Builders Bulletin - CCBA · 6/1/18 Morro Bay. 2:00 PM . Bid Package 1 - Student Support Center...
Transcript of Builders Bulletin - CCBA · 6/1/18 Morro Bay. 2:00 PM . Bid Package 1 - Student Support Center...
May 28, 2018
We Build Futures ~ Communities ~ Confidence ~ We Build Your Business
Bidding This Week...
Builders Bulletin
CLEAN USED BRICK - PAVERS CARMEL STONE GRANITE ROCKS
FIREWOOD TIMBERS CYPRESS
ADOBE BLOCKS
FIXTURES APPLIANCES
CABINETS
BARN WOOD NEW & USED
LUMBER METAL GATES
CONSTRUCTION & BUILDING
SUPPLIES ROOF TILES
“We’re Not The Best Because We’re the Oldest…
We’re The Oldest Because We’re the Best!”
Overhead Door Company of Salinas 733 Sanborn Place • Salinas, CA 93901
Salinas (831) 422-3667 • Monterey (831) 375-3667 Fax (831) 422-1061 • Santa Cruz (831) 662-3122
Lic. #529655
Overhead Door Company of Santa Clara Valley 1266 Lawrence Station Road • Sunnyvale, CA 94089
Tel (408) 734-8010 • Fax (408) 734-3728 Lic. #215098
Bid Time Project Name Location Bid Date
5/29/18 * Seaside Seaside High School Corrosion Repair 2:00 PM
5/29/18 Shandon Shandon Elementary School – Kitchen Upgrade 2:00 PM
5/29/18 Stanford Stern Hall- Retrofit Basement Common Rooms Rfp (Larkin, Zapata, Burbank, Twain & Donner)
10:00 AM
5/29/18 * Santa Cruz Rfq For Construction Management Services - Riverside Underground And Streetscape Project And Rail Trail Segment 7 (Phase I & Ii) Project
2:00 PM
5/29/18 * Milpitas Big Al's 2:00 PM
5/30/18 Paso Robles Dot 05-1j1704 Resurface Pavement With Rhma (Bonded Wearing Course)
2:00 PM
5/30/18 * Saratoga Saratoga High School 800 Wng Project- Los Gatos-Saratoga Joint Union High School District
2:00 PM
5/30/18 Santa Cruz Re-Roofing At Santa Cruz High School 1:00 PM
5/30/18 * San Jose Leigh High School T-Wing Refurbishment - Campbell Union High School District
3:30 PM
5/30/18 Aptos Cw Drinking Fountains Phase Ii 2:00 PM
5/30/18 Boulder Creek Pasatiempo Well 8 Replacement 2:00 PM
5/30/18 Burlingame Electronic Vehicle Charging Stations Project 2:00 PM
5/30/18 * Sunnyvale Smart Station Storm Water Management System Upgrade Re-Bid 3:00 PM
5/30/18 * Los Gatos University Avenue Acp Sewer Rehabilitation - West Valley Sanitation District
10:00 AM
5/30/18 Capitola Capitola Branch Library 3:00 PM
5/30/18 Monterey Safe Place Shelter - Phase 2 11:00 AM
5/30/18 * Monterey Safeway 0173 5:00 PM
5/31/18 * San Jose Independence High School Ghklk Modernization (Repaving Parking Lots) - Esuhsd
2:00 PM
5/31/18 San Jose Hugh Gillis Hall Roof Replacement- Sjsu 2:00 PM
5/31/18 San Luis Obispo City Hall Chiller Replacement 2:00 PM
5/31/18 San Jose 8117-Brigadoon Park Playground Renovation 3:00 PM
5/31/18 Morgan Hill Santa Clara County Holden Ranch Emergency Vehicle Operation Center (Evoc)
2:00 PM
5/31/18 Santa Cruz Plymouth Street Storm Channel Emergency Repair 2:00 PM
5/31/18 Freedom Los Arboles Pump Station Drainage Improvements 2:00 PM
5/31/18 Santa Cruz 2018 Full Depth Recycle & Overlay Project 2:00 PM
5/31/18 Palo Alto Lower Page Mill Road 12" Sewer Rehab Project 3:00 PM
5/31/18 * Seaside Oldemeyer Center Boiler Replacement 4:00 PM
5/31/18 Arroyo Grande 2018 Concrete Repairs 2:00 PM
5/31/18 * Santa Clara County Maintenance Service Contract For Rail Grinding - Scvta 2:00 PM
5/31/18 * Santa Clara County 2018 Micro-Surfacing Of County Roads At Various Locations 2:00 PM
5/31/18 * Atascadero Statewide Enhanced Treatment Units At Atascadero State Hospital 2:00 PM
6/1/18 Morro Bay Bid Package 1 - Student Support Center 2:00 PM
6/1/18 San Luis Obispo Adult School Paving Improvement 2:00 PM
6/1/18 Sunnyvale Sewer Line On-Call Maintenance & Repair Services 3:00 PM
6/1/18 Los Altos Rfp Traffic Signal Maintenance Services 2:00 PM
6/1/18 * Gilroy Monterey Gateway Senior Apartments 11:00 AM
Central Coast Builders Association
242 East Romie Lane (831) 758-1624 Salinas Salinas, CA 93901 (831) 423-5900 Santa Cruz Mon-Thurs 8-5 Fri 8-3 (831) 883-3933 Monterey
(831) 758-6203 Fax
Board of Directors
President: Clifford Fasnacht, Dougherty Pump & Drill Brian Kenny, Hayward Lumber
Vice President: Kevin McIntosh, Blach Constuction Miguel Bustos, MIG Electric
Secretary/Treasurer: Anka Hepper, WM. B Saleh Painting Kate Rueter, AON Risk Services
Past President: Kristine O’Dell, Absolute HR Gabriel Torres, CCRB/CHISPA
Oscar Blancas, Blancas Construction
CCBA STAFFChristie Cromeenes
Executive Director
Merary Rodriguez FInance Coordinator Shelly Verba Office Planroom Manager
Rikki Montejano Public Relations Coordinator
DisclaimerAll information provided by CCBA is obtained from sources deemed to be reliable. It is the user’s responsibility to confirm the accuracy of
all facts. We assume no responsibility for errors and/or omissions.All information included is for the intended recipient only, we ask that
you do not share this information
Central Coast Builders Association
has partnered with Accurate Finance Group to present…
Quickbooks Basic Payroll for the Contractor
Date: Wednesday, June 27, 2018
Time: 1:00pm - 3:30pm
Fee: $25.00
This basic payroll class will walk through how to set up Quickbooks for processing your
own payroll, set up your employees (including vacation, pto, etc), track work comp, track payroll for job costing , paying employees, using payroll reports, paying payroll liabilities
and quarterly and year end reporting using Quickbooks.
This class is for the Contractor who is doing his/her own bookkeeping and needs further understanding...
Come and learn the basics of: Setting Up Payroll in Quickbooks Correctly
Setting up employees and paying them
Using Payroll Reports in Quickbooks to track taxes correctly
Paying Payroll Liabilities (Payroll taxes-IRS, EDD, wage attachments)
Payroll and Job Costing Quarterly and Year End Reporting
Would you like to learn how to utilize our Online Planroom from one of the experts?
BRING a lunch, and learn how to get the most bang for your buck during this lunchtime lesson in our classroom on our new 60” monitor!
Join us for this COMPLIMENTARY Class
Bring your own
July 11, 2018
11:30am—1:00pm
Special ONE TIME discount
will be offered to any members who are not yet signed up for the Online Planroom! Don’t miss out! Please Contact our office at (831) 758—1624 / [email protected] if you’d like to register for this class OR fill out this form and send it over to [email protected] or fax to (831) 758—6203
Company Name Phone Email
Names of Attendees
*** Lunch will NOT be provided***
** Parking is limited, please carpool if possible!**
242 E. Romie Lane, Salinas, CA 93901
July 25, 2018
ONLY 20 SPOTS AVAILABLE
Mon
day,
Aug
ust 2
0, 2
018
1:00
PM
- 4:
00 P
M
Employers have a legal obligation to establish an effective injury and illness prevention program to promote health and safety in the workplace. Complying with safe and healthful work practices, includes first aid kits easily accessible to each work area, and training of at least one employee on each shift currently qualified to render first aid. Contractors are required, by law, to have an employee certified in CPR/First Aid on each job site. Sessions have limited space so register early. This course is designed to provide skills in CPR, First Aid & Automated External Defibrillation (AED). Students will learn adult CPR, rescue breathing and choke saving. Upon successful completion, students will receive the American Red Cross CPR & First Aid Certificate. Both CPR & First Aid Certificates are valid for 2 Years.
CPR & First Aid Training American Red Cross Certified
Cost: $70 members $85 non-members
Bi-Lingual Instructor: PEDRO ALFARO Mr. Alfaro has a Bachelor of Science degree in Nutrition and has been a Health Educator for over 20 years. He volunteered for the Los Angeles American Red Cross Chapter for CPR/First Aid for over 3 years. He was with the Monterey County Health Department for 12 years.
Attendees:_______________________________________________________________________________________________ Company:___________________________________________________Contact:_____________________________________ Email_______________________________________________________Phone:______________________________________
Paying by: □ □ Check: □ Total:__________________________ Card Card #_________________________________________________________Expiration Date________________________
Class will be held at 242 E. ROMIE LANE, SALINAS
PLEASE MAIL, FAX OR EMAIL FORM TO: Central Coast Builders Association
242 E. Romie Lane Salinas, Ca 93901
Phone 831-758-1624 Fax 831-758-6203 Email: [email protected]
***fee will be applied for a “no show” ONLY 15 SPOTS AVAILABLE! RESERVE YOUR SPOT NOW!
Certified CPR/First Aid Training Sponsored by the Central Coast Builders Association
Projects Out To Bid
Deadline for submission of materials for our Bulletin is end of day Wednesday each week.
Weekly Projects Bidding 5/24/2018
Reasonable care is given in gathering, compiling and furnishing the information contained herein which is obtained from sources believed to bereliable, but the Planroom is not responsible or liable for errors, omissions or inaccuracies.
Name Bid Date Time Contract # EstimateLocationOPR#
Monterey County
Bidders:
Seaside
Project consists of: Site Demo; Selective Building Demo; Concrete; Structural Steel and Misc Iron; Metal Stairs; Metal Railings;Thermoplastic Sheet Waterproofing; Joint Sealers; Expansion Joint Covers; Aluminum Windows; Glass Glazing; Lath and Plaster;Painting; Mechanical General; Plumbing; HVAC; Electrical; Structured Cabling; Fire Alarm System Exiting; Earthwork; ExteriorImprovements; Utilities.
PREVAILING WAGE
Project Contact: Tom MillmanEmail: [email protected]
MAND 5/1 @ 3pm- site
18-01126
4
2:00 PM5/29/18
Addenda:SEASIDE HIGH SCHOOL CORROSION REPAIR
Prebid Conf:
Concrete/Masonry Contractor Fax: 213-443-9563Office: 408-605-6861Professional Grade Construction
Bidders:
Plan Issuer:
Monterey $165,000
Bid opening will occur at the Community Human Services office located at 2560 Garden Road #201B, Monterey.
Remodel downstairs bathroom for ADA compliance - including enlarging door/Remodel upstairs and downstairs kitchens with newcounter tops, sink, faucets, and install new exhaust hood at first floor with new ADA cabinet, as well as associated work to bring areaof work to code/Street POC to fire protection riser/Electrical service sub-panel relocation and panel upgrade including dryer forincreased loads/Comply with items as noted in report by S-Tech Consulting dated November 28th, 2017 - concluded that all demolitionmust be performed under containment/Remove, replace and reuse existing ceiling systems as needed to install fire sprinkler. Installbuilding interior fire sprinkler system. Install a monitored fire alarm system/Remove existing chimney/match finishes as close aspossible/Replace stair handrails at two exit stairs - one interior, one exterior/Replace (2) two windows with anodized flush fin retrofitcasement windows.Trades requesting bids for: Demolition/Abatement, Rough Finish Carpentry, Drywall, Acoustical Ceiling, Fry Toilet Accessories,Counter Tops, Doors and Hardware, Glazing, Painting, Flooring, Plumbing, Electrical, Fire Sprinkler Systems.
DBE
Construction Manager: Murrer ConstructionPhone: 831-521-0131Plans & Specs available for review at 1219 Forest Ave. Ste H, Pacific Grove, CA
MAND 5/9 @ 11am- site
18-01069
1
11:00 AM5/30/18
Addenda:SAFE PLACE SHELTER - PHASE 2
Prebid Conf:
Murrer Construction, Inc. [email protected] 831-521-0131 831-372-1644
Electrical Contractor Fax: 844-270-5526Office: 831-783-1080Kol Electrical
General Contractor Fax: 831-275-4188Office: 831-275-2103California Premier Restoration
General Contractor Fax: 831-274-2519Office: 831-274-2518Silcon, Inc./Silverie Properties
Type Not Set Fax: 831-372-8340Office: 831-375-2727Sentry Alarm Systems
Projects Out To Bid Name Bid Date Time Contract # EstimateLocationOPR#
Bidders:
Plan Issuer:
Monterey
Anticipated scopes: Concrete Saw Cutting, Concrete Floor Polishing, Concrete Finishing, Structural Steel, Carpentry, Décor,Insulation, Roofing, Doors and Hardware, Store Front Glazing, Miscellaneous Interior Demo, Acoustic Ceiling, Gypsum BoardSystems, EIFS / Stucco, Flooring, Interior Painting, Exterior Painting, FRP Wall Coverings, Fixtures, Plumbing, Automatic FireSprinkler, HVAC, Fire Alarm, and Electrical.
Questions: [email protected]
18-01395
2
5:00 PM5/30/18
Addenda:SAFEWAY 0173
Curt Faus Corp 503-699-1103 503-699-1106
Concrete/Masonry Contractor Fax: 213-443-9563Office: 408-605-6861Professional Grade Construction
General Contractor Office: 000-000-0000!!!There May Be Other Gc's Bidding ThisProject That We Are Unaware Of
General Contractor Fax: 503-699-1106Office: 503-699-1103Curt Faus Corp
Roofing Contractor Fax: 831-726-9183Office: 831-750-7044Ariana Roofing
Supplier Fax: 209-547-0554Office: 209-547-1937Armor Fire Extinguisher Company
Type Not Set Fax: 831-372-8340Office: 831-375-2727Sentry Alarm Systems
Bidders:
Plan Issuer:
Seaside
The scope of the work will consist of all labor, material, equipment and services necessary to complete the work identified in planstitled City Hall Boiler Replacement and in the specifications, including but not limited to: the furnishing of all labor, materials,equipment, and services necessary for, and reasonably incidental to providing and installing complete hot water heating system, andother mechanical work as shown or indicated in the Drawings and Specifications.
Project Contact: Leslie LlanteroEmail: [email protected]
5/9 @ 10am- site
18-01296
1
4:00 PM5/31/18
Addenda:OLDEMEYER CENTER BOILER REPLACEMENT
Prebid Conf:
City of Seaside 831-899-6825 831-899-6211
General Contractor Fax: 805-548-1995Office: 831-869-8100Jacob Construction & Design
Plan Issuer:
Monterey County
Removing a Hydrojet Hose/Nozzle and Hydrojetting and Televising a Sludge Pipeline.
PREVAILING WAGE
Project Contact: Jerry ValladaoEmail: [email protected]
MAND 5/22 @ 10am- 14811 Del Monte Blvd, Marina
18-01342
0
2:00 PM6/5/18
Addenda:PRIMARY CLARIFIER NO. 5 SLUDGE LINE – REMOVAL OF CLOG AND HYDROJET HOSE/NOZZLE
Prebid Conf:
Monterey One Water [email protected] 831-883-6182 831-883-0516
Plan Issuer:
Salinas
The Project consists of all labor, materials equipment and services necessary to Remove and replace existing exterior fascia at theMultipurpose/Cafeteria building at Gavilan View Middle School.
PREVAILING WAGE
Project Contact: Diane MillerEmail: [email protected]
MAND 5/29 @ 10am- site
18-01433
0
3:00 PM6/5/18
Addenda:REMOVE AND REPLACE EXTERIOR FASCIA AT GAVILAN VIEW MIDDLE SCHOOL MULTIPURPOSEBUILDING
6-2018-5
Prebid Conf:
Santa Rita Union School District 831-443-7227
NEW
Projects Out To Bid
Name Bid Date Time Contract # EstimateLocationOPR#
Plan Issuer:
Monterey County
All licensed contractors are invited to participate in this process by submitting to MCOE a request for inclusion in the County Office’slist of qualified bidders for Calendar Year 2018 (July 1, 2018- June 30, 2019).The type(s) of work in which the Contractor is interested and currently licensed to perform, such as, but not limited to, GeneralEngineering, General Building, or Specialty Contracting such as, Electrical, Mechanical, Plumbing, Structural, Heating, Ventilating, andAir Conditioning (HVAC), Earthwork, Pipelines, Floor Coverings, Carpentry, Concrete, Demolition, Excavation, Landscaping, Masonry,Painting, Roofing, etc.
Questions: Lou BartlettEmail: [email protected]
18-01273
0
5:00 PM6/6/18
Addenda:PREQUALIFICATION FOR MONTEREY COUNTY OFFICE OF EDUCATION
Wald Ruhnke Dost Architects 831-649-4642 831-649-3530
Plan Issuer:
Monterey
The City desires to obtain the services of an outside organization to help develop a storm water outfall study and analysis that will beused to evaluate the removal of the existing storm water outfall and to design the concept for the best alternative for handling the stormwater at the Ord Military Community in Seaside, California.
RFP/RFQ Contact: Andreas BaerTel: (831) 242-8777
18-01331
1
5:00 PM6/7/18
Addenda:RFP - ORD MILITARY COMMUNITY (OMC) STORM WATER OUTFALL STUDY
City of Monterey [email protected] 831-242-8777 831-646-3405
Bidders:
Plan Issuer:
Salinas
The principal components of the work consists of: (i) crack fill & double emulsion seal coat, construction of bio-swales (ii) variousdepths of HMA overlay (iii) removals and pave backs and/or install PCC stairs and ramps at portables, pavement markings and (iv)related work.
PREVAILING WAGE
Questions: Dania RamirezEmail: [email protected]
MAND 5/29 @ 1pm- site
18-01447
0
2:30 PM6/7/18
Addenda:LINCOLN ELEMENTARY SCHOOL ASPHALT PAVEMENT REHABILITATION
Prebid Conf:
Salinas City Elementary School District [email protected] 831-753-5696 831-753-5208
NEW
General Contractor Fax: 831-761-1042Office: 831-763-6100Granite Construction
Bidders:
Plan Issuer:
Monterey $1,500,000
In general, the work consists of, but is not limited to, the demolition and construction of concrete curbs, gutters, sidewalks, sidewalkcrossings (driveway approach), curb ramps, cross gutters, storm drains, rock blanket, street lights, signage and striping, isolated streetand driveway surface repairs, pavement grinding, street reconstruction, full depth reclamation, glass grid asphalt reinforcement, andhot mix asphalt paving.
Project Contact: Thomas KormanEmail: [email protected]
5/22 @ 3pm- 601 Wave Street, Suite 100, Monterey
18-01364
0
2:00 PM6/12/18
Addenda:CITYWIDE ADA RAMPS AND STREET RECONSTRUCTION, PHASE 7
Prebid Conf:
City of Monterey-PW/Engineering [email protected] 831-646-3997 831-646-5686
General Contractor Fax: 661-366-8001Office: 661-366-8000Dod Construction
General Contractor Fax: 831-761-1042Office: 831-763-6100Granite Construction
General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company
NEW
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Plan Issuer:
Marina
Project consists of: Site Demo; Selective Structure Demo; Metal Railings; Door Hardware; Painting; Modular Scope Matrix; Electrical;Structured Cabling; IC-PA-Clock; Intrusion Alarm; Fire Alarm System; Emergency Voice Evac System; Earthwork; ExteriorImprovements; Utilities.
PREVAILING WAGE
MAND 5/16 & 5/23 @ 10am- site
18-01390
4
3:00 PM6/12/18
Addenda:MARINA HIGH SCHOOL NEW GYMNASIUM & LOCKER BUILDING - INCREMENT 1
Prebid Conf:
Monterey Peninsula Unified School District 831-645-1200 831-649-4175
Plan Issuer:
Marina
Project consists of: Custom Hollow Metal Frames; Flush Wood Doors; FRP Flush Doors; Door Hardware; Portland Cement Plaster;Resilient Wall Base and Accessories; Resilient Tile Flooring; Vinyl Coated Pre-Wrapped Panels; Painting; Plumbing; HVAC; Electrical;Fire Alarm System; Earthwork; Aggregate Base Courses; Asphalt Pavement; Concrete Paving; Ornamental Steel Fencing.
PREVAILING WAGE
MAND 5/15 @ 3pm- site
18-01429
1
3:00 PM6/12/18
Addenda:MARINA DEL MAR PRESCHOOL HV UPGRADES
Prebid Conf:
Monterey Peninsula Unified School District 831-645-1200 831-649-4175
NEW
Plan Issuer:
Marina
Project consists of: Site Demo; Selective Structure Demo; Rough Carpentry; Painting; Plumbing General; Common Work Results forPlumbing; Mechanical General Requirements; Basic Mechanical Materials and Methods; Electrical; Fire Alarm System.
PREVAILING WAGE
MAND 5/16 @ 3pm- site
18-01415
1
2:00 PM6/14/18
Addenda:LOS ARBOLES MIDDLE SCHOOL HV UPGRADES
Prebid Conf:
Monterey Peninsula Unified School District 831-645-1200 831-649-4175
NEW
Bidders:
Plan Issuer:
Salinas
Project consists of: Selective Demo; Cast-In-Place Concrete; Structural Steel; Steel Decking; Cold-formed Metal Framing; RoughCarpentry; Plastic-laminate-faced Architectural Cabinets; Thermal and Moisture Protection; Aluminum-Framed Entrances andStorefronts; Door Hardware; Glazing; Finishes; Panel Signage; Fire Extinguisher Cabinets; Fire Extinguishers; Metal Countertops;Plastic-Laminate-Clad Countertops; Mechanical; Plumbing; Electrical; Earth Moving; Concrete Paving; Tactile Warning Surfacing.
PREVAILING WAGE
Project Contact: Luis VargasEmail: [email protected]
MAND 5/31 @ 2pm- site
18-01435
0
2:00 PM6/14/18
Addenda:NEW SECURITY OFFICE - KIOSK AT HARTNELL COMMUNITY COLLEGE
Prebid Conf:
In Studio Architecture - ISA [email protected] 831-320-2655
NEW
General Contractor Fax: 831-722-9360Office: 831-722-9949Selden & Son
General Contractor Fax: 831-422-0566Office: 831-422-9696Tombleson Inc
NEW
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Bidders:
Plan Issuer:
Carmel Valley $1,400,000
• Approximately 2,400 cubic yards of excavation• Approximately 1,000 tons of imported rock• Trenching and installation of approximately 650 lineal feet of various pipe sizes and appurtenances• Construction of a 1,750 square-foot building and equipment for a recirculating aquaculture system• Installation of a 720 square-foot settling basin• Installation and modification of associated equipment• Temporary dewatering of the Carmel River channel• Installation of a new river water intake
PREVAILING WAGE
Project Contact: Larry HampsonEmail: [email protected]
6/15 @ 1pm- Carmel Valley Road (County Road G16)
18-01426
0
3:00 PM6/29/18
Addenda:SLEEPY HOLLOW STEELHEAD REARING FACILITY RAW WATER INTAKE AND WATER SUPPLYSYSTEM UPGRADE
Prebid Conf:
Monterey Pennisula Water Management District (MPWMD) 831-658-5640
NEW
Concrete/Masonry Contractor Fax: 213-443-9563Office: 408-605-6861Professional Grade Construction
Plan Issuer:
Carmel Valley $570,000
• Approximately 300 cubic yards of excavation• Approximately 225 cubic yards of imported fill• Approximately 950 tons of imported rock• Installation of approximately 160 lineal feet of log crib wall• Installation of approximately 60 lineal feet of logs and boulders for streambank stabilization• Seeding and Erosion Control
PREVAILING WAGE
Project Contact: Larry HampsonEmail: [email protected]
6/15 @ 9am- 26700 Rancho San Carlos Road
18-01427
0
2:00 PM6/29/18
Addenda:CARMEL RIVER BANK STABILIZATION AT RANCHO SAN CARLOS ROAD
Prebid Conf:
Monterey Pennisula Water Management District (MPWMD) 831-658-5640
NEW
San Benito County
Plan Issuer:
Hollister
The work includes the furnishing of all labor, materials, incidentals, and equipment necessary for the construction of Aerostar SewerUpgrade Pipe CIP C1702 including: trench restoration; temporary sewer main bypass; removal of existing sewer main; installation ofnew sewer main; connection to existing manhole; removal and replacement of curb and gutter; striping, and other related work asdescribe within contract specifications and drawings.
Project Contact: Danny HillstockEmail: [email protected]
18-01422
0
4:00 PM6/6/18
Addenda:AEROSTAR SEWER UPGRADE
City of Hollister 831-636-4340 831-636-4913
NEW
Plan Issuer:
Hollister
The work includes the furnishing of all labor, materials, incidentals, and equipment necessary for the construction of Bella Vista StormDrain Improvements Project CIP 1610 including: trench restoration; installation of city standard catch basins; installation of stormdrains; installation of new manholes; construction of AC shoulder; striping, and other related work as described with the contractspecifications and drawings.
Project Contact: Danny HillstockEmail: [email protected]
18-01424
0
2:00 PM6/6/18
Addenda:BELLA VISTA STORM DRAIN IMPROVEMENTS
C1610
City of Hollister 831-636-4340 831-636-4913
NEW
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Plan Issuer:
Hollister $427,000
The project includes, but is not limited to, improve roadways at various locations by Seal Coat (Chip Seal) 0.67 Mile and Slurry Seal0.37 Mile. (San Felipe Road, Gardena Lane, Nash Road, Ladd Lane, Cienega Road)
Project Contact: Adam GoldstoneEmail: [email protected]
18-01336
0
2:00 PM6/7/18
Addenda:SEAL COAT (CHIP SEAL) AND SLURRY SEAL AT VARIOUS LOCATIONS
PWB-1802
County of San Benito 831-636-4170 831-636-4176
Bidders:
Plan Issuer:
Hollister $387,000
The project includes, but is not limited to improve roadways at two locations by a 2” AC Overlay (Magladry Road and Southside Road)
Project Contact: Adam GoldstoneEmail: [email protected]
18-01337
0
2:00 PM6/7/18
Addenda:HMA OVERLAY PROJECT AT TWO LOCATIONS
PWB-1803
County of San Benito 831-636-4170 831-636-4176
General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company
General Contractor Fax: 925-621-5799Office: 925-621-5703Teichert Construction
Bidders:
Plan Issuer:
Hollister
Construction of approximately 5,300 LF of 18” C-900, 4,100 LF of 16” C-900, and 200 LF of 16” Ductile water pipeline, a new boosterpump station and CMU building, and 3 blending stations.
PREVAILING WAGE
Questions: James BowlandEmail: [email protected]
6/4 @ 9am- site
18-01441
0
2:00 PM6/18/18
Addenda:CROSSTOWN PIPELINE PROJECT
Prebid Conf:
Sunnyslope Co Water Dist 831-637-4670 831-637-1399
NEW
General Contractor Fax: 831-449-0700Office: 831-449-4273Don Chapin Co
Sub-Contractor/SpecialtyContractor
Office: 559-997-9762Badger Daylighting Corporation
San Luis Obispo County
Bidders:
Shandon
The work consists of upgrading the existing kitchen, including the replacement of a type I hood. An existing office shall be demolishedto provide additional area in the cafeteria. An adjacent classroom shall be reduced in size to allow for a relocated office, and addedrefrigerated and dry storage.
PREVAILING WAGE
5/17 @ 3pm- 301 S 1st Street, Shandon
18-01343
1
2:00 PM5/29/18
Addenda:SHANDON ELEMENTARY SCHOOL – KITCHEN UPGRADE
Prebid Conf:
Concrete/Masonry Contractor Fax: 213-443-9563Office: 408-605-6861Professional Grade Construction
General Contractor Fax: 805-345-3148Office: 805-345-3147Precon Industries
Paso Robles $3,300,000
Resurface pavement with RHMA (Bonded Wearing Course) In San Luis Obispo County In And Near Paso Robles From Huer HueroCreek Bridge To Geneseo RoadThe Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-12.
18-00266
1
2:00 PM5/30/18
Addenda:DOT 05-1J1704 RESURFACE PAVEMENT WITH RHMA (BONDED WEARING COURSE)
05-SLO-46-32.0/37.0
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Bidders:
Atascadero $6,000,000
Project comprises labor, material and services necessary for: Demolition, fire sprinklers, fire alarms, doors, plumbing, HVAC, fixtures,toilets, beds, concrete, electrical raceway, wiring, cable, and related work.
Project Contact: Nathan HigginsEmail: [email protected]
MAND 5/9 @ 10am- 10333 El Camino Real, Atascadero
18-01110
1
2:00 PM5/31/18
Addenda:STATEWIDE ENHANCED TREATMENT UNITS AT ATASCADERO STATE HOSPITAL
137497A
Prebid Conf:
Equipment Fax: 559-651-1379Office: 559-651-1336Haulaway Storage Container
General Contractor Office: 714-774-4778D.F. Perez Construction
General Contractor Fax: 714-490-4016Office: 714-490-4000Pinner Construction
General Contractor Fax: 951-678-1083Office: 951-678-1038Prowest Constructors
General Contractor Office: 858-444-1963Ral Investment Corporation
General Contractor Fax: 858-369-7971Office: 858-444-1974Silverstrand Construction
General Contractor Fax: 805-466-5176Office: 805-466-1038Wysong Construction
Plan Issuer:
Arroyo Grande $108,800
In general the project consists of the replacement of lifted and/or broken sidewalk and curb/gutter sections throughout the City ofArroyo Grande, along with sidewalk and curb ramp installation of Farroll Avenue.
PREVAILING WAGE
Contact Person: Jill McPeek, Capital Improvement Project ManagerEmail: [email protected]
5/22 @ 3pm- 1375 Ash Street, Arroyo Grande
18-01316
0
2:00 PM5/31/18
Addenda:2018 CONCRETE REPAIRS
PW 2018-03
Prebid Conf:
City of Arroyo Grande [email protected] 805-473-5444 805-473-5462
Plan Issuer:
San Luis Obispo $150,000
In general the project consists of the replacement of the roof-mounted Chiller unit. All work will be performed on the roof level.
PREVAILING WAGE
Project Manager: Mike McGuire at (805) 783-7716
MAND 5/22 @ 10am or 2pm- site
18-01386
0
2:00 PM5/31/18
Addenda:CITY HALL CHILLER REPLACEMENT
91568
Prebid Conf:
City of San Luis Obispo 805-781-7200 805-781-7198
Bidders:
Morro Bay $1,500,000
Bid Package 1 will include the following trades: Demolition, Site Utilities, Earthwork, pursuant to the following Spec Sections:1. 023000 – Subsurface Investigation2. 024119 – Selective Demolition3. Division 31 – Earthwork4. Division 33 – Utilities
PREVAILING WAGE
Questions: Mike MastagniEmail: [email protected]
5/24 @ 3pm- site
18-01369
0
2:00 PM6/1/18
Addenda:BID PACKAGE 1 - STUDENT SUPPORT CENTER
Prebid Conf:
Asbestos Abatement /Hazardous Materials Contract
Fax: 805-222-2372Office: 661-203-5924Alliance Environmental Group
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Bidders:
Plan Issuer:
San Luis Obispo
Removal and replacement of asphalt paving including but not limited to: base construction, paving, sealing, striping and all relatedwork to provide a complete project.
PREVAILING WAGE
Questions: Karen BrightEmail: [email protected]
5/22 @ 9am- site
18-01408
0
2:00 PM6/1/18
Addenda:ADULT SCHOOL PAVING IMPROVEMENT
297
Prebid Conf:
San Luis Coastal Unified School District [email protected] 805-549-1200
General Contractor Fax: 805-335-6858Office: 805-458-5252Rdz Contractors
Plan Issuer:
San Luis Obispo
The City of San Luis Obispo is requesting sealed Statements of Qualification from Control Systems Integration Subcontractors for theCity’s Water Resource Recovery Facility Project. The City has determined that all general contractors, electrical subcontractors, andcontrol systems integrators interested in bidding on this Project must be prequalified prior to submitting a bid. Candidates with a provenrecord as a control systems integrator and substantial experience as a supplier/integrator of real-time computer data acquisition,control and communication systems utilized on large scale municipal wastewater, recycled water, or potable water treatment plantconstruction are invited to participate in the prequalification process. Candidates must complete the prequalification package and bedeemed prequalified by City to be eligible to submit bids for the control systems integration scope of the Project to prequalified generalcontractors.
Project Manager: Justin PickardEmail: [email protected]
5/8 @ 10am- 25 Prado Road, San Luis Obispo
18-01160
3
2:00 PM6/5/18
Addenda:CONTROL SYSTEMS INTEGRATION SUBCONTRACTORS FOR WATER RESOURCE RECOVERYFACILITY
91363CS
Prebid Conf:
City of San Luis Obispo 805-781-7200 805-781-7198
Plan Issuer:
San Luis Obispo
The City of San Luis Obispo is requesting sealed Statements of Qualification from Electrical Subcontractors for the City’s WaterResource Recovery Facility Project. The City has determined that electrical subcontractors interested in bidding on this Project mustbe prequalified prior to submitting a bid (to general contractors). Electrical subcontractors specifically experienced with large-scalemunicipal wastewater, recycled water, or potable water treatment plant construction are invited to participate in the prequalificationprocess. Candidates must complete the prequalification package and be deemed prequalified by City to be eligible to submit bids forthe electrical scope of the Project to prequalified general contractors.
Project Manager: Justin PickardEmail: [email protected]
5/8 @ 10am- 25 Prado Road, San Luis Obispo
18-01161
3
2:00 PM6/5/18
Addenda:ELECTRICAL SUBCONTRACTORS FOR WATER RESOURCE RECOVERY FACILITY
91363ES
Prebid Conf:
City of San Luis Obispo 805-781-7200 805-781-7198
Plan Issuer:
San Luis Obispo
The City of San Luis Obispo is requesting sealed Statements of Qualification from General Contractors for the City’s Water ResourceRecovery Facility Project. The City has determined that all general contractors, electrical subcontractors, and control systemsintegrators interested in bidding on this Project must be prequalified prior to submitting a bid. General contractors specificallyexperienced with large-scale municipal wastewater, recycled water, or potable water treatment plant construction are invited toparticipate in the prequalification process. Each general contractor wishing to bid on the contract to construct the Project must fullycomplete the Prequalification Package and provide all information and materials requested and satisfy the prequalification criteria.
Project Manager: Justin PickardEmail: [email protected]
5/8 @ 10am- 25 Prado Road, San Luis Obispo
18-01162
3
2:00 PM6/5/18
Addenda:GENERAL CONTRACTORS FOR WATER RESOURCE RECOVERY FACILITY
91363GC
Prebid Conf:
City of San Luis Obispo 805-781-7200 805-781-7198
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Plan Issuer:
San Luis Obispo
California Polytechnic State University, San Luis Obispo (Cal Poly) is requesting proposals from qualified and experienced contractorsfor roof replacement on various buildings around campus.This RFP contains 3 projects that will be awarded. Proposers may propose on all or each individual project, and are not required topropose on all projects as the University reserves the right to award separately, or together as a whole.-Sierra Madre Lounge and Sierra Madre Tower 5-Yosemite Hall-Graphic Arts, Building 26
Bid Contact: Jeanette Paolucci(805) [email protected]
5/24 @ 11am- Cal Poly Campus Facilities Building 70 Room 114
18-01443
0
3:00 PM6/6/18
Addenda:RFP - ROOFING DESIGN AND REPLACEMENT
JP2000015331
Prebid Conf:
Cal Poly Facilities Planning & Capital Projects 805-756-1299 805-756-7566
NEW
Plan Issuer:
Templeton $1,746,381
This project will place new hot mix asphalt overlay at Main Street in Templeton, CA. Work includes cold plane asphalt concrete roadsurfaces, placing hot mix asphalt overlay, digout repairs, and other such items or detail work not mentioned herein that are required bythe Plans, the Standard Specifications, Standard Plans, or Special Provisions.
Bid Contact: JR Beard(805) [email protected]
18-01389
0
3:00 PM6/14/18
Addenda:2016-17 ASPHALT OVERLAY, MAIN STREET IN TEMPLETON
300585
County of San Luis Obispo [email protected] 805-781-4073
Plan Issuer:
Santa Margarita $57,641
This project is for installation of pedestrian activated pole mounted flashing LED signs with solar panels at an existing markedcrosswalk at the intersection of State Route 58 and Encina Avenue, and reconstruct two curb ramps, and other such items or detailwork not mentioned herein that are required by the Plans, the Standard Specifications, Standard Plans, or Special Provisions.
Bid Contact: JR Beard(805) [email protected]
18-01431
0
3:00 PM6/14/18
Addenda:CROSSWALK IMPROVEMENTS - ENCINA AVE AND STATE HIGHWAY 58
300610
County of San Luis Obispo [email protected] 805-781-4073
NEW
Paso Robles
By means of this Request for Qualifications (RFQ), the District invites proposals from qualified developers or Developer's Teams(Developer) to plan, design, finance, construct and operate an income-generating proposed Project. The selected proposed Project willbe sited at the District’s North County Campus located at 2800 Buena Vista Drive, Paso Robles, California 93446 pursuant to a longterm revenue-generating ground lease identifying the District as the Lessor and Developer as Lessee. The selected Developer will,upon the Governing Board’s direction, have an opportunity to submit further detailed Project Proposals to the District and its GoverningBoard.
Questions: [email protected]
18-01114
0
4:00 PM6/19/18
Addenda:RFQ - DEVELOPER OWNED AND OPERATED PROJECT AT CUESTA COLLEGE NORTH COUNTYCAMPUS
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Plan Issuer:
Pismo Beach
The City of Pismo Beach (City) is interested in acquiring the services of a qualified playground equipment provider (Contractor) toprovide Playground Design, Playground Equipment Manufacture, and Playground Equipment Delivery for the Dinosaur Caves Parkand Spyglass Park Playground Project.The project will include the design, manufacture, and delivery of playground equipment to both Dinosaur Caves Park (2701 PriceStreet) and Spyglass Park (Spyglass Drive).
Questions: Colleen Cashmore-GhigliaEmail: [email protected]
18-01460
0
2:00 PM6/25/18
Addenda:RFP - PLAYGROUND DESIGN, PLAYGROUND EQUIPMENT MANUFACTURE, AND PLAYGROUNDEQUIPMENT DELIVERY
City of Pismo Beach . 805-773-4656 805-773-4684
NEW
Bidders:
Paso Robles
This project proposal includes, but is not limited to: the replacement of the existing improvements at the facility, which includes thedemolition of the existing structures and the design and phased construction of a standard 14-bed barracks/messhall (4,093± sf), a 3-bay apparatus building (1,999± sf), administration building (512± sf), a building (400± sf), a vehicle wash rack with treatment/recyclingequipment, a generator/pump/storage building with generator, transfer switch and fuel supply, a hose wash rack, and a fuel storagetank canopy. Also included in the project are: site perimeter fencing and gates, grading and trenching, landscaping, irrigation,approximately 100,000 square feet of paving and flatwork installation of approximately 2280 Lf of 8” sanitary sewer, replacement andconnections for all utilities, curbing, sidewalks, landscaping, appurtenances and demolition of the existing barracks, apparatus buildingand miscellaneous out-buildings, utilities, paving and other associated improvements.
PREVAILING WAGE
Project Contact: Jonathan PikeEmail: [email protected]
MAND 5/17 @ 11am- site
18-01171
0
1:00 PM6/27/18
Addenda:PASO ROBLES FIRE STATION - REPLACE FACILITY
3400MAA07004
Prebid Conf:
Concrete/Masonry Contractor Fax: 213-443-9563Office: 408-605-6861Professional Grade Construction
Equipment Fax: 661-587-8674Office: 661-809-6838Houchin Equipment Rentals
General Contractor Fax: 661-324-3900Office: 661-324-3000Klassen Corporation
General Contractor Fax: 858-369-7971Office: 858-444-1974Silverstrand Construction
General Contractor Fax: 951-684-9329Office: 951-684-9303Stronghold Engineering, Inc.
Roofing Contractor Fax: 805-962-1168Office: 805-966-5331Craig Roof Company
Plan Issuer:
San Luis Obispo
The City of San Luis Obispo (City) is seeking proposals from qualified firms interested in providing Construction Management andInspection Services for the Water Resource Recovery Facility (WRRF) project as described in this Request for Proposal (RFP). TheConstruction Management Team (CM Team) shall assist in the advertisement, award, and administration of the construction contractfor the project.
6/6 @ 10am- 25 Prado Road, San Luis Obispo
18-01454
0
2:00 PM6/28/18
Addenda:RFP FOR CONSTRUCTION MANAGEMENT & INSPECTION SERVICES FOR WRRF PROJECT
91363CM
Prebid Conf:
City of San Luis Obispo 805-781-7200 805-781-7198
NEW
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Bidders:
Plan Issuer:
Paso Robles
The Phase I Airport Area Infrastructure Improvements Project (project) proposes replacing existing sewer mains, lift station, andvarious linear infrastructure improvements located in the vicinity of the Paso Robles Municipal Airport (Airport) in the City of El Paso deRobles, California. The project includes sewer system, water pipeline, and recycled water pipeline improvements located within theright-of-way along Airport Road, and Dry Creek Road. In addition to the Airport, surrounding land uses consist primarily of activevineyards and other agricultural lands, a golf course, and rural residential and commercial developments.
Project Contact: Ditas EsperanzaEmail: [email protected]
18-01354
0
5:00 PM6/29/18
Addenda:AIRPORT INFRASTRUCTURE PROJECT - PHASE 1
DPW 17-19A
City of Paso Robles 805-237-3861 805-237-3904
Concrete/Masonry Contractor Fax: 213-443-9563Office: 408-605-6861Professional Grade Construction
Equipment Fax: 559-651-1379Office: 559-651-1336Haulaway Storage Container
Sub-Contractor/SpecialtyContractor
Office: 559-997-9762Badger Daylighting Corporation
Supplier Fax: 000-000-0000Office: 661-381-3273R & B Company
Santa Clara County
Bidders:
Plan Issuer:
Milpitas
Tenant improvement
4/19 at 11AM (Job Walk)
18-01060
4
2:00 PM5/29/18
Addenda:BIG AL'S
Prebid Conf:
Tilton Pacific Construction 916-630-7200 916-630-4982
Concrete/Masonry Contractor Fax: 213-443-9563Office: 408-605-6861Professional Grade Construction
General Contractor Fax: 916-630-4982Office: 916-630-7200Tilton Pacific Construction
Sub-Contractor/SpecialtyContractor
Fax: 408-413-4130Office: 408-848-4088R Titus Waterproofing
Supplier Fax: 209-547-0554Office: 209-547-1937Armor Fire Extinguisher Company
Bidders:
Plan Issuer:
Stanford
* Install ceiling treatments* Replace lighting, minor electrical* Provide new sinks in laundry rooms* Painting as required* Replace flooring and carpet* Other misc. items including replacing old non repairable door closures, provide motions sensors,fans, mirrors.* Replace all beige outlets & switches to white* Contractor to remove existing furniture (surplus, dispose or relocate)* Contactor to provide an electrical permit if required
MAND 5/15 at 10AM
18-01397
1
10:00 AM5/29/18
Addenda:STERN HALL- RETROFIT BASEMENT COMMON ROOMS RFP (LARKIN, ZAPATA, BURBANK, TWAIN &DONNER)
Prebid Conf:
Patriot Construction [email protected] 209-982-9900 209-249-5301
General Contractor Fax: 209-249-5301Office: 209-982-9900Patriot Construction
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Plan Issuer:
Sunnyvale
Demolition, sealing, trenching and shoring, dewatering, piping, junction structures, diversion structures, sampling ports, roof drainconnections, pump station, wet well, flow meter and sampling vault and all associated appurtenances, curb drop inlet, HDPE piping(force main and gravity), electrical conduits, control devices, wiring, SCADA system installation and testing, and repairing all disturbedpaved and unpaved areas ready for use,
Project Contact: Lisa Vo 408-730-7608Email: [email protected]
5/8 at 9:30AM (Conference Room)
18-01198
1
3:00 PM5/30/18
Addenda:SMART STATION STORM WATER MANAGEMENT SYSTEM UPGRADE RE-BID
YU-15-01
Prebid Conf:
City of Sunnyvale DPW 408-730-7403
Bidders:
Plan Issuer:
Saratoga
Modernization of the Saratoga High School 800 Wing.
MAND 5/2 at 9AM (Front of McAfee Theater Bldg offHerriman Rd)
18-01206
3
2:00 PM5/30/18
Addenda:SARATOGA HIGH SCHOOL 800 WNG PROJECT- LOS GATOS-SARATOGA JOINT UNION HIGH SCHOOLDISTRICT
1735
Prebid Conf:
McKim Design [email protected] 408-927-8110 000-000-0000
Communications / TechnologyContractor
Fax: 408-275-8895Office: 408-275-8888Cal Coast Telecom
Communications / TechnologyContractor
Fax: 415-826-5887Office: 415-826-5100Mcmillan Data Communications
Electrical Contractor Fax: 408-708-7611Office: 408-506-4143Lakeshore Electric And Engineering
General Contractor Fax: 650-965-7139Office: 650-965-3430Rc Benson & Sons, Inc.
General Contractor Fax: 408-286-1288Office: 408-594-1566Strawn Construction, Inc
Sub-Contractor/SpecialtyContractor
Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc
Sub-Contractor/SpecialtyContractor
Fax: 408-413-4130Office: 408-848-4088R Titus Waterproofing
Bidders:
Plan Issuer:
Los Gatos
The Project is located along University Avenue and Winchester Boulevard in the Town of Los Gatos, CA. The pipeline traverses fromManhole (MH) 8-049-90 at Blossom Hill Road northward along University Avenue and Lake Vasona terminating at MH 6-084-88 justNorth of Smith Ranch Court.
The scope of work includes, but is not limited to, the following:1. Trenchless rehabilitation of approximately 9,100 lf of 15-inch to 18-inch diameter Vitrified Clay Pipe (VCP) and Asbestos CementPipe (ACP) trunk sewer.2. Sanitary sewer lateral reinstatement.3. Rehabilitation of 28 existing sanitary sewer manholes.4. Abandonment of an existing manhole and installation of a new manhole.5. Extension and replacement of existing sewer laterals.6. Open cut installation of approximately 29 lf of 18-inch diameter Polyvinyl (PVC) trunk sewer.7. Site and pavement restoration.
5/15 at 10AM (100 East Sunnyoaks Ave, Campbell)
18-01251
1
10:00 AM5/30/18
Addenda:UNIVERSITY AVENUE ACP SEWER REHABILITATION - WEST VALLEY SANITATION DISTRICT
Prebid Conf:
West Valley Sanitation Dist 408-378-2407
Excavation/SiteWork/Irrigation/Drainage/Landscape
Fax: 408-383-0750Office: 669-214-9142United Rentals Trench Safety
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Plan Issuer:
Burlingame
Installation of a dual cord Commercial Level 2 electric vehicle (EV) charging station, also known as Electric Vehicle Supply Equipment(EVSE), at two city-owned properties:
Project Contact: Marie Galvin 650-558-7681Email: [email protected]
Hard copies also available for review at Santa Clara Builders Exchange
5/21 at 1PM (501 Primrose Rd, Burlingame)
18-01361
1
2:00 PM5/30/18
Addenda:ELECTRONIC VEHICLE CHARGING STATIONS PROJECT
Prebid Conf:
City of Burlingame, DPW 650-558-7230
Plan Issuer:
San Jose
Complete refurbishment of T-Wing portables interior and exterior with new wall board overlay, new receptacle covers and switches,prepare for new flooring, new ceiling tiles, light lenses, windows, and blinds. Paint all exterior including doors, trim, gutters,downspouts, etc. Inspect roofing to complete any repairs to metal roof and apply water barrier sealant.
MAND 5/11 at 3PM
18-01374
2
3:30 PM5/30/18
Addenda:LEIGH HIGH SCHOOL T-WING REFURBISHMENT - CAMPBELL UNION HIGH SCHOOL DISTRICT
Prebid Conf:
Campbell Union High School District [email protected] 408-371-0960
Plan Issuer:
Santa Clara County
One-year contract for rail grinding services.
Project Contact: Florante TanadaEmail: [email protected]
5/3 at 10AM (3331 N. First St., San Jose)
18-01158
1
2:00 PM5/31/18
Addenda:MAINTENANCE SERVICE CONTRACT FOR RAIL GRINDING - SCVTA
M18057
Prebid Conf:
SCVTA -Santa Clara Valley Transportation Authority 408-321-7189
Plan Issuer:
Santa Clara County
Removal and installation of thermoplastic striping, resurfacing ·county roads with Type II micro-surfacing and all work needed tocomplete application.
Project Contact; Herbert Naraval 408-494-1308Email: [email protected]
5/15 at 11:30AM (101 Skyport Dr, San Jose)
18-01259
1
2:00 PM5/31/18
Addenda:2018 MICRO-SURFACING OF COUNTY ROADS AT VARIOUS LOCATIONS
Prebid Conf:
County of Santa Clara Roads & Airports 408-573-2440
Bidders:
Plan Issuer:
San Jose $1,200,000
Replacement of approximately 41,000 square feet of built-up roofing with specified thermoplastic membrane roofing. A portion of roofreplacement requires tapered insulation.
Project Contact: Sylvia Sosa 408-925-1583
MAND 5/15 at 10AM (1st Fl Conference Room)
18-01274
2
2:00 PM5/31/18
Addenda:HUGH GILLIS HALL ROOF REPLACEMENT- SJSU
SJSU-360
Prebid Conf:
SJSU - Contracts 408-924-6994 408-924-1910
General Contractor Fax: 415-665-9470Office: 415-221-2065Agbayani Construction
General Contractor Fax: 714-536-2223Office: 714-539-2222Exbon Development
General Contractor Fax: 925-371-0277Office: 925-735-3000Joseph Murphy Construction, Inc.
General Contractor Fax: 650-877-0747Office: 650-877-0717Southwest Construction
General Contractor Fax: 510-487-8246Office: 510-487-8363Stronger Bldg Services
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Bidders:
Plan Issuer:
Morgan Hill $4,000,000
The Work will consist of:1. Construct New Emergency Vehicle Operations Center to include:a. Relocation of dedicated driveway connecting entrance into the Holden Ranch Justice Training Facility and new road intersections foruse as a secondary measure to enter through EVOC course into the training facility.b. Large paved lot for driving course and various driving curriculum.c. 180 feet by 120 feet concrete skid pad.d. Bioretention planters, irrigation system, and necessary electronics and electrical utilities and equipment to operate.e. Stormwater pollution prevention plan.f. Water Systems.g. Storm Drain System.
Questions: Paulo Garcia, Project Manager, at (408) 993-4619, or by email to: [email protected]
5/17 @ 10AM
18-01335
2
2:00 PM5/31/18
Addenda:SANTA CLARA COUNTY HOLDEN RANCH EMERGENCY VEHICLE OPERATION CENTER (EVOC)
263-CP18016
Prebid Conf:
County of Santa Clara - Capital Programs 408-993-4600
Concrete/Masonry Contractor Fax: 213-443-9563Office: 408-605-6861Professional Grade Construction
General Contractor Fax: 510-887-6501Office: 510-887-6500Dl Falk Construction, Inc
General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company
Plan Issuer:
Palo Alto
Repair 1,500 feet of a 12” clay sewer pipe using Cured-In-Place Pipe (CIPP) method.
Project Contact: Romel AntonioEmail: [email protected]
None
18-01353
0
3:00 PM5/31/18
Addenda:LOWER PAGE MILL ROAD 12" SEWER REHAB PROJECT
170620
Prebid Conf:
City of Palo Alto - DPW 650-329-2271
Plan Issuer:
San Jose $162,800
Demolition, clearing and grubbing, remove and replace protective surfacing, remove and replace play equipment panels.
Project Contact: Katy Martin 408-535-8300
18-01377
1
3:00 PM5/31/18
Addenda:8117-BRIGADOON PARK PLAYGROUND RENOVATION
8117
City of San Jose - DPW 408-535-8300
Plan Issuer:
San Jose $180,000
Demo asphalt overlay of temporary class room building ADA ramps and repave/seal and stripe parking lots used for temporaryhousing. As well as install permanent power to modular restroom bld installed in parking lot, Demo distribution panel, overhead utilities,and remove wood poles used for overhead utilities.
Project Contact: Brian CameronEmail: [email protected]
5/23 at 11AM (Adjacent to KIPP Charter School)
18-01378
2
2:00 PM5/31/18
Addenda:INDEPENDENCE HIGH SCHOOL GHKLK MODERNIZATION (REPAVING PARKING LOTS) - ESUHSD
B-07-17-18
Prebid Conf:
East Side Union High School District (ESUHSD) 408-347-5100
Plan Issuer:
Los Altos
Provide traffic signal maintenance service for equipment.
Hard copies also available for review at Santa Clara Builders Exchange
None
18-01323
1
2:00 PM6/1/18
Addenda:RFP TRAFFIC SIGNAL MAINTENANCE SERVICES
Prebid Conf:
City of Los Altos - Engineering 650-947-2780
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Bidders:
Plan Issuer:
Gilroy
The Project consists of the construction of a Senior Housing Facility in Gilroy CA. Its a 4 story, 58,190 square foot building. It will beState Prevailing wage so all union contractors can have a competitive bid.
18-01325
1
11:00 AM6/1/18
Addenda:MONTEREY GATEWAY SENIOR APARTMENTS
Danco Group [email protected] 707-267-3769 707-825-2802
Concrete/Masonry Contractor Office: 209-226-8382Docon, Inc.
Concrete/Masonry Contractor Office: 209-857-8556Docon, Inc.
General Contractor Fax: 707-825-2802Office: 707-267-3769Danco Group
HVAC Contractor Fax: 661-631-8197Office: 661-864-1925Holder's Air Cond & Heating
Sub-Contractor/SpecialtyContractor
Fax: 831-755-0510Office: 831-801-6523Culligan Water Conditioning
Supplier Fax: 209-547-0554Office: 209-547-1937Armor Fire Extinguisher Company
Plan Issuer:
Sunnyvale
Provide on-call maintenance and repair emergency services and non-emergency services for sewage spill cleanups, cleaning of largesanitary sewer lines and miscellaneous repairs in support of municipal services.
Project Contact : Deborah Cordova 408-730-7708Email: [email protected]
Hard copies also available for review at Santa Clara Builders Exchange
18-01371
0
3:00 PM6/1/18
Addenda:SEWER LINE ON-CALL MAINTENANCE & REPAIR SERVICES
F18-245
City of Sunnyvale DPW 408-730-7403
Bidders:
Plan Issuer:
San Jose $4,700,000 $6,000,000
Please refer to specifications for complete scope of work.
MAND 4/26 at 10AM (Cypress Pavilion)
18-01091
5
2:00 PM6/4/18
Addenda:CUNNINGHAM FLOOD DETENTION CERTIFICATION PROJECT - SCVWD
C0641 to
Prebid Conf:
SCVWD- Santa Clara Valley Water District 408-630-3088
General Contractor Fax: 925-932-0500Office: 925-932-7900Brosamer & Wall Inc
General Contractor Fax: 650-259-9651Office: 650-259-9545Disney Construction Inc.
General Contractor Fax: 925-826-5766Office: 925-826-5387Dmz Builders
General Contractor Fax: 925-838-5915Office: 925-838-5675Gordon N. Ball, Inc.
General Contractor Fax: 408-327-7090Office: 408-327-7013Granite Construction
General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company
General Contractor Fax: 000-000-0000Office: 916-730-0554Great Lakes Environmental
General Contractor Fax: 707-439-7301Office: 707-439-7300Kiewit Infrastructure West Co
General Contractor Fax: 510-562-5209Office: 510-632-7676Mcguire & Hester
General Contractor Fax: 415-822-3703Office: 415-822-3700Ranger Pipelines Inc.
General Contractor Fax: 408-279-2286Office: 408-279-2277Robert A. Bothman., Inc.
General Contractor Fax: 415-643-4807Office: 415-643-4802Seton Pacific Construction
General Contractor Fax: 714-540-1434Office: 714-460-1000Sukut Construction Inc.
General Contractor Fax: 707-419-4851Office: 707-427-3210Suulutaaq Inc.
General Contractor Fax: 925-621-5799Office: 925-621-5700Teichert Construction
Sub-Contractor/SpecialtyContractor
Fax: 831-753-1740Office: 831-758-1820Associated Rebar Inc
Sub-Contractor/SpecialtyContractor
Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Bidders:
Plan Issuer:
San Jose
Plumbing, Automatic Fire Sprinkler, HVAC, and Electrical.The proposed project consists of select fixture and refrigeration cases change out, modification of cart storage area to new Drive-up &Go staging area, polished flooring, and minor décor package. The project will be constructed in multiple phases while the storeremains in operation once a Contractor has been selected.
18-01382
1
5:00 PM6/4/18
Addenda:SAFEWAY STORE #1476
1476
Curt Faus Corp 503-699-1103 503-699-1106
Concrete/Masonry Contractor Fax: 213-443-9563Office: 408-605-6861Professional Grade Construction
General Contractor Fax: 503-699-1106Office: 503-699-1103Curt Faus Corp
Bidders:
Plan Issuer:
San Jose
Multi- Prime Contracts for the following:2.1 Acoustical Estimate: $35,000.002.2 Demolition Estimate: $75,000.002.3 Electrical Estimate: $850,000.002.4 General Estimate: $750,000.002.5 Grading & Pavement Estimate: $350,000.2.6 Mechanical Estimate: $245,000.002.7 Plumbing Estimate: $55,000.002.8 Roofing Estimate: $250,000.00
Project Contact: Dale GroganEmail: [email protected]
5/24 at 1PM
18-01461
0
2:00 PM6/4/18
Addenda:DEL MAR HIGH SCHOOL MUSIC FACILITIES MODERNIZATION BUILDING C MULTI-PRIME PACKAGES -CAMPBELL UNION HIGH SCHOOL DISTRICT
Prebid Conf:
Campbell Union High School District [email protected] 408-371-0960
NEW
Communications / TechnologyContractor
Fax: 408-275-8895Office: 408-275-8888Cal Coast Telecom
Plan Issuer:
San Jose
Video surveillance, electrical work, security electronics, HVAC systems, work station furniture.
Project Contact: Michael Llagan 408-993-4647Email; [email protected]
MAND 4/25 at 1PM & 5/17 at 1PM (Front Lobby)
18-00847
4
2:00 PM6/5/18
Addenda:JUVENILE HALL VIDEO SURVEILLANCE & SECURITY SYSTEMS UPGRADE PROJECT
RFP-FAF-FY18-0186
Prebid Conf:
County of Santa Clara - Capital Programs 408-993-4600
Plan Issuer:
San Jose
Provide design-build and construction manager services with lump sum pricing for the design, preconstruction, and construction ofmultiple projects under a two-year master enabling agreement (MEA).
18-01315
2
3:00 PM6/5/18
Addenda:RFQ TASK ORDER-CONSTRUCTION AGREEMENT FOR MULTIPLE PROJECTS - MASTER ENABLINGAGREEMENT- SJSU
SJSU-361
San Jose State University - SJSU 408-924-2246
Bidders:
Plan Issuer:
Gilroy
Construction of concrete curb and gutter repairs, access ramps, weed kill, crack seal, sweeping asphalt point repairs, micro-surfacing,rubberized cape seal, asphalt grind and hot mix asphalt overlay, utility lowering and adjusting and pavement striping and markings andclean up on various streets.
18-01368
0
2:00 PM6/5/18
Addenda:FY 18 CITYWIDE PAVEMENT MAINTENANCE
18-PW-250
City of Gilroy DPW 408-846-0237
General Contractor Fax: 831-761-1042Office: 831-763-6100Granite Construction
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Bidders:
Plan Issuer:
Santa Clara County
Please refer to specifications for complete scope of work.
MAND 5/10 at 9:30AM (Intersection of Yuba Dr & Stevens Creek Trail, Mtn View)
18-01196
1
2:00 PM6/6/18
Addenda:STEVENS CREEK BANK & ACCESS/TRAIL ROAD REPAIR DOWNSTREAM OF EL CAMINO REAL (SR82) PROJECT - SCVWD
C0638
Prebid Conf:
SCVWD- Santa Clara Valley Water District 408-630-3088
General Contractor Fax: 408-327-7090Office: 408-327-7013Granite Construction
General Contractor Fax: 415-459-0665Office: 415-456-8972Thompson Builders Corp.
Bidders:
Plan Issuer:
Sunnyvale
Renovating and repairing pump and irrigation systems at Braly and Ponderosa Parks
Project Contact: Lisa Vo 408-730-7608Email: [email protected]
18-01358
0
3:00 PM6/6/18
Addenda:PARK IRRIGATION & PUMP SYSTEMS REHABILITATION
PW18-19
City of Sunnyvale DPW 408-730-7403
Electrical Contractor Fax: 844-270-5526Office: 831-783-1080Kol Electrical
Plan Issuer:
San Jose
Provide all labor, material, and equipment necessary to install and remove striping in City-owned parking garages and lots as required.
Project Contact: Cindy Johnson 408-794-7465Email: [email protected]
18-01446
0
2:00 PM6/6/18
Addenda:RFQ STRIPING SERVICES FOR CITY-OWNED PARKING GARAGES & LOTS
RFQ 26048
City of San Jose - DPW 408-535-8300
NEW
Plan Issuer:
Morgan Hill
Provide engineering plan review, map review, and/or transportation/traffic engineering services on an “on-call” basis for the LandDevelopment Engineering Division of the City’s Development Services Department.
Project Contact: Maria AngelesEmail: [email protected]
Hard copies also available for review at Santa Clara Builders Exchange
18-01380
0
4:00 PM6/7/18
Addenda:RFQ ON-CALL ENGINEERING SURVEYOR/SERVICES
CDENG-RFQ-2018-001
City of Morgan Hill, DPW 408-778-6480
Plan Issuer:
Palo Alto
Provide professional services for on-call soils and material testing for various capitalimprovement projects
Project Contact: Holly Boyd
None
18-01407
0
3:00 PM6/7/18
Addenda:RFP PROFESSIONAL SERVICES ON-CALL SOILS & MATERIALS TESTING SERVICES
172075
Prebid Conf:
City of Palo Alto - DPW 650-329-2271
Plan Issuer:
San Jose
Provide equipment necessary for saw cutting of concrete, asphalt or slab and core drilling services as required on an “as needed”basis in support of Department of Transportation.
Project Contact: Cindy Johnson 408-794-7465Email: [email protected]
18-01445
0
2:00 PM6/7/18
Addenda:RFQ CONCRETE/ASPHALT SAW CUTTING & CORE DRILLING SERVICES
RFQ 26096
City of San Jose - DPW 408-535-8300
NEW
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Plan Issuer:
San Jose
Remove and install surveillance camera systems and provide monitoring, technical support, and cloud storage services for the HappyHollow Zoo.
Project Contact: Theresa Porter 408-535-7048Email: [email protected]
18-01289
1
3:00 PM6/8/18
Addenda:RFB CAMERA SYSTEMS HAPPY HOLLOW ZOO
RFB 17-18-55
City of San Jose - DPW 408-535-8300
Plan Issuer:
Los Altos Hills
Replacing various segments of the existing sanitary system.
6/1 at 10AM (26379 Fremont Rd., Los Altos Hills)
18-01428
0
1:30 PM6/8/18
Addenda:2018 SANITARY SEWER REPAIR & REPLACEMENT PROJECT
Prebid Conf:
Town of Los Altos Hills - DPW 650-941-7222
NEW
Plan Issuer:
San Jose
Install new decorative security fencing across the perimeter of the campus. Installation includes 7ft. panel heights, pedestrian gates,and vehicle gates.
MAND 5/30 at 12PM (Front of Admin Bldg)
18-01466
0
3:00 PM6/11/18
Addenda:BRANHAM SECURITY FENCING- CAMPBELL UNION HIGH SCHOOL DISTRICT
Prebid Conf:
Campbell Union High School District [email protected] 408-371-0960
NEW
Plan Issuer:
San Jose
A. Install new decorative security fencing across the perimeter of the campus. Installation includes 7ft.- 8ft. panel heights, pedestriangates, and vehicle gates.B. Add Alt #1: Install powered automated vehicle entrance and exit gate at north driveway including sensor loops, gate motors, back upbatteries, knox box with key override to open/close/hold open the gates, new electrical breaker and equipment, and remote transmittersignal.C. Add Alt #2: Substitute hardware at main entrance to electrified system for future electronic access.
MAND 5/30 at 8:30AM (Front of Admin Bldg)
18-01467
0
3:00 PM6/11/18
Addenda:DEL MAR HIGH SCHOOL SECURITY FENCING- CAMPBELL UNION HIGH SCHOOL DISTRICT
Prebid Conf:
Campbell Union High School District [email protected] 408-371-0960
NEW
Plan Issuer:
San Jose
A. Install new decorative security fencing across the perimeter of the campus. Installation includes 7ft. panel heights, pedestrian gates,and vehicle gates.B. Add Alt #1: Install 7ft. panel height black vinyl coated chain link around stadium.
MAND 5/30 at 11AM (Front of Admin Bldg)
18-01468
0
3:00 PM6/11/18
Addenda:LEIGH HIGH SCHOOL SECURITY FENCING- CAMPBELL UNION HIGH SCHOOL DISTRICT
Prebid Conf:
Campbell Union High School District [email protected] 408-371-0960
NEW
Plan Issuer:
Saratoga
A. Install new decorative security fencing across the perimeter of the campus. Installation includes 7ft. panel heights, pedestrian gates,and vehicle gates.B. Add Alt #1: Install 7ft. panel height black vinyl coated chain link fencing around stadium.
MAND 5/30 at 9AM (Front of Admin Bldg)
18-01469
0
3:00 PM6/11/18
Addenda:PROSPECT HIGH SCHOOL SECURITY FENCING- CAMPBELL UNION HIGH SCHOOL DISTRICT
Prebid Conf:
Campbell Union High School District [email protected] 408-371-0960
NEW
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Plan Issuer:
Campbell
A. Install new decorative security fencing across the perimeter of the campus. Installation includes 7ft. panel heights, pedestrian gates,and vehicle gates.B. Add Alt #1: Extend security fencing by 400’ and a 20’ clear vehicle gate.C. Ded Alt #1: Delete 119’ of security fencing and a 20’ sliding gate.
MAND 5/30 at 10AM (Front of Admin Bldg)
18-01470
0
3:00 PM6/11/18
Addenda:WESTMONT HIGH SCHOOL SECURITY FENCING- CAMPBELL UNION HIGH SCHOOL DISTRICT
Prebid Conf:
Campbell Union High School District [email protected] 408-371-0960
NEW
Bidders:
Plan Issuer:
Mountain View
This project is for ARC Building 025 which is a two story reinforced concrete building with 7,453 square feet gross for the ground floor,5,429 square feet gross for the second floor and a basement of approximately 8,000 square feet gross. It is located within the historicalShenandoah Plaza of Moffett Field next to NASA/Ames Research Center and north of the City of Mountain View, CA.
PREVAILING WAGES apply. Contract duration = 600 calendar days
18-01453
0
4:00 PM6/12/18
Addenda:BUILDING 25 RESTORATION AMES FLIGHT RESEARCH CENTER
Herman Construction Group, Inc. 619-964-9274
NEW
General Contractor Office: 619-964-9274Herman Construction Group, Inc.
General Contractor Fax: 209-249-5301Office: 209-982-9900Patriot Construction
Sub-Contractor/SpecialtyContractor
Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc
Bidders:
Plan Issuer:
Sunnyvale
The project consists of .81 acres of improvements, 14 Townhomes, including Accessible Lot 14 and BMR Lot 2 with associated on siteand off site work. Each Townhome will be plumbed for sub water meters supplied by Classic Communities. Construction will beginAugust 07, 2018.
18-01436
0
5:00 PM6/15/18
Addenda:CLASSICS AT NORTH FAIR OAKS STATION
Nexgen Builders 650-322-5800 650-322-5806
NEW
General Contractor Fax: 650-322-5806Office: 650-322-5800Nexgen Builders
Plan Issuer:
San Jose
Provide irrigation system repairs and maintenance services to perform such services at the City’s Regional Wastewater Facility (RWF).
Project Contact: Theresa Porter 408-535-7048Email: [email protected]
18-01442
1
3:00 PM6/15/18
Addenda:RFQ IRRIGATION SYSTEM REPAIRS & MAINTENANCE SERVICES
RFQ 25965
City Of San Jose, DPW 408-535-8300
NEW
Plan Issuer:
Los Altos
The Project includes removal and replacement of playground surfacing and equipment.
Location of Work: The Project sites are located at the Los Altos Youth Center, 1 N San Antonio Road, and the San Antonio Club, 647San Antonio Road.
5/30 @ 10AM (meet at Los Altos Youth Ctr, 1 N San Antonio Rd, Los Altos)
18-01477
0
2:00 PM6/19/18
Addenda:PLAYGROUND EQUIPMENT RENOVATIONS
CF-0101718
Prebid Conf:
City of Los Altos - Engineering 650-947-2780
NEW
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Plan Issuer:
Santa Clara County $300,000 $400,000
For purposes of this Contract, Work consists of furnishing all labor, materials, tools, equipment, services, supervision, and incidentalsnecessary to repair, rehabilitate, and restripe 11 VTA parking lots including asphalt plugs, monolithic concrete repairs to curbs andgutters, slurry seal, and restriping.
Project Contact: Del SabetiEmail: [email protected]
6/7 at 10AM (3331 N. First St, Bldg A, San Jsoe)
18-01410
0
1:30 PM6/21/18
Addenda:REHABILITATE 11 VTA PARK & RIDE LOTS - SCVTA
C18029 to
Prebid Conf:
SCVTA -Santa Clara Valley Transportation Authority 408-321-7189
Bidders:
Plan Issuer:
Mountain View
Please refer to specifications for complete scope of work.
Project Contact: Dotty SelmeczkiEmail: [email protected]
MAND 5/30 at 11AM
18-01437
0
2:00 PM6/21/18
Addenda:NEW CONSTRUCTION OF DISTRICT OFFICE- MOUNTAIN VIEW WHISMAN SCHOOL DISTRICT
Prebid Conf:
Greystone West Company 707-933-0624 707-996-8390
NEW
Concrete/Masonry Contractor Fax: 213-443-9563Office: 408-605-6861Professional Grade Construction
General Contractor Fax: 408-286-1288Office: 408-594-1566Strawn Construction, Inc
Sub-Contractor/SpecialtyContractor
Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc
Plan Issuer:
Morgan Hill
Provide Pest Control Services at various city facilities and parks,
Project Contact: Cynthia IwanagaEmail: [email protected]
Hard copies also available for review at Santa Clara Builders Exchange
5/24 at 9AM (100 Edes Ct., Morgan Hill)
18-01277
1
11:00 AM6/22/18
Addenda:RPF PEST CONTROL SERVICES
Prebid Conf:
City of Morgan Hill, DPW 408-778-6480
Santa Cruz County
Plan Issuer:
Santa Cruz
Riverside Project Description: The Riverside Project, from Beach Street to Third Street, generally involves the undergrounding ofoverhead utilities within an established undergrounding district, reconstruction of the water line, reconstruction of sidewalks andstreetscape elements, installation of decorative streetlights and landscaping and final paving. The arterial street is the main corridor tothe Beach Area and Boardwalk. This project will involve working with the contractor, city staff, projects designer, utility companies andarea businesses and residents on construction phasing and staging, traffic control, co-ordination with a hotel project that is underconstruction, and utility coordination.Trail Project Description: The City of Santa Cruz, in coordination with Santa Cruz County Regional Transportation Commission (RTC),is to construct, in two phases, a 2.1-mile bicycle/pedestrian trail adjacent to an existing rail line that is owned by the RTC. The TrailProject would be constructed in two phases. Phase I includes 1.3 mile trail from Natural Bridges Drive to California Street. Phase IIincludes .8 mile of trail from California Street to Pacific Avenue.
RFP/RFQ Contact: Nathan NguyenTel:(831) 420-5188
18-01293
1
2:00 PM5/29/18
Addenda:RFQ FOR CONSTRUCTION MANAGEMENT SERVICES - RIVERSIDE UNDERGROUND ANDSTREETSCAPE PROJECT AND RAIL TRAIL SEGMENT 7 (PHASE I & II) PROJECT
City of Santa Cruz 831-420-5160 831-420-5161
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Bidders:
Plan Issuer:
Capitola $9,650,000
The proposed new library will be a 11,700 square-foot single story building positioned in the south-east corner of the 47,536 square-foot parcel, located at 2005 Wharf Road, in Capitola, CA.The construction of a new ground-up wood-frame, Type V-B, non-rated, single-story library, including; reading rooms, group studyareas, stack shelving areas, meeting rooms, multi-purpose room, and staff offices. Work includes all relevant scopes of work; sitework, weather-tight exterior assemblies, roofing, metal-stud framing and interior gypsum board, related electrical, plumbing, HVAC,and fire protection systems, utilities-infrastructure, and interior and exterior architectural finishes.
PREVAILING WAGE
Jamie Goldstein – City ManagerSteve Jesberg – Public Works DirectorPhone: 831-426-8191
MAND 5/22 @ 10am- site
18-01300
0
3:00 PM5/30/18
Addenda:CAPITOLA BRANCH LIBRARY
Prebid Conf:
City of Capitola 831-475-7300 831-479-8879
Concrete/Masonry Contractor Fax: 213-443-9563Office: 408-605-6861Professional Grade Construction
General Contractor Fax: 916-797-7400Office: 916-757-1000Flint Builders, Inc.
General Contractor Fax: 650-802-2970Office: 650-802-2960Gonsalves & Stronck Construction
General Contractor Fax: 831-657-9820Office: 831-657-9805Otto Construction
General Contractor Fax: 000-000-0000Office: 805-822-5084Prowest Constructors
General Contractor Fax: 831-475-4544Office: 831-475-7100Swenson Builders
General Contractor Fax: 415-984-1204Office: 415-617-1467Swinerton Builders
General Contractor Fax: 415-459-0665Office: 415-456-8972Thompson Builders Corp
Glass & Glazing Contractor Fax: 408-922-0554Office: 408-922-0555Lincoln Glass & Mirror
Sub-Contractor/SpecialtyContractor
Fax: 415-468-4796Office: 415-467-9235Collier Building Specialties
Supplier Fax: 209-547-0554Office: 209-547-1937Armor Fire Extinguisher Company
Plan Issuer:
Santa Cruz
The proposed project will entail removal and replacement of approximately 52,000 sq ft of roofing and associated components at SantaCruz High School.
PREVAILING WAGE
Project Contact: Trevor MillerEmail: [email protected]
MAND 5/14 @ 10:30am- site
18-01359
1
1:00 PM5/30/18
Addenda:RE-ROOFING AT SANTA CRUZ HIGH SCHOOL
2018-13
Prebid Conf:
Santa Cruz City School District [email protected] 831-429-3904 831-425-7639
Plan Issuer:
Aptos $132,000
This project consists of removal of old drinking fountains and replacing them with new drinking fountains and bottle fillers.
PREVAILING WAGE
Project Contact: Gale Stevens 831-477-5613
MAND 5/17 @ 10am- Purchasing, Contracts, Risk Management Office, Bldg 2030
18-01387
1
2:00 PM5/30/18
Addenda:CW DRINKING FOUNTAINS PHASE II
B18-07
Prebid Conf:
Cabrillo Community College District 831-477-5613 831-477-5640
Plan Issuer:
Boulder Creek
The purpose of the work is to provide a replacement well for the existing Pasatiempo Well No. 6, which has experienced structuralproblems necessitating its replacement. The design capacity of the well is 400 gallons per minute (gpm).
PREVAILING WAGE
18-01391
2
2:00 PM5/30/18
Addenda:PASATIEMPO WELL 8 REPLACEMENT
San Lorenzo Valley Water District 831-338-2153 831-338-7986
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Bidders:
Plan Issuer:
Santa Cruz $215,000
The work to be done consists in general of removing the existing concrete storm drain channel, repairing the base material, andinstalling a new concrete storm drain channel with debris rack and overflow section. The work includes replacing a portion of theadjacent storm drain system and paving the roadway shoulder.
Project Contact: David GlucsEmail: [email protected]
18-01340
0
2:00 PM5/31/18
Addenda:PLYMOUTH STREET STORM CHANNEL EMERGENCY REPAIR
City of Santa Cruz 831-420-5160 831-420-5161
General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company
Sub-Contractor/SpecialtyContractor
Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc
Plan Issuer:
Freedom $101,290
This project serves to reduce the surface storm water runoff entering the existing valve vault and wet well at the Los Arboles PumpStation. The project includes the installation of three new drainage inlets, a storm drain junction box, associated storm drain pipes, anda concrete cross gutter. Also included are modifications to the existing asphalt concrete pavement, berms, curbs, and gutters in theproject area.
Project Contact: Ashleigh TrujilloEmail: [email protected]
18-01351
0
2:00 PM5/31/18
Addenda:LOS ARBOLES PUMP STATION DRAINAGE IMPROVEMENTS
P52623
County of Santa Cruz 831-454-2160 831-454-2385
Bidders:
Plan Issuer:
Santa Cruz $1,358,000
This project involves the construction of full depth recycling, culvert replacement, asphalt concrete overlay, asphalt concrete dikes,striping, pavement markings, and re-establishing street monuments. Project is located on two streets - Granite Creek Road andBranciforte Drive in Central Santa Cruz County.
Project Contact: Casey CarlsonEmail: [email protected]
18-01352
0
2:00 PM5/31/18
Addenda:2018 FULL DEPTH RECYCLE & OVERLAY PROJECT
County of Santa Cruz 831-454-2160 831-454-2385
General Contractor Fax: 831-761-1042Office: 831-763-6100Granite Construction
General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company
Plan Issuer:
Santa Cruz $170,000
Replacement of existing smoke detectors in Building 1 to 7 with new, code compliant detectors. Modifications to the existing XLS firealarm panel are also required. The work shown in the Contract Documents for building 8 to 14 is not in the scope of the work and willbe part of a future phase.
Project Contact: Luis RoaEmail: [email protected]
MAND 5/23 @ 1:30pm- Physical Planning, Development & Operations Conference Rm 151H
18-01392
2
10:00 AM6/5/18
Addenda:CROWN MERRILL APARTMENTS - PERMANENT SMOKE DETECTOR INSTALLATION - REBID
2318-064
Prebid Conf:
UCSC Physical Planning & Construction 831-459-2366 831-459-5540
Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#
Plan Issuer:
Santa Cruz $150,000
Replacement of existing MXL fire alarm control units with new XLS units, modules and power supplies. All work associated with thereplacement of the devices within the individual apartment buildings and apartment dwelling units (smoke detectors, combinationcarbon monoxide/smoke detectors, heat detectors, occupant notification appliances, power supplies, etc.) shown in the ContractDocuments is no longer included as the scope of the Project. This work will be performed in a future phase.
Project Contact: Luis RoaEmail: [email protected]
MAND 5/23 @ 1:30pm- Physical Planning, Development & Operations Conference Room 151H
18-01393
2
11:00 AM6/5/18
Addenda:RACHEL CARSON COLLEGE APARTMENTS - SMOKE DETECTORS & UNIT REPLACEMENT - REBID
5305-015
Prebid Conf:
UCSC Physical Planning & Construction 831-459-2366 831-459-5540
Bidders:
Plan Issuer:
Corralitos $978,920
This project involves the replacement of an existing bridge with a new bridge/side-hill viaduct. The bridge is approximately 29 feet andthe side-hill viaduct is 93.75 feet. The superstructure is a cast-in-place slab supported on CIDH pile extensions and diaphragmabutments on CIDH piles. Approach roadway work includes construction of approximately 242 feet of reconstructed roadway withsoldier pile retaining wall and drainage improvements.
Project Contact: Jeffrey delosSantosEmail: [email protected]
18-01381
0
2:00 PM6/7/18
Addenda:REDWOOD ROAD OVER BROWNS CREEK TRIBUTARY (36C0179) BRIDGE REPLACEMENT
County of Santa Cruz 831-454-2160 831-454-2385
General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company
Sub-Contractor/SpecialtyContractor
Fax: 831-763-1409Office: 831-763-1811Superior Hydroseeding
Bidders:
Watsonville $2,580,000
Intersection realignment and left-turn channelization In Santa Cruz County In And Near Watsonville From 0.3 Mile West To 0.2 MileEast Of Carlton RoadThe Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-12.
18-00265
0
2:00 PM6/13/18
Addenda:DOT 05-1F3504 INTERSECTION REALIGNMENT AND LEFT-TURN CHANNELIZATION
05-SCr-129-3.0/3.5
General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company
Plan Issuer:
Santa Cruz $64,000
This project is for licensed contractors with a Type B, General Building Contractor license to remodel the current office space into areception area and install new doors in several County buildings.
PREVAILING WAGE
Questions: Scott Moats at 831-454-5497
6/6 @ 9am- site
18-01455
0
2:30 PM6/20/18
Addenda:1080 EMELINE RECEPTION REMODEL AND MULTI-SITE DOOR REPLACEMENT
17C1-009
Prebid Conf:
County of Santa Cruz 831-454-2160 831-454-2385
NEW
Projects Qual ListContractors Pre Qualification Notices for the Week of April 23, 2018
The following agencies are now looking for contractors to be pre-qualified for upcoming projects at their public agency. Please read each qualification request as they vary with each agency. Click on the name of the agency as this will provide you with a direct link to their website for more information.
Name of Public Agency Completion Date
Sonoma-Marin Area Rail Transit (SMART) June 29, 2018 Union School District May 11, 2018 Los Gatos Union School District Open Ended Cabrillo Community College District Open Ended San Luis Coastal Unified School District Open Ended Ben Lomond Fire Protection District Open Ended Santa Cruz Harbor Open Ended Santa Cruz Housing Authority Open Ended South Monterey County Joint Union High School District Open Ended San Jose Unified School District Open Ended San Mateo-Foster City School District Open Ended Carmel Unified School District Open Ended San Lorenzo School District Open Ended Milpitas Unified School District Open Ended Hayward Unified School District Open Ended City of Watsonville Open Ended City of Pismo Beach Open Ended Santa Rita Union School District Open Ended Bret Harte Union High School District Open Ended Contra Costa Community College District Open Ended Alameda Municipal Power Open Ended County of Sonoma Open Ended Cayucos Sanitary District Open Ended Redwood City School District Open Ended Contra Costa County Office of Education Open Ended Morgan Hill Unified School District 2/21/2018 San Rafael City School District Open Ended Sonoma Valley School District Open Ended Wright Elementary School District Open Ended Calistoga Joint Unified School District Open Ended Roseland School District Open Ended Sacramento County Open Ended Valle Lindo School District Open Ended
G R A N I T E R O C K C O N S T R U C T I O N D I V I S I O N
CO
NS
TR
UC
TI
ON
D
IV
IS
IO
N
ALL OF YOUR CONSTRUCTION NEEDS - FROM DRIVEWAYS TO FREEWAYS • Asphalt and Concrete Driveways
• Parking Lots
• Site Work
• Seal Coating and Striping
• Underground Utilities (Water, Sewer, Storm Drain)
• Chip Sealing
• Culverts and Walls
• Golf Cart Path Work
• Concrete Curb and Gutters
• Concrete Flatwork
• Asphalt Grinding
• Subdivision Site Work Development
• Structures
General Engineering Contractor - LIC#22 • For an estimate call 831.768.2789 • Fax 831.768.2701
We start by helping a former contractor make what’s old new again! Are reminded of the Beatles song, ‘Nowhere Man’ with an LLC question and take a ‘cut’ at answering a “C-27”. Our last contractor learns to his horror that he has no place to ‘stand’ after a license is allowed to die… Q: I was licensed from 1990 thru 2003. I got out of the contracting business and I have been running another business since 2003. I want to get my license back now, I don’t remember if I cancelled it or just let it expire, but it was always in good standing. My understanding from reading the CSLB’s website is that I will not need to show recent experience since I have held the license in the past. Can you please confirm that? Also, is it possible to get my old license number back? A: You will not need to document recent experience if you were licensed in the same category in the past. You will be required to re-take the law and trade exams since your license has been expired for over five years. I looked up your license and since it’s a Sole Proprietor license, you can request the old number be re-issued. Q: We are applying for a Limited Liability Company (LLC) Contractor’s License. I can see from the forms that we must list at least one Member or Manager with the Secretary of State and a CEO if one is elected. If the LLC elects Officers at some point in the future, are they required to notify the Secretary of State and the CSLB? A: The LLC is not required to notify the Secretary of State of Officers, and in fact, besides the CEO box you mentioned, there is nowhere to list LLC Officers with the Secretary of State. The CSLB does allow you to add Officers to an LLC License, so whether you update the Officers with the CSLB is up to you.
Q: You are currently helping me obtain my “C-27” (Landscape) license. I have taken on several new accounts recently and I have been leasing employees from a staffing company, but I’m now realizing it would be much cheaper for me to hire employees and get Worker’s Comp. Do I need to have the policy in place prior to you submitting the license application? A: No, you don’t. We can submit the license application and your proof of Worker’s Compensation Insurance can follow once you are issued an application fee number. Q: Our company license recently expired, and we don’t have any current jobs in progress so we weren’t too worried about it. However, we also have a Joint Venture license with another company and we have ongoing projects under the JV license. We are listed on the contract however our JV partner is doing all the work. Is the Joint Venture still active? A: No, the Joint Venture license goes Suspended when either entity’s license is not in “good standing.” While knowledge is power, knowing where to go for the answers is half the battle. Get expert assistance immediately when you call 866-443-0657, email [email protected], or write us at Capitol Services, Inc., 1225 8th St. Ste. 500, Sacramento, CA 95814. Research past columns at www.cutredtape.com.
#
City Building PermitsSalinas
Permit No. B17-0086 Permit Amount $Owner(s)
CityBuilder Property Address Permit TypePermit No. B17-0594 Permit Amount $Owner(s)
CityBuilder Property Address Permit TypePermit No. B17-0598 Permit Amount $Owner(s)
CityBuilder Property Address Permit TypePermit No. B18-0146 Permit Amount $Owner(s)
CityBuilder Property Address Permit TypePermit No. B18-0155 Permit Amount $Owner(s)
CityBuilder Property Address Permit TypePermit No. B18-0282 Permit Amount $Owner(s)
CityBuilder Property Address Permit TypePermit No. R18-0190 Permit Amount $Owner(s)
CityBuilder Property Address Permit TypePermit No. R18-0195 Permit Amount $Owner(s)
CityBuilder Property Address Permit Type
Bid ResultsCity: WATSONVILLE Date: 04/26/18 Project: TRANSPORTATION BUS WASH ONPOINT CONSTRUCTION $985,000.00 PUEBLO CONSTRUCTION $1,357,605.00 City: SANTA CRUZ Date: 05/04/18
Project: RACHEL CARSON COLLEGE KITCHEN INFRASTRUCTURE RENOVATION
CEN-CON, INC. $458,805.00 City: SALINAS Date: 05/08/18 Project: EL GABILAN ELEM. SCHOOL ASPHALT PAVEMENT AMERICAN ASPHALT $606,554.16 G RAVITE $684,841.93 SILICON VALLEY $756,316.09 City: ARROYO GRANDE Date: 05/08/18 Project: ARROYO GRANDE H.S. VERNON EDWARDS $63,997.00 EFFECT CONTRACTORS $88,747.00 RAMINHA $94,600.00
City: ATASCADERO Date: 05/10/18Project: EL CAMINO REAL AND SAN ANSELMO PAVEMENT REHAB
FERRAVANTI GRADING $1,591,431.00 SOUZA ENG. $1,605,050.50 GRANITE CONSTRUCTION $1,756,301.00 City: GROVER BEACH Date: 05/10/18 Project: TRAIN STATION EXPANSION THE J.F. WILL COMPANY INC $2,267,354.32 GRANITE CONSTRUCTION $2,469,496.50 RAMINHA CONSTRUCTION $2,483,890.00 City: SANTA CRUZ Date: 05/11/18 Project: EAST REMOTE PARKING LOT #5 GRANITE ROCK CO $632,644.00 GALEB PAVING $635,000.00 EARTHWORKS $775,500.00 City: SALINAS Date: 05/14/18 Project: SALINAS PUMP STATION VFD ROOM HVAC DELLA MORA HEATING $236,000.00 BLOCKA CONSTRUCTION $329,500.00
Mechanic’s Liens
Notice of Completion
Release of Lien
Date: 05/18 GRANTOR: NINO HOMES AT ARBOLEDO GRANTEE: NINO DEVELOPMENT CITY: KING CITYDate: 05/18 GRANTOR: ROGGE ROAD GRANTEE: BLUE MOUNTAIN CONSTRUCTION CITY: SALINASDate: 05/18 GRANTOR: UCP EAST GARRISON GRANTEE: BENCHMARK COMMUNITES CITY: EAST GARRISONDate: 05/17 GRANTOR: CARMEL UNIFIFED SCHOOL DISTRICT GRANTEE: LEGACY ROOFING CITY: CARMELDate: 05/17 GRANTOR: WC MARINA GRANTEE: SAME CITY: MARINADate: 05/16 GRANTOR: BMC EG COURTYARDS GRANTEE: SAME CITY: EAST GARRISONDate: 05/16 GRANTOR: CITY OF SAND CITY GRANTEE: MARK NICHOLSON CITY: SAND CITYDate: 05/16 GRANTOR: BMC EG GROVE GRANTEE: SAME CITY: EAST GARRISONDate: 05/16 GRANTOR: BMC EG BUNGALOW GRANTEE: SAME CITY: EAST GARRISONDate: 05/15 GRANTOR: NINO HOMES AT ARBOLEDA GRANTEE: NINO DEVELOPMENT CITY: KING CITYDate: 05/15 GRANTOR: CYPRESS MARINA HEIGHTS GRANTEE: RENASCI MANAGEMENT CORP. CITY: MARINADate: 05/15 GRANTOR: WC MARINA GRANTEE: SAME CITY: MARINADate: 05/15 GRANTOR: BMCH CALI. GRANTEE: SAME CITY: SALINASDate: 05/14 GRANTOR: WC MARINA GRANTEE: SAME CITY: MARINADate: 05/14 GRANTOR: BMCH CALI. GRANTEE: SAME CITY: SALINASDate: 05/14 GRANTOR: BMC EG BUNGALOW GRANTEE: SAME CITY: EAST GARRISON
Date: 05/18 CREDITOR: GREG FRIES CONSTRUCTION DEBTOR: SPRECHER JO AMOUNT: 708.00Date: 05/18 CREDITOR: CALI. PREMIER RESTORATION DEBTOR: MCVAY JEFF AMOUNT: $38,856.82
Date: 05/14 GRANTOR: DBI CONTRACTING GRANTEE: NILSSON KEITH CITY: MONTEREY
What's In It For You:How the homesphereprogram works:
bundle and earn more
[email protected] | (650) 793-8432CONTACT Lorri Lasley to enroll
CONNECT Choose from 80+ Preferred Partner brands across 23 product categories to earn rebates. Continue to purchase products locally.
TRACK Your local HomeSphere expert will help you efficiently track your closings by community, lot and block.
COLLECT HomeSphere bundles your rebate incentives together across all products and brands in a single check.
It’s Easy to Get Started! Set a 10-minute meeting with your local HomeSphere Expert who will walk you through:1. Your Builder Profile & Latest Closed Homes2. Your Enrollment Form3. Your W-9 Form
•Get access to Single-Familyand Multi-Family Rebates
•Bundle all your rebates intoone monthly check
•Continue to increase yourrebate check through HomeSphere’s network ofbuilding product manufacturers
Your cash back can grow. Tap in to HomeSphere's network of 80 manufacturers and brands to increase your rebate check, including:
Over 80+ Partners offer builder incentives exclusively through HomeSphere's national rebate program. Start collecting rebates on building essentials today!
Earn cash back on each productyou install
Join 831 Conserve for a Training & Networking Event in the Central Coast!
831 Conserve and The City of Watsonville invite you to register for our 2nd annual event!
Come discover, connect and engage with industry experts to gain an understanding of your role in meeting Building Energy Efficiency Standards.
GENERAL CONTRACTOR Did you know that you need to engage a HERS rater early in your project to have them review plans and schedule inspections for on-time and on-budget completion? Are you communicating with your BUILDING INSPECTOR in determining time schedules for when Certificates of Installation (CF2Rs) and Certificates of Verification (CF3Rs) need to be completed?
ARCHITECTS/DESIGNER Are you informing the CONTRACTOR and PLAN CHECKER of the CF1R requirements/HERS verifications that your ENERGY CONSULTANT has modeled?
ENERGY CONSULTANT Do you understand the processes involved for each credit and/or mandatory measure that must be field-verified by a HERS-Rater? Are you conveying those procedures to your DESIGNER and GENERAL CONTRACTOR?
BUILDING INSPECTOR Did you know that the CalCerts Registry Project Status Report (checklist) guides you in spot-checking the CF2Rs for accuracy? Do you know to check ALL “Green Dots” in the Project Status Report for the Certificate of Occupancy?
Friday, June 8, 2018
Session 1: 1 – 4 pm (1 hour Q&A included) Session 2: 5 – 8 pm (1 hour Q&A included)
Space is limited - register early! Watsonville Civic Center - Community Room (top
floor) (831) 726-4018
2018
10 + Employers 5/31
THURSDAY
2 - 4 PM 831-637-JOBS
1111 San Felipe Rd. #107 Hollister, CA 95023
ADA/ Equal Opportunity Employer/ Program Auxiliary Aids and Services are available upon request to individuals with disabilities. TTY access call: (831) 637-3265
RAFF
LE
APPLICATION ASSISTANCE DRESS TO IMPRESS BRING A FRIEND CREATE A RESUME WIN PRIZES GET A JOB!
Ages 16-25 Open to the Public
PRE-REGISTER @ www.eventbrite.com
Sponsors
Employers
Logos
Here
www.inspiredexpos.com
dream • plan • build
why exhibit at inspired expos?CONNECT with 3,000 to 5,000
qualified clients in 2 days.
INCREASE brand recognition.
ACQUIRE leads and set appointments.
EDUCATE the community on your services.
Reserve Your Space TODAY805.772.4600 • 831.222.0772
MONTEREY EXPOSFall: Oct. 14 & 15, 2017 | Spring: April 21 & 22, 2018
Monterey Home & Garden Expo at the Monterey Fairgrounds
93%are building or
remodeling
14%are home & garden
professionals
7%are purchasing
a home
Employer Sponsored Options Products you can get through your employer. Enrolling is easy! Your company receives a single, consolidated bill and participating employees have the convenience of payment through payroll deductions. Both Group and Voluntary options are available.
Medical – All CA Carriers & Covered CA MetLife Dental – Group and Voluntary VSP Group Vision Anthem Blue View Voluntary Vision Landmark Chiropractic & Acupuncture MetLife Term Life - Group and Voluntary CADR+ Telemedicine - 24/7 Doctors on Call LifeLock Identity Theft Protection
Colonial Life Optional Benefits Accident Insurance Critical Illness Insurance Short Term Disability Insurance Hospital Confinement Insurance Whole Life with LTC Rider
LegalShield Pre-Paid Legal Services Legal Shield Identity Theft Shield
Build a Better Benefits Package!
Through the California Builders Exchanges (CBX), the Central Coast Builders Association now offers a highly competitive benefits program to our member firms and their employees.
Want More Information?
Go to www.cbxbenefits.com
Or contact our local Benefits Consultant!
Tina Nelson Q&A Insurance Marketing, CA Lic. 0B17048 Cecy Insurance Services, CA Lic. 0802215 (831) 477-1730 [email protected]
Individual Options Valuable products, services and discounts that your employees can get directly from one of our contracted providers because you are a member of the Association.
Health Insurance for Individuals and Families Nationwide Pet Insurance LifeLock Identity Theft Protection MetLife Home & Auto Insurance Working Advantage Employee Perks Program LegalShield Pre-Paid Legal Services LegalShield Identity Theft Shield
Great Voluntary Benefits!
No Minimum Participation Low Rates Consolidated Billing Guarantee Issue Options
CONSTRUCTION ESTIMATING
Material quantity takeoffs for residential/ commer-cial. Foundation excava-tion, forms, reinforcing, concrete. Rough and finish carpentry. Lumber lists. Experienced.
Contact email: [email protected]
Architectural Photography
Harold Gomes Email:
[email protected] Cell: 831-227-1942
IG:
A&R Corporation, Inc is seeking a Project Manager, Project Engi-neer and Superintendents to staff a multi-family apartment project located in Paso
Robles. Please send resumes to Neil Miller at the following email address,
Construction Project Manager / Estimator Monterey CA $80,000-$90,000 a year General Contractor specializing in Prevailing Wage Projects seeks experienced Project Manager for California. Must have a minimum of 10 years hands-on abilities to handle the planning, coordination, and control of a project from inception through comple-tion. Strong estimating skills a must. Our projects are fast paced and require immedi-ate response to field personnel and customer requirements. The position will require job walks and client meetings throughout Central and Northern California. In addition to the required experience above, the right candidate will have natural leadership abilities, be able to work independently, and is organized and detail-oriented. It is criti-cal that you have the ability to communicate effectively and appropriately with clients, colleagues and coworkers, as well as the ability to recognize a potential problem and resolve immediately and effectively. Must have experience supervising field staff in-cluding sub-contractors. Responsibilities Include: Bidding and estimating TI projects throughout California, performing prevailing wage projects. Selecting, negotiating and coordinating the work of sub-contractors Adhering to proper administration of construction contracts with knowledge of and the experience with AIA documents Reporting/updating to owners the progress of projects including any changes needed Preparing transmittals, submittals, contracts and daily logs Preparing and processing change orders timely and accurately Supervising and supporting field staff Timely preparing of monthly invoicing for the accounting department Maintaining data and cost of projects Travel will be required Strong verbal and written communication skills Advanced computer skills including MS Project, Word, Excel and Outlook MUST be able to read plans and be willing to work as a Team member to ensure the success and timely completion of all projects Email resume to [email protected] Job Type: Full Time Salary: $80,000-$90,000 & Federal Holidays + 2 weeks of Vacation Experience: Construction: 5 years minimum
Construction Project Management: 5 years minimum
Your Local Plan Room Just Got Better!! STATEWIDE ACCESS
Introducing the Golden State Plan Service
Single Statewide Plan Room - You choose the counties you want to see. No more searching multiple Plan Rooms for projects
Mobile Device Accessible - Take your plan room with you
Your local, community based Exchange has always been the best resource for the local con-struction industry. Now your local exchange just got BETTER and STRONGER. This new
plan room combines 14 of the best exchanges in the state, decades of local plan room experi-ence with our local relationship and resources to bring you the most comprehensive plan
room available. Our plans aren’t uploaded from one central location, rather each exchange cultivates its local relationships to bring the best projects from each region to our contractors.
LOCALLY GROUNDED - STATE POWERED
Keep the Plan Room You Know & Use Your company bidding history & saved projects are preserved Updated Plan Room Platform 2.0 - Increased functionality, ease of use & updated search options. You told us what you wanted - WE IMPROVED
More Private Projects- Our collaboration means more cultivation of private work
Safety Tip of the Week
FIRST AID FOR BURNS
Just the thought of being a burn victirn is most unpleasant - but - as a construction worker you know that there are many opportunities for burn injuries to occur every day. Your job can bring you into contact with hot surfaces, flammable liquids, gasoline motors, torches, welding equipment, portable heaters, chemicals, electricity, and the sun and wind, all of which can cause burns. All burns are painful and the danger of infection must be addressed. Most burns require professional medical attention.
First Degree Bums - affect the outer layer of skin such as sunburn or contact with a hot objects. The skin will be red and sore. First aid treatment: apply cold water to the burned area or submerge the area in cold water. Apply a sterile dressing. Second Degree Bums - affect the entire outer layer of skin and may penetrate deeper. The skin usually blisters. These burns are caused by a bad sunburn, contact with hot liquids, or burns from gasoline for example. First aid treatment: apply cold water as you would for a first degree burn, or use a cold pack, or cover the burn with a cold, wet dressing. Don't break blisters or use ointments, antiseptics, etc. Seek professional medical help. Third Degree Burns - penetrate both layers of skin and are very serious! Contact with flames, burning clothing, or electricity can cause third degree burns. First aid treatment: if clothing is on fire, drop and roll the victim to extinguish the flames, cover burn area with a sterile dressing, never use cold water, ointments, antiseptics, etc. Get medical help at once!
Here are a few tips to prevent burn accidents:
Keep sparks and open flames away from combustible and flammable materials.
Practice good housekeeping - dispose of scrap materials promptly and properly.
Always keep chemicals in their original containers with labels, and use chemicals safely, check the MSDS and use caution when pouring hot liquids - even that morning cup of coffee.
Observe all electrical codes - lock-out/tag-out energy sources before working on machinery or equipment. Cover live electrical panels and post warning signs.
Wear the right personal protective equipment for the job.
Burns occur off the job, too. Keep children away from matches, portable heaters, ranges and fireplaces. Store flammables and combustibles properly.
Safety Recommendations:__________________________________________________________________________________
Job Specific Topics:_______________________________________________________________________________________
M.S.D.S Reviewed:_______________________________________________________________________________________
Attended By:
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________
_______________________________________________________________________________________________________