BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...

24
BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ATTRIBUTED TO CLIMATE CHANGE January 22, 2015 Tyle Zuchowski Capital Planning Manager

Transcript of BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...

Page 1: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...

BUDD INLET TREATMENT PLANT

VULNERABILITY ASSESSMENT

ATTRIBUTED TO CLIMATE CHANGE

January 22, 2015

Tyle Zuchowski Capital Planning Manager

Page 2: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...

OUTLINE • Study Variables • Combined system • Flooding vulnerabilities • Strategies to mitigate • Summary

Page 3: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...

STRATEGIES

Page 4: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...

• Sea level rise (low, medium, high) – 0.25, 0.50, 1.83 feet

• High tides (100-year return frequency) • Waves (0.43 feet) • Storm surge and precipitation runoff

VARIABLES

Page 5: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...

0

5

10

Treatment Plant Sits at 12 to 20 Feet

mean sea level (0) mean tide

range

100-year tide (10.94)

TIDAL ELEVATIONS

UW very high SLR (12.8)

Olympia Flood Model (14.4)

mean low low water (-7.42)

mean low water (-4.36)

Modeled ranges 14.4 to 11.2

mean high high water (7.14) mean high water (6.13)

Feet from mean sea level

15

Page 6: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...

UW very low sea level rise (11.2 feet)

0.20 feet SLR

Page 7: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...

UW medium sea level rise (11.4 feet)

0.50 feet SLR

Page 8: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...

UW very high sea level rise (12.8 feet)

1.83 feet SLR

Page 9: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...

100-year tidal wave (13.4 feet)

2.00 feet SLR with 0.43 tidal wave

Page 10: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...

Olympia Flood Model (14.4 feet)

2.0 feet SLR with extreme 100-yr storm runoff

Page 11: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...

COMBINED STORM/SEWER SYSTEM

351 Acres

Page 12: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...

FLOW TO LOTT: AVERAGE OVER LAST 8 YEARS

Parameter Flow (MGD)

Base Flow 8.8

Annual Average 11.3

Maximum Monthly Average 15.4

Maximum Day 35.8

Peak Hourly 56.5

Instantaneous 72

Page 13: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...

POTENTIAL FLOODING

Page 14: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...

• Utilidor (~0.5 feet) – Electrical equipment – Piping and appurtenances

• Headworks (13 feet) – Influent pumps (-19 feet) – Back up generator(13 feet) – Motor control centers (13 feet)

• Effluent pumping (12.5) – Pumps – Electrical

• Substations – Service entry switchgear (12 feet) – LOTT substations (13.0 to 14.9 feet) – PSE Substation (12 feet)

VULNERABILITIES

Page 15: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...

PLANT ELEVATIONS

10’

10’

Head Works

West Primaries

Secondary Clarifiers

1st Anoxic

UV Effluent Pump

Station 2nd Anoxic

1st Aeration

14.4’

14.4’

-20’

Page 16: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...

-20’

HEADWORKS

-2’

Influent Pumps

Influent Motors

The 80 Level

Page 17: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...

Motor Control Centers

Backup Generators

13’

13’

Page 18: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...

Backup Generators

13’

Page 19: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...

Backup Generator Ventilation Fan Grill

13’

Page 20: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...

EFFLUENT PUMPING

12.5’

12.5’

Page 21: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...

QUESTIONS?

Service Entry Switch Gear (12 feet)

12’

Page 22: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...

PSE SUBSTATION (12 FEET)

12’

Page 23: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...

• Design standards • Raise key electrical infrastructure • Separate combined system • Increase influent/effluent pumping • Develop sandbagging protocols • Continue to coordinate with City

RECOMMENDATIONS

Page 24: BUDD INLET TREATMENT PLANT VULNERABILITY ASSESSMENT ...

QUESTIONS?