OUTLINE OF THE ASSIGNMENT The report would give a detail on the following topics: 1. Budget - What is a budget? - Why budget? - What are the characteristics of budgeting? - What are its advantages? - Problems of budgeting - Budgeting cycle 2. Budgetary control - What is budgetary control? - Advantages of budgetary control? - Applicability of budget and budgetary control 3. Meaning of strategic planning and forecasting - Difference between strategic planning vs. Budgeting and forecasting vs. Budgeting 4. Budgetary control and responsibility centres 5. Types of budget - What are the types of budget? - What are its characteristics? - Advantages and disadvantages

Transcript of Budgetary Control

Page 1: Budgetary Control

OUTLINE OF THE ASSIGNMENT

The report would give a detail on the following topics:

1. Budget

- What is a budget?

- Why budget?

- What are the characteristics of budgeting?

- What are its advantages?

- Problems of budgeting

- Budgeting cycle

2. Budgetary control

- What is budgetary control?

- Advantages of budgetary control?

- Applicability of budget and budgetary control

3. Meaning of strategic planning and forecasting

- Difference between strategic planning vs. Budgeting and forecasting vs. Budgeting

4. Budgetary control and responsibility centres

5. Types of budget

- What are the types of budget?

- What are its characteristics?

- Advantages and disadvantages

Page 2: Budgetary Control

I. Introduction

Planning and control are major activities of management in all organisations. Budgets are

central to the process of planning and control. The involvement with budgets places the

management accountant as a key player in the provision of management information. Most

organisations employ some form of budgeting, those of any size have quite formal

mechanisms. A large survey of over 300 companies supported by ACCA, on which the

author was engaged, reported recently that almost all respondents used some form of

budgeting and budgetary control.

Budgets can be prepared for and used by anyone and anything. That is, we can prepare and

use personal budgets and organisations, ministries and non profit making organisations can

all use them.

Budgets, by definition, have to be prepared in advance; and for this reason, they are often

referred to in terms of their being part of a feed forward system. Feedback is a term

frequently heard both in accounting and ordinary use. Feed forward, on the other hand tends

to be less frequently heard, yet this word incorporates the most important aspect of

budgeting: looking at situations in advance, thinking about the impact and implications of

things in advance, and attempting to take control of situations in advance.

Budgets

A budget is a plan expressed in quantitative and money terms. Budgets need to be prepared

and approved in advance of the period in which they are to be used. Budgets can include

some or all of income, expenditure, and the capital to be employed. Moreover, a budget can

be drawn up for an entire organization, any segment of the organization such as a department

or sales territory or division, or for a significant activity such as the production and sale of a

specific product.

We should also add that a budget can include non monetary as well as monetary information

in it.

Page 3: Budgetary Control

Budgets and management behaviour

Some would argue that any problems which arise out of the budget system are a result of how

managers use the information provided by it and how such use affects the information that is

entered into the budget. That is, budgets have implications for human behaviour. A few

points on this are briefly mentioned below, note that the syllabus for paper 8 does require

appreciation of behavioural issues at an introductory level.

Budgets as targets

From many psychological studies it is pointed out that better performance is achieved when

targets exist than when this is not the case. Furthermore, demanding targets extract better

performance than weak ones. This is up to a point, totally unattainable targets tend to be

counterproductive. The precision which is applied to a target is seen to be important because

if targets are not accepted by an individual, then poorer performance may result from that

person’s ‘withdrawal’ from the task than would apply if a less demanding target had been set.

It is also important that managers achieve their targets frequently enough to give the positive

reinforcement in their efforts. A practical consequence of this is that a budget which might

get the best performance out of a manager, a demanding target, is unlikely to be achieved

most of the time. It is not therefore, a useful forecast of actual outturn. Conversely a budget

that is an accurate forecast of what is likely to be achieved will only motivate a modest level

of performance.

Budget as forecasts

General observations and academic experiments have suggested that managers behave

conservatively when required to make budgets which are to be used as forecasts for future

achievement. That is, they under estimate sales and over estimate costs. They see it as in their

interests to incorporate ‘slack’ into the budget. Managers also engage in games of building up

slack in good years and converting it to reported profit in poor years. Conversely, there are

observations from other studies that some managers, after a run of mediocre results,

deliberately overstate revenues and understate cost estimates. They no doubt feel the need to

make an immediate favourable impact by promising better performance in the future. It may

be, of course, that this merely delays the problem for which these managers are subsequently

censured when they fail to hit these optimistic targets.

Page 4: Budgetary Control

Budgets in performance evaluation

A further use of budgets is as a basis for setting performance standards and rewards, for

example, bonus, status or enhanced promotion prospects are often linked to budget

attainment. Organisations are complex, tasks are interdependent, there are many dimensions

of performance and these are not all easily quantified and certainly not in financial terms.

Problems can occur here because the budgets are quite narrow specifications of what are

desired organisational outcomes.

Placing emphasis on budget achievement can have repercussions on other, perhaps long-term,

aspects of organisational performance. Management might not place emphasis on other

important aspects of their jobs such as maintaining quality or staff morale if, as a

consequence, they run the risk of not achieving the financial budget. Alternatively, stressing

the need to achieve these budget results may result in the budget being met but this may be as

a result of manipulation by managers of both the budget and actual results.

The budgeting process

It would be easy to dismiss the budgeting process as beginning when the first budget is

prepared, and as being complete when the master budget is finalised. In reality, the budgeting

process begins for many organisations a long time before the budget period begins; and the

process ends once the budget period has ended. This means the budgeting process is a very

lengthy process: typically, for a large organisation, the pre budgeting phase can begin up to a

year before the budget period starts.

Jones and Pendlebury (1984), give us some insight into the beginning of the budgeting cycle

when they present a "Timetable for preparation of detailed revenue budget and capital

programme" for a Local Authority. They show that the process starts in June in the year

preceding the budget period with the draft budget manual being sent to Finance Officers, who

will discuss this draft with their departmental staff (with a view to adoption or amendment).

The budgetary planning phase is completed in March (ready for an April start) when the

printed budget book is published and the approved estimates are put into the financial control

system. (Colville (1989) presents a similar view, but this time of the budgeting for a Police

Authority in the UK).

Page 5: Budgetary Control

The budget period

The budget period is the period for which a set of budgets is prepared: typically the budget

period is of one year's duration, and will be designed to coincide with an organisation's

financial, or fiscal, year. There is no reason why a budget period has to be one year, but

typically it is.

On the other hand, if we are dealing with a project, then the budget will clearly be linked to

that project. A three month project will have a budget covering the whole project and will

thus be a three months budget.

Most organisations will divide their budget period into calendar months (or periods); whereas

others have thirteen period years (all of an equal four week period). In certain situations, the

budget period will be analysed according some particular feature of the work in that situation:

for example, stockbrokers have their year divided into "accounts" of two and three weeks'

duration. These divisions of a budget period are control periods.

The benefits of budgeting

Many of us prepare budgets on a personal level: how much is my income for the month?

How much am I going to spend? and, most importantly, is there anything left over? It seems

true, however, that many businessmen do not prepare budgets for their businesses. Thus, even

though managers prepare budgets for their relatively simple lives, when it comes to the much

more complex situation of their business, they prefer to let cash inflows and outflows look

after themselves. The purpose of this part of the chapter is to demonstrate that budgets are

useful, informative and communicative. We will see that a budget is a necessity not a luxury.

We will also see some of the problems underlying organisations: the nature of the

organisation and the interactions of the people working in them. By considering these

problems, we will be considering ways in which your budgeting system, or the organisation

itself, can be changed, if necessary, to overcome them.

Problems in budgeting

Whilst budgets may be an essential part of any marketing activity they do have a number of

disadvantages, particularly in perception terms.

Page 6: Budgetary Control

· Budgets can be seen as pressure devices imposed by management, thus resulting in:

a) Bad labour relations

b) inaccurate record-keeping.

· Departmental conflict arises due to:

a) Disputes over resource allocation

b) departments blaming each other if targets are not attained.

· It is difficult to reconcile personal/individual and corporate goals.

· Waste may arise as managers adopt the view, "we had better spend it or we will lose it".

This is often coupled with "empire building" in order to enhance the prestige of a department.

Responsibility versus controlling, i.e. some costs are under the influence of more than one

person, e.g. power costs.

· Managers may overestimate costs so that they will not be blamed in the future should they

overspend.

The Budget Cycle

As the financial component of program planning, budgeting should begin with the overall

goals of the LEA/school technology plan and the school’s instructional program as outlined

in the school improvement plan—and these goals should be reflected in the budget priorities

and details.

Effective budget development is a continuous cyclical process. Wise budget planners

continuously complete the cycle of steps shown.

Page 7: Budgetary Control

II. Budgetary Control

Budgets are simply exercises in calculation unless they are used. When we use a budget, we

do so as part of a system of budgetary control. That is, we have some basic ideas of what we

want to do, we prepare budgets to help us achieve those ideas; and then once we have done

whatever it is that we wanted to do, we check to see if we kept to our budget.

Budgetary control relates to the establishment of budgets relating the responsibilities of

budget holders the needs of a policy. Budgetary control also relates to the continuous

comparison of actual with budgeted results: it does this to try to ensure that the objectives of

that policy are achieved; or to provide a basis for the change of those objectives.

In summary, a budget is a statement setting out the monetary, numerical or non quantitative

aspects of an organisation's plans for the coming week or month or year. Budgetary control is

the analysis of what happened when those plans came to be put into practice, and what the

organisation did or did not do to correct for any variations from these plans.

Advantages of budgeting and budgetary control

There are a number of advantages to budgeting and budgetary control:

· Compels management to think about the future, which is probably the most important

feature of a budgetary planning and control system. Forces management to look ahead, to set

Page 8: Budgetary Control

out detailed plans for achieving the targets for each department, operation and (ideally) each

manager, to anticipate and give the organisation purpose and direction.

· Promotes coordination and communication.

· Clearly defines areas of responsibility. Requires managers of budget centres to be made

responsible for the achievement of budget targets for the operations under their personal

control.

· Provides a basis for performance appraisal (variance analysis). A budget is basically a

yardstick against which actual performance is measured and assessed. Control is provided by

comparisons of actual results against budget plan. Departures from budget can then be

investigated and the reasons for the differences can be divided into controllable and non-

controllable factors.

· Enables remedial action to be taken as variances emerge.

· Motivates employees by participating in the setting of budgets.

· Improves the allocation of scarce resources.

· Economises management time by using the management by exception principle.

Applicability of Budgeting and Budgetary Control

Budgeting can be applied to virtually every situation. It does not matter whether we work in

the Public or Private Sector of the Economy. We may work for a profit making business or a

non profit making business. Your company may be engaged in trading, manufacturing, or

providing a service. In all of these situations, budgeting and budgetary control is of use to

you.

As we will see, there are many issues underlying the use of a budgeting system that need

careful consideration. For example, we will see that budgeting systems cannot just be

imposed on an organisation nor do they run themselves. Managers at all levels often resent

budgets and budget targets for a variety of reasons.

Page 9: Budgetary Control

III. Difference between strategic planning, budgeting and forecasting

The requirement for accurate and timely forecasting of corporate results increases every day.

Fuelled by the demands of the web-driven world for instant access to information, financial

managers are expected to be able to predict the financial and operational impact of each big

decision in days, or even hours. The truth is often far removed – most management

accountants still rely on a planning methodology designed in the early Twentieth Century and

a bewildering tower of spreadsheets. Long hours, questionable accuracy, and the ever-present

danger of the spreadsheet tower collapsing under the strain mean that most financial

managers dread the planning process. In the first of a series of six articles, FSN contributing

editor Steve Bows examines aspects of a new process for the Twenty-First Century that

combines best-practice techniques with the latest in enabling technology to help take the

stress out of the planning cycle.

The Planning Cycle

Most organisations currently plan their business on an annual cycle structured around the

financial year – top-down strategic planning by senior management starts about six months

out, leading into the annual budget, a detailed bottom-up exercise designed to align proposed

cost centre expenditure with the top-down plan for the coming year. Once the new year starts,

and the first month's actuals are in, the budget will start to be revised in a forecasting process

that tends to be high-level, quarterly and less structured than the annual budget.

 

Page 10: Budgetary Control

Out of these three distinct planning activities, it is the annual budget process that leads to

most dissatisfaction amongst all concerned, and consumes most time and money. Based on an

outdated model of a command-and-control business structure, the process engenders mistrust

between senior and middle management as both sides engage in a highly-charged political

battle to secure a lower or higher cost budget respectively for the year ahead. This battle can

rage for months, distracting attention from external events and draining the energy of all

involved.

Worst of all, the hard-fought budget outcome becomes redundant within a matter of months,

being overtaken by back-of-an-envelope forecast calculations that are produced in a hurry by

senior management, in response to changing market conditions or big new ideas. Often this

forecast "process" is carried out without consulting the cost centres, further undermining the

morale of middle management.

IV. Budgetary control and responsibility centres

Responsibility Centres

A responsibility centre is an organizational subsystem charged with a well-defined mission

and headed by a manager accountable for the performance of the centre. "Responsibility

centres constitute the primary building blocks for management control." It is also the

fundamental unit of analysis of a budget control system. A responsibility centre is an

organization unit headed by a responsible manager.

There are four major types of responsibility centres: cost centres, revenues centres, profit

centres and investment centres.

Cost Centre

A cost centre is a responsibility centre in which manager is held responsible for

controlling cost inputs. There are two general types of cost centres: engineered

expense centres and discretionary expense centres. Engineered costs are usually

expressed as standard costs. A discretionary expense centre is a responsibility centre

whose budgetary performance is based on achieving its goals by operating within

predetermined expense constraints set through managerial judgement or discretion.

Revenue Centre

Page 11: Budgetary Control

A revenue centre is a responsibility centre whose budgetary performance is measured

primarily by its ability to generate a specified level of revenue.

Profit Centre

In a profit centre, the budget measures the difference between revenues and costs.

Investment Centre

An investment centre is a responsibility centre whose budgetary performance is based

on return on investment. The uses of responsibility centres depend to a great extent on

the type of organization structure involved. Engineered cost centres, discretionary

expense centre, and revenue centres are more often used with functional

organization designs and with the function units in a matrix design.

In contrast, with a divisional organization designs, it is possible use profit centres

because the large divisions in such a structure usually have control over both the

expenses and the revenues associated with profits

V. Types of budget

1. Zero based budgeting

Purpose of Zero-Base Budgeting

The Objective of Zero Based Budgeting is to “reset the clock” each year. The

Traditional incremental budgeting assumes that there is a guaranteed budgetary base-the

previous year’ level of appropriations -and the only question is how much of an increment

will be given. Zero Based Budgeting implies that managers need to build a budget from the

ground up, building a case for their spending as if no baseline existed- to start at zero.

Resources are not necessarily allocated in accordance with previous patterns and

consequently each existing item of expenditure has to be annually re-justified.

Put differently, the purpose of ZBB is to reevaluate and reexamine all programs and

expenditures for each budgeting cycle by analyzing workload and efficiency measures to

determine priorities or alternative levels of funding for each program or expenditure. Through

this system, each program is justified in its entirety each time a new budget is developed.

Page 12: Budgetary Control

Historical development of ZBB

ZBB or some modified version of it, has been used in the private- and public -sectors for

decades. The first known application of zero-base budgeting was by the U.S Department of

Agriculture in 1962. However, the general problem of incremental budgeting that zero-base

budgeting attempts to solve has been recognized from a much earlier period.

Indeed, the major next application of ZBB in government has been tracked back to

GOV. Jimmy Carter’s use of it in Georgia in the early 1970s.

In the private sector, the major leap forward occurred with the development at Texas

Instruments Inc. of a way to handle the mass of data. This involved the implementation of a

“Decision Package” approach to prepare the 1970 budget for the Staff & Research Divisions.

Applications of ZBB

The practical application of ZBB involves the use of the “Decision Package”. All budgetary

procedures involve an identification of organizational objectives. In the context of these

objectives, ZBB involves three stages:

1. Identification of decision units.

2. Development of decision package.

3. Review and ranking of decision packages.

Advantages of ZBB

ZBB unlike incremental traditional line item budget, it dose not assume that last

year’s allocation of resources is necessarily appropriate for the current year, all the

functions of an organization are re-evaluated annually from a zero base. The

systematic nature of such a fundamental review imposes a discipline on the

organization which has produced in practice secondary advantages;

It produces in a readily accessible form more and better management information.

This in turn will improve the quality of management’s decision.

Page 13: Budgetary Control

Another advantage that stems from this improved management information is that

its production involves the participation of lower - level management in the

budgetary process, and the smaller the decision units, the greater this involvement

will become.

Unexpected events that occur during the financial year can be more readily

adjusted for. This is because the basic information for modifying goals has already

been generated.

If implemented well, ZBB can eliminate a sense of “entitlement” to cost increases.

Improved discipline in developing budgets.

More meaningful budget discussions during plan review sessions.

Disadvantages of ZBB

ZBB vastly overestimates man’s ability to calculate.

In practice the effects of different levels of effort on each alternative mutually

exclusive decision package are not considered, due to the short budgetary cycle

and the need for expediency. But this might lead to a sub-optimal allocation of

resources.

By incorporating performance measures in the formation of decision packages, it

forces managers to establish a preference for effectiveness, efficiency, or equity as

they try to rank decision packages. This make the ranking process difficult.

The use of cutoff point for packages is different in public agencies. As a result,

when funds become tight, even in ZBB systems, each department is asked to make

marginal reductions, rather than eliminate the lowest ranked programs.

The implementation of a ZBB system requires a great deal of time on the part of

agency staff, limiting their ability to perform other important functions.

Attempts by agencies to manipulate priority listings by ranking popular items

lower than items that would have little chance of funding.

Established programs have political support and they will continue to receive their

share of the budget regardless of any analysis produced.

Page 14: Budgetary Control

2. Performance budgeting

Tight budgets and demanding citizens put governments under increasing pressure to show

that they are providing good value for money. Providing information about public sector

performance can satisfy the public’s need to know, and could also be a useful tool for

governments to evaluate their performance.

Performance information is not a new concept, but the governments of OECD countries have

taken a closer look at integrating it into the budget process in the past decade as part of efforts

to improve decision making by moving the focus away from inputs (“how much money will I

get?”) towards measurable results (“what can I achieve with this money?”).

The introduction of performance budgeting has been linked to broader efforts to improve

expenditure control as well as public sector efficiency and performance. Thus, performance

budgeting can be combined with increased flexibility for managers in return for stronger

accountability for the results, so as to enable them to decide how to best deliver public

services.

Performance information is a fairly simple concept: providing information on whether

programmes, agencies and public service providers are doing the job required of them

effectively and efficiently. Performance information has a long history in OECD countries:

most of them have been working on it for at least five years, and almost half of them for more

than ten.

Much of this information does find its way into budget documents, but simply including

information on performance in budget documents is a long way from performance budgeting.

If governments want to use performance information in budget setting, they need to find a

way to integrate performance into the budget decision process, not just the budget paperwork.

To complicate matters, there are no single agreed standard definitions of performance

budgeting, of the type of information it should include, or of the stage of the budget process

Page 15: Budgetary Control

when it should be introduced. There is also the question of whether performance information

should be used in deciding how to allocate resources and, if so, how.

There is no single model of performance budgeting. Even when countries have adopted

similar models, they have taken diverse approaches to implementing them and have adapted

them to their own national capacities, cultures and priorities.

The OECD has defined performance budgeting as budgeting that links the funds allocated to

measurable results. There are three broad types: presentational, performance-informed, and

direct performance budgeting.

Presentational performance budgeting simply means that performance information is

presented in budget documents or other government documents. The information can refer to

targets, or results, or both, and is included as background information for accountability and

dialogue with legislators and citizens on public policy issues. The performance information is

not intended to play a role in decision making and does not do so.

In performance-informed budgeting, resources are indirectly related to proposed future

performance or to past performance. The performance information is important in the budget

decision-making process, but does not determine the amount of resources allocated and does

not have a predefined weight in the decisions. Performance information is used along with

other information in the decision-making process.

Direct performance budgeting involves allocating resources based on results achieved. This

form of performance budgeting is used only in specific sectors in a limited number of OECD

countries. For example, the number of students who graduate with a Master’s degree will

determine the following year’s funding for the university running the programme.

3. Flexible budgeting

A budget is a plan for the future. Hence, budgets are planning tools, and they are usually

prepared prior to the start of the period being budgeted. However, the comparison of the

budget to actual results provides valuable information about performance. Therefore, budgets

are both planning tools and performance evaluation tools.

 

Usually, the single most important input in the budget is some measure of anticipated output.

For a factory, this measure of output is the number of units of each product produced. For a

Page 16: Budgetary Control

retailer, it might be the number of units of each product sold. For a hospital, it is the number

of patient days (the number of patient admissions multiplied by the average length of stay).

 

The static budget is the budget that is based on this projected level of output, prior to the

start of the period. In other words, the static budget is the “original” budget. The static

budget variance is the difference between any line-item in this original budget and the

corresponding line-item from the statement of actual results. Often, the line-item of most

interest is the “bottom line”: total cost of production for the factory and other cost centers; net

income for profit centers.

 

The flexible budget is a performance evaluation tool. It cannot be prepared before the end of

the period. A flexible budget adjusts the static budget for the actual level of output. The

flexible budget asks the question: “If I had known at the beginning of the period what my

output volume (units produced or units sold) would be, what would my budget have looked

like?” The motivation for the flexible budget is to compare apples to apples. If the factory

actually produced 10,000 units, then management should compare actual factory costs for

10,000 units to what the factory should have spent to make 10,000 units, not to what the

factory should have spent to make 9,000 units or 11,000 units or any other production level.

 

The flexible budget variance is the difference between any line-item in the flexible budget

and the corresponding line-item from the statement of actual results.

 

The following steps are used to prepare a flexible budget:

 

1. Determine the budgeted variable cost per unit of output. Also determine the budgeted

sales price per unit of output, if the entity to which the budget applies generates

revenue (e.g., the retailer or the hospital).

 

2. Determine the budgeted level of fixed costs.

 

3. Determine the actual volume of output achieved (e.g., units produced for a factory,

units sold for a retailer, patient days for a hospital).

 

Page 17: Budgetary Control

4. Build the flexible budget based on the budgeted cost information from steps 1 and 2,

and the actual volume of output from step 3.

 

Flexible budgets are prepared at the end of the period, when actual output is known.

However, the same steps described above for creating the flexible budget can be used prior to

the start of the period to anticipate costs and revenues for any projected level of output, where

the projected level of output is incorporated at step 3. If these steps are applied to various

anticipated levels of output, the analysis is called pro forma analysis. Pro forma analysis is

useful for planning purposes. For example, if next year’s sales are double this year’s sales,

what will be the company’s cash, materials, and labor requirements in order to meet

production needs?

 

 

Pro Forma Analysis at XYZ Ltd:

Following are pro forma monthly income statements for XYZ Ltd, a small, start-up fashion

jeans manufacturer. The pro forma analysis was prepared at the beginning of the month and

considered three alternative sales levels. The company has no variable marketing costs.

Page 18: Budgetary Control

 

XYZ LTD

PRO FORMA ANALYSIS

FOR THE UPCOMING MONTH

Income

Statement

line-item

Budgeted

amount

per unit

Pro Forma Analysis for

Alternative Output Levels

 

10,000 units

 

20,000 units

 

30,000 units

Revenue

 

Variable costs:

  Materials

  Labor

  Overhead

    Total

 

Contribution margin

 

Fixed costs:

  Manufacturing

     Overhead

  Marketing costs

    Total fixed costs

 

Operating income

$40

 

 

15

10

5

30

 

$10

$400,000

 

 

150,000

100,000

50,000

300,000

 

100,000

 

 

 

100,000

50,000

150,000

 

($50,000)

$800,000

 

 

300,000

200,000

100,000

600,000

 

200,000

 

 

 

100,000

50,000

150,000

 

$50,000

 

 

$1,200,000

 

 

450,000

300,000

150,000

900,000

 

300,000

 

 

 

100,000

50,000

150,000

 

$150,000

 

Page 19: Budgetary Control

Since by definition, fixed costs are not expected to change as volume of output changes

within the relevant range, fixed costs remain the same at all three projected levels of output.

Revenue and variable costs vary with output in a linear fashion. Hence, when output

increases 100% from 10,000 units to 20,000 units, revenue, each line-item for variable costs,

and contribution margin all increase 100%.

 

 

Static Budget Variance at XYZ Ltd:

XYZ Ltd management decides that 10,000 units is the most likely output volume, and sets the

static budget based on this sales and production level. After the end of the month, company

personnel prepare the following table, showing the static budget, actual results, and the static

budget variance.

Page 20: Budgetary Control

 XYZ LTD

STATIC BUDGET VARIANCE

FOR THE MONTH JUST ENDED

Income

Statement

line-item

Budgeted

amount per

unit

Static

 Budget

(A)

10,000 units

Actual

Results

(B)

16,000 units

Static

Budget

Variance

(A) – (B)

Revenue

 

Variable costs:

  Materials

  Labor

  Overhead

    Total

 

Contribution margin

 

Fixed costs:

  Manufacturing Overhead

  Marketing costs

    Total fixed costs

 

Operating income

$40

 

 

15

10

5

30

 

$10

$400,000

 

 

150,000

100,000

50,000

300,000

 

100,000

 

 

100,000

50,000

150,000

 

($50,000)

 

$670,000

 

 

230,000

167,000

84,000

481,000

 

189,000

 

 

105,000

49,000

154,000

 

$35,000

 

 

$270,000

 

 

(80,000)

(67,000)

(34,000)

(181,000)

 

89,000

 

 

(5,000)

1,000.

(4,000)

 

$85,000

 

In the variance column, positive numbers are favorable variances (good news), and negative

numbers are unfavorable (bad news).

 

Page 21: Budgetary Control

The static budget variance shows a large favorable variance for revenue, and large

unfavorable variances for variable costs. These large variances are due primarily to the fact

that the static budget was built on an output level of 10,000 units, while the company actually

made and sold 16,000 units. The revenue variance might also be due to an average unit sales

price that differed from budget. The variable cost variances might also be due to input prices

that differed from budget (e.g., the price of fabric), or input quantities that differed from the

per-unit budgeted amounts (e.g., yards of fabric per pair of pants). 

 

There are also small variances for fixed costs. These costs should not vary with the level of

output (at least within the relevant range). However, many factors can cause actual fixed

costs to differ from budgeted fixed costs that are unrelated to output volume. For example,

property tax rates and the fixed salaries of front office personnel can change, and depreciation

expense can change if unexpected capital acquisitions or dispositions occur.

 

 

The Flexible Budget Variance at XYZ Ltd:

In order to better understand the causes of the large revenue and variable cost variances in the

static budget variance column, XYZ Ltd personnel prepare the following flexible budget.

 

 

Page 22: Budgetary Control

XYZ LTD

FLEXIBLE BUDGET VARIANCE

FOR THE MONTH JUST ENDED

Income

Statement

line-item

Budgeted

amount per

unit

Flexible

 Budget

(A)

16,000 units

Actual

Results

(B)

16,000 units

Flexible

Budget

Variance

(A) – (B)

Revenue

 

Variable costs:

  Materials

  Labor

  Overhead

    Total

 

Contribution margin

 

Fixed costs:

  Manufacturing Overhead

  Marketing costs

    Total fixed costs

 

Operating income

$40

 

 

15

10

5

30

 

$10

$640,000

 

 

240,000

160,000

80,000

480,000

 

160,000

 

 

100,000

50,000

150,000

 

$10,000

$670,000

 

 

230,000

167,000

84,000

481,000

 

189,000

 

 

105,000

49,000

154,000

 

$35,000

 

 

$30,000

 

 

10,000

(7,000)

(4,000)

(1,000)

 

29,000

 

 

(5,000)

1,000.

(4,000)

 

$25,000

 

Once again, positive variances are favorable (good news), and negative variances are

unfavorable (bad news).

 

From this table, XYZ Ltd management sees that even after adjusting for sales volume,

revenue was higher than would have been expected. The favorable $30,000 variance must be

due entirely to an average sales price that was higher than planned (almost $42 per pair

compared to the original budget of $40 per pair).

Page 23: Budgetary Control

 Materials costs were lower than would have been expected for a sales volume of 16,000

units. This favorable variance could be due to lower fabric prices, or to more efficient

utilization of fabric (less waste than expected), or a combination of these two factors. Labor

and overhead were higher than expected, even after adjusting for the sales volume of 16,000

units. This unfavorable flexible budget variance implies that either wage rates were higher

than planned, or labor was not as efficient as planned, or both. Similarly, the components of

variable overhead were either more expensive than budgeted, or were used more intensively

than budgeted. For example, electric rates might have been higher than planned, or more

electricity was used than planned per unit of output. 

 

The fixed cost variances are identical in this table to the previous table. In other words, the

flexible budget and flexible budget variance provide no additional information about fixed

costs beyond what can be learned from the static budget variance.

Page 24: Budgetary Control

Learning Objectives

An indication and explanation of the importance of budgetary control as a control

technique

An overview of the advantages and disadvantages of budgeting

Difference between strategic planning, budgeting and forecasting

An introduction to the types of budgets

Relation of Budgetary control and responsibility centres

Page 25: Budgetary Control

A Report

on

BUDGETARY CONTROL

Submitted to

Mr. Ajay Shah

Submitted by:

Abhilash Guddi

Gowri T R

Pranavi N P

Saurabh Priyadarshi

Vignesh Prabhu

(SECTION A)