BUDD INLET TREATMENT PLANT
VULNERABILITY ASSESSMENT
ATTRIBUTED TO CLIMATE CHANGE
January 22, 2015
Tyle Zuchowski Capital Planning Manager
![Page 2: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...](https://reader034.fdocuments.us/reader034/viewer/2022050218/626e9e83ba024f0e43561be7/html5/thumbnails/2.jpg)
OUTLINE • Study Variables • Combined system • Flooding vulnerabilities • Strategies to mitigate • Summary
![Page 3: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...](https://reader034.fdocuments.us/reader034/viewer/2022050218/626e9e83ba024f0e43561be7/html5/thumbnails/3.jpg)
STRATEGIES
![Page 4: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...](https://reader034.fdocuments.us/reader034/viewer/2022050218/626e9e83ba024f0e43561be7/html5/thumbnails/4.jpg)
• Sea level rise (low, medium, high) – 0.25, 0.50, 1.83 feet
• High tides (100-year return frequency) • Waves (0.43 feet) • Storm surge and precipitation runoff
VARIABLES
![Page 5: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...](https://reader034.fdocuments.us/reader034/viewer/2022050218/626e9e83ba024f0e43561be7/html5/thumbnails/5.jpg)
0
5
10
Treatment Plant Sits at 12 to 20 Feet
mean sea level (0) mean tide
range
100-year tide (10.94)
TIDAL ELEVATIONS
UW very high SLR (12.8)
Olympia Flood Model (14.4)
mean low low water (-7.42)
mean low water (-4.36)
Modeled ranges 14.4 to 11.2
mean high high water (7.14) mean high water (6.13)
Feet from mean sea level
15
![Page 6: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...](https://reader034.fdocuments.us/reader034/viewer/2022050218/626e9e83ba024f0e43561be7/html5/thumbnails/6.jpg)
UW very low sea level rise (11.2 feet)
0.20 feet SLR
![Page 7: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...](https://reader034.fdocuments.us/reader034/viewer/2022050218/626e9e83ba024f0e43561be7/html5/thumbnails/7.jpg)
UW medium sea level rise (11.4 feet)
0.50 feet SLR
![Page 8: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...](https://reader034.fdocuments.us/reader034/viewer/2022050218/626e9e83ba024f0e43561be7/html5/thumbnails/8.jpg)
UW very high sea level rise (12.8 feet)
1.83 feet SLR
![Page 9: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...](https://reader034.fdocuments.us/reader034/viewer/2022050218/626e9e83ba024f0e43561be7/html5/thumbnails/9.jpg)
100-year tidal wave (13.4 feet)
2.00 feet SLR with 0.43 tidal wave
![Page 10: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...](https://reader034.fdocuments.us/reader034/viewer/2022050218/626e9e83ba024f0e43561be7/html5/thumbnails/10.jpg)
Olympia Flood Model (14.4 feet)
2.0 feet SLR with extreme 100-yr storm runoff
![Page 11: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...](https://reader034.fdocuments.us/reader034/viewer/2022050218/626e9e83ba024f0e43561be7/html5/thumbnails/11.jpg)
COMBINED STORM/SEWER SYSTEM
351 Acres
![Page 12: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...](https://reader034.fdocuments.us/reader034/viewer/2022050218/626e9e83ba024f0e43561be7/html5/thumbnails/12.jpg)
FLOW TO LOTT: AVERAGE OVER LAST 8 YEARS
Parameter Flow (MGD)
Base Flow 8.8
Annual Average 11.3
Maximum Monthly Average 15.4
Maximum Day 35.8
Peak Hourly 56.5
Instantaneous 72
![Page 13: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...](https://reader034.fdocuments.us/reader034/viewer/2022050218/626e9e83ba024f0e43561be7/html5/thumbnails/13.jpg)
POTENTIAL FLOODING
![Page 14: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...](https://reader034.fdocuments.us/reader034/viewer/2022050218/626e9e83ba024f0e43561be7/html5/thumbnails/14.jpg)
• Utilidor (~0.5 feet) – Electrical equipment – Piping and appurtenances
• Headworks (13 feet) – Influent pumps (-19 feet) – Back up generator(13 feet) – Motor control centers (13 feet)
• Effluent pumping (12.5) – Pumps – Electrical
• Substations – Service entry switchgear (12 feet) – LOTT substations (13.0 to 14.9 feet) – PSE Substation (12 feet)
VULNERABILITIES
![Page 15: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...](https://reader034.fdocuments.us/reader034/viewer/2022050218/626e9e83ba024f0e43561be7/html5/thumbnails/15.jpg)
PLANT ELEVATIONS
10’
10’
Head Works
West Primaries
Secondary Clarifiers
1st Anoxic
UV Effluent Pump
Station 2nd Anoxic
1st Aeration
14.4’
14.4’
-20’
![Page 16: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...](https://reader034.fdocuments.us/reader034/viewer/2022050218/626e9e83ba024f0e43561be7/html5/thumbnails/16.jpg)
-20’
HEADWORKS
-2’
Influent Pumps
Influent Motors
The 80 Level
![Page 17: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...](https://reader034.fdocuments.us/reader034/viewer/2022050218/626e9e83ba024f0e43561be7/html5/thumbnails/17.jpg)
Motor Control Centers
Backup Generators
13’
13’
![Page 18: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...](https://reader034.fdocuments.us/reader034/viewer/2022050218/626e9e83ba024f0e43561be7/html5/thumbnails/18.jpg)
Backup Generators
13’
![Page 19: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...](https://reader034.fdocuments.us/reader034/viewer/2022050218/626e9e83ba024f0e43561be7/html5/thumbnails/19.jpg)
Backup Generator Ventilation Fan Grill
13’
![Page 20: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...](https://reader034.fdocuments.us/reader034/viewer/2022050218/626e9e83ba024f0e43561be7/html5/thumbnails/20.jpg)
EFFLUENT PUMPING
12.5’
12.5’
![Page 21: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...](https://reader034.fdocuments.us/reader034/viewer/2022050218/626e9e83ba024f0e43561be7/html5/thumbnails/21.jpg)
QUESTIONS?
Service Entry Switch Gear (12 feet)
12’
![Page 22: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...](https://reader034.fdocuments.us/reader034/viewer/2022050218/626e9e83ba024f0e43561be7/html5/thumbnails/22.jpg)
PSE SUBSTATION (12 FEET)
12’
![Page 23: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...](https://reader034.fdocuments.us/reader034/viewer/2022050218/626e9e83ba024f0e43561be7/html5/thumbnails/23.jpg)
• Design standards • Raise key electrical infrastructure • Separate combined system • Increase influent/effluent pumping • Develop sandbagging protocols • Continue to coordinate with City
RECOMMENDATIONS
![Page 24: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...](https://reader034.fdocuments.us/reader034/viewer/2022050218/626e9e83ba024f0e43561be7/html5/thumbnails/24.jpg)
QUESTIONS?