shall provide the nameand address to which a Notice to Contractors or Proposal should be mailed, a phone number at which the contractor may be reached,the type of work in which the contractor is interested in doing and currently licensed to do (earthwork, pipelines, electrical, painting,general building, etc.), together with the class of contractor’s license(s) held and contractor license number(s).Contractors interesting in being included on the District’s list of bidders for the 2016 calendar year may submit the above-describedinformation in person or by U.S. Mail to:Carmel Unified School DistrictAttn: Dan PaulPO Box 222700Carmel, CA 93922It is the sole responsibility of the person submitting such information in person or by U.S. Mail to ensure that is delivered to the Districtand includes all requested information. Any contractor providing a submittal that lacks the information set forth herein will not be addedto the District’s list of prequalified bidders for the 2016 calendar year.

16-01553

0

5:00 PM12/30/16

Addenda:NOTICE INVITING LICENSED CONTRACTORS

Carmel Unified School District [email protected] 831-624-6311

San Benito County

Plan Issuer:

San Juan Bautista

The Aromas-San Juan Unified School District offers this information to any individual, company, or firm wishing to be added to theDistrict's general construction informal bid list for all trades pursuant to Public Contract Codes 22032 and 22034 - The CaliforniaUniform Public Construction Cost Accounting Act (CUPCCA). Interested parties must submit the CUPCCA contractor/vendorapplication to be included. Application forms are available through the Aromas-San Juan Unified School District Maintenance andOperations Department or can be downloaded by clicking the links below or by contacting Bill Rupert at (831) 623-4776 [email protected]. Forms must be returned via US mail to:

Aromas-San Juan Unified School DistrictAttn: Bill Rupert2320 San Juan Highway, San Juan Bautista, CA 95045or by fax to (831) 623-4907

16-01511

0

5:00 PM12/30/16

Addenda:CUPCCA

Aromas-San Juan Unified School District [email protected] 831-623-4776 831-623-1572

San Luis Obispo County

Plan Issuer:

Visit

Paso Robles $498,000

Class B. Construction of an addition to an existing building of Type V-N light wood frame construction, adding fire protection waterstorage tanks, and related plumbing and site improvements and accessibility upgrades. PrevailingDIVISION 2 - EXISTING CONDITIONS02 40 00 DEMOLITIONDIVISION 3 - CONCRETE03 30 00 CAST-IN-PLACE CONCRETE03 60 00 GROUTDIVISION 5 - METALS05 43 00 SLOTTED CHANNEL FRAMING SYSTEM5 50 00 METAL FABRICATIONSDIVISION 6 - WOOD AND PLASTICS6 10 00 ROUGH CARPENTRY6 17 00 PREFABRICATED WOOD STRUCTURAL MEMBERSDIVISION 7 - THERMAL AND MOISTURE PROTECTION07 19 00 WEATHER RESISTANT BARRIER

6/7 10a @ site

16-01484

0

3:00 PM6/23/16

Addenda:MERIDIAN FIRE STATION APPARATUS BAY EXPANSION

320062

Prebid Conf:

NON-MANDATORY

County of San Luis Obispo [email protected] 805-781-5213 805-781-5212

Page 8: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

NEW

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

7 19 20 UNDER SLAB VAPOR BARRIER07 20 00 BUILDING INSULATION07 30 00 SHINGLE ROOFING07 60 00 FLASHING AND SHEET METAL07 65 00 SHEET MEMBRANE UNDERLAYMENT07 70 00 ROOF ACCESSORIES7 90 00 JOINT PROTECTIONDIVISION 8 - DOORS AND WINDOWS8 10 00 METAL DOORS AND FRAMES08 31 00 ACCESS DOORS08 36 13 OVERHEAD SECTIONAL DOORS08 51 00 ALUMINUM WINDOWS08 62 50 TUBULAR SKYLIGHTS8 70 00 DOOR HARDWAREDIVISION 9 - FINISHES9 20 00 LATH AND PLASTER09 25 00 GYPSUM BOARD09 68 00 CARPET9 90 00 PAINTINGDIVISION 10 - SPECIALTIES10 20 00 LOUVERS AND VENTS10 26 00 WALL PROTECTION10 40 00 SIGNAGEDIVISION 21 - FIRE SUPPRESSION21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION21 10 00 WATER-BASED FIRE SUPPRESSION SYSTEMS21 40 00 FIRE PROTECTION WATER STORAGE TANKSDIVISION 22 - PLUMBING22 05 00 COMMON RESULTS FOR PLUMBING22 05 23 GENERAL DUTY VALVES FOR PLUMBING PIPING22 07 00 PLUMBING INSULATION22 11 16 DOMESTIC WATER PIPING22 11 19 DOMESTIC WATER PIPING SPECIALTIES22 11 23 DOMESTIC WATER PUMPS22 13 16 SANITARY WASTE AND VENT PIPING22 13 19 SANITARY WASTE PIPING SPECIALTIES22 34 00 FUEL FIRED DOMESTIC WATER HEATERSDIVISION 23 – HEATING, VENTILATION AND AIR CONDITIONING23 05 00 COMMON WORK RESULTS FOR HVAC23 05 13 COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT23 05 48 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT23 05 93 TESTING, ADJUSTING AND BALANCING FOR HVAC23 11 23 FACILITY NATURAL GAS PIPING23 31 00 HVAC DUCTS AND CASINGS23 34 23 HVAC POWER VENTILATORS23 37 13 DIFFUSERS, REGISTERS AND GRILLES23 73 33 INDIRECT-FIRED H&V UNITSDIVISION 26 – ELECTRICAL SYSTEMS26 05 00 COMMON WORK RESULTS FOR ELECTRICAL26 05 01 SELECTIVE ELECTRICAL DEMOLITION26 05 19 LOW VOLTAGE POWER CONDUCTORS AND CABLES26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS26 05 33 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS26 05 53 IDENTIFICATION OF ELECTRICAL SYSTEMS26 27 26 WIRING DEVICES26 51 00 INTERIOR LIGHTING26 56 00 EXTERIOR LIGHTING26 56 70 LIGHTING ACCEPTANCE TESTINGDIVISION 31 - EARTHWORK31 00 00 EARTHWORK31 22 80 SOIL TREATMENTDIVISION 32 - EXTERIOR IMPROVEMENTS32 10 15 CONCRETE PAVING AND SITEWORK32 12 00 ASPHALTIC CONCRETE PAVING32 17 00 PAVEMENT MARKING32 31 00 FENCES AND GATE

Page 9: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Electrical Contractor Fax: 831-480-8469Office: 831-524-6416Adept Electrical Services

General Contractor Fax: 661-745-4893Office: 661-745-4890J.E. Burke Construction, Inc.

General Contractor Fax: 805-548-1995Office: 805-460-6940Jacob Construction & Design Inc.

Bidders:

Plan Issuer:

San Luis Obispo $350,000

Class B. Remove an existing structural concrete dining facility, Bldg. 112, disconnecting & capping of all site utilities & selectiveclearing of vegetation to prepare the site for new construction. Prevailiing

MAND 6/8 9a @ Facilities, Bldg. 70 Rm. 109 on campus

16-01578

1

2:00 PM6/23/16

Addenda:VISTA GRANDE FACILITY DEMOLITION AT CAL POLY

MAJ 15-MJ0061-D

Prebid Conf:

Cal Poly Facilities Planning & Capital Projects 805-756-2581 805-756-7566

General Contractor Fax: 805-549-0702Office: 805-549-0667Sansone Company, Inc.

Bidders:

Plan Issuer:

Paso Robles

DIVISION 02 - EXISTING CONDITIONS02 4100 DemolitionDIVISION 03 - CONCRETE03 2000 Concrete Reinforcing03 3000 Cast-in-Place ConcreteDIVISION 12 - FURNISHINGS12 9300 Site FurnishingsDIVISION 31 - EARTHWORKDIVISION 32 - EXTERIOR IMPROVEMENTSDIVISION 33 - UTILITIES33 4111 Site Storm Utility Drainage Piping

MAND 6/21 11a @ 801 Niblick Rd., Admin office

16-01638

0

1:00 PM6/27/16

Addenda:VETERANS MEMORIAL STADIUM & PASO ROBLES HIGH SCHOOL - ATHLETIC FIELDSMODERNIZARION

B15/16-003

Prebid Conf:

Paso Robles Joint Unified School District 805-238-2222

NEW

Electrical Contractor Fax: 805-238-0996Office: 805-238-3502Rossi & Carr Electrical Inc

General Contractor Fax: 805-549-0702Office: 805-549-0667Sansone Company, Inc.

Plan Issuer:

Paso Robles

The work is generally described as tree trimming and tree maintenance work on 13 established park trees and planting one new tree.

6/9 @ 10am

16-01497

0

2:00 PM6/30/16

Addenda:CITY PARK TREE MAINTENANCE

DPW Project No. 14-09B

Prebid Conf:

City of Paso Robles 805-237-3861 805-237-3904

Plan Issuer:

San Luis Obispo

Replacement of existing pathway lighting fixtures and poles; pole replacement of existing court lights; and all existing lighting systemwiring and grounding.

16-01662

0

2:00 PM7/14/16

Addenda:MEADOW PARK LIGHTING REPLACEMENT

91323

City of San Luis Obispo 805-783-7716 805-781-198

NEW

Bidders:

Plan Issuer:

Paso Robles $1,725,000

The work shall include but is not limited to, localized removal and reconstruction of asphalt pavement structural section, crack fill andseal, removal and installation of water line, portland cement concrete flatwork, adjust utilities to grade, slurry seal and pavementmarkings.

7/1 @ 10am- 4912 Wing Way, Paso Robles

16-01622

0

2:00 PM7/15/16

Addenda:REHABILITATE TAXIWAY B, C, D, AND E

DPW NO. 16-02

Prebid Conf:

City of Paso Robles 805-237-3861 805-237-3904

NEW

General Contractor Fax: 805-548-1995Office: 805-460-6940Jacob Construction & Design Inc.

Page 10: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

San Luis Obispo $529,700

In general the project includes a complete renovation of the existing Sinsheimer Park playground area. The project involves removingand disposing of play equipment, foundations, sand, concrete flatwork and curbs, asphalt walks, trees and landscaping, rubberizedsurfacing and concrete bases, embankments, grading and compacting, installation of city-furnished play equipment, installation ofdrainage system, gravel, filter fabric, and wood fiber surfacing, concrete curbs, walkways, flatwork, retaining walls and access ramps,picnic tables, benches, trash receptacles, installation of irrigation system, landscaping, erosion control and other improvements asshown on the plans.

16-01668

0

2:00 PM7/21/16

Addenda:SINSHEIMER PARK PLAYGROUND RENOVATION

90650

City of San Luis Obispo 805-781-7200 805-781-7198

NEW

Plan Issuer:

Paso Robles

It is mandatory that all General Contractors, Mechanical/Plumbing Subcontractors, and Electrical Subcontractors (Contractors) forprojects estimated at $1,000,000 or over must full complete this Questionnaire, provide all materials requested herein, and beapproved by the Paso Robles Joint Unified School District in order to bid.

16-00858

0

5:00 PM12/30/16

Addenda:CONTRACTOR PRE-QUALIFICATION REQUIREMENTS

Paso Robles Joint Unified School District 805-238-2222

Santa Clara County

Plan Issuer:

Palo Alto

Demolition of the existing fuel station facility.

Project Contact: Elizabeth AmesEmail: [email protected]

Plans and specs also available for review at Santa Clara Builders Exhange

5/17 at 11AM

16-01284

3

3:00 PM6/21/16

Addenda:MUNICIPAL SERVICE CENTER (MSC) FUEL STATION DEMOLITION AND EXCAVATION 164103

164103

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

Bidders:

Plan Issuer:

Los Altos

Deep lift asphalt concrete pavement repairs (cut & plug), asphalt overlay on existing pavement, rubberized chip seal, traffic control,miscellaneous re-striping.

Plans and specs also available for review at Santa Clara Builders Exchange

None

16-01384

3

2:00 PM6/21/16

Addenda:STREET RESURFACING TS-0100116

TS-0100116

Prebid Conf:

City of Los Altos - Engineering 650-947-2780

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock

Plan Issuer:

Cupertino $45,000

Replace carpeting various locations at De Anza College

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 6/2 at 10AM

16-01457

0

1:00 PM6/21/16

Addenda:CARPETING AT VARIOUS LOCATION DE ANZA COLLEGE #1768 - FOOTHILL-DE ANZA COLLEGEDISTRICT

1768

Prebid Conf:

Foothill De Anza College District (Foothill) 650-949-6165

Page 11: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Palo Alto

Seeking the on-call services of a qualified General Street Services contractor to perform standard highway sign installations, roadwaymarking removal & installations, curb painting and thermoplastic installations.

Project Contact: Chris Anastole - 650-617-3167Email: [email protected]

RFQ also available for review at Santa Clara Builders Exchange

None

16-01463

0

3:00 PM6/21/16

Addenda:RFQ GENERAL STREET SERVICES

163335

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

Bidders:

Plan Issuer:

Cupertino

Installation of sidewalk, curb, gutter, and park strips where they do not exist now. In addition, the scope includes construction of curbramps and driveways as well as drainage modifications, pavement restoration.

6/8 at 10AM

16-01474

0

2:00 PM6/21/16

Addenda:PASADENA AVENUE PUBLIC IMPROVEMENTS 2016-13

2016-13

Prebid Conf:

City of Cupertino DPW 408-777-3354

General Contractor Fax: 661-327-5305Office: 661-346-5292Dalian Construction

Plan Issuer:

Los Altos $100,000 $125,000

Remove and replace concrete driveway, sidewalk, curb and gutter and base, excavation, earthwork, compaction, aggregate base, ACpavement, curb drains, bollards, signs, install ADA ramps and restripe parking stalls.

Plans and specs also available for review at Santa Clara Builders Exchange

None

16-01524

0

2:00 PM6/21/16

Addenda:PARKING PLAZA DRIVEWAY APPROACH IMPROVEMENTS

TS-01028 to

Prebid Conf:

City of Los Altos - Engineering 650-947-2780

Bidders:

Plan Issuer:

Cupertino $550,000

Installation of exterior pathway and building lights and the replacement of light fixtures at specific buildings on Campus

Plans and specs also available for review at Santa Clara Builders Exchange.

MAND 6/2 at 11AM

16-01525

0

3:00 PM6/21/16

Addenda:CAMPUS EXTERIOR LIGHTING PHASE III - FOOTHILL DE ANZA COMMUNITY COLLEGE DISTRICT

1766-276

Prebid Conf:

Foothill-De Anza College 650-949-6163

General Contractor Fax: 650-965-7139Office: 650-965-3430RC Benson & Sons, Inc.

General Contractor Fax: 650-508-1705Office: 650-508-1700Rodan Builders Inc.

Plan Issuer:

Campbell

Asphalt concrete dig out repairs; removal and replacement of traffic striping, markers and markings; installation of Type II PolymerModified Slurry Seal (using black aggregate); public notification including street posting; associated traffic control including allconstruction signs and equipment, flaggers, temporary signing and striping; and all other incidentals necessary to complete the work.Additive alternate bid items work include: Microsurfacing seal coat on downtown streets and crack sealing on Winchester Boulevard.

Project Contact: Fredrick Ho 408-866-2156Email: [email protected]

Specs also available for review at Santa Clara Builders Exchange

16-01527

0

3:00 PM6/21/16

Addenda:ANNUAL STREET MAINTENANCE LOCAL STREET SEALING

City of Campbell, DPW 408-866-2150

Page 12: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

San Jose $1,400,000 $1,900,000

Plumbing repair and replacement services at the designated Santa Clara Valley Transportation Authority Facilities, including but notlimited to, administrative facilities, operational facilitates (including three bus maintenance yards and one train yard), outlyingproperties, (including bus and rail operator break rooms), light rail stations and other VTA owned assets.

Project Contact: Florante TanadaEmail: [email protected]

Specs also available for review at Santa Clara Builders Exchange

6/7 at 10AM

16-01529

2

2:00 PM6/21/16

Addenda:PLUMBING SERVICES, MAINTENANCE & REPAIR - ALL VTA FACILITIES-SCVTA

M15154 to

Prebid Conf:

SCVTA -Santa Clara Valley Transportation Authority 408-321-7189

Plan Issuer:

Morgan Hill

Procurement and installation of fencing, etc.

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 6/14 at 11AM

16-01575

0

11:00 AM6/21/16

Addenda:SOBRATO HIGH SCHOOL ATHLETIC FIELD FENCE INSTALLATION - MORGAN HILL UNIFIED SCHOOLDISTRICT

Prebid Conf:

Morgan Hill Unified School District 408-201-6085 408-201-6094

Plan Issuer:

San Jose

Bid Package #01 – Exterior Building Repairs SJUSD Bid #2074CBid Package #02 – Painting, SJUSD Bid #2075C

Project Contact: Cheryl Butterton, Blach ConstructionEmail: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 6/10 at 10AM or 6/16 at 1PM

16-01614

0

2:00 PM6/21/16

Addenda:HESTER EXTERIOR BUILDING REPAIRS & PAINTING - SAN JOSE UNIFIED SCHOOL DISTRICT

Z0481

Prebid Conf:

SJUSD-San Jose Unified School District 408-535-6071

Plan Issuer:

San Jose

1. Asphalt paving.2. Installation of owner-furnished ball walls.3. Basketball standards.4. Court striping.5. Sewer pump replacement.6. Concrete seatwall.7. Limited accessibility upgrades in existing restrooms.

Plans and specs also available for review at Santa Clara Builders Exchange

Non-Mandatory 6/14 at 2PM

16-01648

0

2:00 PM6/21/16

Addenda:EASTERBROOK DISCOVERY SCHOOL ASPHALT & PUMP STATION - MORELAND SCHOOL DISTRICT

Prebid Conf:

Greystone West Company 707-933-0624 707-996-8390

NEW

Plan Issuer:

Morgan Hill

Installation and connection of new sewer and water line to existing.

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 6/15 at 11AM

16-01649

0

2:00 PM6/21/16

Addenda:WALSH ELEMENTARY SCHOOL SEWER AND WATER LINE REPLACEMENT- MORGAN HILL UNIFIEDSCHOOL DISTRICT

Prebid Conf:

Morgan Hill Unified School District -Anessa Espinosa 408-201-6087

NEW

Page 13: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

San Jose $115,000

A Remove debris from roofs.B. Clean all drains overflow drains, primary and overflow scuppers, gutters and downspouts.C. Water-test all drains and downspouts for blockage.D. Prior to installation of any materials, provide odor control measures at nearby air intakes.E. Trim all tree branches and vegetation back away from the roof surfaces.

Project Contact: Ed Fregoso, GilbaneEmail: [email protected]

Specs also available for review at Santa Clara Builders Exchange

MAND 6/2 at 9AM

16-01461

1

2:00 PM6/22/16

Addenda:ROOFING REPAIRS (PHASE I) #31325, SAN JOSE CITY COLLEGE (SJCC)

G-2010.0148

Prebid Conf:

San Jose/Evergreen College District-Priscilla Louangrath 408-270-6496

Bidders:

Plan Issuer:

Saratoga $306,000

Grading and drainage improvements, rock placements (e.g. weirs and engineered streambed materials), SWPPP development andimplementation, native plant installation and maintenance.

Project Contact: Elizabeth Witt, Gilbane Building CompanyEmail: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

16-01601

0

1:00 PM6/22/16

Addenda:VASONA CREEK RESTORATION & HABITAT IMPROVEMENT PROGRAM 2 WEST VALLEY COLLEGE

#11-1516

West Valley Mission College, Facilities 408-741-2187

General Contractor Fax: 707-768-3386Office: 707-834-4492Wallace Structures

Plan Issuer:

Menlo Park

Install carpet tiles and broad room carpeting.Installation of carpet will involve interfacing of carpet to an in carpet raceway system.

Project Contact: Lawrence Tam

Plans and specs also available for review at Santa Clara Builders Exchange

6/15 at 2PM

16-01619

0

4:00 PM6/22/16

Addenda:CITY HALL RENOVATION PROJECT CARPET INSTALLATION

13-018

Prebid Conf:

City Of Menlo Park, DPW 650-330-6770

Bidders:

Plan Issuer:

San Jose $1,025,000

New restroom, concession, storage building.

Project Contact: Daniel Phan 408-535-8412Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

Non-Mandatory 6/8 at 10AM

16-01558

0

3:00 PM6/23/16

Addenda:BRAMHALL RESTROOM - CONCESSION - STORAGE BUILDING PROJECT 7855

7855

Prebid Conf:

City of San Jose - DPW 408-535-8300

Concrete/Masonry Contractor Fax: 213-443-9563Office: 408-605-6861Professional Grade Construction

General Contractor Fax: 831-747-1106Office: 831-760-0806Krautstrunk Inc.

General Contractor Fax: 650-685-2491Office: 650-685-2490Omni Construction Services Inc.

General Contractor Fax: 775-329-2297Office: 775-329-2227Public Restroom Company

General Contractor Fax: 650-508-1705Office: 650-508-1700Rodan Builders Inc.

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc

Page 14: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

San Jose

Provide construction services and 3-years of management and monitoring to restor a pond and wetland at Calero County Park.

Project Contact: Terah Donovan 669-253-6566Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 6/14 at 10AM

16-01571

0

3:00 PM6/23/16

Addenda:POND AND WETLAND RESTORATION AT CALERO COUNTY PARK

Prebid Conf:

Santa Clara Valley Habitat Agency 408-779-7261

Plan Issuer:

Palo Alto

The district is seeking a highly qualified Architect to serve as the District's Architec of Record for the Expansion of the ChildDevelopment Center.

RFQ also available for review at Santa Clara Builders Exchange

16-01660

0

4:00 PM6/23/16

Addenda:RFQ FOR ARCHITECTURAL SERVICES FOR EXPANSION OF RAVENSWOOD CITY SCHOOL DISTRICTCHILD DEVELOPMENT CENTER

Burke Williamson & Sorensen, LLP 510-273-8780 510-839-9104

NEW

Plan Issuer:

Palo Alto $400,000

Seeking proposals from qualified firms to provide professional services for the design of the WQCP Primary Outfall Line as well asrepair options for re-lining of the existing Outfall Line.

Project Contact: Cecilia MaganaEmail: [email protected]

Plans and specs available ONLINE ONLY

MAND 5/25 at 10AM

16-01414

1

3:00 PM6/28/16

Addenda:RFP FOR PROFESSIONAL SERVICES WQCP PRIMARY OUTFALL LINE DESIGN WQ-80021 (ONLINE)

WQ-80021

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

Plan Issuer:

Los Altos $40,000 $50,000

Lead abatement, repair building walls/surfaces and re-paints the buildings.

Specs also available for review at Santa Clara Builders Exchange

MAND 6/16 at 10AM

16-01562

1

2:00 PM6/28/16

Addenda:GRANT PARK COMMUNITY CENTER EXTERIOR PAINTING

CF-01008 (#15-21) to

Prebid Conf:

City of Los Altos - Engineering 650-947-2780

Bidders:

Plan Issuer:

Los Altos $240,000 $400,000

Removing of stripes and markings, temporary striping, slurry seal, traffic control.

Specs also available for review at Santa Clara Builders Exchange

None

16-01566

0

2:00 PM6/28/16

Addenda:ANNUAL STREET SLURRY SEAL

TS-0100416 to

Prebid Conf:

City of Los Altos - Engineering 650-947-2780

General Contractor Fax: 510-783-9907Office: 510-783-9909Bond Blacktop, Inc

Bidders:

Plan Issuer:

Sunnyvale $158,000

New Kinder Play Area Expansion – Asphalt and concrete paving, fencing, striping at existing parking, landscape site work.

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 6/14 at 10AM

16-01577

1

2:00 PM6/28/16

Addenda:STOCKLMEIR ELEMENTARY SCHOOL KINDER PLAY AREA EXPANSION 16-1B10-24- CUPERTINOUNION SCHOOL DISTRICT

16-1B10-24

Prebid Conf:

Cupertino Union School District 408-252-3000 408-343-2802

General Contractor Fax: 000-000-0000Office: 650-364-8466Anza Engineering Corp.

General Contractor Fax: 408-279-2044Office: 408-279-2027Guerra Construction Group

Page 15: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

General Contractor Fax: 408-925-0245Office: 408-925-0220Lewis & Tibbitts, Inc

Plan Issuer:

San Jose

Provide Valley Medical Center Telecommunications Cabling Services on an “as needed” basis.

Project Contact: Leslie Harper 408-993-4748Email: [email protected]

Specs also available for review at Santa Clara Builders Exchange

Non-Mandatory 6/14 at 9AM

16-01603

0

3:00 PM6/28/16

Addenda:VALLEY MEDICAL CENTER TELECOMMUNICATIONS CABLING SERVICES #ITB-FAF-FY16-0201

#ITB-FAF-FY16-0201

Prebid Conf:

County of Santa Clara Facilities & Fleet 408-993-4600

Plan Issuer:

Sunnyvale

Replace or rehabilitate approximately 6,780 feet of existing sanitary sewer main by open cut excavation, and cured-in-place pipe(CIPP).

Project Contact: Pete Gonda 408-730-7418Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

16-01598

0

3:00 PM6/29/16

Addenda:2012-13 SANITARY SEWER MAIN REPLACEMENT PHASE 3

PW 16-22

City of Sunnyvale DPW 408-730-7415

Bidders:

Plan Issuer:

San Jose

Provide design, pre-construction and construction services.

RFQ also available for review at Santa Clara Builders Exchange

6/23 at 12PM

16-01516

1

2:00 PM7/7/16

Addenda:RFQ DESIGN-BUILD CONTRACT FOR MODULAR MAKER SPACE BUILDINGS-UNION SCHOOLDISTRICT

2017-17

Prebid Conf:

Greystone West Company 707-933-0624 707-996-8390

General Contractor Fax: 408-286-1288Office: 408-286-1299Strawn Construction, Inc

Plan Issuer:

San Jose $175,000

Establish a term contract with a contractor to provide concrete repairs on an “as needed” basis.

Project Contact: Kim Huynh 408-993-4632Email: [email protected]

Specs also available for review at Santa Clara Builders Exchange

MAND 6/20 at 10AM

16-01604

0

3:00 PM7/7/16

Addenda:CONCRETE REPAIR SERVICES #ITB-FAF-FY16-0199

#ITB-FAF-FY16-0199

Prebid Conf:

County of Santa Clara Facilities & Fleet 408-993-4600

Plan Issuer:

Palo Alto

Relocation of a single portable classroom to a different location, including preparation work for building pad and utilities. Also, modifysix single portable classrooms into two large single classrooms.

Note: Demolition work of existing ramps, new openings for double doors, electrical safe-off and disconnection of low-voltage will becompleted prior to commencement of the project. It is part of this scope of work that all electrical and low-voltage are to be re-connected and systems such as lighting, fire alarm, data ports and telephones are working.

Plans and specs are also available for review at Santa Clara Builders Exchange

MAND 6/22 at 11AM

16-01651

0

11:00 AM7/7/16

Addenda:GUNN HIGH SCHOOL SUMMER 2016 PORTABLES PROJECT - PALO ALTO UNIFIED SCHOOL DISTRICT

GHSP-16

Prebid Conf:

Palo Alto Unified School District 650-329-3927

NEW

Page 16: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Santa Clara County

Installation and Rehabilitation of asphalt concrete (AC) roadway surface paving; Shallow and deep roadway settlement repairs;Clearing and removal of project area debris and vegetation; Removal and replacement of roadway drainage inlet structures;Miscellaneous drainage infrastructure improvements; Installation of roadway signage, striping, guardrails, and associated safetyinfrastructure; Installation of rock fall netting system; Installation of roadside debris catchment concrete barriers; and three sets of solarpowered automatic gate systems (gate leafs supplied by District).

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 6/17 at 10:30AM

16-01653

0

2:00 PM7/8/16

Addenda:MOUNT UMUNHUM ROAD REHABILITATION PROJECT SIERRA AZUL OPEN SPACE PRESEVE

Prebid Conf:

Midpeninsula Regional Open Space Dist 650-691-1200

NEW

Plan Issuer:

San Jose

Provide pumps maintenance and repair/replacement services on an “as needed” basis

Project Contact: Kim Huynh 408-993-4632Email: [email protected]

Specs also available for review at Santa Clara Builders Exchange

.

6/24 at 10AM

16-01655

0

3:00 PM7/11/16

Addenda:PUMPS MAINTENANCE AND REPAIR/REPLACEMENT SERVICES #ITB-FAF-FY16-0207

#ITB-FAF-FY16-0207

Prebid Conf:

County of Santa Clara Facilities & Fleet 408-993-4600

NEW

Plan Issuer:

Cupertino $73,000

Provide and install three (3) emergency phone systems.

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 6/24 at 10AM

16-01650

0

2:00 PM7/13/16

Addenda:PARKING LOT "E" EMERGENCY PHONES DE ANZA COLLEGE #1758

#1758

Prebid Conf:

Foothill De Anza College District (Foothill) 650-949-6165

NEW

Plan Issuer:

Sunnyvale

Replace aging and deteriorating infrastructure to minimize failures and water service interruption. This project consists of replacingapproximately 6,500 feet of water mains, valves and fire hydrants, tie-in of new mains to existing mains, replacement of service laterals(excluding existing copper ones) up to existing water meters, and replacement of non-radio-read water meters.

Project Contact: Husam Aburabi 408-730-7627Email: [email protected]

Specs also available for review at Santa Clara Builders Exchange

16-01633

0

3:00 PM7/14/16

Addenda:RFP FOR PROFESSIONAL DESIGN SERVICES ASSOCIATED WATER LINE REPLACEMENT 2016-17

UW 16-01

City of Sunnyvale DPW 408-730-7403

NEW

Bidders:

Santa Clara County $15,000,000

Div 1-3, 5, 7, 9-10, 18 & 20. Remove and demolish an existing steel and timber two (2) track rail bridge, which spans the Los GatosCreek, immediately south of the Caltrain Diridon Station, in San Jose CA; and replace the existing bridge with three (3) separateconcrete pre-cast bridges. The new spans will be supported on Cast in Drilled Hole (CIDH), and Cast inSteel Shell (CISS) piles, as well as: cast in place concrete piers, caps, and abutments.

Project Contact: Robert Isom 650-508-7933Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 6/14 & 6/17 at 9AM

16-01590

0

2:00 PM8/2/16

Addenda:LOS GATOS CREEK BRIDGE REPLACEMENT PROJECT 16-J-C-005 CALTRAIN

16-J-C-005

Prebid Conf:

General Contractor Fax: 415-206-0528Office: 415-206-0524Con-Quest Contractors, Inc

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock

Page 17: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Santa Cruz County

Plan Issuer:

Watsonville $520,000

The project includes reconstructing sidewalk corners with widened pedestrian walkways and ADA compliant ramps, constructingstreetside bioswales, constructing medians, installation of new storm drain inlets and storm drain pipe (tie into existing manholes andinlets), planting of medians and bioswales, striping, installation of traffic signal detector loops, replacing street light fixtures.

16-01630

1

11:00 AM6/22/16

Addenda:MAIN ST. IMPROVEMENTS, FIRST ST. TO EAST BEACH ST.

ST-15-01

City of Watsonville 831-768-3115 831-763-4065

NEW

Bidders:

Plan Issuer:

Santa Cruz $4,099,637

The Project includes realigning East Cliff Drive within the County right-of-way, adding bicycle lanes, pedestrian walkways andsidewalks, new crosswalks, public parking, mini-roundabout improvements, a visitor drop off area, storm water quality improvements,various other project amenities and year-round access to the beach via a ramp and stairway built into a coastal bluff protectionstructure. Re-design work included reducing the size of the coastal protection structure, converting the traffic circle to a mini-roundabout, and revision to some finishes.Contact Person: Martha Shedden E-mail: [email protected]

5/24 @ 3:30 - East Cliff Drive and 5th Avenue

16-01391

5

2:00 PM6/23/16

Addenda:TWIN LAKES BEACHFRONT IMPROVEMENT PROJECT - EAST CLIFF DRIVE, 5TH AVENUE TO 7THAVENUE

Prebid Conf:

County of Santa Cruz [email protected] 831-454-2160 831-454-2385

General Contractor Fax: 831-449-0700Office: 831-444-4125Don Chapin Co.

General Contractor Fax: 888-647-8589Office: 209-957-9797F. Loduca Co

General Contractor Fax: 925-838-5915Office: 925-838-5675Gordon N. Ball, Inc.

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock

Plan Issuer:

Santa Cruz

The City of Santa Cruz is requesting written proposals from qualified consultants to prepare a design development plan and then plansand specifications for facility improvements to the Louden Nelson Community Center. The selected Consultant will review existingplans of the facility, familiarize themselves with the facility and how it's used, meet with facility staff, community center users and othercity employees. The goal is to develop a design development plan that will be approved by staff. Once approved the Consultant willthen prepare plans and specifications ready for construction to be submitted for public bid.

16-01573

0

5:00 PM6/24/16

Addenda:RFP FOR LOUDEN NELSON COMMUNITY CENTER FACILITY IMPROVEMENTS

PKLN-1601

City of Santa Cruz - Parks & Recreation 831-420-5270

Plan Issuer:

Santa Cruz

The City of Santa Cruz is requesting written proposals from qualified consultants to prepare a design development plan and then plansand specifications for facility improvements to the Louden Nelson Community Center. The selected Consultant will review existingplans of the facility, familiarize themselves with the facility and how it's used, meet with facility staff, community center users and othercity employees. The goal is to develop a design development plan that will be approved by staff. Once approved the Consultant willthen prepare plans and specifications ready for construction to be submitted for public bid.

16-01602

0

5:00 PM6/24/16

Addenda:LOUDEN NELSON COMMUNITY CENTER FACILITY IMPROVEMENTS PROJECT

PKLN-1601

City of Santa Cruz - Parks & Recreation 831-420-5270

Bidders:

Plan Issuer:

Santa Cruz

The Project consists of removal of existing natural turf field, lime treatment the subgrade, reinstallation of all drainage and watersystems as shown on plans and installation of synthetic turf field and safety pad. Contractor will be working with District selected turfmanufacturer and installer.

16-01609

1

2:00 PM6/28/16

Addenda:SANTA CRUZ HIGH SCHOOL STADIUM FIELD IMPROVEMENTS

2016-03

Santa Cruz City School District [email protected] 831-429-3904 831-425-7639

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock

Page 18: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Capitola

The City of Capitola is seeking qualified consultants experienced in evaluating and updating local jurisdictional Americans withDisabilities Act Self Evaluation and Transition Plans. This Request for Proposal seeks to secure the most qualified consultant to assistthe City of Capitola by performing field evaluations/inspections of all City facilities, evaluation of the City’s right-of-ways, programs,services and activities, and provide a comprehensive update of the City’s ADA Transition Plan.Should you have any questions about this RFP or the selection process, please contact me by phone at (831) 475-7300 or via email [email protected] Van Son Building Official

16-01606

0

5:00 PM6/30/16

Addenda:UPDATE OF THE CITY OF CAPITOLA ACCESSIBLE TRANSITION PLAN

City of Capitola 831-475-7300 831-479-8879

Plan Issuer:

Boulder Creek

The San Lorenzo Valley Unified School District hereby solicits proposals from qualified firms for the purchase and installation of twoshade structures for the Boulder Creek Elementary School. The selected firm will provide specified equipment and installation atBoulder Creek Elementary School Site.

Installation of two DSA preapproved ( PC ) shade structure’s, including design, plans and specifications for DSA submittal andapproval, Shade structure, roofing, concrete, foundations, paving. A complete installation of a DSA Preapproved shade structureincluding all approvals, plans, and specifications to be included into the Districts plan set for the full approval by the Division of theState Architect. Project includes but is not limited to the following:Cost Estimating, design, installationProject Scheduling Construction Administration

16-01591

0

9:00 AM7/1/16

Addenda:RFP BOULDER CREEK ELEMENTARY SHADE STRUCTURES

San Lorenzo Valley Unified School District [email protected] 831-336-9679 831-336-9531

Plan Issuer:

Corralitos $25,000

This project is for licensed contractors with a Type C12, Earthwork and Paving Contractors license to patch, resurface and stripeexisting tennis and basketball courts.

6/28 @ 10am- site

16-01644

0

2:30 PM7/12/16

Addenda:ALDRIDGE LANE PARK SPORTS COURT RESURFACING

15C1-011

Prebid Conf:

County of Santa Cruz 831-454-2210 831-454-2710

NEW

Plan Issuer:

Santa Cruz County

The Housing Authority of the County of Santa Cruz requests responses from qualified General Contractors and Specialty Contractors,including but not limited to: Concrete, Electrical, Painting, Plumbing, Roofing and similar specialty classifications. The HousingAuthority is developing a list of pre-qualified contractors to provide construction services for a variety of on-going facility maintenanceand modification projects – including vacant unit turnovers, service work and similar. Contractors will be evaluated based on the natureof services required and the qualifications of the Contractor. Depending on nature and location of work, select prevailing wage rateswill apply to jobs.Interested Contractors must complete a “Contractor Information” form. Contractors must submit completed forms to the HousingAuthority office located at:Housing Authority of the County of Santa Cruz2931 Mission St.ATT: Peter RogersSanta Cruz, CA 95062This Notice will remain open - there is no deadline for submitting a written “Contractor Information” forms.Please contact Peter Rogers at 831-454-5928 with questions.

16-00733

0

5:00 PM12/30/16

Addenda:NOTICE TO INTERESTED GENERAL AND SPECIALTY CONTRACTORS

Housing Authority of Santa Cruz Co. 831-454-5923 831-469-3719

Page 19: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,
Page 20: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,
Page 21: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,
Page 22: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

A contractor ‘stepping up to the plate’ for his first application ‘triples’ a question down the right line in seeking expert advice. Another interested in getting back to work discovers there is an extra step or two because of his ‘inactivity’.

Like a rerun of Johnny Carson’s rerun of The Tonight Show’s fortune teller act Karnak-The-Great, I ‘telecommunicate’ an answer for an electrical contractor…Q:  We currently have a “C-10” (Electrical) license.  I am aware that we can do low voltage work with our current license, however some of our customer’s request that we have a “C-7” (Low Voltage) license in order to do telecommunications work.  How difficult would it be to add that classification to our license?  Would I have to take the test?

A:  B&P Code section 7065.3 allows for Contractors to request a Waiver of the Trade Exam for some additional classifications - if the classification is closely related to your current license and is a significant portion of the work you perform.  These Waiver requests are reviewed on a case-by-case basis and is dependent on your work experience and project background, but I believe you would have a pretty good chance of being approved to Waive the exam based on your “C-10” experience.  Waiver requests need to be done in writing.

Q:  I’m scheduled to take the “B” (General Building) exam at the end of the month. (1) If I don’t pass how much does it cost to retake it?  (2) How long do I have to wait to take it again?  (3) Is there a limit to the number of

times I can take it?  

A:  If you fail the exam you are required to pay a $60 rescheduling fee.  The fee should be submitted with the application on the bottom of the notice informing you that you didn’t pass.  The CSLB will then reschedule you for the exam (usually about 3 weeks out), and you can take the exam as many times as needed within an 18-month period.  If you don’t pass within 18 months, your application ‘strikes out’ and will be void.

Q:  I have an Inactive license that I obtained years ago and I want to Reactivate it.  The Responsible Managing Employee (RME) that I used to obtain the license no longer works with me and I want to become the Responsible Managing Officer (RMO) on the license.  Can I still reactivate it?

A:  Yes, however, a reactivation application requires the signature of your Qualifier.  Therefore, I would suggest completing an Application to Replace your Qualifier in order to then add yourself as the RMO, and then request a Reactivation application. Call if you need any assistance.

While knowledge is power, knowing where to go for the answers is half the battle. Get expert assistance immediately when you call 866-443-0657, email [email protected], or write us at Capitol Services, Inc., 1225 8th St. Ste. 500, Sacramento, CA 95814. Research past columns at www.cutredtape.com.

Page 23: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

The Flyers Fuel Program offers member discounts of 2-5 cents per gallon at over 240,000 gas stations throughout the United States. In addition, you can utilize their Fleet Management System that helps members control costs, set limits on fuel services, and streamline reporting. Contact Irish Chapman to sign up today to sign up or to get your free fuel cost analysis.

• 5 cents per gallon discount at CFN sites

• 2 cents at gas stations everywhere

Discount Fuel Program for CCBA Members

CONTROL YOUR FUEL Contact Irish Chapman

[email protected] (530) 885-0401 ext. 2181

Page 24: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,
Page 25: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,
Page 26: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

City Building Permits Salinas

Permit No. R16-0146 Permit Amount $85000.00Owner(s) St Ansgars Lutheran Church

72 E San Joaquin St City SalinasBuilder Premo Roofing CoProperty Address same Permit Type Com Reroof

Permit No. R16-0149 Permit Amount $11000.00Owner(s) Aromin, Eliseo D & Jean B

1515 Los Altos Way City SalinasBuilder Gold Shield RoofingProperty Address same Permit Type Res Reroof

Pebble Beach Property $395,000

¼ acre lot, level, country club area, Pacific Grove School, Biology server provided, water may be purchased from Pebble Beach Co.

Contact: First City Real Estate, Steve 831-917-8043

BRE# 01872086

Page 27: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

City Building Permits Monterey

Permit No. B15-0615 Permit Amount $50000.00Owner(s) Churchill, Kenneth B & Monica

487 Alvarado St City MontereyBuilder Giles Healey ConstructionProperty Address same Permit Type Com Alter

Permit No. B16-0035 Permit Amount $12000.00Owner(s) Lizarraga, Raul H

908 Rider Ave City SalinasBuilder M N ConstructionProperty Address same Permit Type Res Alter

Permit No. B16-0072 Permit Amount $354722.00Owner(s) Distler-Popp Ingrid CO-TR

600 Franklin St City MontereyBuilder DMC Residential IncProperty Address same Permit Type Com Alter

Permit No. B16-0150 Permit Amount $180000.00Owner(s) Terkelson, Carolynne

125 Surf Way City MontereyBuilder Dry Creek ConstructionProperty Address same Permit Type Res Alter

Permit No. B16-0170 Permit Amount $50000.00Owner(s) Monterey Bay Aquarium Fo.

886 Cannery Row City MontereyBuilder Covell ConstructionProperty Address same Permit Type Com Alter

Permit No. B16-0171 Permit Amount $24000.00Owner(s) Abinante, Eugene G 2002 Trust

423 Alvardado St City MontereyBuilder C R Whitney & Son, IncProperty Address same Permit Type Com Alter

Permit No. B16-0222 Permit Amount $16000.00Owner(s) Holman Building Associates

449 Alvarado St City MontereyBuilder Blanco Const ServicesProperty Address same Permit Type Com Alter

Permit No. B16-0225 Permit Amount $12000.00Owner(s) Johnson, Ronald C

555 Ramona Ave City MontereyBuilder O/BProperty Address same Permit Type Res Alter

Page 28: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

Richard ZenkLic #0E21165

Ted J. RinkerLic #0486570

Rinker/Zenk I N S U R A N C E S E R V I C E S

Exchange member since 1988Serving the Tri-County area since 1974

See our ad on the Membership Listings tab

“We Specialize in Construction”Ted J. Rinker, Broker/Agent • Richard Zenk, Broker/Agent

35 E. Romie Lane, Suite C - Salinas, CA 93901Toll Free: (800) 991-8822 • Office: (831) 758-8472 • Fax: (831) 758-8942

[email protected]

Page 29: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,
Page 30: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

Bid ResultsHollister 6/1 Ladd Lane Roof Repair Project REBID

Scudder Roofing apparent low

Greenfield 6/2 Greenfield Pavement Maintenance

American Pavement Systems Inc $843,435

Telfer Pavement Technologies LLC $848,975

Graham Contractors, Inc. $859,578

Salinas 6/2 SVMH Kitchen Remodel

Hauser Construction $300,000

Property Restoration Services $446,992

Salinas 6/7 Proposition 39 District Wide Energy Efficiency LED Retrofit Program

Collins Electric Co Inc. apparent low

Salinas 6/9 SVMH ED Optimization

Property Restoration Services $704,926

FTG Builders Inc $736,500

Tombleson Inc $766,000

San Luis Obispo 6/9 CDBG Curb Ramps 2016

Victor Concrete $204,800

Maino Construction $224,000

S. Chaves Construction Inc. $231,539

King City 6/13 Peach Tree Road Bridge No. 412

Granite Rock $1,432,182

Specialty Construction Inc. $1,502,286

Viking Construction $1,807,340

Arroyo Grande 6/14 Le Point Area Water Main Upgrade

Specialty Construction $486,892

Crandall Construction $540,660

Brough Construction, Inc. $563,545

Arroyo Grande 6/14 South Alpine Waterline Improvement

Crandall Construction $259,100

Brough Construction $272,243

Specialty Construction Inc. $283,861

Page 31: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

Rent a temporary Debris Box— Earn a Bonus.

“We’ll drop it off and you load it up.”

Republic Services of Salinaswww.republicservicessalinas.com For further information call: 831-775-3840

r P

rinte

d on

recy

cled

pape

r.

PARTNERS for a GREENER,CLEANER Salinas.

SALINAS RECYCLES

Why should I rent a debris box?

• Sanitary • Reduces Fire Hazard • Saves Labor• Aids in pest control • Versatile in a variety of sizes

For every 5th Debris Box you rent*, receive a $50. Gift Card Certificate for any

Oldtown Salinas business of your choice!

*Account must be paid current to receive Gift Card Certificate

$50.Gift Card Certificate=

3 or 4 Yard Dumpster

10 Yard (Limited to Rock and Concrete)

15 Yard

20 Yard

30 Yard

Debris box promo_bleeds.indd 1 10/7/11 9:32:55 AM

Page 32: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

Release of Mechanic’s Liens

Notice of Completion

Mechanic’s Liens

DATE GRANTOR GRANTEE CITY 06/07 Scudder Roofing First Church of Christ Monterey 06/10 Disaster Kleenup Specialists Selleck Clinton Seaside

DATE GRANTOR GRANTEE CITY 06/08 Rogge Homes L P Woodman Development Co. Inc Salinas06/10 Carmel By The Sea Otto Construction Carmel By The Sea 06/10 BMC EG Grove LLC BMC EG Grove LLC E. Garrison06/10 The Trustees of Cali. Univ. Tombleson Inc. Seaside 06/10 U S Army Avila Construction Monterey 06/10 County of Monterey Pueblo Construction Inc. Salinas

NONE THIS WEEK

Page 33: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

Get strategic counseling for increased bond capacity.

575 Price Street, #207 Pismo Beach, CA 93449

805-343-7434

www.cndbonding.com

Work with the largest independently owned surety only brokerage in the Western US.

Myrna Smith, FPO Title

We specialize in bonds of all types:

• Bidbonds• Subdivisionbonds• PerformanceandPaymentbonds• Commercial,licenseandpermitbonds

Withover80yearsofcombinedsuretyandunderwritingexperience,weprovidebondstocontractors,developersandallotherusersofsuretycreditsectors.

Your link to the right SuretY Bond CompanY

Myrna Smith, Vice President

Page 34: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,
Page 35: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

BUILDING INSPECTOR II

$4,896 - $6,683 Monthly The County of Monterey seeks a results-oriented individual who demonstrates excellent leadership and management skills to join the Building Services Division of the Monterey County Resource Management Agency. The Building Inspector II will conduct on-site inspections and investigations in all of the following areas: structural, electrical, plumbing, heating, ventilating, air conditioning, refrigeration, sewer, water, gas, disposal and grading. This position requires a significant amount of independent judgment in advising builders of possible modifications to bring construction into compliance with codes and ordinances.

FOR COMPLETE INFORMATION AND TO APPLY VISIT: Apply On-line!

Our Website: http://agency.governmentjobs.com/montereycounty

Applications may be obtained from and submitted to: Monterey County Resource Management Agency, Human Resources Department

Attn: Julie Aulenta, Personnel Analyst 168 W. Alisal Street, 2nd Floor, Salinas, CA 93901

Email: [email protected] Phone: (831) 755-5014 Fax: (831) 784-5603

This recruitment is open until the position is filled

PRIORITY SCREEN DATE June 20, 2016

For a guaranteed review, all required materials must be received by Monday, June 20, 2016. Applicants who fail to provide all required materials will not be considered. Resumes will not be accepted as a substitute for required application materials. All required application materials will be competitively evaluated. Those applications that are determined to be the most appropriately qualified will be invited to participate further in the selection process. To assess applicants’ possession of required qualifications, the process may include an oral examination, pre-exam exercises, performance exam, and/or written examination. A complete application packet will include:

A completed County of Monterey Employment Application Responses to all of the Supplemental Questions

Page 36: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

Classified Ads

"Specialty Construction, Inc. (SCI) is seeking to potentially employ qualified individuals who are residents of the Monterey Bay area (Monterey, Santa Cruz or San Benito Counties) should we be the successful bidder/awarded contractor on the Reservation Road Siphon Remediation Project for the Marina Coast Water District scheduled to bid on 8/27/15. Potential positions include La-borers, Operators, and Teamsters. SCI is also seeking services from qualified subcontractors who employ Monterey Bay area residents. In-terested parties should contact Doug Clay at [email protected] & reference the "Reservation Road Siphon Remediation Pro-ject" for more information."

HELP WANTED Earthworks Paving Contractors, Inc of Capitola,

CA, is hiring an Underground Foreman who would be a project estimator and team leader. Applicants should have extensive experience

with water, sewer, storm mains & laterals, water & sewer and backflow devices, and be able to perform grade setting & pipe fitting. It is desir-able for applicant to have a Class A drivers li-

cense and be able to perform equipment mainte-nance.

Earthworks Paving Contractors, Inc offers competitive compensation with benefits and is an equal opportunity employer. Please email resumes to [email protected]

Estimator Wanted Site Development, Grading & Paving,

Underground Utilities Experience and References preferred.

Please call 831-623-1200 or

Send resume to: [email protected]

Maintenance/Landscape (Full-Time)

Peacock Acres Inc. is now hiring. All interested applicants should direct a cover letter and resume to Employ-

[email protected] with position name in subject line or mail to 838 South Main St. STE C, Salinas, CA 93901.

Help Wanted Central Coast Site Work

Contractor looking for equipment operators,

and pipe layers. Must have grading,

paving, and pipe laying experience.

Competitive benefits, Salary DOE. Please fax resumes to

(831)637-8648

Free dirt/Base Rock please call for more

information (831)757-6251 x139

Office Building

Seaside Ca, 1200 Sq ft. Divided into 5 separate spaces

Available 6/15/2016 $900.00 a month

First City Real Estate

Steve 831-917-8043 BRE# 01872086

Page 37: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

Now Hiring

Full Time Estimator For

General Engineering (civil estimating)

Must have experience in grading, paving, concrete and underground utilities. Must have knowledge of estimating for private and public works projects, and fully understand

the reading and interpretation of architectural, civil, and structural plans and specs.

Pay commensurate with experience.

Excellent benefits provided and growth potential.

Please print application from our website at www.donchapin.com or send resumes to:

Attn: Human Resource Mgr. The Don Chapin Co. Inc

560 Crazy Horse Cyn. Rd. Salinas, CA 93907

[email protected]

The Don Chapin Co. Inc is an equal opportunity employer. All applications will be considered.

Page 38: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,

Safety Tip of the WeekSUMMER - HOT WEATHER

Summer is here and we need - to think serious about working in heat and high humidity. Too much heat and humidity can make people sick and in some cases, even cause death. Everyone reacts differently to heat but we all need to know how to recognize and treat heat emergencies.

Normally the body cools itself by sweating. When the outside temperature is equal to or above the temperature of the body and the humidity is high, our sweat does not evaporate and the body can become overheated. Heat emergencies fall into three different categories:

HEAT CRAMPS cause painful spasms of the leg and stomach muscles resulting from loss of fluids and salt from sweating. Treatment is simple: massage the cramped muscles and drink fluids.

HEAT EXHAUSTION - the skin will be cold, pale and clammy from perspiration. You may feel fatigue, nausea and have a headache; you may also feel weak and faint. Treatment - move the victim to a cooler place and lay them down with their feet elevated. Have them drink small amounts of fluids at frequent intervals. Medical follow-up may be advisable.

HEAT STROKE is the most serious and potentially deadly heat emergency. here is a malfunction in the body's regulating system resulting in lack of sweating. Heat stroke is a medical emergency and requires immediate treatment by a doctor. Symptoms include mental confusion, the victim may stagger or even lapse into unconsciousness. The skin will be dry, hot and flushed. Treatment - call an ambulance or nearest medical responder immediately. Move the victim to a cooler place and lay them down with the head elevated. Sponge with cool water until help arrives.

Here are some basic things we can do to prevent heat emergencies and make it easier for our bodies to handle the heat and humidity. Get a good nights sleep, eat moderately on hot days, wear loose fitting, lightweight clothing, drink plenty of cool water, avoid intake of alcohol, drugs, etc. Even some prescription drugs may affect your tolerance to heat. Never ignore the symptoms of heat illness in yourself or a co-worker. Get help immediately!

THE 'ASSURED EQUIPMENT GROUNDING CONDUCTOR PROGRAM FOR JULY, AUGUST & SEPTEMBER IS RED. ALL ELECTRICAL CORDS & TOOLS MUST BE TESTED & COLOR CODED

Safety Recommendations:__________________________________________________________________________________

Job Specific Topics:_______________________________________________________________________________________

M.S.D.S Reviewed:_______________________________________________________________________________________

Attended By:

_______________________________________________________________________________________________________

_______________________________________________________________________________________________________

_______________________________________________________________________________________________________

_______________________________________________________________________________________________________

_______________________________________________________________________________________________________

Page 39: Builders Bulletin - CCBA · certification. Remove and replace two (2) rooftop air handling units (AHU) and all associated plumbing, electrical, and mechanical services; duct assemblies,