BUFORD DAM ROADPROFESSIONALNO. 27817
Transcript of BUFORD DAM ROADPROFESSIONALNO. 27817
110 Samaritan Drive, Suite 201
Cumming, GA 30040
(770) 977-5747
www.cecincga.com
Copyright 2021
Civil Engineering Consultants, Inc.
THESE DRAWINGS AND THEIR REPRODUCTIONS ARE THE PROPERTY OF
THE ENGINEER AND MAY NOT BE REPRODUCED, PUBLISHED OR USED IN
ANY WAY WITHOUT THE WRITTEN PERMISSION OF THIS ENGINEER.
c
LOCATION MAP
SCALE: N.T.S.
1. OWNER / PRIMARY PERMITTEE: CITY OF CUMMING
100 MAIN STREET
CUMMING, GEORGIA
30040
(770) 781-2020
2. ENGINEER: CIVIL ENGINEERING CONSULTANTS, INC.
110 SAMARITAN DRIVE, SUITE 201
CUMMING, GEORGIA 30040
PHONE: (770) 977-5747
3. SURVEYOR: CIVIL ENGINEERING CONSULTANTS, INC.
110 SAMARITAN DRIVE, SUITE 201
CUMMING, GEORGIA 30040
PHONE: (770) 977-5747
ORIGIN OF SURVEY: FIELD RUN TOPOGRAPHY - OCTOBER 2020
4. SITE ADDRESS:
FROM: 1750 HOMESIDE DR, - TO: 2005 BUFORD DAM RD,
CUMMING, GA 30041 CUMMING, GA 30041
5. DISTURBED AREA:
TOTAL LINEAR DISTURBED AREA: 0.45 AC.
6. PORTIONS OF THIS SITE LIE WITHIN A FLOOD HAZARD
AREA PER FEMA FLOOD INSURANCE RATE MAP PANEL
13117C0161G, 03/04/2013
7. ZONING DISTRICTS: LR, CBD R2R, R3
8. LAND LOTS: 215, 216, 42
9. PROJECT DESCRIPTION:
THIS PROJECT WILL INVOLVE THE INSTALLATION OF
APPROXIMATELY 1,980 LF OF 12-INCH DIP WATER MAIN ALONG
BUFORD DAM ROAD. THE WATER MAIN WILL BE INSTALLED
UTILIZING OPEN CUT. EXISTING WATER SERVICES SHALL BE
CONNECTED TO THE PROPOSED WATER MAIN AS INDICATED ON
THE PLANS. THE PROJECT SHALL INCLUDE FURNISHING ALL
MATERIALS, LABOR, EQUIPMENT AND ANY APPURTENANCES AS
NECESSARY FOR COMPLETION OF THE WORK DESCRIBED WITHIN
THESE PLANS AND SPECIFICATIONS.
10. PROJECT LOCATION:
THIS PROJECT BEGINS AT 34°11'03.3"N, 84°06'20.0"W, AND
ENDS AT 34°10'58.1"N 84°05'57.6"W
BUFORD DAM ROAD 12" WATER LINE IMPROVEMENTS
SITE DEVELOPMENT PLANS
CITY OF CUMMING, FORSYTH COUNTY, GA
THREE WORKING DAYS BEFORE YOU DIG IT'S THE LAW
UTILITIES PROTECTION CENTER, INC.
Call FREE THROUGHOUT
GEORGIA 1-800-282-7411
IN ATLANTA: 325-5000
N
:PROPOSAL READY 04/07/2021
20072 - B
UF
OR
D D
AM
R
OA
D W
AT
ER
L
IN
E - JE
SS
E N
EL
SO
N - 4/6/2021 2:43 P
M
PROPOSED 12" DIP
WATER LINE
LAKE SIDNEY
LANIER
Sheet List Table
Sheet Number Sheet Title
1 COVER SHEET
2 OVERALL SITE PLAN
3 PLAN & PROFILE PART 1
4 PLAN & PROFILE PART 2
5 PLAN & PROFILE PART 3
6 PLAN & PROFILE PART 4
7 MISCELLANEOUS DETAILS PART 1
8 MISCELLANEOUS DETAILS PART 2
9 MISCELLANEOUS DETAILS PART 3
10 MISCELLANEOUS DETAILS PART 4
11 ES&PC PART 1
12 ES&PC PART 2
13 ES&PC DETAILS PART 1
14 ES&PC DETAILS PART 2
15 ES&PC DETAILS PART 3
NOTIFY FORSYTH COUNTY INSPECTOR 24 HOURS BEFORE
BEGINNING PHASE OF CONSTRUCTION. (770) 781-2165
ESPCP CERTIFICATION:
1. I CERTIFY UNDER PENALTY OF LAW THAT THIS PLAN WAS
PREPARED AFTER A SITE VISIT TO THE LOCATIONS DESCRIBED
HEREIN BY MYSELF OR MY AUTHORIZED AGENT, UNDER MY DIRECT
SUPERVISION.
2. I CERTIFY THAT THE PERMITTEE'S EROSION, SEDIMENTATION AND
POLLUTION CONTROL (ES&PC) PLAN PROVIDES FOR AN
APPROPRIATE AND COMPREHENSIVE SYSTEM OF BEST
MANAGEMENT PRACTICES REQUIRED BY THE GEORGIA WATER
QUALITY CONTROL ACT AND THE DOCUMENT "MANUAL FOR
EROSION AND SEDIMENT CONTROL IN GEORGIA," (MANUAL)
PUBLISHED BY THE STATE SOIL AND WATER CONSERVATION
COMMISSION AS OF JANUARY 1 OF THE YEAR IN WHICH THE
LAND-DISTURBING ACTIVITY WAS PERMITTED, PROVIDES FOR THE
SAMPLING OF THE RECEIVING WATER(S) OR THE SAMPLING OF THE
STORM WATER OUTFALLS AND THAT THE DESIGNED SYSTEM OF
BEST MANAGEMENT PRACTICES MEETS THE DESIGN
REQUIREMENTS CONTAINED IN THE GENERAL NPDES PERMIT NO.
GAR 100002.
EROSION CONTROL NOTES:
1. THE PROJECT RECEIVING WATERS ARE LAKE LANIER.
2. LAKE LANIER IS WITHIN 500' OF THIS PROJECT.
3. THIS SITE DOES NOT CONTAIN WETLANDS.
4. WASTE MATERIALS SHALL NOT BE DISCHARGED TO WATERS OF
THE STATE, EXCEPT AS AUTHORIZED BY A SECTION 404 PERMIT.
5. EROSION CONTROL, ANY BUFFER DELINEATIONS AND TREE
PROTECTION MEASURES SHALL BE INSTALLED PRIOR TO ANY
OTHER CONSTRUCTION ACTIVITY AND MAINTAINED UNTIL
PERMANENT GROUND COVER IS ESTABLISHED.
6. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE
PREVENTED BY THE INSTALLATION OF EROSION AND SEDIMENT
CONTROL MEASURES AND PRACTICES PRIOR TO, AND/OR
CONCURRENT WITH ALL LAND DISTURBING ACTIVITIES.
7. EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL
TIMES. IF FULL IMPLEMENTATION OF THE APPROVED PLAN DOES
NOT PROVIDE FOR EFFECTIVE EROSION CONTROL, ADDITIONAL
EROSION AND SEDIMENT CONTROL MEASURES SHALL BE
IMPLEMENTED TO CONTROL AND/OR TREAT THE SEDIMENT
SOURCE.
8. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER
THAN 7 DAYS SHALL BE STABILIZED WITH MULCH OR
TEMPORARY SEEDING.
9. NON-EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE
25 OR 50-FOOT UNDISTURBED STREAM BUFFERS AS MEASURED
FROM THE POINT OF WRESTED VEGETATION WITHOUT FIRST
ACQUIRING THE NECESSARY VARIANCES AND PERMITS.
24-HOUR CONTACT PERSON: MR. JON HEARD
DIRECTOR OF UTILITIES
(770) 781-2020
GENERAL CONSTRUCTION NOTES:
1. EXISTING SITE CONDITIONS: THE PROPOSED SITE IS LOCATED IN
FORSYTH COUNTY. THE PROJECT SITE IS WITHIN THE PUBLIC
RIGHT-OF-WAY AND OTHER AREAS CONSIST OF WOODED LAND,
PRIMARILY UNDEVELOPED WITH SOME AREAS RESIDENTIAL
AREAS. THE EXISTING PROJECT SITE CONSISTS OF GRADES FROM
0.00% TO 10.00%. SURROUNDING AREAS ARE UNDISTURBED WITH
FEW EXCEPTIONS AND SURFACE RUNOFF IS MINIMAL.
2. PROPOSED CONDITIONS: PROJECT AREA IS LESS THAN ONE (1)
ACRE OF DISTURBANCE. ALL DISTURBED AREAS WILL BE
RESTORED TO EXISTING GRADE AND STABILIZED WITHIN 3 DAYS
AS SOON AS CONSTRUCTION PERMITS. THE PROJECT WILL ADD
NO IMPERVIOUS SURFACE.
3. ALL IMPROVEMENTS WILL CONFORM WITH THE CITY OF CUMMING
AND/OR FORSYTH COUNTY CONSTRUCTION STANDARDS AND
SPECIFICATIONS, LATEST EDITION.
4. ALL UNDISTURBED BUFFERS SHALL BE IDENTIFIED WITH ORANGE,
FOUR-FOOT TREE-SAVE FENCING PRIOR TO ANY LAND
DISTURBANCE (UDC SEC. 18-10.1)
5. OUTSIDE CONSTRUCTION ACTIVITY SHALL BE LIMITED TO THE
HOURS OF 7:00 A.M. TO 7:00 P.M. MONDAY TROUGH FRIDAY, 8:00
A.M. TO 6:00 P.M. SATURDAY, AND NO OUTSIDE CONSTRUCTION
ON SUNDAY (UDC 10-1.13).
6. THE PROJECT SITE IS WITHIN 200 FEET OF STATE WATERS.
7. CONSTRUCTION WASTE MAY NOT BE BURNED OR BURIED AND
MUST BE HAULED TO A STATE APPROVED LANDFILL.
8. ALL UTILITY LINES SHALL BE INSTALLED UNDERGROUND.
9. ALL DISTURBED AREAS SHALL BE RETURNED TO EXISTING GRADE
AS SOON AS CONSTRUCTION PERMITS.
FORSYTH COUNTY REQUIREMENTS:
1. FORSYTH COUNTY UTILITY PERMIT REQUIRED. CALL 770-781-2165
FOR UTILITY PERMIT INFORMATION.
2. CONTACT SCOTT GUNTER AT (770) 781-2165
24 HOURS PRIOR TO WORKING WITHIN 400' OF ANY TRAFFIC
SIGNAL.
3. NOTIFY FORSYTH COUNTY INSPECTOR 24 HOURS BEFORE THE
BEGINNING PHASE OF CONSTRUCTION. (770) 781-2165
4. IRRIGATION SYSTEMS ARE PROHIBITED ON ALL EXISTING AND
PROPOSED COUNTY RIGHT-OF-WAY AND CONSIDERED TO BE A
VIOLATION OF THE COUNTY'S ORDINANCE PROHIBITING
UN-PERMITTED RIGHT-OF-WAY ENCROACHMENTS.
5. FULL SERVICE DRIVES WILL REVERT TO RIGHT IN / RIGHT OUT
DRIVES IF FORSYTH COUNTY DETERMINES THEY ARE CREATING
TRAFFIC PROBLEMS AND/OR ACCIDENTS OR IF ROAD IS WIDENED
TO A MULTI-LANE HIGHWAY WITH MEDIAN.
6. NO STRUCTURES, FENCES OR OTHER OBSTRUCTIONS MAY BE
LOCATED WITHIN A DRAINAGE OR ACCESS EASEMENT WITHOUT
PRIOR APPROVAL BY THE FORSYTH COUNTY DEPARTMENT OF
ENGINEERING.
7. APPROVAL OF THESE PLANS DOES NOT CONSTITUTE APPROVAL BY
FORSYTH COUNTY OF ANY LAND DISTURBING ACTIVITIES WITHIN
WETLAND AREAS. IT IS THE RESPONSIBILITY OF THE PROPERTY
OWNER TO CONTACT THE APPROPRIATE REGULATORY AGENCY
FOR APPROVAL OF ANY WETLAND AREA DISTURBANCE.
8. MAXIMUM CUT SLOPES SHALL BE 2 HORIZONTAL TO 1 VERTICAL.
CONTINUOUS FILL SLOPES TEN (10) FEET IN HEIGHT OR LESS MAY
BE 2 HORIZONTAL TO 1 VERTICAL. ALL CONTINUOUS FILL SLOPES
THAT EXCEED TEN (10) FEET IN HEIGHT MUST BE 3 HORIZONTAL TO
1 VERTICAL UNLESS: a) A MECHANICALLY ENGINEERED STABILIZED
SLOPE IS APPROVED BY THE FORSYTH COUNTY DIRECTOR OF
ENGINEERING; OR b) THE DESIGNED AND CONSTRUCTED SLOPES
ARE CERTIFIED BY A REGISTERED ENGINEER EXPERIENCED IN
GEOTECHNICAL ENGINEERING AND LICENSED IN THE STATE OF
GEORGIA.
9. APPROVAL OF THESE PLANS BY FORSYTH COUNTY IS SUBJECT TO
AND CONTINGENT UPON THE APPLICANT OR OWNER OBTAINING
THE NECESSARY APPROVALS FROM OTHER JURISTICTION
AGENCIES INCLUDING BUT NOT LIMITED TO, THE UNITED STATES
ARMY CORPS OF ENGINEERS, OR UNITED STATES ENVIRONMENTAL
PROTECTION AGENCY, GEORGIA DEPARTMENT OF NATURAL
RESOURCES, GEORGIA ENVIRONMENTAL PROTECTION DIVISION,
AND THE GEORGIA SOIL AND WATER CONSERVATION COMMISSION.
10. THIS DEVELOPMENT IS EXCEPTED FROM THE GEORGIA
STORMWATER MANAGEMENT MANUAL AND FORSYTH COUNTY
ADDENDUM TO THE GEORGIA STORMWATER MANAGEMENT
MANUAL AS THERE IS LESS THAN ONE (1) ACRE OF DISTURBANCE
AT ANY ONE TIME AND THERE IS LESS THAN 5000 SF OF NEW
IMPERVIOUS SURFACE BEING CREATED.
PURK YOTAKHONG, P.E.
GSWCC NO. 0000059231
B
U
F
O
R
D
D
A
M
R
O
A
D
N
GENERAL PIPE LINE NOTES:
1. ALL DUCTILE IRON PIPE AND FITTINGS SHALL
BE INSTALLED PER MANUFACTURER’S
RECOMMENDATION & INSTRUCTIONS.
2. RESTRAINED FITTINGS SHALL HAVE FULL JOINT
OF PIPE (NORMALLY 18 OR 20 FT.) ON EACH
SIDE OF THE FITTING UNLESS STATED
OTHERWISE ON THE DRAWING PLAN. WHERE
ANOTHER FITTING IS LOCATED LESS THAN 20
FT. FROM THE FIRST FITTING, THE PIPE
BETWEEN THE TWO SHALL BE A SINGLE PIECE
OF PIPE.
3. FOR RESTRAINED JOINT PIPE INSTALLATION,
JOINT PIPE ASSEMBLY EXTENSION “SLACK”
MUST BE PERFORMED PER MANUFACTURE’S
RECOMMENDATIONS AND INSTRUCTION.
4. CONTRACTOR SHALL COORDINATE ALL PIPE
TIE-INS WITH THE ENGINEER AND THE CITY.
CONTRACTOR SHALL PROVIDE A WRITTEN
WORK PLAN AND SCHEDULE FOR APPROVAL
PRIOR TO MAKING TIE-INS.
5. LOCATION OF HYDROSTATIC LEAK TESTS
SHALL BE APPROVED BY THE ENGINEER.
CONTRACTOR SHALL NOTIFY THE ENGINEER A
WEEK IN ADVANCED PRIOR TO CONDUCTING
THE HYDROSTATIC LEAK TEST.
UTILITY NOTES:
1. LOCATIONS OF UNDERGROUND UTILITIES ARE
APPROXIMATE, & SOME UTILITIES MAY EXIST THAT
ARE NOT SHOWN. BEFORE BEGINNING BORING,
CONTRACTOR SHALL FIELD LOCATE & POT HOLE
ALL EXISTING UNDERGROUND UTILITIES TO
DETERMINE THE EXACT LOCATIONS & ELEVATIONS, &
CONFIRM THAT SPECIFIED ELEVATIONS OF CASINGS
ARE NOT IN CONFLICT WITH EXISTING
UNDERGROUND UTILITIES.
2. CARE SHALL BE TAKEN WHILE EXCAVATING AROUND
ANY EXISTING UTILITIES. WATER AND GAS LINES
MARKED ON THE PLAN AS ABANDONED AND TO BE
REMOVED IF CONFLICTS WITH THE CONSTRUCTION
OF THE PROPOSED WATER MAIN SHALL BE FIELD
VERIFIED/CHECKED BY THE CONTRACTOR PRIOR TO
COMMENCING WORK. NOTIFY THE ENGINEER FOR
ANY DISCREPANCIES.
GENERAL NOTES:
1. INSTALL MARKER BALLS EVERY 200-FT, AT ALL
FITTINGS & CASING ENDS.
2. ALL PIPES SHALL BE INSTALLED W/ A MINIMUM
COVER OF 4'-0" BELOW EXISTING GRADE OR AS
SHOWN ON THE DRAWING. (SEE PROFILE FOR
REFERENCE)
3. PIPE BEDDING SHALL BE TYPE 5. REFERENCE
TYPE 5 BEDDING DETAIL ON SHEET 7.
LEGEND OF SYMBOLS
WATER VALVE
WATER METER
FIRE HYDRANT
UTILITY POLE
LIGHT POLE
SINGLE WING CATCH BASIN (LEFT/RIGHT)
DOUBLE WING CATCH BASI N
JUNCTION BOX
HEADWALL
FLARED END SECTION
SANITARY SEWER MANHOLE
SIGN SINGLE
BENCHMARK
CONTROL POINT
GUY-WIRE
W
LINE LEGEND
EXISTING (SCREENED)
PROPOSED (DARKER AND/OR COLOR)
PROPOSED WATER
PROPOSED SANITARY SEWER
PROPOSED STEEL CASING
PROPOSED CONTOURS
SURVEY LINE LEGEND
EX. WATER LINE
ABANDONED WATER LINE
EX. SEWER LINE
ABANDONED SEWER LINE
EX. FORCE MAIN
ABANDONED FORCE MAIN
EX. OVERHEAD POWER LINE
EX. UNDERGROUND POWER LINE
EX. STORM DRAIN LINE
EX. GUARD RAIL
EX. GAS LINE
EX. FIBER OPTIC CABLE
EX. COMMUNICATION CABLE
EX. UNDERGROUND TELEPHONE LINE
EX. OVERHEAD TELEPHONE LINE
CENTERLINE CREEK
CENTERLINE ROAD
EX. FENCE LINE
EX. MAJOR CONTOUR
EX. MINOR CONTOUR
W W W W
W X W X
SS SS SS
SS X
FM FM FM
FM X
E E E
E E E E
G G G G
FO FO FO
COMM COMM
TEL TEL TEL
TEL TEL
X X X X
1200
1200
1200
00 200' 400'
SCALE IN FEET
SCALE: 1" = 200'-0"
110 Samaritan Drive, Suite 201
Cumming, GA 30040
(770) 977-5747
www.cecincga.com
OF
Copyright 2021
Civil Engineering Consultants, Inc.
THESE DRAWINGS AND THEIR
REPRODUCTIONS ARE THE PROPERTY
OF THE ENGINEER AND MAY NOT BE
REPRODUCED, PUBLISHED OR USED IN
ANY WAY WITHOUT THE WRITTEN
PERMISSION OF THIS ENGINEER.
c
CLIENT
APPROVAL STAMP
PROJECT NAME
Drawn By :
Checked By :
Designed By :
Scale :
SHEET TITLE
PROJECT INCEPTION DATE
DRAWING NUMBER
RELEASES
No DescriptionDate
REVISIONS
No DescriptionDate
1
2
3
4
5
1
2
3
4
5
6
7
8
04/07/2021 PROPOSAL READY
02/16/2021
15
OVERALL SITE PLAN
BUFORD DAM ROAD WATER
LINE IMPROVEMENTS
2
GRP
BJR
GRP
CITY OF CUMMING
SEE DETAIL
20
07
2 - B
UF
OR
D D
AM
R
OA
D W
AT
ER
L
IN
E - J
ES
SE
N
EL
SO
N - 4
/6
/2
02
1 2
:4
3 P
M
PROPOSED 12" DIP WATER LINE
S
W
W
S
T
W
W
W
W
W
W
W
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EE E E E E E
GG
G GG
GG
GG
GG
G
G
G
G
G
G
G
G
G
G
G
G
G
G
SS
SS
SSSS
SS
XX
1
2
1
0
1
2
0
0
1
1
9
0
1
1
8
0
1
1
7
0
~N/F~
WILLIAMS DEBORAH J ETAL
DB 5388 PG 197
PARCEL 198 363
~N/F~
LONG SUBDIVISION
PHASE 1
PB 134 PG 193
PARCEL 198 447
~N/F~
WILLIAMS DEBORAH ETAL
DB 6390 PG 229
PARCEL 198 399
BUFORD DAM ROAD
~100' R/W~
1
8
"
C
M
P
1
8
"
R
C
P
FOUND
1/2" REBAR
FOUND
DIST. CONDUIT
TBM
CITY STATE BOLT
ON HYDRANT
ELEV = 1185.14
TV
TV
TV
TV
TV
TV
TV
TV
TV
TVTV
TVTV
TVTV
TVTV
T
HOMESIDE DRIVE
~50' R/W~
SS
SS
SS
SS
SS
SS
SS
SS
8" P
VC
8" P
VC
18" R
CP
8" P
VC
10" PVC
SSMH TOP = 1204.87
INV. IN = 1194.39
INV. OUT = 1194.20
SSMH TOP = 1181.07
INV. IN = 1176.37
INV. PLUGGED CORE = 1176.17 (NWLY)
INV. OUT = 1176.07
YI TOP = 1201.47
INV. OUT = 1196.07
JB TOP = 1203.95
INV. IN = 1190.85 (18" CMP ELY)
INV. IN = 1190.85 (18" CMP NWLY)
INV. IN = 1194.40 (18" RCP WLY)
INV. OUT = 1190.80 (18" RCP SLY)
1
8
"
C
M
P
1
8
"
R
C
P
CB TOP = 1204.73
INV. IN = 1191.70
INV. OUT = 1191.53
CB TOP = 1204.18
INV. OUT = 1195.32
P
P
P
P
F
H
F
H
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FMX
FMX
FMX
FMX
FMX
FMX
FMX
FMX
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
W
W W W W W WW
WW
WW
WW
WW
WW
WW
WW
W
W
W
W
W
W
W
W
W
W
W
W
W
WW
WW
W
W
W
W
W
W
0+00
1+00
2+00
3+00
4+00
5+00
R/W
R/W
R/W
R/W
P
/L
P
/L
P
/L
P
/L
P
/L
P
/L
CONTRACTOR TO MAINTAIN MIN. 5'-0"
SEPERATION FROM EX. GAS LINE
CONTRACTOR TO MAINTAIN MIN. 5'-0"
SEPERATION FROM EX. GAS LINE
GRAVEL
DRIVE
EXISTING 12" WATER LINE
TIE IN TO EXISTING
WATER LINE w/
MJ SLEEVE RESTRAINED
EXISTING 8" WATER LINE
EX. FORCE MAIN
PROP. 12" DIP
WATER LINE CL 350
PROP. CONC. THRUST COLLAR
(SEE DETAIL)
5'-0" MIN. FROM EDGE
OF PAVEMENT
PROP. FIRE HYDRANT ASSEMBLY
(SEE DETAIL ON SHEET 8)
ABANDONED FORCE MAINS
0+50
1+50
2+50
3+50
4+50
5+50
MA
TC
H L
IN
E - (1)
5+
00
PROFILE:PROPOSED WATER MAIN - (1)
1145
1150
1160
1170
1180
1190
1200
1210
1220
1145
1150
1160
1170
1180
1190
1200
1210
1220
-0+25 0+00
0+25 0+50 0+75
1+00
1+25 1+50 1+75
2+00
2+25 2+50 2+75
3+00
3+25 3+50 3+75
4+00
4+25 4+50 4+75
5+00
-0+25 0+00
0+25 0+50 0+75
1+00
1+25 1+50 1+75
2+00
2+25 2+50 2+75
3+00
3+25 3+50 3+75
4+00
4+25 4+50 4+75
5+00
PROP. 12" DIP
WATER LINE CL 350
EXISTING GRADE
TIE IN TO EXISTING
WATER LINE w/
MJ SLEEVE RESTRAINED
PROP. CONC. THRUST COLLAR
(SEE DETAIL)
EX. 12" WATER LINE
EXISTING GRAVEL
DRIVEWAY
110 Samaritan Drive, Suite 201
Cumming, GA 30040
(770) 977-5747
www.cecincga.com
OF
Copyright 2021
Civil Engineering Consultants, Inc.
THESE DRAWINGS AND THEIR
REPRODUCTIONS ARE THE PROPERTY
OF THE ENGINEER AND MAY NOT BE
REPRODUCED, PUBLISHED OR USED IN
ANY WAY WITHOUT THE WRITTEN
PERMISSION OF THIS ENGINEER.
c
CLIENT
APPROVAL STAMP
PROJECT NAME
Drawn By :
Checked By :
Designed By :
Scale :
SHEET TITLE
PROJECT INCEPTION DATE
DRAWING NUMBER
RELEASES
No DescriptionDate
REVISIONS
No DescriptionDate
1
2
3
4
5
1
2
3
4
5
6
7
8
04/07/2021 PROPOSAL READY
02/16/2021
15
PLAN & PROFILE PART 1
BUFORD DAM ROAD WATER
LINE IMPROVEMENTS
3
GRP
BJR
GRP
CITY OF CUMMING
SEE DETAIL
20
07
2 - B
UF
OR
D D
AM
R
OA
D W
AT
ER
L
IN
E - J
ES
SE
N
EL
SO
N - 4
/8
/2
02
1 1
1:0
6 A
M
SCALE:
1" = 20'-0" horiz.
1" = 10'-0" vert.
N
00 20' 40'
SCALE IN FEET
SCALE: 1" = 20'-0"
NOTES:
1. CONTRACTOR RESPONSIBLE FOR TRAFFIC CONTROL AND COORDINATION.
2. CONTRACTOR SHALL PLACE 2" OF ASPHALT COLD PATCH OVER PIPE TRENCH
EACH EVENING FROM STATION 10+90 TO 19+70. REPLACEMENT COLD PATCH
MAY BE REQUIRED TO CORRECT UNSAFE CONDITIONS.
W
T
T
T
S
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EE
E
EE
EE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
G
G
G
GG
GG
GG
GG
GG
GG
GG
G
G
G
G
X
X XX
1
1
7
0
1160
1150
1
1
4
0
1130
1120
~N/F~
WILLIAMS MORRIS ETAL
DB 6390 PG 227
PARCEL 198 007
~N/F~
MOHEBESFAHANI MOHAMMADREZA &
FOROUSHANI SOHAYLA MOHEBBI
DB 8668 PG 450
PARCEL 198 008
TOW
NHOM
ES OF L
ANIER P
HASE IV
~N/F~
WILLIAMS DEBORAH ETAL
DB 6390 PG 229
PARCEL 198 399
K
E
M
P
D
R
I
V
E
~
6
0
'
R
/
W
~
RID
GE
R
OA
D
~60' R
/W
~
12" CPP
18" CPP
18" CPP
15" RCP
FOUND
1/2" REBAR
FOUND
DIST. CONDUIT
FOUND
5/8" REBAR
FOUND
1" O.T.P.
FOUND
1/2" REBAR
FIBER OPTIC
MARKER
"45 MPH"
"20 MPH"
"STOP"
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
BUFORD DAM ROAD
~100' R/W~
P
P
P
P
P
P
P
P
FMXFMXFMXFMXFMXFMXFMXFMXFMXFMXFMXFMXFMXFMXFMXFMXFMXFMXFMXFMXFM
FM X FM X FM X FM X FM X FM X FM X FM X FM X FM X FM X FM X FM X FM X FM X FM X FM X FM XFM
FM FM FM FM FM
FM
FM
FM
FM
FM
FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM
FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM
W WW
WW
WW
WW
WW
WW
W W W W W W W W W W W W W W W W W W W W W W W W W W W
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S5+00 6+00 7+008+00 9+00 10+00
R/W
R/W
R/W
R/W
R/W
P
/
L
P
/L
P
/
L
P
/L
P
/
L
P
/
L
P
/L
P
/
L
FMFMFMFMFMFMFMFMFMFMFMFMFM
FM
FM
FM
F
M
F
M
CONTRACTOR TO MAINTAIN MIN. 5'-0"
SEPERATION FROM EX. GAS LINE
PROP. 12" DIP
WATER LINE CL 350
CONTRACTOR TO MAINTAIN MIN. 5'-0"
SEPERATION FROM EX. GAS LINE
GRAVEL
DRIVE
GRAVEL
DRIVE
EXISTING 8" WATER LINE
EXISTING 8" WATER LINE
EX. 6" & 2-1/2" FORCE MAINS
EX. 3" FORCE MAIN
CONTRACTOR TO MAINTAIN MIN. 10'-0"
SEPERATION FROM EX. FORCE MAIN
CONTRACTOR TO MAINTAIN MIN. 10'-0"
SEPERATION FROM EX. FORCE MAIN
5'-0" M
IN. F
ROM
EDG
E
OF P
AVEMENT
MB
MB
MB
ABANDONED FORCE MAINS
STA - 10+77
PROP. 12" GATE VALVE, MJ
4+50 5+50 6+50 7+508+50 9+50 10+50
MA
TC
H L
IN
E - (1
)
5+
00
MA
TC
H L
IN
E - (2)
10+
00
PROFILE:PROPOSED WATER MAIN - (2)
1103
1110
1120
1130
1140
1150
1160
1170
1180
1103
1110
1120
1130
1140
1150
1160
1170
1180
5+00
5+25 5+50 5+75
6+00
6+25 6+50 6+75
7+00
7+25 7+50 7+75
8+00
8+25 8+50 8+75
9+00
9+25 9+50 9+75
10+00
5+00
5+25 5+50 5+75
6+00
6+25 6+50 6+75
7+00
7+25 7+50 7+75
8+00
8+25 8+50 8+75
9+00
9+25 9+50 9+75
10+00
PROP. 12" DIP
WATER LINE CL 350
EXISTING GRADESTA. - 5+17
EXISTING 6" & 2-1/2"
FORCE MAIN
EXISTING GRAVEL
DRIVEWAY
EXISTING GRAVEL
DRIVEWAY
120'-0"
380 LF
ALL RESTRAINED
110 Samaritan Drive, Suite 201
Cumming, GA 30040
(770) 977-5747
www.cecincga.com
OF
Copyright 2021
Civil Engineering Consultants, Inc.
THESE DRAWINGS AND THEIR
REPRODUCTIONS ARE THE PROPERTY
OF THE ENGINEER AND MAY NOT BE
REPRODUCED, PUBLISHED OR USED IN
ANY WAY WITHOUT THE WRITTEN
PERMISSION OF THIS ENGINEER.
c
CLIENT
APPROVAL STAMP
PROJECT NAME
Drawn By :
Checked By :
Designed By :
Scale :
SHEET TITLE
PROJECT INCEPTION DATE
DRAWING NUMBER
RELEASES
No DescriptionDate
REVISIONS
No DescriptionDate
1
2
3
4
5
1
2
3
4
5
6
7
8
04/07/2021 PROPOSAL READY
02/16/2021
15
PLAN & PROFILE PART 2
BUFORD DAM ROAD WATER
LINE IMPROVEMENTS
4
GRP
BJR
GRP
CITY OF CUMMING
SEE DETAIL
20
07
2 - B
UF
OR
D D
AM
R
OA
D W
AT
ER
L
IN
E - J
ES
SE
N
EL
SO
N - 4
/8
/2
02
1 1
1:0
6 A
M
SCALE:
1" = 20'-0" horiz.
1" = 10'-0" vert.
N
00 20' 40'
SCALE IN FEET
SCALE: 1" = 20'-0"
NOTES:
1. CONTRACTOR RESPONSIBLE FOR TRAFFIC CONTROL AND COORDINATION.
2. CONTRACTOR SHALL PLACE 2" OF ASPHALT COLD PATCH OVER PIPE TRENCH
EACH EVENING FROM STATION 10+90 TO 19+70. REPLACEMENT COLD PATCH
MAY BE REQUIRED TO CORRECT UNSAFE CONDITIONS.
T
S
W
W
T
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
G
G
G
G
G
G
G
G
G
G
G
X
X
X
X
X
X
X
X
X
1
1
3
0
1120
1
1
1
0
1
1
0
0
1
0
9
0
~N/F~
TOWNHOMES OF LANIER PHASE IV
PB 107 PG 57
PARCEL 198 587
~N/F~
HABERSHAM ACTION
COMMITTEE INC
DB 4316 PG 47
PARCEL 198 360
BUFORD DAM ROAD
~100' R/W~
TO
WN
HO
US
E
CIR
CL
E
~P
RIV
AT
E~
48" CMP
1
8
"
C
M
P
15" RCP
FOUND
1/2" REBAR
FOUND
3/8" REBAR
~N/F~
CINDY CARTER SCURRY
1945 BUFORD DAM RD
DB 9580 PG 217
PARCEL 198 036
~N/F~
DAVID WALL
1925 BUFORD DAM RD
DB 339 PG 494
PARCEL 198 035
~N/F~
U.S. ARMY CORPS
OF ENGINEERS
"LAKE SYDNEY
LANIER"
U.S
. AR
MY
CO
RP
S O
F E
NG
INE
ER
S
FIBER OPTIC
MARKER
2
5
'
S
T
A
T
E
B
U
F
F
E
R
5
0
'
U
N
D
I
S
T
U
R
B
E
D
B
U
F
F
E
R
"ABANDONED
UTILITY POLE"
25' S
TA
TE
BU
FF
ER
50' U
ND
IS
TU
RB
ED
BU
FF
ER
E
D
G
E
O
F
W
A
T
E
R
E
D
G
E
O
F
W
A
T
E
R
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
BUFORD DAM
ROAD
~100' R/W~
N
E
IG
H
B
O
R
H
O
O
D
S
IG
N
P
P
P
P
P
PP
P
P
P
P
P
P
P
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
F
M
X
F
M
X
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FMFM
FMFM
FMFM
FM
FM
FM
FM
FM
FM
FM
FMFM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FMFM
FMFM
FMFM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
~N
/F
~
U.S
. A
RM
Y C
OR
PS
O
F
EN
GIN
EE
RS
"L
AK
E S
YD
NE
Y L
AN
IE
R"
PA
RC
EL
312 145
10+00
1
1
+
0
0
12+00
13+00
14+00
15+00
R/W
R/W
R/W
R/W
P/L
P/L
P
/L
P
/L
P
/
L
P
/L
FM
FM
FM
FM
PROP. 12" DIP
WATER LINE CL 350
CONTRACTOR TO MAINTAIN MIN. 5'-0"
SEPERATION FROM EX. GAS LINE
EXISTING 8" WATER LINE
EXISTING 8" WATER LINE
EX. 6" & 2-1/2" FORCE MAINS
CONTRACTOR TO MAINTAIN MIN. 10'-0"
SEPERATION FROM EX. FORCE MAIN
CONTRACTOR TO MAINTAIN MIN. 10'-0"
SEPERATION FROM EX. FORCE MAIN
CONTRACTOR TO MAINTAIN MIN. 10'-0"
SEPERATION FROM EX. FORCE MAIN
STA - 10+83
PROP. 12" DIP
45° BEND, MJ
STA - 11+12
PROP. 12" DIP
45° BEND, MJ
5'-0" FROM EDGE
OF PAVEMENT
ABANDONED
FORCE MAINS
STA - 10+77
PROP. 12" GATE VALVE, MJ
STA - 12+19
PROP. 12"x8" DIP
CROSS, MJ.
PROP. CONC. THRUST COLLAR
(SEE DETAIL)
9+50
10+50
11+50
12+50
13+50
14+50
15+50
MA
TC
H L
IN
E - (2)
10+
00
MA
TC
H L
IN
E - (3)
15+
02
PROFILE:PROPOSED WATER MAIN - (3)
1063
1070
1080
1090
1100
1110
1120
1130
1140
1063
1070
1080
1090
1100
1110
1120
1130
1140
10+00
10+25 10+50 10+75
11+00
11+25 11+50 11+75
12+00
12+25 12+50 12+75
13+00
13+25 13+50 13+75
14+00
14+25 14+50 14+75
15+00
10+00
10+25 10+50 10+75
11+00
11+25 11+50 11+75
12+00
12+25 12+50 12+75
13+00
13+25 13+50 13+75
14+00
14+25 14+50 14+75
15+00
ASPHALT ROAD
(BUFORD DAM ROAD)
STA - 10+83
PROP. 12" DIP
45° BEND, MJ
STA - 11+12
PROP. 12" DIP
45° BEND, MJ
PROP. 12" DIP
WATER LINE CL 350
EXISTING GRADE
EX. SEWER LINE
STA - 10+77
PROP. 12" GATE VALVE, MJ
STA - 12+19
PROP. 12"x8" DIP
CROSS, MJ.
120'-0" 120'-0"
380 LF
ALL RESTRAINED
110 Samaritan Drive, Suite 201
Cumming, GA 30040
(770) 977-5747
www.cecincga.com
OF
Copyright 2021
Civil Engineering Consultants, Inc.
THESE DRAWINGS AND THEIR
REPRODUCTIONS ARE THE PROPERTY
OF THE ENGINEER AND MAY NOT BE
REPRODUCED, PUBLISHED OR USED IN
ANY WAY WITHOUT THE WRITTEN
PERMISSION OF THIS ENGINEER.
c
CLIENT
APPROVAL STAMP
PROJECT NAME
Drawn By :
Checked By :
Designed By :
Scale :
SHEET TITLE
PROJECT INCEPTION DATE
DRAWING NUMBER
RELEASES
No DescriptionDate
REVISIONS
No DescriptionDate
1
2
3
4
5
1
2
3
4
5
6
7
8
04/07/2021 PROPOSAL READY
02/16/2021
15
PLAN & PROFILE PART 3
BUFORD DAM ROAD WATER
LINE IMPROVEMENTS
5
GRP
BJR
GRP
CITY OF CUMMING
SEE DETAIL
20
07
2 - B
UF
OR
D D
AM
R
OA
D W
AT
ER
L
IN
E - J
ES
SE
N
EL
SO
N - 4
/8
/2
02
1 1
1:0
6 A
M
SCALE:
1" = 20'-0" horiz.
1" = 10'-0" vert.
N
00 20' 40'
SCALE IN FEET
SCALE: 1" = 20'-0"
PROP. FIRE HYDRANT ASSEMBLY
(SEE DETAIL ON SHEET 8)
NOTES:
1. CONTRACTOR RESPONSIBLE FOR TRAFFIC CONTROL AND COORDINATION.
2. CONTRACTOR SHALL PLACE 2" OF ASPHALT COLD PATCH OVER PIPE TRENCH
EACH EVENING FROM STATION 10+90 TO 19+70. REPLACEMENT COLD PATCH
MAY BE REQUIRED TO CORRECT UNSAFE CONDITIONS.
3. MILL 1 1/2" OF EXISTING PAVEMENT AND PAVE 1 1/2" - 12.5mm SUPERPAVE
SURFACE COURSE. FROM EX. CURB TO ROAD CL AS SHOWN ON PLANS.
SAW CUT & CONNECT TO EXISTING WATER LINE WITH 12 x 8 CROSS,
MJ. CONTRACTOR TO FIELD VERIFY TIE-IN LOCATION & ELEVATION.
NOTIFY ENGINEER OF CONFLICTS. ALL FITTING TO BE RESTRAINED
SAW CUT & CONNECT TO EXISTING WATER LINE WITH 12 x 8 CROSS,
MJ. CONTRACTOR TO FIELD VERIFY TIE-IN LOCATION & ELEVATION.
NOTIFY ENGINEER OF CONFLICTS. ALL FITTING TO BE RESTRAINED
REPAVE AS SHOWN
(SEE NOTE 3 THIS SHEET)
T
X
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
G
G
GGGG
G
G
G
1
0
9
0
1
1
0
0
1
1
1
0
1
1
2
0
~N/F~
NORTH COVE PHASE 2-A
PB 186 PG 44
PARCEL 199 502
BU
FOR
D D
AM
RO
AD
~100' R/W
~
12" RCP
24" RCP
1
5
"
R
C
P
FOU
ND
1/2" R
EB
AR
~N/F~
MAY LE PHAN
2005 BUFORD DAM RD
DB 9434 PG 643
PARCEL 224 380
~N
/F~
U.S
. A
RM
Y C
OR
PS
OF
EN
GIN
EE
RS
"L
AK
E S
YD
NE
Y
LA
NIE
R"
~N/F~
U.S. ARMY CORPS OF ENGINEERS
"LAKE SYDNEY LANIER"
DB 185 PG 271
PARCEL 312 145
6" DIP
WA
TER
LIN
E
EX
PO
SE
D E
LBO
W
FIBE
R O
PTIC
MA
RK
ER
2
5
' S
T
A
T
E
B
U
F
F
E
R
2
5
' S
T
A
T
E
B
U
F
F
E
R
5
0
' U
N
D
IS
T
U
R
B
E
D
B
U
F
F
E
R
25' S
TA
TE
BU
FF
ER
E
D
G
E
O
F
W
A
T
E
R
E
D
G
E
O
F
W
A
T
E
R
~N/F~
JONATHAN & LEANNE BROWN
2015 BUFORD DAM RD
DB 1823 PG 188
PARCEL 224 014
WW
WW
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
BUFORD DAM ROAD
~100' R/W
~
P
P
P
P
P
P
~N/F~
U.S. ARMY CORPS OF
ENGINEERS
"LAKE SYDNEY LANIER"
FM
FM
FM
FM
FM
FM
FM
F
M
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FMFM
FM
FM
F
M
FM
FM
FM
F
M
FM
FM
FM
FMFM
FM
FM
FM
FM
F
M
FM
FM
FM
FM
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
E
D
G
E
O
F
W
A
T
E
R
ED
GE
O
F W
AT
ER
~N
/F
~
U.S
. A
RM
Y C
OR
PS
O
F
EN
GIN
EE
RS
"L
AK
E S
YD
NE
Y L
AN
IE
R"
PA
RC
EL
312 145
15+00
16+00
17+00
18+00
19+00
19+70
R/W
R/W
R/W
P/L
P
/
L
P/L
P/L
PROP. 12" DIP
WATER LINE CL 350
CONTRACTOR TO MAINTAIN MIN. 5'-0"
SEPERATION FROM EX. GAS LINE
EXISTING 12"
WATER LINE
EXISTING 8" WATER LINE
EX. 6" & 2-1/2" FORCE MAINS
CONTRACTOR TO MAINTAIN MIN. 10'-0"
SEPERATION FROM EX. FORCE MAIN
TIE IN TO EXISTING
WATER LINE w/
MJ SLEEVE RESTRAINED
STA - 18+57
PROP. 12" DIP
45° BEND, MJ
STA - 18+81
PROP. 12" DIP
45° BEND, MJ
5'-0" FROM EDGE
OF PAVEMENT
14+50
15+50
16+50
17+50
18+50
19+50
MA
TC
H L
IN
E - (3)
15+
02
PROFILE:PROPOSED WATER MAIN - (4)
1058
1060
1070
1080
1090
1100
1110
1120
1130
1140
1058
1060
1070
1080
1090
1100
1110
1120
1130
1140
15+00
15+25 15+50 15+75
16+00
16+25 16+50 16+75
17+00
17+25 17+50 17+75
18+00
18+25 18+50 18+75
19+00
19+25 19+50 19+75
19+85
15+00
15+25 15+50 15+75
16+00
16+25 16+50 16+75
17+00
17+25 17+50 17+75
18+00
18+25 18+50 18+75
19+00
19+25 19+50 19+75
19+85
STA. - 18+71
EXISTING 4"
PLASTIC GAS LINE
PROP. 12" DIP
WATER LINE CL 350
EXISTING GRADE
STA - 18+81
PROP. 12" DIP
45° BEND, MJ
STA - 18+57
PROP. 12" DIP
45° BEND, MJ
TIE IN TO EXISTING
WATER LINE w/
MJ SLEEVE RESTRAINED
40'-0"
153 L.F.
ALL RESTRAINED
EX. 12" WATER LINE
ASPHALT ROAD
(BUFORD DAM ROAD)
EXISTING ASPHALT
DRIVEWAY
110 Samaritan Drive, Suite 201
Cumming, GA 30040
(770) 977-5747
www.cecincga.com
OF
Copyright 2021
Civil Engineering Consultants, Inc.
THESE DRAWINGS AND THEIR
REPRODUCTIONS ARE THE PROPERTY
OF THE ENGINEER AND MAY NOT BE
REPRODUCED, PUBLISHED OR USED IN
ANY WAY WITHOUT THE WRITTEN
PERMISSION OF THIS ENGINEER.
c
CLIENT
APPROVAL STAMP
PROJECT NAME
Drawn By :
Checked By :
Designed By :
Scale :
SHEET TITLE
PROJECT INCEPTION DATE
DRAWING NUMBER
RELEASES
No DescriptionDate
REVISIONS
No DescriptionDate
1
2
3
4
5
1
2
3
4
5
6
7
8
04/07/2021 PROPOSAL READY
02/16/2021
15
PLAN & PROFILE PART 4
BUFORD DAM ROAD WATER
LINE IMPROVEMENTS
6
GRP
BJR
GRP
CITY OF CUMMING
SEE DETAIL
20
07
2 - B
UF
OR
D D
AM
R
OA
D W
AT
ER
L
IN
E - J
ES
SE
N
EL
SO
N - 4
/8
/2
02
1 1
1:0
6 A
M
SCALE:
1" = 20'-0" horiz.
1" = 10'-0" vert.
N
00 20' 40'
SCALE IN FEET
SCALE: 1" = 20'-0"
NOTES:
1. CONTRACTOR RESPONSIBLE FOR TRAFFIC CONTROL AND COORDINATION.
2. CONTRACTOR SHALL PLACE 2" OF ASPHALT COLD PATCH OVER PIPE TRENCH
EACH EVENING FROM STATION 10+90 TO 19+70. REPLACEMENT COLD PATCH
MAY BE REQUIRED TO CORRECT UNSAFE CONDITIONS.
3. MILL 1 1/2" OF EXISTING PAVEMENT AND PAVE 1 1/2" - 12.5mm SUPERPAVE
SURFACE COURSE. FROM EX. CURB TO ROAD CL AS SHOWN ON PLANS.
REPAVE AS SHOWN
(SEE NOTE 3 THIS SHEET)
PROP. FIRE HYDRANT ASSEMBLY
(SEE DETAIL ON SHEET 8)
110 Samaritan Drive, Suite 201
Cumming, GA 30040
(770) 977-5747
www.cecincga.com
OF
Copyright 2021
Civil Engineering Consultants, Inc.
THESE DRAWINGS AND THEIR
REPRODUCTIONS ARE THE PROPERTY
OF THE ENGINEER AND MAY NOT BE
REPRODUCED, PUBLISHED OR USED IN
ANY WAY WITHOUT THE WRITTEN
PERMISSION OF THIS ENGINEER.
c
CLIENT
APPROVAL STAMP
PROJECT NAME
Drawn By :
Checked By :
Designed By :
Scale :
SHEET TITLE
PROJECT INCEPTION DATE
DRAWING NUMBER
RELEASES
No DescriptionDate
REVISIONS
No DescriptionDate
1
2
3
4
5
1
2
3
4
5
6
7
8
04/07/2021 PROPOSAL READY
02/16/2021
15
MISCELLANEOUS DETAILS
PART 1
BUFORD DAM ROAD WATER
LINE IMPROVEMENTS
7
GRP
BJR
GRP
CITY OF CUMMING
SEE DETAIL
20
07
2 - B
UF
OR
D D
AM
R
OA
D W
AT
ER
L
IN
E - J
ES
SE
N
EL
SO
N - 4
/8
/2
02
1 1
1:4
9 A
M
10
"
6"
6"
6"
24"
5"
10 1/2'
11 3/4"
COMPACTED GRAVEL
SUB-BASE
6"
10
"
6"
6"
24"
6"18"
ROLL BACK CURB
COMPACTED GRAVEL
SUB-BASE
SLOPE - 3/4" IN 5"
1" R
1"
2" R
5 1/4"
6"
FINISHED
GROUND
8" R
6"
FINISHED
GROUND
1"
ROADWAY
ROADWAY
HIGH BACK CURB
CITY OF CUMMING
DEPARTMENT OF UTILITIES
CURB AND GUTTER DETAILS
W-4 LATEST REVISION
SCALE: NOT TO SCALE
DETAIL NUMBER:
04/21/2020
8 1/2" RAD
LATEST REVISION
SCALE: NOT TO SCALE
04/21/2020
CITY OF CUMMING
DEPARTMENT OF UTILITIES
ALLOWABLE TRENCH WIDTH
CHART
W-3B LATEST REVISION
SCALE: NOT TO SCALE
DETAIL NUMBER:
09/11/2020
CITY OF CUMMING
DEPARTMENT OF UTILITIES
BEDDING DETAILS
WATER MAINS
DETAIL NUMBER:
09/11/2020
NOTES:
1. TRENCH WIDTH MINIMUMS PER DETAIL W-3B.
2. BACKFILL SHALL BE PLACED IN MAXIMUM 4-6 INCH LIFTS, TAMPED OR COMPACTED IN ACCORDANCE WITH AWWA C600
(CURRENT EDITION).
3. NATIVE OR LOOSE SOILS ARE THOSE EXCAVATED FROM THE TRENCH, FREE OF LARGE ROCKS (GREATER THAN 2-INCHES),
FOREIGN MATERIALS, AND FROZEN EARTH.
4. GRANULAR OR SELECT FILL MATERIAL SHALL BE COMPACTED TO 90% STANDARD PROCTOR
PER AASHTO T-99.
5. TYPE "V" BEDDING REQUIRED FOR ALL WATER MAIN INSTILLATION.
6. WHERE TRENCH IS EXPOSED ROCK, 6-9 INCHES MIN. CUSHION REQUIRED BETWEEN PIPE & ROCK.
7. TYPE I AND TYPE II LAYING CONDITIONS SHALL NOT BE ALLOWED FOR WATER MAINS.
C
LATEST REVISION
W-3ASCALE: NOT TO SCALE
TYPE V BEDDING
APPROVED
GRANULAR FILL
OR # 57 STONE
1
8
O.D.
OR 6" MIN IN
ROCK TRENCH
OR 4" MIN FOR
EARTH TRENCH,
WHICHEVER IS
GREATER
O
.
D
.
L
BA
CK
FIL
L
TO
G
RA
DE
(N
OT
E 2)
EARTH OR ROCK TRENCH
(NOTE 6)
12" COVER
DIP
MJ BEND
2" X 1/4" COATED STEEL STRAP (2 REQUIRED)
DIP
6" MIN
6" MIN
9"
2" X 1/4" COATED STEEL STRAP
A
4" 4"
STRAP DETAIL
A
C
D
B
R
CONCRETE THRUST
BLOCK SEE W-16B
FOR DIMENSIONS
A,B,C,D.
CITY OF CUMMING
DEPARTMENT OF UTILITIES
THRUST RESTRAINT
UPWARD THRUST
W-14A LATEST REVISION
SCALE: NOT TO SCALE
DETAIL NUMBER:
04/21/2020
C/L
C
A
B
D
MINIMUM DIMENSIONS FOR CONCRETE BLOCKING
NOTES:
1. SEE STRAP DETAIL IN W-16A FOR REQUIRED STRAPS.
2. COVER GLANDS & BOLTS W/ 6 MIL POLYETHYLENE BEFORE PLACING
CONCRETE.
3. ALLOW CONCRETE TO SET FOR A MINIMUM OF 6 HOURS BEFORE PLACING
BACKFILL.
4. CONCRETE SHALL BE 3000 PSI CLASS A.
5. ALL DUCTILE IRON FITTINGS SHALL BE BLOCKED AND SUPPORT AS SHOWN
6. UNDER ADVERSE CONSTRUCTION CONDITIONS,
CONCRETE SHALL BE "HIGH EARLY" TYPE.
7. COAT STEEL STRAP W. BITUMINOUS ASPHALT COATING.
CITY OF CUMMING
DEPARTMENT OF UTILITIES
THRUST RESTRAINT SIZE CHART
UPWARD THRUST
W-14B LATEST REVISION
SCALE: NOT TO SCALE
DETAIL NUMBER:
04/21/2020
DESIGN DATA
1. DIMENSION OF THRUST BLOCK IN FEET BASED ON 2000 POUNDS PER SQUARE FOOT SOIL BEARING PRESSURE. ACTUAL
INSIDE DIAMETER OF DIP, CLASS 50, 250 PSI TEST PRESSURE.
2. CONCRETE SHALL BE CLASS A, 3000 PSI.
3. UNDER ADVERSE CONSTRUCTION CONDITIONS, CONCRETE SHALL BE "HIGH EARLY" TYPE.
SECTION "A"
NOTES:
1. SOIL CONDITIONS SHALL BE VERIFIED BY THE ENGINEER
BEFORE THRUST BLOCK DESIGN IS IMPLEMENTED.
2. COVER GLANDS & BOLTS W/ POLYETHYLENE BEFORE
PLACING CONCRETE.
3. ALLOW CONCRETE TO SET UP A MIN. OF 6 HOURS BEFORE
PLACING BACKFILL.
MINIMUM DIMENSIONS FOR CONCRETE BLOCKING
B
D
1/2 D
C
A
A
A
CONCRETE THRUST BLOCK
BEND, TEE, OR PLUG
WRAP FITTING W/ 6MILPOLYETHYLENE BEFORE
POURING CONCRETE THRUST BLOCK
UNDISTURBED SOIL
UNDISTURBED
SOIL
BEND, TEE, OR PLUG
CONCRETE THRUST BLOCK
A
CITY OF CUMMING
DEPARTMENT OF UTILITIES
THRUST RESTRAINT:
HORIZONTAL THRUST
W-13 LATEST REVISION
SCALE: NOT TO SCALE
DETAIL NUMBER:
04/21/2020
NOTES:
1. IF "G" IS GREATER THAN 1 / 2", AT ITS NARROWEST POINT, THEN A FULL-CIRCLE SPACER OR "DUTCHMAN" MUST BE
CUT AND PLACED IN THE GAP BEFORE THE SLEEVE IS USED TO CLOSE THE JOINT.
2. THE "DUTCHMAN" SPACER SHALL BE CUT TO A WIDTH NO LESS THAN 1 / 4" LESS THAN THE NARROWEST WIDTH OF
"G".
3. EACH PIPE SPIGOT SHALL BE MARKED TO INDICATE THE POINT WHERE THE SLEEVE WILL BE PROPERLY CENTERED
OVER THE POINT.
4. "FULL-CIRCLE" REPAIR CLAMPS ARE NOT APPROVED FOR JOINING PIPE.
DIP SOLID SLEEVE OR DRESSER
TYPE
"G"
"DUTCHMAN" SPACER
SPACES ARE FOR ILLUSTRATION PURPOSES ONLY.
CITY OF CUMMING
DEPARTMENT OF UTILITIES
PIPE JOINING: USE OF SOLID SLEEVE
W-11 LATEST REVISION
SCALE: NOT TO SCALE
DETAIL NUMBER:
04/21/2020
DESIGN DATA
1. DIMENSION OF THRUST BLOCK IN FEET BASED ON 2000 POUNDS PER SQUARE FOOT SOLI BEARING PRESSURE AND 250 PSI
TEST PRESSURE. ACTUAL INSIDE DIAMETER OF DIP, CLASS 50, USED AS STANDARDS.
2. CONCRETE SHALL BE CLASS A, 3000 PSI. UNDER ADVERSE CONSTRUCTION CONDITIONS, CONCRETE SHALL BE "HIGH
EARLY" TYPE.
MINIMUM DIMENSIONS FOR CONCRETE BLOCKING
A
1/2 O.D
A
B
A
C
1/2 D
D
SECTION "A"
CONCRETE
THRUST BLOCK
BEND, TEE, OR PLUG
WRAP FITTING W/ 6MILPOLYETHYLENE BEFORE
POURING CONCRETE THRUST BLOCK
UNDISTURBED
SOIL
NOTES:
1. SOIL CONDITIONS SHALL BE VERIFIED BY THE ENGINEER
BEFORE THRUST BLOCK DESIGN IS IMPLEMENTED.
2. COVER GLANDS & BOLTS W/ POLYETHYLENE BEFORE
PLACING CONCRETE.
3. ALLOW CONCRETE TO SET UP A MIN. OF 6 HOURS BEFORE
PLACING BACKFILL.
CONCRETE
THRUST BLOCK
BEND, TEE, OR PLUG
A
CITY OF CUMMING
DEPARTMENT OF UTILITIES
THRUST RESTRAINT:
DOWNWARD THRUST
W-15 LATEST REVISION
SCALE: NOT TO SCALE
DETAIL NUMBER:
04/21/2020
110 Samaritan Drive, Suite 201
Cumming, GA 30040
(770) 977-5747
www.cecincga.com
OF
Copyright 2021
Civil Engineering Consultants, Inc.
THESE DRAWINGS AND THEIR
REPRODUCTIONS ARE THE PROPERTY
OF THE ENGINEER AND MAY NOT BE
REPRODUCED, PUBLISHED OR USED IN
ANY WAY WITHOUT THE WRITTEN
PERMISSION OF THIS ENGINEER.
c
CLIENT
APPROVAL STAMP
PROJECT NAME
Drawn By :
Checked By :
Designed By :
Scale :
SHEET TITLE
PROJECT INCEPTION DATE
DRAWING NUMBER
RELEASES
No DescriptionDate
REVISIONS
No DescriptionDate
1
2
3
4
5
1
2
3
4
5
6
7
8
04/07/2021 PROPOSAL READY
02/16/2021
15
MISCELLANEOUS DETAILS
PART 2
BUFORD DAM ROAD WATER
LINE IMPROVEMENTS
8
GRP
BJR
GRP
CITY OF CUMMING
SEE DETAIL
20
07
2 - B
UF
OR
D D
AM
R
OA
D W
AT
ER
L
IN
E - J
ES
SE
N
EL
SO
N - 4
/8
/2
02
1 1
1:4
9 A
M
NOTES:
1. PIPE SHALL BE DUCTILE IRON.
2. SOIL CONDITIONS SHALL BE VERIFIED BY THE ENGINEER PRIOR TO THRUST RESTRAINT DESIGN.
3. WATER MAINS 4"-8" DIAMETER SHALL USE #5'S AT 9" ON CENTER E.W.E.F. WITH 3" CLEAR COVER.
10"-16" DIAMETER SHALL BE ON #6'S AT 9".
4. WATER MAINS LARGER THAN 16" I.D. SHALL BE SIZED AND DESIGNED BY THE ENGINEER.
DESIGN DATA:
1. DIMENSION OF THRUST RESTRAINT IN FEET BASED ON 2000 POUNDS PER SQUARE FOOT SOIL
BEARING PRESSURE AND 250 PER SQUARE INCH TEST PRESSURE. ACTUAL INSIDE DIAMETER OF
DUCTILE IRON PIPE, CLASS 50, USED AS STANDARD.
2. CONCRETE SHALL BE CLASS A, 3000 PSI.
3. CONCRETE SHALL BE "HIGH EARLY" TYPE FOR ADVERSE APPLICATIONS.
4. ALLOW CONCRETE TO SETUP A MINIMUM OF 6 HOURS BEFORE PLACING BACKFILL.
DIP
(TO BE USED WITH EMBEDDED DUCTILE IRON RETAINER GLAND)
THRUST COLLAR
(INSPECTOR MUST WITNESS
INSTALLATION)
CENTER
IN COLLAR
CITY OF CUMMING
DEPARTMENT OF UTILITIES
THRUST RESTRAINT
CONCRETE COLLAR
W-16 LATEST REVISION
SCALE: NOT TO SCALE
DETAIL NUMBER:
04/21/2020
NOTE 3
A
B
C
D
E
3" CLR
MINIMUM DIMENSIONS
NOTES:
1. ALL CROSSINGS SHALL BE FREE-BORE UNLESS
SPECIFIED BY CONTRACT DRAWINGS OR
APPROVED BY THE CITY.
2. SUBGRADE COMPACTION AND MATERIALS
SHALL MEET CITY SPECIFICATIONS AND
TRENCHING STANDARD DETAILS.
3. SAW CUTS SHALL BE VERTICAL AND
EXPANSION MATERIAL INSTALLED AS
REQUIRED.
4. FOR CONCRETE DRIVEWAYS REMOVE &
REPLACE BACK TO THE NEAREST
CONSTRUCTION JOINT(S).
5. FINISHED GRADE TO BE FLUSH WITH EDGE OF
DRIVE.
6. FINISHED SURFACE OF REPAIRED AREA TO
MATCH EXISTING SURFACE.
CITY OF CUMMING
DEPARTMENT OF UTILITIES
DRIVEWAY CUT REPAIRS
W-27 LATEST REVISION
SCALE: NOT TO SCALE
DETAIL NUMBER:
04/21/2020
CONCRETE
GRAVEL
ASPHALT
DRIVEWAY WIDTH REPAIR
MATCH EXISTING
MATERIALS
3,000 PSI
CONCRETE
MATCH
EXISTING
(4'' MIN)
DRIVEWAY WIDTH REPAIR
MATCH EXISTING
MATERIALS
DRIVEWAY WIDTH REPAIR
MATCH EXISTING
MATERIALS
SECTION A - A
GRAVEL OR
GRADED
AGGREGATE BASE
COMPACT TO 98%
STD. PROCTER
PLAN VIEW
SUBGRADE (NOTE 2)
SUBGRADE
(NOTE 2)
SUBGRADE
(NOTE 2)
MATCH
EXISTING
(6'' MIN)
RO
AD
WA
Y / S
TR
EE
T
DR
IV
EW
AY
A
CULVERT/
STORM DRAIN
TRENCH
A
CONSTRUCTION
JOINT (NOTE 3,4)
RIG
HT
O
F
WA
Y
ED
GE
O
F
P
VM
T
TOP OF
PAVEMENT
MATCH EXISTING
(2-1/2" MIN)
6" MIN GRADED
AGGREGATE BASE
PIPE O.D.
8"
TRENCH WIDTH
8"
PIPE O.D.
8"
REPLACE ORIGINAL
EXCAVATED MATERIAL AS FILL
AND CONSOLIDATE
CLASS "B"
CONCRETE
ENCASEMENT
REQUIRED
NOTE:
WHERE CONCRETE ENCASEMENT IS
REQUIRED, ANY OVER EXCAVATION
OF TRENCH SHALL BE FILLED
W/CLASS "B" CONCRETE
8"
CITY OF CUMMING
DEPARTMENT OF UTILITIES
CONCRETE ENCASEMENT
DETAIL
W-32 LATEST REVISION
SCALE: NOT TO SCALE
DETAIL NUMBER:
04/21/2020
TRENCH WIDTH SHALL BE IN ACCORDANCE WITH THE SEE
ALLOWABLE TRENCH WIDTH CHART STANDARD DETAIL.
FINISH GRADE
PVC CAP
LOCATOR BALL
6" MIN.
2'-0" MAX.
3'-0" MAX.
6" PVC SCHEDULE
40
INSTALL TRUE
AND PLUMB
TEMPORARY GRADE
MARKER POST AND CAP TO
BE PROTECTED UNTIL
FINAL GRADE
ESTABLISHED
SAND OR No.57
STONE BACKFILL TO
TOP OF PIPE
PVC CAP
MARKER BALL TABLE
MARKER BALL #
165-9312
245-3944
DESCRIPTION
36 IN X 45 DEG BEND
END 48" CASING
NORTHING
1526675.18
1522406.26
EASTING
2300936.89
2302786.52
ELEVATION: TOP OF PIPE OR FITTING
1196.60
1224.20
CITY OF CUMMING
DEPARTMENT OF UTILITIES
TYPE V BEDDING & ASPHALT
REPAIR /REPLACEMENT
SCALE: NOT TO SCALE
DETAIL NUMBER:
NON-STANDARD
DETAIL
NOTES:
1. ALL PAVEMENT TO BE SAW CUT
2. D = NOMINAL PIPE DIAMETER
3. SURFACES TO BE CLEANED AND BITUMINOUS TACK COAT PRIME APPLIED
BEFORE PLACEMENT OF ASPHALTIC TOP.
4. SHEETING, SHOREUP, AND BRACE TRENCH WHEN LOOSE SOIL
& SAFETY REQUIRES.
"42"
"12"
8" MIN. UNDER BELL
12"
4'-0" M
IN
. (S
EE
P
RO
FIL
E)
12"12"
BEDDING OF
COMPACTED #57
STONE OR OTHER
APPROVED
GRANULAR
MATERIAL.
SELECT MATERIAL
COMPACTED TO
100% STD. PROCTOR.
1-1/2" MIN. TYPE "E" OR "F"
ASPHALT SURFACE COURSE
OR MATCH EXISTING DEPTH
℄
6" GRADED
AGGREGATE
COMPACT TO
SPECIFICATIONS
EDGE OF
CONC.
CURB &
GUTTER
REFER TO PLAN
℄
EX. ASPHALT
PAVEMENT REPAIR TYPE "A"
TACK COAT
PRIME COAT
2-1/2" MIN. TYPE "B" ASPHALT
BASE COURSE OR MATCH
EXISTING DEPTH
CITY OF CUMMING
DEPARTMENT OF UTILITIES
MARKER BALLS
W-38 LATEST REVISION
SCALE: NOT TO SCALE
DETAIL NUMBER:
04/21/2020
NOTES:
1. MARKER BALLS SHALL BE 3M DYNATEL SERIES EMS ID BALL MARKERS, MODEL NUMBER 1424-XR/ID FOR SEWER,
WITH LOCATOR 3M DYNATEL 2250M-ID-UU-3W-RT.
2. IN ASPHALT PAVING, CUT OFF MARKER POST TO BRING TOP OF CAP FLUSH WITH TEMPORARY PAVING.
3. MARKER BALLS SHALL BE INSTALLED ALONG ℄OF PIPE AT A MAXIMUM 200 FT INTERVALS, AT ALL TEES, BENDS
AND CASING ENDS.
DURING CONSTRUCTION FINISHED CONSTRUCTION
No. 57 STONE
BACKFILL
PIPE SIZE AND TYPE VARIES
C/L
MA
RK
ER
P
OS
T
PIPE SIZE AND TYPE VARIES
INSIDE MARKER POST SHALL BE KEPT FREE
OF DIRT,GRAVEL AND DEBRIS UNTIL
MARKER BALL IS GPS LOCATED AND
MEASURED
C/L
MA
RK
ER
P
OS
T
CITY OF CUMMING
DEPARTMENT OF UTILITIES
VALVE MARKER DETAIL
W-39 LATEST REVISION
SCALE: NOT TO SCALE
DETAIL NUMBER:
04/21/2020
1/8" X 2" LONG
DOWEL (2)
3/32"
DETAIL OF
ALUMINUM PLATE
2"
1 1/4"
4'-0
"
1'-6
"
MARKED ON
TWO SIDES
2 - #3
BARS
4"
4"
NOTES:
1. ALUMINUM PLATE CAST IN SIDE OF MARKER POST.
2. DISTANCE (NEAREST FOOT) FROM CENTER LINE OF POST TO CENTER LINE OF
VALVE BOX AND DIRECTION ARROW TO BE STAMPED INTO PLATE WITH STEEL DIE
AFTER MARKER IS SET.
1'-0"
MIN
.
RIG
HT
O
F W
AY
1
1
2
"
17" M
IN
.
MIN. 4'-0" COVER
MAX. 5'-0" COVER
5'-0"
BACK OF CURB
#57
STONE
(TYP)
BURY
DEPTH
NO CONTACT ONVALVE BONNET
BRICK
GATE VALVE MJ
WEEP HOLE
CONC.
THRUST
BLOCK
HYDRANT TEE
CONCRETE
THRUST BLOCK
(SEE DETAIL W-13)
CITY OF CUMMING
DEPARTMENT OF UTILITIES
FIRE HYDRANT INSTALLATION
W-19 LATEST REVISION
SCALE: NOT TO SCALE
DETAIL NUMBER:
08/30/2017
CAST IRONSLIP-TYPE
ADJUSTABLEVALVE BOX
MJ W/
RETAINER GLANDS
12" MIN.
D.I.P. ANCHORING
PIPE COUPLING
18"
16"
NOTES:
1. WORK WITHIN GEORGIA D.O.T. OR COUNTY RIGHT OF WAYS REQUIRE A PERMIT FROM THE APPROPRIATE AGENCY AND
MORE STRINGENT STANDARDS MAY APPLY.
2. WATER MAINS SHALL HAVE MIN. 4-FT COVER (FIN. GRADE TO TOP OF PIPE).
3. SET HYDRANT PLUMB WITH MIN. 1.5 IN. FROM FIN. GRADE TO BOTTOM FLANGE.
4. FOR REGULAR TEE FITTING, MIN. NIPPLE LENGTH SHALL BE 12-INCHES.
5. COMPACTED #57 STONE UNDER HYDRANT. STONE SHALL BE PLACED 6-INCHES ABOVE WEEP HOLES, 18-INCHES BELOW
WEEP HOLES AND 18-INCHES TOWARDS THE MAIN. ALSO 16-INCHES LATERALLY ON EACH SIDE.
6. THRUST BLOCKING SHALL NOT COVER WEEP HOLES
PLAN VIEW
FINISHED
GRADE
CONC. VALVE PAD2'-0" SQ.
ANCHOR
COUPLING
VALVE w/
MEGALUGS
STAINLESS
STEEL RODS
MEGALUGS
C/L
W A T E R
CAST IRON COVER WITH
"WATER" CAST ON TOP
ADJUSTABLE - TYPE
CAST IRON
VALVE BOX
PROVIDE CONCRETE
COLLAR IN UNPAVED AREA
GATE VALVES FOR
LINES 10" AND
SMALLER
BASE OF VALVE
BOX SHALL NOT
REST ON VALVE
BLOCK
SUPPORTS
4"
NOTES:
1. ALL GATE VALVES SHALL HAVE A VALVE BOX.
2. VALVE STEM REQUIRED ON INSTALLATIONS OVER 4' OF DEPTH, BROUGHT TO WITHIN 2' OF FINISHED GRADE.
3. VALVE EXTENSION TO HAVE SET SCREWS.
CITY OF CUMMING
DEPARTMENT OF UTILITIES
GATE VALVE INSTALLATION DETAIL
20" AND SMALLER
W-6 LATEST REVISION
SCALE: NOT TO SCALE
DETAIL NUMBER:
09/11/2020
2'-0" SQUARE
VALVE
VALVE OPERATING NUT
STANDARD OPERATING
WRENCH COUPLING
SQUARE SOLID STEEL
STEM (LENGTH VARIES)
STANDARD VALVE
OPERATING NUT
CENTERING STEEL PLATE
VALVE STEM EXTENSION DETAIL
COMPACTED
#57 STONE
SET SCREWS
110 Samaritan Drive, Suite 201
Cumming, GA 30040
(770) 977-5747
www.cecincga.com
OF
Copyright 2021
Civil Engineering Consultants, Inc.
THESE DRAWINGS AND THEIR
REPRODUCTIONS ARE THE PROPERTY
OF THE ENGINEER AND MAY NOT BE
REPRODUCED, PUBLISHED OR USED IN
ANY WAY WITHOUT THE WRITTEN
PERMISSION OF THIS ENGINEER.
c
CLIENT
APPROVAL STAMP
PROJECT NAME
Drawn By :
Checked By :
Designed By :
Scale :
SHEET TITLE
PROJECT INCEPTION DATE
DRAWING NUMBER
RELEASES
No DescriptionDate
REVISIONS
No DescriptionDate
1
2
3
4
5
1
2
3
4
5
6
7
8
04/07/2021 PROPOSAL READY
02/16/2021
15
MISCELLANEOUS DETAILS
PART 3
BUFORD DAM ROAD WATER
LINE IMPROVEMENTS
9
GRP
BJR
GRP
CITY OF CUMMING
SEE DETAIL
20
07
2 - B
UF
OR
D D
AM
R
OA
D W
AT
ER
L
IN
E - J
ES
SE
N
EL
SO
N - 4
/8
/2
02
1 1
1:4
9 A
M
THOROUGHLY COMPACTED BACKFILL
TO SPECIFICATION REQUIREMENTS
COPPER (TYPE K)
EXIST. WATER LINE: 4'' TO 16''
DOUBLE
STRAP
TAPPING
SADDLE
CORPORATION STOP
A.Y. McDONALD BRASS
OUTLET PIPE SIZE: 3/4'' TO 2''
DOUBLE STRAP
BRASS SADDLE
COPPER (TYPE K)
DOUBLE STRAP BRASS SADDLE
CORPORATION STOP
CITY OF CUMMING
DEPARTMENT OF UTILITIES
TAPPING SADDLE AND
CORPORATION STOP
W-8B LATEST REVISION
SCALE: NOT TO SCALE
DETAIL NUMBER:
09/11/2020
EXIST. WATER LINE: 4'' TO 16''
( 1 FULL JOINT )
NOTES:
1. IF PIPE ON BOTH SIDES OF VALVE IS NOT DIP, THEN VALVE
MUST BE SUPPORTED AND STRAPPED DOWN TO A CONCRETE
PAD.
2. STUB OUT MUST BE HYDROSTATICALLY TESTED WITH REST
OF WATER MAIN.
3. IN LIEU OF SLIP-JOINT AND COMPRESSION PLUG, AN M.J.
JOINT MAY BE USED WITH A M.J. PLUG
4. STUB OUT PLUG SHALL BE TAPPED W/ 3/4" COPPER
CORPORATION STOP & ROUTED TO METER BOX & CURB STOP
CAST IRON
SLIP-TYPE
ADJUSTABLE VALVE
BOX
SEE BLOW OFF VALVE DETAIL 4-INCH AND LARGER
DETAIL
PROPERTY
LINE OR
AS DIRECTED
DUCTILE IRON RETAINER
GLAND
DETAIL W-16
3' MINIMUM
COVER FOR 10"
& SMALLER.
4' MINIMUM
FOR 12" &
LARGER
GATE VALVE
NO CONTACT WITH
TOP OF VALVE
DIP-SEE
NOTE 1
CONCRETE COLLAR THRUST
RESTRAINT SEE DETAIL W-16
FOR EXACT DIMENSIONS
FOR VARIOUS PIPE
DIAMETERS
STUB OUT
MJ PLUG
(NOTE 4)
3FT MIN.
12" MIN.
+/- 10FT
CITY OF CUMMING
DEPARTMENT OF UTILITIES
STUB OUT DETAIL
W-9 LATEST REVISION
SCALE: NOT TO SCALE
DETAIL NUMBER:
09/11/2020
CITY OF CUMMING
DEPARTMENT OF UTILITIES
AIR VALVE INSTALLATION
(WATER MAIN SIZE 20" AND
SMALLER)
W-21 LATEST REVISION
SCALE: NOT TO SCALE
DETAIL NUMBER:
09/11/2020
4' DIA PRECAST MH
(TOP SLAB NOT SHOWN)
CRISPIN COMBINATION AIR VALVE
OR VENT-TECHWATER MAIN SIZE
VARIES
12"
MIN
. 24"
FINISHED GRADE
HIG
H P
OIN
T
PLAN
SECTION A-A SECTION B-B
2"
A
A
B
B
NOTES:
1. ALL NIPPLES TO BE "ALL
THREADED" MINIMUM LENGTH.
2. ALL PIPE TO BE RED BRASS.
3. ALL FITTINGS TO BE BRASS.
AIR VALVE SIZING
MAIN
SIZE
AIR VALVE
SIZE
6" - 10" 1"
12" - 20" 2"
VALVE MAY NOT BE LOCATED UNDER PAVEMENT WITH
MANHOLE IN THE FLOW OF TRAFFIC. IF MANHOLE MUST BE IN
PAVEMENT, IT IS TO BE VENTED TO OUT OF THE PAVEMENT AND
FLOW OF TRAFFIC.
FLAT TOP W/ MANHOLE FRAME AND
VENTED COVER (BOLTED DOWN).
(SEE W-40)
CRISPIN OR VENT-TECH
COMBINATION AIR VALVE
BRASS UNION
CORP. COCK
"FORD" BALL VALVE
WITH HANDLE
MANHOLE STEPS
@16" C.C.
WATER MAIN
SIZE VARIES
FILL WITH
FLEXIBLE
SEALANT
#57 STONE
4' DIA.
PRECAST
MH RISER
12"
#57 STONE
PAVED LOCATIONS
12" A
BO
VE
DOUBLE STRAP
BRASS TAPPING
SADDLE
CITY OF CUMMING
DEPARTMENT OF UTILITIES
WATER LINE CONSTRUCTION
OR SINGLE SERVICE DETAIL
W-2B LATEST REVISION
SCALE: NOT TO SCALE
DETAIL NUMBER:
07/14/2017
3/4-INCH COPPERTUBING TYPE "K"
1-INCH X 34-INCHREDUCER
1-INCH TYPE "K" HARD COPPERTUBING SERVICE LINE
SAW-CUT"W" IN
CURBPAINTED
BLUE
CORPORATION STOP
1-INCH DOUBLE STRAPBRASS SADDLE
WATER MAIN
18" MAX
DEPTH TO
BALL VALVE
NOTE: TAP MAY BE POSITIONED UP TO 20 DEGREES FROM
HORIZONTAL IF APPROVED BY CITY WATER INSPECTOR
WATER METERBOX W-37
ENCASED IN 2" PVCCONDUIT (LONG SIDESERVICE ONLY).
LONG SIDE SERVICE
SHORT SIDE SERVICE
3-FT MINIMUM (NOTE 3)
R/W
PAVEMENT
1" DOUBLE STRAP SADDLE
WITH CORP. STOP
1-INCH COPPER
TUBING TYPE "K"
5'-0" OFFSET FROM BACK
RIGHT-OF-WAY
VARIES
WATER MAIN
PAVING
1" COPPER SERVICE
LINE W/ 2" CASING PER
DOT STANDARDS
(NOTE 1&2)
1" DOUBLE STRAP
SADDLE WITH
CORP. STOP
C/LR/W
CITY OF CUMMING
DEPARTMENT OF UTILITIES
1-INCH METER LOCATION
GA DOT & COUNTY ROADS
W-23C
NOTES:
1. IN THE EVENT CASING IS NOT PRESENT ON LONG SIDE LOT, BORING SHALL BE PERMITTED.
2. NO PAVEMENT CUTS WILL BE PERMITTED WITHOUT APPROVAL OF THE CITY WATER INSPECTOR AND THE
(CITY, COUNTY, OR STATE) ROAD ENGINEER.
3. 3-4 FT MIN. COVER FOR SUBDIVISION ROADS. STATE AND COUNTY ROADS, MIN. 4 FT COVER.
4. ALL CUTS IN PAVEMENT SHALL BE REPAIRED IN ACCORDANCE WITH GA D.O.T. OR FORSYTH CO.
STANDARDS. SEE PAVEMENT CUT REPAIR STANDARD DETAIL.
5. METERS SHALL NOT BE OFFSET LATERALLY FROM TAP ON WATER MAIN,SET DIRECTLY OPPOSITE TAP
LOCATION.
6. FOR SERVICE LINE RELOCATIONS TO NEW MAINS COPPER TUBING TYPE "K" SHALL BE REQUIRED.
LATEST REVISION
SCALE: NOT TO SCALE
DETAIL NUMBER:
TBD
WATER MAIN
5'-0" OFFSET FROM BACK
RIGHT-OF-WAY
METER VALVE
BACK FLOW
BACK FLOW
METER VALVE WATER METER
WATER METER
GRAVEL
C
I
T
Y
O
F
C
U
M
M
I
N
G
4 1/2 X 7 1/2 C.I. METER LID
OPENS UNDER 90°
1/2" X 4" PULL SLOT
WITH 3/16" CENTER PIN
TAMPER RESISTANT
S.S. PENTA HEAD BOLT
(2 REQD.)
THRU HOLE DEEP
COUNTERBORE
1 3/4" DIA THRU HOLE
WITH 4 5/8" DIA X 7/16"
DEEP COUNTERBORE
SKID RESISTANT
SURFACE MS-86
(2) 4" X 4" MOUSEHOLE
CENTERED AT EACH END
3/8-7 SELF ALIGNING
REPLACEABLE S.S.
EZ-NUT
2 PLACES
NOTES:
1. ASSEMBLY RATED FOR STATIC DESIGN LOAD OF 5,000 LBS. OVER A 10 X 10 AREA
PASSING A MIN. STATIC TEST LOAD OF 7,500 LBS.
2. ACCEPTABLE MANUFACTURERS: HUBBELL OR OLD CASTLE
(EQUIVALENT BY DESIGN SUBMITTAL AND PRIOR APPROVAL ONLY).
CITY OF CUMMING
DEPARTMENT OF UTILITIES
WATER SERVICE METER BOX
W-37 LATEST REVISION
SCALE: NOT TO SCALE
DETAIL NUMBER:
09/11/2020
18"
25"
15 1/2"
"CITY OF CUMMING"
LETTERING
S.S. FLAT
WASHER (2 REQD.)
HUBBLE MODEL SHOWN
FOR CLARITY
(ITEM No. PG1324BB18)
METER BOX COVER
(HUBBLE MODEL No. PG1324C538)
110 Samaritan Drive, Suite 201
Cumming, GA 30040
(770) 977-5747
www.cecincga.com
OF
Copyright 2021
Civil Engineering Consultants, Inc.
THESE DRAWINGS AND THEIR
REPRODUCTIONS ARE THE PROPERTY
OF THE ENGINEER AND MAY NOT BE
REPRODUCED, PUBLISHED OR USED IN
ANY WAY WITHOUT THE WRITTEN
PERMISSION OF THIS ENGINEER.
c
CLIENT
APPROVAL STAMP
PROJECT NAME
Drawn By :
Checked By :
Designed By :
Scale :
SHEET TITLE
PROJECT INCEPTION DATE
DRAWING NUMBER
RELEASES
No DescriptionDate
REVISIONS
No DescriptionDate
1
2
3
4
5
1
2
3
4
5
6
7
8
04/07/2021 PROPOSAL READY
02/16/2021
15
MISCELLANEOUS DETAILS
PART 4
BUFORD DAM ROAD WATER
LINE IMPROVEMENTS
10
GRP
BJR
GRP
CITY OF CUMMING
SEE DETAIL
20
07
2 - B
UF
OR
D D
AM
R
OA
D W
AT
ER
L
IN
E - J
ES
SE
N
EL
SO
N - 4
/8
/2
02
1 1
1:4
9 A
M
S
W
W
S
T
W
W
W
W
W
W
W
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EE E E E E E
GG
G GG
GG
GG
GG
G
G
G
G
G
G
G
G
G
G
G
G
G
G
SS
SS
SSSS
SS
XX
1
2
1
0
1
2
0
0
1
1
9
0
1
1
8
0
1
1
7
0
~N/F~
WILLIAMS DEBORAH J ETAL
DB 5388 PG 197
PARCEL 198 363
~N/F~
LONG SUBDIVISION
PHASE 1
PB 134 PG 193
PARCEL 198 447
~N/F~
WILLIAMS DEBORAH ETAL
DB 6390 PG 229
PARCEL 198 399
BUFORD DAM ROAD
~100' R/W~
1
8
"
C
M
P
1
8
"
R
C
P
FOUND
1/2" REBAR
FOUND
DIST. CONDUIT
TBM
CITY STATE BOLT
ON HYDRANT
ELEV = 1185.14
TV
TV
TV
TV
TV
TV
TV
TV
TV
TVTV
TVTV
TVTV
TVTV
T
HOMESIDE DRIVE
~50' R/W~
SS
SS
SS
SS
SS
SS
SS
SS
8" P
VC
8" P
VC
18" R
CP
8" P
VC
10" PVC
SSMH TOP = 1204.87
INV. IN = 1194.39
INV. OUT = 1194.20
SSMH TOP = 1181.07
INV. IN = 1176.37
INV. PLUGGED CORE = 1176.17 (NWLY)
INV. OUT = 1176.07
YI TOP = 1201.47
INV. OUT = 1196.07
JB TOP = 1203.95
INV. IN = 1190.85 (18" CMP ELY)
INV. IN = 1190.85 (18" CMP NWLY)
INV. IN = 1194.40 (18" RCP WLY)
INV. OUT = 1190.80 (18" RCP SLY)
1
8
"
C
M
P
1
8
"
R
C
P
CB TOP = 1204.73
INV. IN = 1191.70
INV. OUT = 1191.53
CB TOP = 1204.18
INV. OUT = 1195.32
P
P
P
P
F
H
F
H
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FMX
FMX
FMX
FMX
FMX
FMX
FMX
FMX
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
W
W W W W W WW
WW
WW
WW
WW
WW
WW
WW
W
W
W
W
W
W
W
W
W
W
W
W
W
WW
WW
W
W
W
W
W
W
0+00
1+00
2+00
3+00
4+00
5+00
R/W
R/W
R/W
R/W
P
/L
P
/L
P
/L
P
/L
P
/L
P
/L
GRAVEL
DRIVEX
X
X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XX
X
XX
X
X
Sd1-C
PROP. 12"
WATER LINE
Ds1 Ds2 Ds3
ALL DISTURBED AREAS
X
X
X
0+50
1+50
2+50
3+50
4+50
5+50
MA
TC
H L
IN
E - (1)
5+
00
W
T
T
T
S
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EE
E
EE
EE
E
E
E
E
E
E
E
E
E
E
E
E
E
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
GG
G
G
G
GG
GG
GG
GG
GG
GG
GG
G
G
G
G
X
X XX
1
1
7
0
1160
1150
1
1
4
0
1130
1120
~N/F~
WILLIAMS MORRIS ETAL
DB 6390 PG 227
PARCEL 198 007
~N/F~
MOHEBESFAHANI MOHAMMADREZA &
FOROUSHANI SOHAYLA MOHEBBI
DB 8668 PG 450
PARCEL 198 008
TOW
NHOM
ES OF L
ANIER P
HASE IV
~N/F~
WILLIAMS DEBORAH ETAL
DB 6390 PG 229
PARCEL 198 399
K
E
M
P
D
R
I
V
E
~
6
0
'
R
/
W
~
RID
GE
R
OA
D
~60' R
/W
~
12" CPP
18" CPP
18" CPP
15" RCP
FOUND
1/2" REBAR
FOUND
DIST. CONDUIT
FOUND
5/8" REBAR
FOUND
1" O.T.P.
FOUND
1/2" REBAR
FIBER OPTIC
MARKER
FORCE MAIN
MARKER
"45 MPH"
"20 MPH"
"STOP"
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
TV
BUFORD DAM ROAD
~100' R/W~
P
P
P
P
P
P
P
P
FMXFMXFMXFMXFMXFMXFMXFMXFMXFMXFMXFMXFMXFMXFMXFMXFMXFMXFMXFMXFM
FM X FM X FM X FM X FM X FM X FM X FM X FM X FM X FM XFM X FM X FM X FM X FM X FM X FM X
FM
FM FM FM FM FM
FM
FM
FM
FM
FM
FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM
FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM FM
W W WW
WW
WW
WW
WW
WW W W W W W W W W W W W W W W W W W W W W W W W W W W
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S5+00 6+00 7+008+00 9+00 10+00
R/W
R/W
R/W
R/W
R/W
P
/
L
P
/L
P
/
L
P
/L
P
/
L
P
/
L
P
/L
P
/
L
FMFMFMFMFMFMFMFMFMFMFMFMFM
FM
FM
FM
F
M
F
M
GRAVEL
DRIVE
GRAVEL
DRIVE
X
X
XX
X
X
X XX X X X X X X X X XX X X X
X
XX
XX
XX
X
X
X
X
X
X
X
XX
X X X
Sd1-C
PROP. 12" WATER LINE
Ds1
ALL DIS
TURBED AREAS
Ds1 Ds2 Ds3
ALL DISTURBED AREAS
Cd-S
Cd
MB
MB
MB
4+50 5+50 6+50 7+508+50 9+50 10+50
MA
TC
H L
IN
E - (1)
5+
00
MA
TC
H L
IN
E - (2)
10+
00
110 Samaritan Drive, Suite 201
Cumming, GA 30040
(770) 977-5747
www.cecincga.com
OF
Copyright 2021
Civil Engineering Consultants, Inc.
THESE DRAWINGS AND THEIR
REPRODUCTIONS ARE THE PROPERTY
OF THE ENGINEER AND MAY NOT BE
REPRODUCED, PUBLISHED OR USED IN
ANY WAY WITHOUT THE WRITTEN
PERMISSION OF THIS ENGINEER.
c
CLIENT
APPROVAL STAMP
PROJECT NAME
Drawn By :
Checked By :
Designed By :
Scale :
SHEET TITLE
PROJECT INCEPTION DATE
DRAWING NUMBER
RELEASES
No DescriptionDate
REVISIONS
No DescriptionDate
1
2
3
4
5
1
2
3
4
5
6
7
8
04/07/2021 PROPOSAL READY
02/16/2021
15
ES&PC PART 1
BUFORD DAM ROAD WATER
LINE IMPROVEMENTS
11
GRP
BJR
GRP
CITY OF CUMMING
SEE DETAIL
20
07
2 - B
UF
OR
D D
AM
R
OA
D W
AT
ER
L
IN
E - J
ES
SE
N
EL
SO
N - 4
/8
/2
02
1 1
1:0
6 A
M
N
00 20' 40'
SCALE IN FEET
SCALE: 1" = 20'-0"
00 20' 40'
SCALE IN FEET
SCALE: 1" = 20'-0"
T
S
W
W
T
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
G
G
G
G
G
G
G
G
G
G
G
X
X
X
X
X
X
X
X
X
1
1
3
0
1120
1
1
1
0
1
1
0
0
1
0
9
0
~N/F~
TOWNHOMES OF LANIER PHASE IV
PB 107 PG 57
PARCEL 198 587
~N/F~
HABERSHAM ACTION
COMMITTEE INC
DB 4316 PG 47
PARCEL 198 360
BUFORD DAM ROAD
~100' R/W~
TO
WN
HO
US
E
CIR
CL
E
~P
RIV
AT
E~
48" CMP
1
8
"
C
M
P
15" RCP
FOUND
1/2" REBAR
FOUND
3/8" REBAR
~N/F~
CINDY CARTER SCURRY
1945 BUFORD DAM RD
DB 9580 PG 217
PARCEL 198 036
~N/F~
DAVID WALL
1925 BUFORD DAM RD
DB 339 PG 494
PARCEL 198 035
~N/F~
U.S. ARMY CORPS
OF ENGINEERS
"LAKE SYDNEY
LANIER"
U.S
. AR
MY
CO
RP
S O
F E
NG
INE
ER
S
FIBER OPTIC
MARKER
2
5
'
S
T
A
T
E
B
U
F
F
E
R
5
0
'
U
N
D
I
S
T
U
R
B
E
D
B
U
F
F
E
R
"ABANDONED
UTILITY POLE"
25' S
TA
TE
BU
FF
ER
50' U
ND
IS
TU
RB
ED
BU
FF
ER
E
D
G
E
O
F
W
A
T
E
R
E
D
G
E
O
F
W
A
T
E
R
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
BUFORD DAM
ROAD
~100' R/W~
N
E
IG
H
B
O
R
H
O
O
D
S
IG
N
P
P
P
P
P
PP
P
P
P
P
P
P
P
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
FM
X
F
M
X
F
M
X
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FMFM
FMFM
FMFM
FM
FM
FM
FM
FM
FM
FM
FMFM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FMFM
FMFM
FMFM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
~N
/F
~
U.S
. A
RM
Y C
OR
PS
O
F
EN
GIN
EE
RS
"L
AK
E S
YD
NE
Y L
AN
IE
R"
PA
RC
EL
312 145
10+00
1
1
+
0
0
12+00
13+00
14+00
15+00
R/W
R/W
R/W
R/W
P/L
P/L
P
/L
P
/L
P
/
L
P
/L
FM
FM
FM
FM
X
X
X
X
X
X
X
X
X
PROP. 12"
WATER LINE
Sd1-C
Ds1 Ds2 Ds3
ALL DISTURBED AREAS
Cd
9+50
10+50
11+50
12+50
13+50
14+50
15+50
MA
TC
H L
IN
E - (2)
10+
00
MA
TC
H L
IN
E - (3)
15+
02
T
X
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
G
G
GGGG
G
G
G
1
0
9
0
1
1
0
0
1
1
1
0
1
1
2
0
~N/F~
NORTH COVE PHASE 2-A
PB 186 PG 44
PARCEL 199 502
BU
FOR
D D
AM
RO
AD
~100' R/W
~
12" RCP
24" RCP
1
5
"
R
C
P
FOU
ND
1/2" R
EB
AR
~N/F~
MAY LE PHAN
2005 BUFORD DAM RD
DB 9434 PG 643
PARCEL 224 380
~N
/F~
U.S
. A
RM
Y C
OR
PS
OF
EN
GIN
EE
RS
"L
AK
E S
YD
NE
Y
LA
NIE
R"
~N/F~
U.S. ARMY CORPS OF ENGINEERS
"LAKE SYDNEY LANIER"
DB 185 PG 271
PARCEL 312 145
6" DIP
WA
TER
LIN
E
EX
PO
SE
D E
LBO
W
FIBE
R O
PTIC
MA
RK
ER
2
5
' S
T
A
T
E
B
U
F
F
E
R
2
5
' S
T
A
T
E
B
U
F
F
E
R
5
0
' U
N
D
IS
T
U
R
B
E
D
B
U
F
F
E
R
25' S
TA
TE
BU
FF
ER
E
D
G
E
O
F
W
A
T
E
R
E
D
G
E
O
F
W
A
T
E
R
~N/F~
JONATHAN & LEANNE BROWN
2015 BUFORD DAM RD
DB 1823 PG 188
PARCEL 224 014
WW
WW
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
G
BUFORD DAM ROAD
~100' R/W
~
P
P
P
P
P
P
~N/F~
U.S. ARMY CORPS OF
ENGINEERS
"LAKE SYDNEY LANIER"
FM
FM
FM
FM
FM
FM
FM
F
M
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FM
FMFM
FM
FM
FM
FM
FM
F
M
FM
FM
FM
F
M
FM
FM
FM
FM
FM
FM
FMFM
FM
F
M
FM
FM
FM
FM
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
E
D
G
E
O
F
W
A
T
E
R
ED
GE
O
F W
AT
ER
~N
/F
~
U.S
. A
RM
Y C
OR
PS
O
F
EN
GIN
EE
RS
"L
AK
E S
YD
NE
Y L
AN
IE
R"
PA
RC
EL
312 145
15+00
16+00
17+00
18+00
19+00
19+70
R/W
R/W
R/W
P/L
P
/
L
P/L
P/L
X
X
X
X
X
X
X
X
X
Sd1-C
PROP. 12"
WATER LINE
Ds1 Ds2 Ds3
ALL DISTURBED AREAS
14+50
15+50
16+50
17+50
18+50
19+50
MA
TC
H L
IN
E - (3)
15+
02
110 Samaritan Drive, Suite 201
Cumming, GA 30040
(770) 977-5747
www.cecincga.com
OF
Copyright 2021
Civil Engineering Consultants, Inc.
THESE DRAWINGS AND THEIR
REPRODUCTIONS ARE THE PROPERTY
OF THE ENGINEER AND MAY NOT BE
REPRODUCED, PUBLISHED OR USED IN
ANY WAY WITHOUT THE WRITTEN
PERMISSION OF THIS ENGINEER.
c
CLIENT
APPROVAL STAMP
PROJECT NAME
Drawn By :
Checked By :
Designed By :
Scale :
SHEET TITLE
PROJECT INCEPTION DATE
DRAWING NUMBER
RELEASES
No DescriptionDate
REVISIONS
No DescriptionDate
1
2
3
4
5
1
2
3
4
5
6
7
8
04/07/2021 PROPOSAL READY
02/16/2021
15
ES&PC PART 2
BUFORD DAM ROAD WATER
LINE IMPROVEMENTS
12
GRP
BJR
GRP
CITY OF CUMMING
SEE DETAIL
20
07
2 - B
UF
OR
D D
AM
R
OA
D W
AT
ER
L
IN
E - J
ES
SE
N
EL
SO
N - 4
/8
/2
02
1 1
1:0
6 A
M
N
00 20' 40'
SCALE IN FEET
SCALE: 1" = 20'-0"
00 20' 40'
SCALE IN FEET
SCALE: 1" = 20'-0"
CERTIFICATION
1. I CERTIFY THAT THE PERMITTEE'S EROSION, SEDIMENTATION AND POLLUTION CONTROL
(ES&PC) PLAN PROVIDES FOR AN APPROPRIATE AND COMPREHENSIVE SYSTEM OF BEST
MANAGEMENT PRACTICES REQUIRED BY THE GEORGIA WATER QUALITY ACT AND THE
DOCUMENT "MANUAL FOR EROSION AND SEDIMENT CONTROL IN GEORGIA", PUBLISHED
BY THE STATE SOIL AND WATER CONSERVATION COMMISSION AS OF JANUARY 1 OF THE
YEAR IN WHICH THE LAND-DISTURBING ACTIVITY WAS PERMITTED, PROVIDES FOR THE
SAMPLING OF THE RECEIVING WATER(S) OR THE SAMPLING OF THE STORM WATER
OUTFALLS AND THAT THE DESIGNED SYSTEM OF BEST MANAGEMENT PRACTICES IS
EXPECTED TO MEET THE DESIGN REQUIREMENTS CONTAINED IN THE GENERAL NPDES
PERMIT NOS. GAR 1000001, GAR 1000002 AND GAR 1000003.
2. I CERTIFY UNDER PENALTY OF LAW THAT THIS PLAN WAS PREPARED AFTER A SITE VISIT
TO THE LOCATIONS DESCRIBED HEREIN BY MYSELF OR MY AUTHORIZED AGENT, UNDER
MY DIRECT SUPERVISION.
3. I CERTIFY UNDER PENALTY OF LAW THAT THIS DOCUMENT AND ALL ATTACHMENTS
WERE PREPARED UNDER MY DIRECTION OR SUPERVISION IN ACCORDANCE WITH A
SYSTEM DESIGNED TO ASSURE THAT QUALIFIED PERSONNEL PROPERLY GATHER AND
EVALUATE THE INFORMATION SUBMITTED. BASED ON MY INQUIRY OF THE PERSON OR
PERSONS WHO MANAGE THE SYSTEM, OR THOSE PERSONS DIRECTLY RESPONSIBLE
FOR GATHERING THE INFORMATION, THE INFORMATION SUBMITTED IS, TO THE BEST OF
MY KNOWLEDGE AND BELIEF, TRUE, ACCURATE, AND COMPLETE. I AM AWARE THAT
THERE ARE SIGNIFICANT PENALTIES FOR SUBMITTING FALSE INFORMATION, INCLUDING
THE POSSIBILITY OF FINE AND IMPRISONMENT FOR KNOWING VIOLATIONS.
4. THE PROPOSED EROSION AND RUNOFF CONTROL MEASURES ARE IN COMPLIANCE WITH
THE FORSYTH COUNTY SEDIMENT CONTROL AND FLOOD PROTECTION REGULATIONS
AND WILL NOT INCREASE THE RUNOFF RATE FROM THE SITE FOR RAINSTORMS WITH A
RETURN PERIOD OF 2, 5, 10, 25, 50 AND/OR 100 YEARS.
DESIGN PROFESSIONAL 7-DAY VISIT CERTIFICATION
DATE OF INSPECTION: ______________
I CERTIFY THE SITE WAS IN COMPLIANCE WITH ES&PC PLAN ON THE DATE OF INSPECTION.
___________________________________________________________
GSWCC LEVEL II DESIGN PROFESSIONAL CERTIFICATION #
INSPECTION REVEALED THE FOLLOWING DISCREPANCIES FROM THE ES&PC PLAN:
_________________________________________________________________________
_________________________________________________________________________
THESE DISCREPANCIES MUST BE ADDRESSED IMMEDIATELY AND A RE-INSPECTION SCHEDULED. WORK
SHALL NOT PROCEED ON THE SITE UNTIL DESIGN PROFESSIONAL CERTIFICATION IS OBTAINED.
INSPECTIONS:
PRIMARY PERMITTEE.
1) Each day when any type of construction activity has taken place at a primary permittee’s site, certified personnel provided by the primary
permittee shall inspect: (a) all areas at the primary permittee’s site where petroleum products are stored, used, or handled for spills and leaks
from vehicles and equipment and (b) all locations at the primary permittee’s site where vehicles enter or exit the site for evidence of off-site
sediment tracking. These inspections must be conducted until a Notice of Termination is submitted.
2) Measure and record rainfall within disturbed areas of the site that have not met final stabilization once every 24 hours except any
non-working Saturday, non-working Sunday and non-working Federal holiday. The data collected for the purpose of compliance with this
permit shall be representative of the monitored activity. Measurement of rainfall may be suspended if all areas of the site have undergone final
stabilization or established a crop of annual vegetation and a seeding of target perennials appropriate for the region.
3) Certified personnel (provided by the primary permittee) shall inspect the following at least once every fourteen (14) calendar days and
within 24 hours of the end of a storm that is 0.5 inches rainfall or greater (unless such storm ends after 5:00 PM on any Friday or on any
non-working Saturday, non-working Sunday or any non-working Federal holiday in which case the inspection shall be completed by the end of
the next business day and/or working day, whichever occurs first): (a) disturbed areas of the primary permittee’s construction site; (b) areas
used by the primary permittee for storage of materials that are exposed to precipitation; and (c) structural control measures. Erosion and
sediment control measures identified in the Plan applicable to the primary permittee’s site shall be observed to ensure that they are operating
correctly. Where discharge locations or points are accessible, they shall be inspected to ascertain whether erosion control measures are
effective in preventing significant impacts to receiving water(s). For areas of a site that have undergone final stabilization or established a crop
of annual vegetation and a seeding of target perennials appropriate for the region, the permittee must comply with Part IV.D.4.a.(4). These
inspections must be conducted until a Notice of Termination is submitted.
4) Certified personnel (provided by the primary permittee) shall inspect at least once per month during the term of this permit (i.e., until a
Notice of Termination is submitted to EPD) the areas of the site that have undergone final stabilization or established a crop of annual
vegetation and a seeding of target perennials appropriate for the region. These areas shall be inspected for evidence of, or the potential for,
pollutants entering the drainage system and the receiving water(s). Erosion and sediment control measures identified in the Plan shall be
observed to ensure that they are operating correctly. Where discharge locations or points are accessible, they shall be inspected to ascertain
whether erosion control measures are effective in preventing significant impacts to receiving water(s).
5) Based on the results of each inspection, the site description and the pollution prevention and control measures identified in the Erosion,
Sedimentation and Pollution Control Plan, the Plan shall be revised as appropriate not later than seven (7) calendar days following each
inspection. Implementation of such changes shall be made as soon as practical but in no case later than seven (7) calendar days following
each inspection.
6) A report of each inspection that includes the name(s) of certified personnel making each inspection, the date(s) of each inspection,
construction phase (i.e., initial, intermediate or final), major observations relating to the implementation of the Erosion, Sedimentation and
Pollution Control Plan, and actions taken in accordance with Part IV.D.4.a.(5). of the permit shall be made and retained at the site or be
readily available at a designated alternate location until the entire site or that portion of a construction site that has been phased has
undergone final stabilization and a Notice of Termination is submitted to EPD. Such reports shall be readily available by end of the second
business day and/or working day and shall identify all incidents of best management practices that have not been properly installed and/or
maintained as described in the Plan. Where the report does not identify any incidents, the inspection report shall contain a statement that the
best management practices are in compliance with the Erosion, Sedimentation and Pollution Control Plan. The report shall be signed in
accordance with Part V.G.2. of this permit.
PRODUCT SPECIFIC PRACTICES
PETROLEUM BASED PRODUCTS - CONTAINERS FOR PRODUCTS SUCH AS FUELS, LUBRICANTS AND TARS WILL
BE INSPECTED DAILY FOR LEAKS AND SPILLS. THIS INCLUDES ON-SITE VEHICLE AND MACHINERY DAILY
INSPECTIONS AND REGULAR PREVENTATIVE MAINTENANCE OF SUCH EQUIPMENT. EQUIPMENT
MAINTENANCE AREAS WILL BE LOCATED AWAY FROM STATE WATER, NATURAL DRAINS AND STORM WATER
DRAINING INLETS. IN ADDITION, TEMPORARY FUELING TANKS SHALL HAVE A SECONDARY CONTAINMENT
LINER TO PREVENT/MINIMIZE SITE CONTAMINATION. DISCHARGE OF OILS, FUELS AND LUBRICANTS IS
PROHIBITED. PROPER DISPOSAL METHODS WILL INCLUDE COLLECTION IN A SUITABLE CONTAINER AND
DISPOSAL AS REQUIRED BY LOCAL AND STATE REQUIREMENTS.
PAINTS/FINISHES/SOLVENTS - ALL PRODUCTS WILL BE STORED IN TIGHTLY SEALED ORIGINAL CONTAINERS
WHEN NOT IN USE. EXCESS PRODUCT WILL NOT BE DISCHARGED TO THE STORM WATER COLLECTION
SYSTEM. EXCESS PRODUCT, MATERIALS USED WITH THESE PRODUCTS AND PRODUCT CONTAINERS WILL BE
DISPOSED OF ACCORDING TO MANUFACTURER'S SPECIFICATIONS AND RECOMMENDATIONS.
CONCRETE TRUCK WASHING - PROVIDE WASHDOWN CONTAINMENT FOR THE WASH-DOWN WATER FROM
CONCRETE MIXER CHUTES, HOPPERS, AND OTHER TOOLS AND EQUIPMENT. PREVENT ANY WATER THAT
CONTACTS UNCURED OR PARTLY CURED CONCRETE DURING ACTIVITIES LIKE EXPOSED AGGREGATE
WASH-OFF, WET CURING, OR EQUIPMENT WASHING FROM DIRECTLY OR INDIRECTLY ENTERING ANY
WATERCOURSE OR STORMWATER SYSTEM.
FERTILIZER/HERBICIDES - THESE PRODUCTS WILL BE APPLIED AT RATES THAT DO NOT EXCEED THE
MANUFACTURER'S SPECIFICATIONS OR ABOVE THE GUIDELINES SET FORTH IN THE CROP ESTABLISHMENT
OR IN THE GSWCC MANUAL FOR EROSION AND SEDIMENT CONTROL IN GEORGIA. ANY STORAGE OF THESE
MATERIALS WILL BE UNDER ROOF IN SEALED CONTAINERS.
BUILDING MATERIALS - NO BUILDING OR CONSTRUCTION MATERIALS WILL BE BURIED OR DISPOSED OF
ONSITE. ALL SUCH MATERIAL WILL BE DISPOSED OF IN PROPER WASTE DISPOSAL PROCEDURES.
WASTE MATERIALS
ALL WASTE MATERIALS WILL BE COLLECTED AND STORED IN A SECURELY LIDDED METAL
DUMPSTER. THE DUMPSTER WILL MEET ALL SOLID WASTE MANAGEMENT REGULATIONS. ALL
TRASH AND CONSTRUCTION DEBRIS FROM THE SITE WILL BE DEPOSITED IN THE DUMPSTER.
THE DUMPSTER WILL BE EMPTIED A MINIMUM OF ONCE PER WEEK OR MORE OFTEN IF
NECESSARY AND TRASH WILL BE HAULED AS REQUIRED BY LOCAL REGULATIONS. NO
CONSTRUCTION WASTE WILL BE BURIED ON SITE.
ALL PERSONNEL WILL BE INSTRUCTED ON PROPER PROCEDURES FOR WASTE DISPOSAL. A
NOTICE STATING THESE PRACTICES WILL BE POSTED AT THE JOB SITE AND THE CONTRACTOR
WILL BE RESPONSIBLE FOR SEEING THAT THESE PROCEDURES ARE FOLLOWED.
NO WASTE MATERIALS WILL BE DISPOSED OF INTO STORM WATER INLETS OR
WATERS OF THE STATE
HAZARDOUS WASTES
ALL HAZARDOUS WASTE MATERIALS WILL BE DISPOSED OF IN THE MANNER SPECIFIED BY
LOCAL, STATE AND/OR FEDERAL REGULATIONS AND BY THE MANUFACTURER OF SUCH
PRODUCTS. THE JOB SITE SUPERINTENDENT, WHO WILL ALSO BE RESPONSIBLE FOR SEEING
THAT THESE PRACTICES ARE FOLLOWED, WILL INSTRUCT SITE PERSONNEL IN THESE
PRACTICES. MATERIAL SAFETY DATA SHEETS (MSDS's) FOR EACH SUBSTANCE WITH
HAZARDOUS PROPERTIES THAT IS USED ON THE JOB SITE WILL BE OBTAINED AND USED FOR
THE PROPER MANAGEMENT OF POTENTIAL WASTES THAT MAY RESULT FROM THESE
PRODUCTS. AN MSDS WILL BE POSTED IN THE IMMEDIATE AREA WHERE SUCH PRODUCT IS
STORED AND/OR USED AND ANOTHER COPY OF EACH MSDS WILL BE MAINTAINED IN THE
ESPCP FILE AT THE JOB SITE CONSTRUCTION TRAILER OFFICE. EACH EMPLOYER WHO MUST
HANDLE A SUBSTANCE WITH HAZARDOUS PROPERTIES WILL BE INSTRUCTED ON THE USE OF
MSDS SHEETS AND THE SPECIFIC INFORMATION IN THE APPLICABLE MSDS FOR THE PRODUCT
HE/SHE IS USING, PARTICULARLY REGARDING SPILL CONTROL TECHNIQUES.
THE CONTRACTOR WILL IMPLEMENT THE SPILL PREVENTION AND COUNTERMEASURES (SPCC)
PLAN FOUND WITHIN THIS ESPCP AND WILL TRAIN ALL PERSONNEL IN THE PROPER CLEANUP
AND HANDLING OF SPILLED MATERIALS. NO SPILLED HAZARDOUS MATERIALS OR HAZARDOUS
WASTES WILL BE ALLOWED TO COME IN CONTACT WITH STORM WATER DISCHARGES. IF SUCH
CONTACT OCCURS, THE STORM WATER DISCHARGE WILL BE CONTAINED ON SITE UNTIL
APPROPRIATE MEASURES IN COMPLIANCE WITH STATE AND FEDERAL REGULATIONS ARE
TAKEN TO DISPOSE OF SUCH CONTAMINATED STORM WATER. IT SHALL BE THE
RESPONSIBILITY OF THE JOB SITE SUPERINTENDENT TO PROPERLY TRAIN ALL PERSONNEL IN
THE USE OF THE SPCC PLAN.
SANITARY WASTES
A MINIMUM OF ONE PORTABLE SANITARY UNIT WILL BE PROVIDED FOR EVERY TEN (10)
WORKERS ON THE SITE. ALL SANITARY WASTE WILL BE COLLECTED FROM THE PORTABLE
UNITS A MINIMUM OF ONE TIME PER WEEK BY A LICENSED PORTABLE FACILITY PROVIDER IN
COMPLETE COMPLIANCE WITH LOCAL AND STATE REGULATIONS.
ALL SANITARY WASTE UNITS WILL BE LOCATED IN AN AREA WHERE THE LIKELIHOOD OF THE
UNIT CONTRIBUTING TO STORM WATER DISCHARGE IS NEGLIGIBLE. ADDITIONAL
CONTAINMENT BMP's MUST BE IMPLEMENTED, SUCH AS GRAVEL BAGS OR SPECIALLY
DESIGNED PLASTIC SKID CONTAINERS AROUND THE BASE, TO PREVENT WASTES FROM
CONTRIBUTING TO STORM WATER DISCHARGES. THE LOCATION OF SANITARY WASTE UNITS
MUST BE IDENTIFIED ON THE EROSION CONTROL PLANS, SHEET 4, BY THE CONTRACTOR
ONCE THE LOCATIONS HAVE BEEN DETERMINED.
SPILL CLEANUP AND CONTROL POLICIES
- LOCAL, STATE AND MANUFACTURER'S RECOMMENDED METHODS FOR SPILL CLEANUP WILL BE
CLEARLY POSTED AND PROCEDURES WILL BE MADE AVAILABLE TO SITE PERSONNEL.
- MATERIAL AND EQUIPMENT NECESSARY FOR SPILL CLEANUP WILL BE KEPT IN THE MATERIAL
STORAGE AREAS. TYPICAL MATERIALS AND EQUIPMENT INCLUDES, BUT IS NOT LIMITED TO,
BROOMS, DUSTPANS, MOPS, RAGS, GLOVES, GOGGLES, CAT LITTER, SAND, SAWDUST AND
PROPERLY LABELED PLASTIC AND METAL WASTE CONTAINERS.
- SPILL PREVENTION PRACTICES AND PROCEDURES WILL BE REVIEWED AFTER A SPILL AND
ADJUSTED AS NECESSARY TO PREVENT FUTURE SPILLS.
- ALL SPILLS WILL BE CLEANED UP IMMEDIATELY UPON DISCOVERY. ALL SPILLS WILL BE
REPORTED AS REQUIRED BY LOCAL, STATE AND FEDERAL REGULATIONS.
- FOR SPILLS THAT IMPACT SURFACE WATER (LEAVE A SHEEN ON SURFACE WATER), THE
NATIONAL RESPONSE CENTER (NRC) WILL BE CONTACTED WITHIN 24 HOURS AT 1-800-426-2675.
- FOR SPILLS OF AN UNKNOWN AMOUNT, THE NATIONAL RESPONSE CENTER (NRC) WILL BE
CONTACTED WITHIN 24 HOURS AT 1-800-426-2675.
- FOR SPILLS LESS THAN 25 GALLONS AND NO SURFACE WATER IMPACTS, THE SPILL WILL BE
CLEANED UP AND LOCAL AGENCIES WILL BE CONTACTED AS REQUIRED.
THE CONTRACTOR SHALL NOTIFY THE LICENSED PROFESSIONAL WHO PREPARED THIS PLAN IF
MORE THAN 1320 GALLONS OF PETROLEUM IS STORED ON SITE (THIS INCLUDES CAPACITIES OF
EQUIPMENT) OR IF ANY ONE PIECE OF EQUIPMENT HAS A CAPACITY GREATER THAN 660 GALLONS.
THE CONTRACTOR WILL NEED A SPILL PREVENTION CONTAINMENT AND COUNTERMEASURES
PLAN PREPARED BY THAT LICENSED PROFESSIONAL.
AMENDMENTS
ANY AMENDMENT TO THE EROSION CONTROL PLANS WHICH HAS A SIGNIFICANT EFFECT ON BMPs
WITH A HYDRAULIC COMPONENT MUST BE CERTIFIED BY THE DESIGN PROFESSIONAL.
OFFSITE VEHICLE TRACKING
A STABILIZED CONSTRUCTION EXIT HAS BEEN PROVIDED TO HELP REDUCE VEHICLE TRACKING OF
SEDIMENT. THE PAVED STREET ADJACENT TO THE SITE EXIT WILL BE INSPECTED DAILY FOR
TRACKING OF MUD, DIRT OR ROCK.
STREAM BUFFERS
NON-EXEMPT ACTIVITIES DOES NOT PROPOSED TO ENCROACH INTO 25' STATE STREAM
BUFFERS.
POST-CONSTRUCTION STORM WATER POLLUTANT CONTROL
IN ORDER TO CONTROL POLLUTANTS IN STORM WATER THAT WILL OCCUR AFTER CONSTRUCTION
OPERATIONS HAVE BEEN COMPLETED THE FOLLOWING MEAURES SHALL BE INSTALLED:
- PERMANENT GRASSING IN ALL DISTURBED AREAS SHALL BE ACCEPTABLE AS DETERMINED BY THE
ENGINEER AND DEFINED AS COVERING 98% OF THE AREA TO BE GRASSED WITH NO BARE AREA
GREATER THAN ONE SQUARE FOOT AND THE ENTIRE AREA FULLY STABILIZED AGAINST EROSION.
RETENTION OF RECORDS
- EACH PRIMARY PERMITTEE SHALL RETAIN A COPY OF THE EROSION, SEDIMENTATION AND POLLUTION
CONTROL PLAN AT THE CONSTRUCTION SITE OR THE PLAN SHALL BE READILY AVAILABLE AT A
DESIGNATED ALTERNATE LOCATION FROM THE DATE OF PROJECT INITIATION TO THE DATE OF FINAL
STABILIZATION. PRIMARY PERMITTEES SHOULD POST COPIES OF THE NOI, EROSION, SEDIMENTATION
& POLLUTION CONTROL PLAN, SAMPLING RESULTS, INSPECTION REPORTS, ETC. ON OR IN A PERMIT
BOARD AT THE BEGINNING OF EACH PHASE TO FACILITATE INSPECTIONS BY EPD.
- COPIES OF ALL NOTICES OF INTENT, NOTICES OF TERMINATION, REPORTS, PLANS, MONITORING
REPORTS, MONITORING INFORMATION, INCLUDING ALL CALIBRATION AND MAINTENANCE RECORDS
AND ALL ORIGINAL STRIP CHART RECORDINGS FOR CONTINUOUS MONITORING INSTRUMENTATION,
EROSION, SEDIMENTATION AND POLLUTION CONTROL PLANS, RECORDS OF ALL DATA USED TO
COMPLETE THE NOTICE OF INTENT AND ALL OTHER REQUIRED RECORDS SHALL BE RETAINED BY THE
PERMITTEE FOR A PERIOD OF THREE YEARS FROM THE DATE THAT THE SITE IS FINALLY STABILIZED.
THESE RECORDS MUST BE MAINTAINED AT THE PERMITTEE'S PRIMARY PLACE OF BUSINESS ONCE THE
CONSTRUCTION ACTIVITY HAS CEASED AT THE PERMITTED SITE. THIS PERIOD MAY BE EXTENDED BY
THE REQUEST OF THE EPD AT ANY TIME UPON WRITTEN NOTIFICATION TO THE PERMITTEE.
SAMPLING FREQUENCY
STORM WATER SAMPLES SHALL BE TAKEN FOR THE FOLLOWING STORM EVENTS:
(a) FOR EACH AREA OF THE SITE THAT DISCHARGES TO A RECEIVING STREAM, THE FIRST
RAIN EVENT THAT REACHES OR EXCEEDS 0.5 INCH AND ALLOWS FOR MONITORING
DURING NORMAL BUSINESS HOURS (MONDAY THROUGH FRIDAY, 8:00 AM TO 5:00 PM AND
SATURDAY 8:00 AM TO 5:00 PM WHEN CONSTRUCTION ACTIVITY IS BEING CONDUCTED BY
THE PRIMARY PERMITTEE) THAT OCCURS AFTER ALL CLEARING AND GRUBBING
OPERATIONS HAVE BEEN COMPLETED IN THE DRAINAGE AREA OF THE LOCATION
SELECTED AS THE SAMPLING LOCATION;
(b) IN ADDITION TO (a) ABOVE, FOR EACH AREA OF THE SITE THAT DISCHARGES TO A
RECEIVING STREAM, THE FIRST RAIN EVENT THAT REACHES OR EXCEEDS 0.5 INCH AND
ALLOWS FOR MONITORING DURING NORMAL BUSINESS HOURS (MONDAY THROUGH
FRIDAY, 8:00 AM TO 5:00 PM AND SATURDAY 8:00 AM TO 5:00 PM WHEN CONSTRUCTION
ACTIVITY IS BEING CONDUCTED BY THE PRIMARY PERMITTEE) THAT OCCURS EITHER 90
DAYS AFTER THE FIRST SAMPLING EVENT OR AFTER ALL MASS GRADING OPERATIONS
HAVE BEEN COMPLETED IN THE DRAINAGE AREA OF THE LOCATION SELECTED AS THE
SAMPLING LOCATION, WHICHEVER COMES FIRST;
(c) AT THE TIME OF SAMPLING PERFORMED PERSUANT TO (a) AND (b) ABOVE, IF BMPS ARE
FOUND TO BE PROPERLY DESIGNED, INSTALLED AND MAINTAINED, NO FURTHER ACTION IS
REQUIRED. IF BMPS IN ANY AREA OF THE SITE THAT DISCHARGES TO A RECEVING
STREAM ARE NOT PROPERLY DESIGNED, INSTALLED AND MAINTAINED, CORRECTIVE
ACTION SHALL BE DEFINED AND IMPLEMENTED WITHIN 2 BUSINESS DAYS, AND TURBIDITY
SAMPLES SHALL BE TAKEN FROM DISCHARGES FROM THAT AREA OF THE SITE FOR EACH
SUBSEQUENT RAIN EVENT THAT REACHES OR EXCEEDS 0.5 INCH DURING NORMAL
BUSINESS HOURS (MONDAY THROUGH FRIDAY, 8:00 AM TO 5:00 PM AND SATURDAY 8:00
AM TO 5:00 PM WHEN CONSTRUCTION ACTIVITY IS BEING CONDUCTED BY THE PRIMARY
PERMITTEE) UNTIL THE SELECTED TURBIDITY STANDARD IS ATTAINED, OR UNTIL
POST-STORM EVENT INSPECTIONS DETERMINE THAT BMPS ARE PROPERLY DESIGNED,
INSTALLED AND MAINTAINED.
(d). WHERE SAMPLING PURSUANT TO (A), (B) OR (C) ABOVE IS REQUIRED BUT NOT
POSSIBLE (OR NOT REQUIRED BECAUSE THERE WAS NO DISCHARGE), THE PERMITTEE, IN
ACCORDANCE WITH PART IV.D.4.A.(6), MUST INCLUDE A WRITTEN JUSTIFICATION IN THE
INSPECTION REPORT OF WHY SAMPLING WAS NOT PERFORMED. PROVIDING THIS
JUSTIFICATION DOES NOT RELIEVE THE PERMITTEE OF ANY SUBSEQUENT SAMPLING
OBLIGATIONS UNDER (A), (B) OR (C) ABOVE; AND
STORM WATER SAMPLING
STORM WATER SAMPLES ARE TO BE ANALYZED IN ACCORDANCE WITH THE METHODOLOGY
AND TEST PROCEDURES ESTABLISHED BY 40 CFR PART 136 AND THE GUIDANCE DOCUMENT
TITLED "NPDES STORM WATER SAMPLING GUIDANCE DOCUMENT, EPA 833-8-92-001."
STORM WATER IS TO BE SAMPLED FOR NEPHELOMETRIC TURBIDITY UNITS (NTU) AT THE
OUTFALL LOCATION. A DISCHARGE OF STORM WATER RUNOFF FROM DISTURBED AREAS
WHERE BEST MANAGEMENT PRACTICES HAVE NOT BEEN PROPERLY DESIGNED, INSTALLED
AND MAINTAINED SHALL CONSTITUTE A SEPARATE VIOLATION FOR EACH DAY ON WHICH
SUCH CONDITION RESULTS IN THE TURBIDITY OF THE DISCHARGE EXCEEDING 75, THE
VALUE THAT WAS SELECTED FROM APPENDIX B IN PERMIT GAR 100002. THE NTU IS BASED
UPON THE THE DISTURBED ACREAGE OF 2.0 ACRES FOR THE PROJECT SITE, THE SURFACE
WATER DRAINAGE AREA OF 0.3 SQUARE MILES, AND RECEIVING WATER WHICH SUPPORTS
WARM WATER FISHERIES.
PURK YOTAKHONG, P.E.
GSWCC NO. 0000059231
PURK YOTAKHONG, P.E.
GSWCC NO. 0000059231
110 Samaritan Drive, Suite 201
Cumming, GA 30040
(770) 977-5747
www.cecincga.com
OF
Copyright 2021
Civil Engineering Consultants, Inc.
THESE DRAWINGS AND THEIR
REPRODUCTIONS ARE THE PROPERTY
OF THE ENGINEER AND MAY NOT BE
REPRODUCED, PUBLISHED OR USED IN
ANY WAY WITHOUT THE WRITTEN
PERMISSION OF THIS ENGINEER.
c
CLIENT
APPROVAL STAMP
PROJECT NAME
Drawn By :
Checked By :
Designed By :
Scale :
SHEET TITLE
PROJECT INCEPTION DATE
DRAWING NUMBER
RELEASES
No DescriptionDate
REVISIONS
No DescriptionDate
1
2
3
4
5
1
2
3
4
5
6
7
8
04/07/2021 PROPOSAL READY
02/16/2021
15
ES&PC DETAILS PART 1
BUFORD DAM ROAD WATER
LINE IMPROVEMENTS
13
GRP
BJR
GRP
CITY OF CUMMING
SEE DETAIL
20
07
2 - B
UF
OR
D D
AM
R
OA
D W
AT
ER
L
IN
E - J
ES
SE
N
EL
SO
N - 4
/8
/2
02
1 1
0:3
0 A
M
J FMAM J J ASO ND
P
C
P
C
P
C
C
P
C
M-L
M-L
P
M-L
P
C
Ds3
TABLE 6-5.2 PLANTS, PLANTING RATES, AND PLANTING DATES FOR PERMANENT COVER
SPECIES
BROADCAST.
RATES 1/ - PLS 2/
PER PER
ACRE 1000
SP. FT.
RESOURCE
AREA 3/
PLANTING DATES BY RESOURCE AREAS
PLANTING DATES
REMARKS
1,787,000 SEED PER POUND.
QUICK COVER. LOW GROWING
AND SOD FORMING. FULL SUN
GOOD FOR ATHLETIC FIELDS.
PLANT WITH WINTER ANNUALS.
PLANT WITH TALL FESCUE.
A CUBIC FOOT CONTAINS
APPROXIMATELY 650 SPRIGS. A
BUSHEL CONTAINS 1.25 CUBIC
FEET OR APPROXIMATELY 800
SPRIGS.
SAME AS ABOVE
SOUTHERN COASTAL PLAIN
EFFECTIVE ADJACENT TO
CONCRETE AND IN
CONCENTRATED FLOW AREA.
IRRIGATION IS NEEDED UNTIL
FULLY ESTABLISHED. DO NOT
PLANT NEAR PASTURES.
227,000 SEED PER POUND. USE
ALONE ONLY ON BETTER SITES.
NOT FOR DROUGHTY SOILS.
MIX WITH PERENNIAL
LESPEDEZAS OR
CROWNVETCH. APPLY
TOPDRESSING IN SPRING
FOLLOWING FALL PLANTINGS.
NOT FOR HEAVY USE AREAS
OR ATHLETIC FIELDS.
1,500,000 SEED PER POUND.
QUICK COVER. DROUGHT
TOLERANT. GROWS WELL WITH
SERICEA LESPEDEZA ON
ROADBANKS.
BERMUDA, COMMON
(CYNODON DACTYLON)
HULLED SEED
ALONE
WITH OTHER PERENNIALS
BERMUDA, COMMON
(CYNODON DACTYLON)
HULLED SEED
WITH TEMPORARY COVER
WITH OTHER PERENNIALS
BERMUDA, COMMON
(CYNODON DACTYLON)
HULLED SEED
COASTAL, COMMOM,
MIDLAND, OR TIFT 44
TIFT 78
CENTIPEDE (EREMOCHLOA
OPHIUROIDES)
FESCUE, TALL
(FESTUCA ARUNDINACEA)
ALONE
WITH OTHER PERENNIALS
LOVEGRASS, WEEDPING
(ERAGROSTIS CURVULA)
ALONE
WITH OTHER PERENNIALS
10 LBS. 0.2 LB.
6 LBS. 0.1 LB.
10 LBS. 0.2 LB.
6 LBS. 0.1 LB.
40 CU. FT. 0.9 CU. FT.
OR
SOD PLUGS 3' x 3'
BLOCK SOD ONLY
50 LBS. 1.1 LB.
30 LBS. 0.7 LB.
4 LBS. 0.1 LB.
2 LBS. 0.05 LB.
FERTILIZER REQUIREMENTS
TYPE OF SPECIES
YEARANALYSIS OF EQUIVALENT
N-P-K
RATE
1. COOL SEASON
GRASSES
2. COOL SEASON
GRASSES AND
LEGUMES
3. GROUND COVER
4. PINE
SEEDLINGS
5. SHRUB
LESPEDEZA
6. TEMPORARY
COVER CROPS
SEEDED ALONE
7. WARM SEASON
GRASSES
8. WARM SEASON
GRASSES AND
LEGUMES
FIRST
SECOND
MAINTENANCE
FIRST
SECOND
MAINTENANCE
FIRST
SECOND
MAINTENANCE
FIRST
FIRST
MAINTENANCE
FIRST
FIRST
SECOND
MAINTENANCE
FIRST
SECOND
MAINTENANCE
6-12-12
6-12-12
10-10-10
6-12-12
0-10-10
0-10-10
10-10-10
10-10-10
10-10-10
20-10-5
0-10-10
0-10-10
10-10-10
6-12-12
6-12-12
10-10-10
6-12-12
0-10-10
0-10-10
1500 LBS./AC.
1000 LBS./AC.
400 LBS./AC.
1500 LBS./AC.
1000 LBS./AC.
400 LBS./AC.
1300 LBS./AC. 3/
1300 LBS./AC. 3/
1100 LBS./AC.
ONE 21-GRAM PELLET
PER SEEDLING PLACED IN
THE CLOSING HOLE
700 LBS./AC.
700 LBS./AC. 4/
500 LBS./AC.
1500 LBS./AC.
800 LBS./AC.
400 LBS./AC.
1500 LBS./AC.
1000 LBS./AC.
400 LBS./AC.
N
TOP DRESSING
RATE
50-100 LBS./AS. 1/ 2/
--
30
0-50 LBS./AS. 1/
--
--
--
--
--
--
--
30 LBS./AS. 5/
50-100 LBS./AS. 2/ 6/
50-100 LBS./AS. 2/
30 LBS./AS.
50 LBS./AS. 6/
1/ APPLY IN SPRING FOLLOWING SEEDLING.
2/ APPLY IN SPLIT APPLICATIONS WHEN HIGH RATES ARE USED.
3/ APPLY IN 3 SPLIT APPLICATIONS.
4/ APPLY WHEN PLANTS ARE PRUNED.
5/ ALLAY TO GRASS SPECIES ONLY.
6/ APPLY WHEN PLANTS GROW TO A HEIGHT OF 2 TO 4 INCHES.
CONSTRUCTION SPECIFICATIONS
Provide a riprap splash pad or other outlet protection device for any point such as natural depressions or
swales where flow may top the sediment fence. Ensure that the maximum height of the fence at a
protected, reinforced outlet does not exceed 1 ft. and that support post spacing does not exceed 4 ft.
Hay or Straw Bales (if approved by local issuing authority)
Bales will be placed in a single row, lengthwise, on the contour and embedded in the soil to a depth of 4
inches. Bales must be securely anchored in place by stakes or bars driven through the bales or by other
acceptable means to prevent displacement. (See Straw Bale Figures).
Silt Fence
A silt fence is specifically designed to allow water to pass through while retaining sediment on site.
Silt Fence Specifications
Two widths of silt fence are available, Type A or C (36" height) and Type B (22" height). In order to
determine which to use, the project duration, slope gradient, and slope length must be known (See Table
6-13.1). Approved silt fence fabrics are listed in the Georgia Department of Transportation list #36. The
manufacturer shall have either an approved color mark yarn in the fabric or label the fabricated silt fence
with both the manufacturer and fabric name every 100 feet.
All silt fence must meet the minimum standards set forth in Section 171 - Temporary Silt Fence, of the
Department of Transportation, State of Georgia, Standard Specification, current edition. See Table 6-13.5
for current Georgia DOT silt fence specifications.
Silt Fence Installation
The contractor shall install the temporary silt fence according to this specification, as shown on the plans or
as directed by the engineer. For installation of Type A or C and B fabric, see Figures 6-13.3 and 6-13.4
respectively.
Post installation shall start at the center of the low point (if applicable) with remaining posts spaced 6 feet
apart. For post size requirements of type A or C and B fabric, see Table 6-13.3. Fasteners for wood posts
are listed in Table 6-13.4.
Silt Fence Maintenance and Removal
The contractor shall maintain the silt fence until the project is vegetated or accepted. Filter fabric shall be
replaced whenever it has deteriorated to such an extent that it reduces the effectiveness of the fabric.
Maintenance - Construction Exit
The exit shall be maintained in a condition which will prevent tracking or flow of mud onto public
rights-of-way/ This may require periodic top dressing with 1.5-3.5 inch stone, as conditions demand, and
repair and/or cleanout of any structures used to trap sediment. All materials spiled, dropped, washed, or
tracked from vehicles or site onto roadways or into storm drains must be removed immediately.
Mulching
Use mulch on all slopes steeper than 3 percent; when seedlings are made so late in the fall and winter that
germination cannot be expected until spring; in the bottom of spillways; and on roadbanks.
Temporary vegetation seeded alone may be established on good sites without the use of mulch.
Mulching material will consist of:
A. Use dry straw or dry hay of good quality and free of weed seeds. Dry straw will be applied at the rate of 2
tones per acre. Dry hay will be used at a rate of 2 1/2 tons per acre; or,
B. For hydraulic seeding, use wood cellulose mulch or wood pulp fiber at the rate of 500 pounds per acre and
dry straw or dry hay at the rate listed in A, above; or,
C. For hydraulic seeding on slopes 3/4:1 or steeper, 1,000 pounds of wood cellulose or wood pulp fiber which
includes a tackifier may be substituted for the treatment in B, above; or,
D. Use three tons per acre of Sericea lespedeza hay containing mature seed; or,
E. Apply pine straw or pine bark at a thickness of 3 inches. Other suitable materials in sufficient quantity may
be used where ornamentals or other ground covers are planted; or,
F. Soil retention blankets, erosion control netting, other manufactured materials, or block sod may be required
in addition to mulch on unstable soils and concentrated flow areas.
Wood cellulose and wood pulp fibers shall not contain germination or growth inhibiting factors. They will have
the property to be evenly dispersed when agitated in water. The fibers shall have a contrasting color to the soil
to allow visual metering and aid in uniform application during seeding.
Applying Mulch
A. Straw or hay mulch will I be spread uniformly within 24 hours after seeding and/or planting. The mulch may
be spread by blower-type spreading equipment, other spreading equipment or by hand. About 75 percent of
the soil surface will be covered.
B. Wood cellulose or wood fiber mulch will be applied with hydraulic seeding equipment.
Anchoring Mulch
A. Anchor straw or hay mulch immediately after application by one of the following methods:
1. By emulsified asphalt, (a) sprayed uniformly onto the mulch as it is ejected from the blower onto the mulch
as it is ejected from the blower machine, or (b) sprayed on the mulch immediately following mulch application
when straw or hay is spread by methods other than special blower equipment.
The combination of asphalt emulsion and water shall consist of a homogeneous mixture satisfactory for
spraying. The mixture shall consist of 100 gallons of grade SS-1h or CSS-1h emulsified asphalt and 100
gallons of water per ton of mulch.
Care shall be taken at all times to protect the public, adjacent property, pavements, curbs, sidewalks, and
all other structures from asphalt discoloration.
2. Press the mulch into the soil immediately after the mulch is spread. A special "packer disk" or disk harrow
with the disks set straight may be used. The disks may be smooth or serrated and should be 20 inches or
more in diameter and 8 to 12 inches apart. The edges of the disks shall be dull enough to press the mulch into
the ground without cutting it, leaving much of it in an erect position.
3. Apply synthetic tackifiers or binders applied immediately after the mulch is spread. Synthetic tackifiers will
be mixed and applied according to manufacturer's specifications.
4. Fall and winter plantings may include 1/2 bushel of rye or wheat to stabilize the mulch.
5. Plastic mesh or netting with no larger than one inch by one inch mesh may be needed to anchor straw or
hay mulch on unstable soils and concentrated flow areas.
B. Where wood cellulose or wood pulp fiber mulch is applied alone, a tackifier will be used.
Irrigation
Irrigation will be applied at a rate that will not cause runoff.
Topdressing
Topdressing will be applied on all temporary grass species and permanent grasses planted alone or in
mixtures with other species. Recommended rates of application are listed in Table 6-25.1, p. 6-144.
Second Year and Maintenance Fertilization
Second year fertilizer rates and maintenance fertilizer rates are listed in the adjacent Fertilization Table.
Lime and Maintenance Application
Apply two tons of agricultural lime every 4 to 6 years or as indicated by soil tests.
Use and Management
Bermudagrass, Bahiagrass and Tall fescue may be mowed as desired. Maintain at least 6 inches of top growth
under any use and management. Moderate use of top growth is beneficial after establishment.
Exclude livestock until the plants are well established.
Disturbed Area Stabilization (With Temporary Seeding)
SPECIFICATIONS
A. Grading and Shaping
1. Excessive water run-off must be controlled by planned and installed erosion control practices such as closed
drains, ditches, dikes, diversions, sediment basins and others.
2. No shaping or grading is required if slopes can be stabilized by hand-seeded vegetation or if hydraulic
seeding equipment is to be used.
B. Seedbed Preparation
1. When a hydraulic seeder is used, seedbed preparation is not required.
2. When using conventional or hand-seeding, seedbed preparation is not required if the soil material is loose
and not sealed by rainfall.
3. When soil has been sealed by rainfall or consists of smooth undisturbed cut slopes, the soil shall be pitted,
trenched or otherwise scarified to provide a place for seed to lodge and germinate.
C. Lime and Fertilizer: Lime Rate 2 tons/acre
1. Agricultural lime is not required.
2. On reasonably fertile soils or soil material, fertilizer is not required.
3. On soils of very low fertility, use 500 to 700 pounds of 10-10-10 fertilizer or the equivalent per acre (12-16
lbs./1,000 sq. ft.). If the site will permit, apply before land preparation and disk, rip or chisel to incorporate.
D. Seeding
1. Select a grass or grass-legume mixture suitable to the area and season of the year (see Table above).
2. Apply seed uniformly by hand, cyclone seeder, drill, cultipacker-seeder, or hydraulic seeder (slurry including
seed and fertilizer). Drill or cultipacker seeders should normally place seed one-half to one inch deep.
E. Mulching
Temporary vegetation can, in most cases, be established without the use of mulch. Mulch without seeding
should be considered for short term protection. See Ds1 - Disturbed Area Stabilization, (With Mulching Only).
F. Irrigation
If water is applied, it must be at a rate not causing runoff and erosion. Thoroughly wet the soil to a depth that
will insure germination of the seed. Subsequent applications should be made when needed.
SPECIFICATIONS
Grading and Shaping
A. Grading and shaping is not normally required where hydraulic seeding and fertilizing equipment is
to be used. Vertical banks shall be sloped to enable plant establishments.
B. When conventional seeding and fertilizing are to be done, grade and shape where feasible and
practical, so that equipment can be used safely and efficiently during seedbed preparation, seeding,
mulching and maintenance of the vegetation.
C. Concentrations of water that will cause excessive soil erosion will be diverted to a safe outlet.
Diversions and other treatment practices must conform with the appropriate standards and
specifications.
Seedbed Preparation
A. Seedbed preparation is not required where hydraulic seeding and fertilizing equipment is to be
used.
B. When conventional seeding is to be used, seedbed preparation will be done as follows:
1. Broadcast plantings.
a. Tillage at a minimum, shall adequately loosen the soil to a depth of 4 to 6 inches; alleviate
compaction; incorporate lime and fertilizer; smooth and firm the soil; allow for the proper placement of
seed, sprigs, or plants; and allow for the anchoring of straw or hay mulch if a disk is to be used.
b. Tillage may be done with any suitable equipment.
c. Tillage may be done on the contour where feasible.
d. On slopes too steep for the safe operation of tillage equipment, the soil surface will be pitted or
trenched across the slope with appropriate hand tools to provide places 6 to 8 inches apart in which
seed may lodge and germinate.
2. Individual plants.
a. Where individual plants are to be set, the soil will be well prepared by excavating holes, opening
furrows, or dibble planting.
b. For nursery stock plants, holes shall be large enough to accommodate roots without crowding.
c. Where pine seedlings are to be planted, subsoil under the row 36 inches deep on the con tour 4
to 6 months prior to planting. Subsoiling should be done when the soil is dry, preferably in August or
September.
Lime and Fertilizer - Rates and Analysis
A. Where permanent vegetation is to be established, agricultural lime shall be applied as indicated by
soil test or at the rate of 2 tons per acre. Agricultural lime shall be within the specifications of the
Georgia Department of Agriculture.
Lime spread by conventional equipment will be ground limestone." Ground limestone is calcitic or
dolomitic limestone ground so that 90 percent of the material will pass through a 1O-mesh sieve, not
less than 50 percent will pass through a 50-mesh sieve and not less than 25 percent will pass through
a 100-mesh sieve.
Agricultural lime spread by hydraulic seeding equipment will be "finely ground limestone." Finely
ground limestone is calcitic or dolomitic limestone ground so that 98 percent of the material will pass
through a 20-mesh sieve and not less than 70 percent will pass through a 100-mesh sieve.
It is desirable to use dolomitic limestone in the Sand Hills, Southern Coastal Plain and Atlantic
Coast Flatwoods MLRAs.
B. No agricultural lime is required where only temporary seeding is to be done or where only trees
are planted.
C. Initial fertilization requirements for each species or combination of species are listed in the
adjacent Fertilization Table.
Lime Fertilizer - Application
A. When hydraulic seeding equipment is used:
1. The initial fertilizer will be mixed with seed, inoculant (if needed) and wood cellulose or wood pulp
fiber mulch and applied in a slurry. The slurry mixture will be agitated during application to keep the
ingredients thoroughly mixed. The mixture will be spread uniformly over the area within one hour after
being placed in the hydroseeder.
2. Finely ground limestone will be mixed with water and applied immediately after mulching is
completed or in combination with the top dressing.
B. When conventional planting is to be done, lime and fertilizer will be applied uniformly in one of the
following ways:
1. Apply before land preparation so that it will be mixed with the soil during seedbed preparation; or,
2. Mix with the soil used to fill the holes, distribute in furrows, or
3. Broadcast after steep surfaces are scarified, pitted or trenched.
4. A fertilizer pellet will be placed at root depth beside each pine tree seedling.
Plant Selection
A. Refer to the adjacent Tables for approved species.
B. Species not listed shall be approved by the State Resource Conservationist of the Natural
Resources Conservation Service before they are used.
C. Plants shall be selected on the basis of species characteristics; site and soil conditions; planned
use and maintenance of the area; time of year of planting; method of planting; and the needs and
desires of the land user.
D. Plant selections may include companion crops to provide quick cover. Care shall be taken in
selecting companion crop species and seeding rates to limit competition so that the desired
permanent vegetation may become established as soon as possible.
E. The term "pure live seed" is used to express the: quality of seed, even if it is not shown on the
label. Pure live seed, PLS, is expressed as a percentage of the seeds that 'are pure and will
germinate. PLS is determined by multiplying the percent of pure seed times the percent of
germination; i.e., PLS = % germination x % purity.
Inoculants
A. All legume seed shall be inoculated with appropriate nitrogen-fixing bacteria.
B. The inoculant shall be a pure culture prepared specifically for the seed species and used within
the dates on the container.
C. A mixing medium recommended by the manufacturer shall be used to bond the inoculant to the
seed.
D. For conventional seeding, two times the amount of inoculant recommended by the manufacturer
shall be used.
E. For hydraulic seeding, four times the amount of inoculant recommended by the manufacturer shall
be used.
F. All inoculated seed shall be protected from the sun and high temperatures and shall be planted
the same day inoculated. No inoculated seed shall remain in the hydroseeder longer than one hour.
Planting
A. Hydraulic seeding - Mix the seed, inoculant, fertilizer, and wood cellulose or wood pulp fiber mulch
with water and apply in aslurry uniformly over the area to be treated. Apply within one hour after the
mixture is made.
B. Conventional seeding - Seeding will be done on a freshly prepared and firmed seedbed. For
broadcast planting, use a cultipacker-seeder, drill, rotary seeder, other mechanical seeder, or hand
seeding to distribute the seed uniformly over the area to be treated. Cover the seed lightly with a
cultipacker or other suitable equipment.
C. No-till seeding is permissible into annual cover crops when planting is done following maturity of
the cover crop or if the temporary cover stand is sparse enough to allow adequate growth of the
permanent species. No-till seeding must be done with appropriate no-till seeding equipment. The
seed must be uniformly distributed and planted at the proper depth.
D. Individual plants - Shrubs, vines and sprigs may be planted with appropriate planters or hand
tools. Pine trees will be planted manually in the subsoil furrow. Each plant will be set in a manner that
will avoid crowding the roots.
Nursery stock plants shall be planted at the same depth or slightly deeper than they grew at the
nursery. The tips of vines and sprigs must be at or slightly above the ground surface.
Where individual holes are dug, place fertilizer in the bottom of the hole, add two inches of soil and
set the plant.
SILT FENCE REQUIREMENTS
TABLE 6-13.2
WIDTH OF FABRICUSE
TYPE A (36") 1) ON DEVELOPMENTS WHERE THE LIFE OF THE PROJECT
IS GREATER THAN OR EQUAL TO 6 MONTHS.
2) WHERE THE SLOPE GRADIENT IS STEEPER THAN 3:1.
TYPE B (22") 1) ON PROJECTS, SUCH AS RESIDENTIAL HOME SITES OR
SMALL COMMERCIAL DEVELOPMENTS, WHERE THE LIFE
OF THE PROJECT IS LESS THAN 6 MONTHS.
2) WHERE THE SLOPE GRADIENT IS LESS THAN OR EQUAL
TO 3:1
TYPE C (36") 1) WHERE FILL SLOPES EXCEED A VERTICAL HEIGHT OF 20
WITH WOVEN WIRE FEET AND THE SLOPE GRADIENT IS STEEPER THAN 3:1.
REINFORCEMENT
SILT FENCE REQUIREMENTS
TABLE 6-13.2
MINIMUM LEHGTH TYPE OF POST SIZE OF POST
TYPE A 4' SOFT WOOD 3" DIA. OR 2x4
OAK 1.5" x 1.5"
STEEL 1.3LB./FT. MIN.
TYPE B 3' SOFT WOOD 2" DIA. OR 2X2
OAK 1" X 1"
STEEL .75LB./FT. MIN.
TYPE C 4' STEEL 1.3LB./FT. MIN.
SILT FENCE REQUIREMENTS
TABLE 6-13.2
GAUGE CROWN LEGS STAPLES/POST
WIRE STAPLES 17 MIN.
3
4
" WIDE
1
2
" LONG 5 MIN.
GAUGE CROWN LEGS STAPLES/POST
NAILS 14 MIN. 1"
3
4
" 4 MIN.
NOTE: FILTER FABRIC MAY ALSO BE ATTACHED TO THE POST BY WIRE, CORD,
AND POCKETS
PURK YOTAKHONG, P.E.
GSWCC NO. 0000059231
110 Samaritan Drive, Suite 201
Cumming, GA 30040
(770) 977-5747
www.cecincga.com
OF
Copyright 2021
Civil Engineering Consultants, Inc.
THESE DRAWINGS AND THEIR
REPRODUCTIONS ARE THE PROPERTY
OF THE ENGINEER AND MAY NOT BE
REPRODUCED, PUBLISHED OR USED IN
ANY WAY WITHOUT THE WRITTEN
PERMISSION OF THIS ENGINEER.
c
CLIENT
APPROVAL STAMP
PROJECT NAME
Drawn By :
Checked By :
Designed By :
Scale :
SHEET TITLE
PROJECT INCEPTION DATE
DRAWING NUMBER
RELEASES
No DescriptionDate
REVISIONS
No DescriptionDate
1
2
3
4
5
1
2
3
4
5
6
7
8
04/07/2021 PROPOSAL READY
02/16/2021
15
ES&PC DETAILS PART 2
BUFORD DAM ROAD WATER
LINE IMPROVEMENTS
14
GRP
BJR
GRP
CITY OF CUMMING
SEE DETAIL
20
07
2 - B
UF
OR
D D
AM
R
OA
D W
AT
ER
L
IN
E - J
ES
SE
N
EL
SO
N - 4
/8
/2
02
1 1
0:3
0 A
M
EROSION CONTROL NOTES:
1. EROSION CONTROL PRACTICES MUST COMPLY WITH THE MINIMUM BEST
MANAGEMENT PRACTICES FOR EROSION CONTROL. AND SHALL COMPLY WITH THE
STANDARDS/SPECIFICATIONS IN THE MANUAL FOR EROSION AND SEDIMENT
CONTROL IN GEORGIA.
2. IN CONCENTRATED FLOW AREAS, ALL SLOPES STEEPER THAN 2.5:1 AND WITH A
HEIGHT TEN FEET OR GREATER, AND CUTS AND FILLS WITHIN STREAM BUFFERS,
SHALL BE STABILIZED WITH THE APPROPRIATE EROSION CONTROL MATTING OR
BLANKET.
3. MULCH TEMPORARY VEGETATION ON ALL EXPOSED AREAS WITHIN 7 DAYS AFTER
DISTURBANCE
4. DISTURBED AREAS LEFT IDLE FOR 5 DAYS, AND NOT TO FINAL GRADE, WILL BE
ESTABLISHED TO TEMPORARY VEGETATION (Ds2). ALL AREAS TO FINAL GRADE WILL
BE ESTABLISHED TO PERMANENT VEGETATION (Ds3) IMMEDIATELY UPON
COMPLETION.
5. WHEN PLANTING VEGETATION, MULCH (HAY OR STRAW) SHOULD BE UNIFORMLY
SPREAD OVER SEEDED AREA WITHIN 24 HOURS OF SEEDING.
6. FORSYTH COUNTY LAND DISTURBANCE PERMIT MUST BE DISPLAYED ON SITE AT ALL
TIMES DURING CONSTRUCTION AND IN PLAIN VIEW FROM A COUNTY ROAD OR
STREET.
7. EROSION AND SEDIMENT CONTROL DEVICES MUST BE INSTALLED AND INSPECTED
PRIOR TO ANY GRADING ON SITE. PLEASE CALL (770) 528-2134 WITH ENOUGH
LEAD-TIME FOR AN INSPECTION TO MEET SCHEDULE.
8. SEDIMENT/EROSION CONTROL DEVICES MUST BE CHECKED AFTER EACH STORM
EVENT. EACH DEVICE IS TO BE MAINTAINED OR REPLACED IF SEDIMENT
ACCUMULATION HAS REACHED ONE HALF THE CAPACITY OF THE DEVICE.
ADDITIONAL DEVICES MUST BE INSTALLED IF NEW CHANNELS HAVE DEVELOPED.
9. THE USE OF POLYMERS (PAMS) IS ACCEPTED AS A BMP AS RECOMMENDED BY THE
STATE SOIL & WATER CONSERVATION COMMISSION BMP "GREEN BOOK". THE
POLYMERS USED TO STABILIZE CONSTRUCTION SITES MUST BE USED IN
CONJUNCTION WITH MULCHING AND/OR HYDRO SEEDING.
10. IF STREAMS ARE ON THE SITE, THE STREAM BUFFERS SHALL BE LEFT UNDISTURBED
AND A CONSERVATION EASEMENT OR A RESTRICTIVE COVENANT BE PLACED ON
THAT PROPERTY.
11. THE ESCAPE OF SEDIMENT FROM THE SITE SHALL BE PREVENTED BY THE
INSTALLATION OF EROSION AND SEDIMENT CONTROL MEASURES AND PRACTICES
PRIOR TO, OR CONCURRENT WITH, LAND DISTURBING ACTIVITIES.
12. EROSION CONTROL MEASURES WILL BE MAINTAINED AT ALL TIMES. IF FULL
IMPLEMENTATION OF THE APPROVED PLAN DOES NOT PROVIDE FOR EFFECTIVE
EROSION CONTROL, ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES
SHALL BE IMPLEMENTED TO CONTROL OR TREAT THE SEDIMENT SOURCE.
13. ANY DISTURBED AREA LEFT EXPOSED FOR A PERIOD GREATER THAN 7 DAYS
SHALL BE STABILIZED WITH MULCH OR TEMPORARY SEEDING.
14. AMENDMENTS/REVISIONS TO THE ES&PC PLAN WHICH HAVE A SIGNIFICANT EFFECT
ON BMP'S WITH A HYDRAULIC COMPONENT MUST BE CERTIFIED BY A DESIGN
PROFESSIONAL.
15. NON-EXEMPT ACTIVITIES SHALL NOT BE CONDUCTED WITHIN THE 25 OR 50-FOOT
UNDISTURBED STREAM BUFFERS AS MEASURED FROM THE POINT OF WRESTED
VEGETATION WITHOUT FIRST ACQUIRING THE NECESSARY VARIANCES AND
PERMITS.
16. RUNOFF COEFFICIENT OR PEAK DISCHARGE FLOW OF THE SITE PRIOR TO AND
AFTER CONSTRUCTION ACTIVITIES ARE COMPLETED: PRE-CN AND POST-CN WILL BE
THE SAME. PRE-CONSTRUCTION IS IN GRASSED AREA THAT WILL BE GRASSED IN
POST-CONSTRUCTION.
6' O.C.
MAX.
FASTENERS FOR SILT FENCES
18"
OVERLAP AT FABRIC ENDS
Sd1-C: SILT FENCE - SENSITIVE
SIDE VIEW
FRONT VIEW
CO: CRUSHED STONE CONSTRUCTION EXIT
EXIT DIAGRAM
ENTRANCE ELEVATION
Sd2-P: CURB INLET PROTECTION
"SNOW" FENCE
Tr: TREE PROTECTION
3' MIN.
12" MIN.
18" MIN.
1.5' MAX.
3' MAX.
3' MAX.
STEEL FRAME AND TYPE C SILT FENCE INSTALLATION
Sd2-F : INLET SEDIMENT TRAP
A PROTECTIVE COVERING USED TO PREVENT
EROSION AND ESTABLISH TEMPORARY OR
PERMANENT VEGETATION ON STEEP SLOPES,
SHORE LINES, OR CHANNELS.
ESTABLISHING A PERMANENT VEGETATIVE COVER
SUCH AS TREES, SHRUBS, VINES, GRASSES, OR
LEGUMES ON DISTURBED AREAS.
ESTABLISHING A TEMPORARY VEGETATIVE
COVER WITH FAST GROWING SEEDINGS ON
DISTURBED AREAS.
ESTABLISHING TEMPORARY PROTECTION FOR DISTURBED
AREAS WHERE SEEDLINGS MAY NOT HAVE A SUITABLE
GROWING SEASON TO PRODUCE AN EROSION RETARDING
COVER.
Ds1
Ds3
Ss
Ds1
Ds3
DISTURBED AREA
STABILIZATION
(WITH MULCHING
ONLY)
DISTURBED AREA
STABILIZATION
(WITH PERM
SEEDING)
SLOPE
STABILIZATION
DISTURBED AREA
STABILIZATION
(WITH TEMP
SEEDING)
Ds2Ds2
Ss
Bf BUFFER ZONE
STRIP OF UNDISTURBED ORIGINAL VEGETATION,
ENHANCED OR RESTORED EXISTING VEGETATION OR THE
REESTABLISHMENT OF VEGETATION SURROUNDING AN
AREA OF DISTURBANCE OR BORDERING STREAMS.
Bf
GEORGIA
FOR SOIL EROSION AND SEDIMENT CONTROL PRACTICES
UNIFORM CODING SYSTEM
GEORGIA SOIL AND WATER CONSERVATION COMMISSION
STRUCTURAL PRACTICES
A BARRIER TO PREVENT SEDIMENT FROM
LEAVING THE CONSTRUCTION SITE. IT MAY BE
SANDBAGS, BALES OF STRAW OR HAY, BRUSH,
LOGS AND POLES, GRAVEL, OR A SILT FENCE.
A PERMANENT OR TEMPORARY STONE FILTER
DAM INSTALLED ACROSS SMALL STREAMS OR
DRAINAGE WAYS.
A TEMPORARY CHANNEL CONSTRUCTED TO
CONVEY FLOW AROUND A CONSTRUCTION SITE
WHILE A PERMANENT STRUCTURE IS BEING
CONSTRUCTED.
AN EARTH CHANNEL OR DIKE LOCATED ABOVE,
BELOW, OR ACROSS A SLOPE TO DIVERT RUNOFF.
THIS MAY BE A TEMPORARY OR PERMANENT
STRUCTURE.
A CRUSHED STONE PAD LOCATED AT THE
CONSTRUCTION SITE EXIT TO PROVIDE A PLACE
FOR REMOVING MUD FROM TIRES THEREBY
PROTECTING PUBLIC STREETS.
IMPROVING, CONSTRUCTING OR STABILIZING AN
OPEN CHANNEL, EXISTING STREAM, OR DITCH.
A SMALL TEMPORARY BARRIER OR DAM
CONSTRUCTED ACROSS A SWALE, DRAINAGE
DITCH OR AREA OF CONCENTRATED FLOW.
Ch
Co
Dc
Di
Rd
Sd1
CHANNEL
STABILIZATION
CONSTRUCTION
EXIT
STREAM
DIVERSION
CHANNEL
ROCK
FILTER
DAM
SEDIMENT
BARRIER
Co
CODE PRACTICE DETAIL DESCRIPTION
MAP
SYMBOL
CODE PRACTICE DETAIL DESCRIPTION
MAP
SYMBOL
VEGETATIVE PRACTICES
Cd
A TEMPORARY BRIDGE OR CULVERT-TYPE
STRUCTURE PROTECTING A STREAM OR
WATERCOURSE FROM DAMAGE BY CROSSING
CONSTRUCTION EQUIPMENT.
Sr
TEMPORARY
STREAM
CROSSING
Sr
A PERMANENT VEGETATIVE COVER USING SODS ON
HIGHLY ERODABLE OR CRITICALLY ERODED LANDS.
Ds4 Ds4
DISTURBED AREA
STABILIZATION
(SODDING)
CHECKDAM
DIVERSION
PURK YOTAKHONG, P.E.
GSWCC NO. 0000059231
110 Samaritan Drive, Suite 201
Cumming, GA 30040
(770) 977-5747
www.cecincga.com
OF
Copyright 2021
Civil Engineering Consultants, Inc.
THESE DRAWINGS AND THEIR
REPRODUCTIONS ARE THE PROPERTY
OF THE ENGINEER AND MAY NOT BE
REPRODUCED, PUBLISHED OR USED IN
ANY WAY WITHOUT THE WRITTEN
PERMISSION OF THIS ENGINEER.
c
CLIENT
APPROVAL STAMP
PROJECT NAME
Drawn By :
Checked By :
Designed By :
Scale :
SHEET TITLE
PROJECT INCEPTION DATE
DRAWING NUMBER
RELEASES
No DescriptionDate
REVISIONS
No DescriptionDate
1
2
3
4
5
1
2
3
4
5
6
7
8
04/07/2021 PROPOSAL READY
02/16/2021
15
ES&PC DETAILS PART 3
BUFORD DAM ROAD WATER
LINE IMPROVEMENTS
15
GRP
BJR
GRP
CITY OF CUMMING
SEE DETAIL
20
07
2 - B
UF
OR
D D
AM
R
OA
D W
AT
ER
L
IN
E - J
ES
SE
N
EL
SO
N - 4
/8
/2
02
1 1
0:3
0 A
M
STONE CHECK DAM
CROSS SECTION
PROFILE VIEW
STONE CHECK DAM
SPACING BETWEEN CHECK DAMS
CD-S CD-S