Transcript of Budget Training The University of Montana 2010/2011 Session I The Budget Environment.
![Page 1: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/1.jpg)
Budget TrainingThe University of Montana
2010/2011Session I
The Budget Environment
![Page 2: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/2.jpg)
Course Outline
• The funding foundation
• The process
• Break
• The current situation and the outlook…
![Page 3: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/3.jpg)
Learning Objectives
At the conclusion of this session, you will be able to: describe the types of funds utilized by the University, and identify the primary
purpose of each fund
identify major sources and uses of each fund
describe the General funds appropriation and allocation processes
explain the concept of spending authority, and the fiduciary responsibilities at various levels of delegation
describe the planning / budget / assessment cycle and associated timelines.
![Page 4: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/4.jpg)
Let’s Start with Fund Accounting.(Don’t be scared.)
![Page 5: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/5.jpg)
What is a fund?A fund is an activity or entity separately accounted for – with its own cash, balance sheet, or income statement
![Page 6: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/6.jpg)
How many different kinds of funds do we have?
Current Restricted Funds
• Grants• Contracts• Gifts
Current Unrestricted Funds
• E&G Funds– General Funds– Designated
Funds• Auxiliary Funds
Non-Current Funds
• Plant Funds• Loan Funds• Endowment
Funds• Agency Funds
![Page 7: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/7.jpg)
General Funds
GENERAL FUNDS revenue comes from:• state appropriations • millage• tuition and fees • investment income
![Page 8: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/8.jpg)
General Funds
R e v e n u e F Y 10A ppropria t ion $45,525,726M illage 6,228,129Tuit ion and F ees 88,185,331O ther O C H E /S ta te F und ing 1,497,938O ther 811,304
To ta l $142,248,428
![Page 9: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/9.jpg)
General Funds
S tate A p p r o p r iati o n4 5 ,5 2 5 ,7 2 6
3 2 %
M illag e6 ,2 2 8 ,1 2 9
4 %
Tu iti o n & F e e s8 8 ,1 8 5 ,3 3 1
6 2 %
O th e r O C H E/S tate F u n d in g
1 ,4 9 7 ,9 3 81 %
O th e r8 1 1 ,3 0 4
1 %
![Page 10: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/10.jpg)
General Funds
General Funds support:• basic teaching, research & public service mission• academic and administrative support activities• maintenance and operation of the University and its
academic facilities
The heart of university financial resources
![Page 11: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/11.jpg)
General Funds
• Instructional programs
• Library operations
• Business services
• Utilities
Examples of General Funds Activities
![Page 12: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/12.jpg)
General Funds – Uses
E x p e n d itu re s b y C a te g o ryS a la rie s 82,272,164B e n e fits 26,863,580T ra n sfe rs 2,644,881O p e ra tin g C o sts 16,366,553Eq u ip m e n t a n d C a p ita l 2,377,509S ch o la rsh ip s a n d F e l lo w sh ip s 11,723,741
$142,248,428
![Page 13: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/13.jpg)
General Funds – Uses
S alar ie s5 9 %
B e n e fi ts1 8 %
O p e r ati n g C o sts1 1 %
Eq u ip m e n t an d C ap ita l
2 %
S c h o lar sh ip s an d F e llo w sh ip s
8 %
Tr an sfe r s2 %
![Page 14: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/14.jpg)
Designated Funds
DESIGNATED FUNDS revenue comes from:• Fee-for-service activities• Self-support activities• Entrepreneurial activities • Indirect cost recovery• Investment income
![Page 15: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/15.jpg)
Designated Funds
• Designated for purposes specified by the Board of Regents or the campus
• Separately classified to accumulate costs or to re-charge other funds or accounts
![Page 16: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/16.jpg)
Designated Funds
• Computing & Information Services
• Student Course Fees
• Indirect Cost Recoveries
• Continuing Education
• Sales & Service Accounts
Examples of Designated funded activities
![Page 17: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/17.jpg)
Designated Funds – Uses
Expenditures by CategorySalaries 11,591,450Benefits 3,947,901Transfers 4,633,655Operating Costs 23,754,997Equipment and Capital 1,656,958Scholarships and Fellowships 1,361,450
$46,946,411
![Page 18: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/18.jpg)
Designated Funds – Uses
S alar ie s$ 1 1 ,5 9 1 ,4 5 0
2 5 %
B e n e fi ts3 ,9 4 7 ,9 0 1
8 %
O p e r ati n g C o sts2 3 ,7 5 4 ,9 9 7
5 1 %
Eq u ip m e n t an d C ap ita l
1 ,6 5 6 ,9 5 8 3 %
S c h o lar sh ip s an d F e llo w sh ip s
1 ,3 6 1 ,4 5 0 3 %
Tr an sfe r s4 ,6 3 3 ,6 5 5
1 0 %
![Page 19: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/19.jpg)
Auxiliary Funds
AUXILIARY FUNDS revenue comes from:Primarily student-related
• Fee-for-service activities• Self-support activities• Entrepreneurial activities and• Investment income
![Page 20: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/20.jpg)
Examples of Auxiliary Funded Activities• Residence Halls
• Food Services
• Printing & Graphics Services
• Golf Course
• Campus Recreation Center
Auxiliary Funds
![Page 21: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/21.jpg)
Auxiliary Funds – Uses
Expenditures by CategorySalaries 16,224,017$ Benefits 4,974,924 Transfers 7,598,225 Operating Costs 17,468,256 Equipment and Capital 177,365 Scholarships and Fellowships -
46,442,787$
![Page 22: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/22.jpg)
Auxiliary Funds – Uses
S alar ie s$ 1 6 ,2 2 4 ,0 1 7
3 4 .9 %
B e n e fi ts4 ,9 7 4 ,9 2 4
1 0 .7 %
O p e r ati n g C o sts1 7 ,4 6 8 ,2 5 6
3 7 .6 %
Eq u ip m e n t an d C ap ita l
1 7 7 ,3 6 5 0 .4 %
Tr an sfe r s7 ,5 9 8 ,2 2 5
1 6 .4 %
![Page 23: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/23.jpg)
Restricted Funds
• Funds which are limited to purposes specified by sources external to the Board of Regents or the Legislature
• Specific projects or programs, which can only be expended under the terms of a governmental or private gift, grant or contract.
![Page 24: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/24.jpg)
Examples of Restricted Funds
• Federal grants and contracts
• Private grants
• Federal financial aid
• Restricted scholarships
• Restricted gifts
![Page 25: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/25.jpg)
Other Fund Types
• Loan Funds
• Plant Funds
• Agency Funds
• Endowment Funds
![Page 26: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/26.jpg)
Fund Integrity
• So, does it really matter what fund gets used for what?
Really?
![Page 27: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/27.jpg)
Break!
![Page 28: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/28.jpg)
Programs (Functions)
• Instruction• Research• Public Service• Academic Support• Student Services• Institutional Support• O&M Plant• Scholarships
![Page 29: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/29.jpg)
Programs (Functions)
• Instruction• Research• Public Service• Academic Support• Student Services• Institutional Support• O&M Plant• Scholarships
So… What kinds of expenses are appropriate for each of these?
![Page 30: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/30.jpg)
Programs (Functions)
• Instruction• Research• Public Service• Academic Support• Student Services• Institutional Support• O&M Plant• Scholarships
![Page 31: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/31.jpg)
Programs (Functions)
• Instruction• Research• Public Service• Academic Support• Student Services• Institutional Support• O&M Plant• Scholarships
How much of our budget does each one represent?
![Page 32: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/32.jpg)
General Funds – by ProgramIns t ruc t ion 69,297,093A c adem ic S upport 17 ,920,452R es earc h 1,703,790P lant 16,299,725Ins t itu t iona l S upport 14 ,858,171P ublic S ervic e 1,406,701S c ho lars h ips 11,723,741S tudent S ervic es 9,038,755
$142,248,428
![Page 33: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/33.jpg)
FY10 Budgeted General Funds by Program
In str u c ti o n6 9 ,2 9 7 ,0 9 3
4 9 %
R e se ar c h1 ,7 0 3 ,7 9 0
1 %P u b lic S e r v ic e1 ,4 0 6 ,7 0 1
1 %
A c ad e m ic S u p p o r t1 7 ,9 2 0 ,4 5 2
1 3 %
S tu d e n t S e r v ic e s9 ,0 3 8 ,7 5 5
6 %
In sti tu ti o n al S u p p o r t
1 4 ,8 5 8 ,1 7 1 1 0 %
O & M P lan t1 6 ,2 9 9 ,7 2 5
1 2 %
S c h o lar sh ip s & F e llo w sh ip s1 1 ,7 2 3 ,7 4 1
8 %
![Page 34: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/34.jpg)
Program Integrity
• So, again – does it really matter what program gets charged for what expense?
Really?
![Page 35: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/35.jpg)
General Funds Process
How do general funds end up in your budget?
![Page 36: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/36.jpg)
General Funds Process(es)
“Lump Sum”$$$
Legislative Appropriations
Executive Budget
Proposal
Allocation
Campus / Unit
Budgeting
![Page 37: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/37.jpg)
General Funds Process(es)
Executive Budget Proposal – Present Law Adjustments– Decision Packages
![Page 38: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/38.jpg)
General Funds Process(es)
Legislative Appropriations– HB2– HB13– OTO– Special Items– Others…
![Page 39: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/39.jpg)
General Funds Process(es)
“Lump Sum”
![Page 40: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/40.jpg)
General Funds Process(es)
Allocation (OCHE, Regents)
![Page 41: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/41.jpg)
General Funds Process(es)
Campus / Unit Budget Process(es)BiennialAnnual
![Page 42: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/42.jpg)
Administrative Assessment
• What is it, really?• Why do it?• Who determines how much, and how
do they do it?
![Page 43: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/43.jpg)
Planning, Budgeting, and Assessment
![Page 44: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/44.jpg)
The Budgeting Environment
• Where we’ve been…
• The current situation!!!
• The outlook???
![Page 45: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/45.jpg)
Where We’ve Been…
• The 2008/2009 Biennium– PL & Payplan funded at 85%– 0% Resident tuition increase, 6.5% Nonresident– 2.9% Payplan– Record enrollments (res & nonres)– No funding for growth– No base funding for quality or new initiatives
![Page 46: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/46.jpg)
Where We’ve Been…
• The 2010/2011 Biennium– Appropriation failed to cover PL & Payplan– 17.6 million (6.5 million Missoula) is Fed OTO– 3% Resident tuition increase, 8.5% Nonresident– No Payplan– Record enrollments (res grew significantly, nonres down
slightly)– No funding for growth– Quality, new initiatives funded from nonresident tuition
![Page 47: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/47.jpg)
The Current Situation!!!
• FY10 tuition shortfall of $1.4 million
• FY11 tuition shortfall could exceed $2 million
• Planning for loss of $17.6 million (6.5 million in Missoula) in 2012/13 Biennium
• Conceptual framework in place
• Detailed planning & implementation will continue remainder of FY10
![Page 48: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/48.jpg)
A Word (or 2) about Reallocation(…and the lump)
Total FY Resident FTE DifferenceCAP FY10 from CAP
The University of Montana-Missoula 8,923 9,967 1,044 Montana Tech of the University of Montana 1,725 1,971 246 The University of Montana-Western 909 941 32 UM-Helena College of Technology 731 948 217
The University of Montana 12,288 13,828 1,540
Montana State University-Bozeman 8,158 8,027 (131) Montana State University-Billings 3,912 3,872 (40) Montana State University-Northern 1,148 988 (160) MSU-Great Falls College of Technology 1,250 1,425 175
Montana State University 14,468 14,312 (156)
The Montana University System 26,756 28,140 1,384
![Page 49: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/49.jpg)
The Outlook???
• State revenues down significantly, possibility of additional State appropriation reductions
• Enrollment prospects uncertain– Resident FTE and headcount continue to grow despite fewer
MT high school graduates– Nonresident enrollment more challenging
• Timing of economic recovery hard to project
• Commitment to continued excellence and achievement of strategic goals is unwavering
![Page 50: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/50.jpg)
Learning Objectives
At the conclusion of this session, you will be able to: describe the types of funds utilized by the University, and identify the primary
purpose of each fund
identify major sources and uses of each fund
describe the General funds appropriation and allocation processes
explain the concept of spending authority, and the fiduciary responsibilities at various levels of delegation
describe the planning / budget / assessment cycle and associated timelines.
![Page 51: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/51.jpg)
Questions?
Discussion?
![Page 52: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/52.jpg)
Preview of Coming Attractions
![Page 53: Budget Training The University of Montana 2010/2011 Session I The Budget Environment.](https://reader030.fdocuments.us/reader030/viewer/2022032522/56649d6c5503460f94a4b2c1/html5/thumbnails/53.jpg)
Thank you !