BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

32
GOVERNMENT OF ANDHRA PRADESH ABSTRACT PRED – MRR Proposals 2012-13 – 609 WORKS COSTING Rs. 20865.12 Lakh for Providing BT Renewal – Administrative sanction – Accorded – Orders – Issued. ------------------------------------------------------------------------------------- PANCHAYAT RAJ & RURAL DEVELOPMENT (PROGS.I) DEPARTMENT G.O.Rt.No. 1840 DATED:05-10-2012. Read the following: 1) From the ENC, Hyderabad Lr. No. W1/DEE1/BTR/12, dt. 12-06-12. 2) From the ENC, Hyderabad Lr. No. W1/PMGSY/B.T.Renewals/2012 dt. 24-09-2012. ***** O R D E R: In the reference 2 nd read above the Engineer-in-Chief, PR, Hyderabad has submitted proposals for BT renewals for 609 road works i.e. 309 works for PMGSY Roads and 300 works for Non PMGSY Roads for a total amount of Rs. 20865.12 lakh for the period 2012-13 under Maintenance of Rural Roads Grant which were completed under PMGSY and Non PMGSY. 2. The proposals have been examined and Government hereby accord administrative sanction for an amount of Rs. 20865.12 lakh for the period 2012-13 for 609 works as annexed to this order under MRR Grant under the following Head of Account. MJH 3054 Roads & Buildings MH 04 District & Other Roads. GH 196 Assistance to Zilla Parishads. SH (12) Assistance to Panchayat Raj Institutions for Maintenance of Rural Roads. 270 Minor works. 272 Maintenance. 3. The Engineer-in-Chief, PR, Hyderabad is directed to take up Maintenance of the roads by providing BT Renewals so as to not only protect the BT road assets already created but also to extend their life. It is further instructed to ensure durable and good riding surface with the presently sanctioned Maintenance works duly having necessary quantitative and qualitative checks and executing the works confirming relevant technical specifications. Propose maintenance of CD works wherever necessary. Removal of High berms and jungle on the road margins must be attended. Removal of encroachments etc, in the road margins in towns and villages, which obstruct flow of rain water wherever necessary may be attended. 4. The Engineer-in-Chief, PR should see that the works are executed within the administrative sanction amounts and no revision of estimated cost exceeding administrative sanction will be allowed. 5. The Superintending Engineer, PR, concerned should check and verify that the works sanctioned in Para 2 above is not already sanctioned/grounded/semi finished under any other grants. Any discrepancy noticed is to be brought to the notice of the higher authority immediately who will inform to Government for further necessary action. The above instructions shall be followed scrupulously. If such works as sanctioned in this GO are already grounded etc., it may deemed to have been cancelled automatically and the same may be informed to Government immediately for taking further necessary action. The technical estimate must be verified by the concerned Executive Engineer, before grounding the work. Alternate sanctions will not be entertained. 6. The Engineer-in-Chief PR, Hyderabad shall take necessary action in the matter accordingly and submit the utilization Certificates to Government soon after completion of the works in the stipulated time. P.T.O.

description

MRR GRANT AP GO

Transcript of BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Page 1: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

GOVERNMENT OF ANDHRA PRADESH ABSTRACT

PRED – MRR Proposals 2012-13 – 609 WORKS COSTING Rs. 20865.12 Lakh for Providing BT Renewal – Administrative sanction – Accorded – Orders – Issued.

------------------------------------------------------------------------------------- PANCHAYAT RAJ & RURAL DEVELOPMENT (PROGS.I) DEPARTMENT

G.O.Rt.No. 1840 DATED:05-10-2012. Read the following:

1) From the ENC, Hyderabad Lr. No. W1/DEE1/BTR/12, dt. 12-06-12. 2) From the ENC, Hyderabad Lr. No. W1/PMGSY/B.T.Renewals/2012 dt. 24-09-2012.

*****

O R D E R:

In the reference 2nd read above the Engineer-in-Chief, PR, Hyderabad has submitted proposals for BT renewals for 609 road works i.e. 309 works for PMGSY Roads and 300 works for Non PMGSY Roads for a total amount of Rs. 20865.12 lakh for the period 2012-13 under Maintenance of Rural Roads Grant which were completed under PMGSY and Non PMGSY.

2. The proposals have been examined and Government hereby accord administrative sanction for an amount of Rs. 20865.12 lakh for the period 2012-13 for 609 works as annexed to this order under MRR Grant under the following Head of Account.

MJH 3054 Roads & Buildings MH 04 District & Other Roads. GH 196 Assistance to Zilla Parishads. SH (12) Assistance to Panchayat Raj Institutions for Maintenance of Rural Roads.

270 Minor works. 272 Maintenance.

3. The Engineer-in-Chief, PR, Hyderabad is directed to take up Maintenance of the roads by providing BT Renewals so as to not only protect the BT road assets already created but also to extend their life. It is further instructed to ensure durable and good riding surface with the presently sanctioned Maintenance works duly having necessary quantitative and qualitative checks and executing the works confirming relevant technical specifications. Propose maintenance of CD works wherever necessary. Removal of High berms and jungle on the road margins must be attended. Removal of encroachments etc, in the road margins in towns and villages, which obstruct flow of rain water wherever necessary may be attended.

4. The Engineer-in-Chief, PR should see that the works are executed within the administrative sanction amounts and no revision of estimated cost exceeding administrative sanction will be allowed.

5. The Superintending Engineer, PR, concerned should check and verify that the works sanctioned in Para 2 above is not already sanctioned/grounded/semi finished under any other grants. Any discrepancy noticed is to be brought to the notice of the higher authority immediately who will inform to Government for further necessary action. The above instructions shall be followed scrupulously. If such works as sanctioned in this GO are already grounded etc., it may deemed to have been cancelled automatically and the same may be informed to Government immediately for taking further necessary action. The technical estimate must be verified by the concerned Executive Engineer, before grounding the work. Alternate sanctions will not be entertained.

6. The Engineer-in-Chief PR, Hyderabad shall take necessary action in the matter accordingly and submit the utilization Certificates to Government soon after completion of the works in the stipulated time.

P.T.O.

Page 2: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

::2::

7. A copy of this order is available on internet and can be accessed at www.ap.gov.in/goir .

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH) C.R. BISWAL

PRINCIPAL SECRETARY TO GOVERNMENT To The Engineer-in-Chief, PR, Hyderabad. Copy to The Chief Engineer, PR, Hyderabad The Superintending Engineer, PR Concerned (Through Chief Engineer (PR), Hyd) The District Treasury Officer, Concerned. The Director of works and Accounts, Hyderabad The Accountant General, AP, Hyderabad The PS to Hon’ble Min. (PR&RWS) The PS to Principal Secretary (PR). Sc/sf.

//FORWARDED::BY ORDER// SECTION OFFICER

Page 3: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

1 Adilabad Asifabad BT Renewal to R/F PWD Road to

Govindapur.

24.00

2 Adilabad Khanapur BT Renewal to R/F PWD road to

Rampur

20.00

3 Adilabad Khanapur BT Renewal to R/F Kaval to Kothapet 12.00

PMGSY

Roads Total

56.00

1 Adilabad Adilabad BT Renewal to R&B Road to Jamini via

Laxmipur

60.00

2Adilabad Asifabad

BT Renewal to Road from R&B Road to

Jamda18.00

3 Adilabad Asifabad BT Renewal to Road from Tadihatnoor

to Gunjala

66.00

4 Adilabad Bellampally BT Renewal to Bellampally Budha

Guest house to Chandravelly

30.00

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

ANNEXURE TO THE G.O.RT. NO. 1840, PR&RD (PROGS.I) DEPT., DT: 05-10-12.

Guest house to Chandravelly

5 Adilabad Bellampally BT Renewal to PWD road to Bugga

Temple via Kannal

35.00

6Adilabad Boath

BT Renewal to R/F PWD Road to

Mahaduguda (In Km 0/0 to 3/5)30.00

7 Adilabad Chennur BT Renewal to Road from PWD Road

to Ramakrishnapur Via Kyathanpalli

MPP Mandamarri

43.00

8 Adilabad Chennur BT Renewal to Road from Chennur to

Arjungutta MPP Kotapally

40.00

9Adilabad Khanapur

BT Renewal to R/F Khanapur to

Tharlapad20.00

10 Adilabad Mancherial BT Renewal to PWD Road to Dwaraka,

Via.Naspur.

65.00

11 Adilabad Mudhole BT Renewal to Kallur to Gollamadugu

via kuntala

140.00

12 Adilabad Nirmal BT Renewal to PWD road to Dilawarpur 35.00

13 Adilabad Nirmal BT Renewal to PWD road to Mujgi via

Chityal

30.00

14Adilabad Sirpur(T)

BT Renewal to R/F. Peddabanda to

Jambuga24.00

15 Adilabad Sirpur(T) BT Renewal to R/F Nazrulnagar

Community Hall to Camp

13.80

Non-PMGSY

Roads Total

649.80

Adilabad 705.80Adilabad

Total

705.80

1 Anantapur Dharmavaram BT Renewal to Dharmavaram

toTadimarri via Thummala

60.00

2 Anantapur Guntakal BT Renewal to Devarapalli to

Hanumpalli

23.40

3 Anantapur Hinudpur BT Renewal to HB Road to Kirikera

Weavers Colony

11.00

4 Anantapur Hinudpur BT Renewal to KA Road to

Tummalakunta

10.00

5 Anantapur Kadiri BT Renewal to AP Road to K.Pulakunta 32.00

1

Page 4: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

6 Anantapur Kalyandurg BT Renewal to Setturu to Chintarlapalli 30.00

7 Anantapur Kalyandurg BT Renewal to Approach road to

Buddaiahdoddi & Gantaiahdoddi

20.00

8 Anantapur Penukonda BT Renewal to Roddam to Dodagatta 40.00

9 Anantapur Puttaparthy BT Renewal to Approach road to

Kandukurivandlapalli

20.00

10 Anantapur Singanamala BT Renewal to Approach road to

Niluvurai

20.00

11 Anantapur Tadipatri BT Renewal to Yadiki to Bayareddypalli

via Chinthalayapalli

16.00

12 Anantapur Tadipatri BT Renewal to Muchukota to

Namanakampalli

13.00

PMGSY

Roads Total

295.40

1 Anantapur Dharmavaram BT Renewal to Dhadithota to 67.58

Chillavaripalli upto mandal limits.

2 Anantapur Guntakal BT Renewal to Gooty to

Nagasamudram road

100.00

3 Anantapur Kalyandurg BT Renewal to Kalyandrug to Mallipalli

via Mudigallu

60.00

4 Anantapur Kalyandurg BT Renewal to Kambadur to

Kotaguddam

60.00

5 Anantapur Puttaparthy BT Renewal to Dharmavaram-Kodur

Road to Iragampalli

35.00

6 Anantapur Rapthadu BT Renewal to C.K. Palli to

Nyamaddala

50.00

7 Anantapur Rapthadu BT Renewal to Atmakur to Peruru in Km

27/0 to 35/0

50.00

8 Anantapur Singanamala BT Renewal to Kotanka to Garladinne-

Penakacherla road in Km 14/0 to 19/0

25.00

9 Anantapur Singanamala BT Renewal to Gugudu to Maddipalli in

Km 4/0 to 14/0

100.00

10 Anantapur Tadipatri BT Renewal to R&B road to

Varadayapalli

36.00

11 Anantapur Uravakonda BT Renewal to Golla to Beluguppa 60.00

Non-PMGSY

Roads Total

643.58

Anantapur

Total

938.98

Total

1 Chittoor Chandragiri BT Renewal to P.N road to Cherlopalle 7.90

2 Chittoor Chandragiri BT Renewal to Pudi to Mundlapudi 12.00

3 Chittoor Chandragiri BT Renewal to P.N road to Settipalle

village road

10.20

4 Chittoor Chandragiri BT Renewal to Karakambadi road to

Mangalam

9.70

5 Chittoor Chandragiri BT Renewal to Rayalacheruvu road to

Papireddilu via Chiguruvada

15.60

6 Chittoor Chittoor BT Renewal to Settinthangal to

Naragallu

23.65

2

Page 5: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

7 Chittoor Kuppam BT Renewal to Kuppam Vijalapuram to

Battuvaripalli

28.60

8 Chittoor Kuppam BT Renewal to KP road to

Bandasettipalle

11.00

9 Chittoor Kuppam BT Renewal to Soniganipalle road to

Yanamasanapalle

13.20

10 Chittoor Kuppam BT Renewal to Kuppam patchuru road

to Mulakalapalle

13.20

11 Chittoor Madanapalle BT Renewal to MPL-NPL road to

Mustoor

28.60

12 Chittoor Palamaner BT Renewal to Dandapalle road to

Nagireddipalle

26.40

13 Chittoor Piler BT Renewal to VGG Road to Cherlopalli

in KM 0/0-2/0

25.00

14 Chittoor Piler BT Renewal to VGG Road to Cherlopalli

in KM 2/0-10/0

80.00

15 Chittoor Punganur BT Renewal to Sodam Nanjampeta 63.8015 Chittoor Punganur BT Renewal to Sodam Nanjampeta

road to Pacharimakula via

Yerrathivaripalli and Buragamanda

63.80

16 Chittoor Puthalapattu BT Renewal to Diguvamogham to

Nallpareddipalle

27.50

17 Chittoor Puthalapattu BT Renewal to Thumbakuppam to

Perumallapalle

28.60

18 Chittoor Satyavedu BT Renewal to Nagalauram

Vembakamroad to Koltakadu

14.40

19 Chittoor Srikalahasthi BT Renewal to KT Road

toThangellapalem

14.00

20 Chittoor Srikalahasthi BT Renewal to P.N road to

Subbanaidugunta

15.00

21 Chittoor Srikalahasthi BT Renewal to PN road to

Annaswampalle

30.00

22 Chittoor Srikalahasthi BT Renewal to P.N road to Guthivari

Palle

12.00

23 Chittoor Srikalahasthi BT Renewal to P.N. road to

Vedullacheruvu

12.00

24 Chittoor Thamballapalle BT Renewal to PTM Kandukuru road to

Gollapalle

26.40

PMGSY

Roads Total

548.75

1 Chittoor Chandragiri BT Renewal to Nennuru Kammapalli

Road to Kandulavaripalli (via) Kotha

Nennuru

36.00

Nennuru2 Chittoor Chandragiri BT Renewal to C.Ramapuram to KKV

Puram (via) Diguva Ramapuram

42.00

3 Chittoor Chittoor BT Renewal to Chittoor-Tiruttani Road

to meet MCB Road (via) 197

Ramapuram

75.20

4 Chittoor G.D.Nellore BT Renewal to Chittoor Penumur road

to Meet Nendragunta Penumur road via

Adavipalli and Bandakindapalli

67.00

5 Chittoor Kuppam BT Renewal to Kuppam - Patchuru road

to Vasanadu via Mnakaladoddi

20.00

3

Page 6: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

6 Chittoor Kuppam BT Renewal to Road from KP road to

Peddabommanapalli

6.00

7 Chittoor Kuppam BT Renewal to KP road to Seegalapalli

via Samaguttapalli

24.00

8 Chittoor Kuppam BT Renewal to Pandyalamadugu -

Chakalakuppam Via Gorivimakulapalli

24.00

9Chittoor Madanapalle

BT Renewal to Tirupathi road to

Pothapolu road via Buchipalle16.00

10 Chittoor Madanapalle BT Renewal to Bangalore road to

Ponnetipalem

18.00

11 Chittoor Nagari BT Renewal to The road from

Kosalanaram to Patha Arcot road in

Vijayapuram Mandal

38.00

12 Chittoor Nagari BT Renewal to Road from Vengalathuru

road to Ururupeta via Mangalagiri

Kandriga in Nindra mandal

52.00

Kandriga in Nindra mandal

13 Chittoor Nagari BT Renewal to Road from Thadukupeta

to Vinayakapuram road via

Melapattu,Tharani in in Nagari mandal

43.00

14Chittoor Palamaner

BT Renewal to MBT Road to Kotur via

Melmoi&Gundl Palle10.40

15 Chittoor Piler BT Renewal to Providing B.T.S to the

road from VG road to Gollapalle

38.40

16 Chittoor Piler BT Renewal to K.V Palli road to

Vangimalluvaripalli (via)

Chinthamakulapalli

18.00

17 Chittoor Piler BT Renewal to Ellamanda road to meet

Ellamdna road via Kotapalle

45.00

18 Chittoor Piler BT Renewal to Agraharm-sodam R & B

road to Kammamittapalle

4.00

19Chittoor Punganur

BT Renewal to MBT road to

Chandramakulapalle18.00

20 Chittoor Punganur BT Renewal to R/F Thudumvaripalle to

Venkayalavaripalle of Pulicherla Mandal

19.00

21 Chittoor Punganur BT Renewal to PPC road to

Chukkavandlapalle Km 0/0 to 3/100

34.00

22 Chittoor Satyavedu BT Renewal to KP road to Katrapalli

Y/C

8.40

Y/C

23 Chittoor Satyavedu BT Renewal to P.V.Road to Endrapeta 6.00

24 Chittoor Srikalahasthi BT Renewal to RPK Road to Madibaka 10.80

25 Chittoor Srikalahasthi BT Renewal to Muchivolu road to

Akkurthi

12.00

26Chittoor Thamballapalle

BT Renewal to Peddamandyam road to

Kayalaallu of Kotala24.50

Non-PMGSY

Roads Total709.70

4

Page 7: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

Chittoor Total1258.45

1 East Godavari Amalapuram BT Renewal to AY Road to KNF Road

(via) A.Vemavarappadu.

15.00

2 East Godavari Amalapuram BT Renewal to Nadipudi to Varrepalem

of Nallacheruvu (via) Khambampadu.

15.00

3 East Godavari Amalapuram BT Renewal to Sriram Nagar Colony of

Nadipudi to Kambam padu of

Palagummi

20.00

4 East Godavari anaparthy BT Renewal to Kuthukuluru to

Pulagurtha

21.00

5 East Godavari Jaggampeta BT Renewal to Approach road to

Yerrampalem

21.00

6 East Godavari Kothapeta BT Renewal to Palivela-Pallipalem R&B

road to Sarepalem

16.98

7 East Godavari Kothapeta BT Renewal to Rajavaram-Podalada 14.887 East Godavari Kothapeta BT Renewal to Rajavaram-Podalada

R&B road to Pujaripalem

14.88

8 East Godavari Kothapeta BT Renewal to Rajavaram-Podalada

R&B road to Jithugapadu

14.18

9 East Godavari P.Gannavaram BT Renewal to B.T Renewals to the

Road from Pappulavaripalem to

Kundalapalli

15.00

10 East Godavari P.Gannavaram BT Renewal to B.T Renewals to the

Road from Z.P.Road to

Chinnamvaripeta of Irusumanda

7.50

11 East Godavari Peddapuram BT Renewal to Tirupathi to Thatiparthi

via Chandramampalli

52.50

12 East Godavari Pithapuram BT Renewal to Jalluru to meet

Samalkota-Uppada R&B road via

Mallam Govindarajupalem

40.50

13 East Godavari Pithapuram BT Renewal to Mallam to meet

Pithapuram Kolanka ZP Road Via

Virawada

21.30

14 East Godavari Prathipadu BT Renewal to -do- L.R.Palem

N.N.Patnam

24.00

15 East Godavari Rajanagaram BT Renewal to Undeswarapuram to

Butchampeta

76.00

16 East Godavari Ramachandrapu

ram

BT Renewal to Kolanka to Pallipalem

road to Corangi canal (Via)

Namavaripalem, Dugguduru, TR Palem

(Proposed from Kolanka to

21.00

(Proposed from Kolanka to

Namavaripalem)17 East Godavari Rampa

chodavaram

BT Renewal to R/f Busigudem to

Tadepalli

56.70

PMGSY

Roads Total

452.53

1 East Godavari Amalapuram BT Renewal to Road from R & B road to

Allavaram to Mamidithota SC colony

20.00

2 East Godavari Amalapuram BT Renewal to Road from R&B road to

Settipeta of Bhathanavalli

21.50

5

Page 8: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

3 East Godavari Amalapuram BT Renewal to Munipalli to N Kothapalli 32.00

4 East Godavari anaparthy BT Renewal to R&B road to L.N.Puram 15.00

5 East Godavari anaparthy BT Renewal to R/f LN Puram to

Kapavaram

15.00

6 East Godavari Jaggampeta BT Renewal to Gandepalli to Kanupuru 60.00

7 East Godavari Jaggampeta BT Renewal to 29/8 of R& B Road @

Gokavaram to R.Yerrmapalem

42.00

8 East Godavari Kakinada ® BT Renewal to Ganganapalli Village

Road

55.00

9 East Godavari Kakinada ® BT Renewal to Panduru to Namam road 24.00

10 East Godavari Mandapeta BT Renewal to R&B to Nalluru 25.00

11 East Godavari Mummidivaram BT Renewal to KM 81/4 of NH 214 to 75.0011 East Godavari Mummidivaram BT Renewal to KM 81/4 of NH 214 to

Krapa chintalapudi

75.00

12 East Godavari P.Gannavaram BT Renewal to Road from Bellampudi to

Narendrapuram (via)

Adimulamvaripoalem

45.00

13 East Godavari Rajahmundry BT Renewal to Kadiam to Burrilanka Via

Venkayammapeta

29.00

14 East Godavari Ramachandrapu

ram

BT Renewal to Road from Korangi cato

Ithalapudi.

70.00

15 East Godavari Razole BT Renewal to BT Road from

Malikipuram to Visweswarayapuram via

mandal office

15.00

16 East Godavari Razole BT Renewal to R&B road to

Gollavaripeta in Sakhinetipalli

Lanka(V)Sakhinetipalli(M)

16.00

17East Godavari Tuni

BT Renewal to Tuni Pentakota R & B

road to Kavalapadu20.00

Non-PMGSY

Roads Total579.50

East Godavari

Total 1032.03

1 Guntur Bapatla BT Renewal to NH 216 to

Bhavanamvaripalem (Via) Chowdipalem

20.00

2 Guntur Bapatla BT Renewal to MN R&B road to 12.602 Guntur Bapatla BT Renewal to MN R&B road to

Nattalavaripalem

12.60

3 Guntur Macherla BT Renewal to Veeranjaneyapuram 7th

Mile to Kothur, Macherla (M)

22.00

4 Guntur Narasaraopet BT Renewal to Satuluru to Dondapadu 40.00

5 Guntur Narasaraopet BT Renewal to Chilakaluripet Major to

Nallagarlapadu

30.00

6 Guntur Narasaraopet BT Renewal to Kesanapalli to

P.Turakapalem

38.00

7 Guntur Pedakurapadu BT Renewal to Thammavaram to

Podapadu

20.00

6

Page 9: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

8 Guntur Prathipadu BT Renewal to Chinalingayapalem to

Kondabalavaripalem

10.00

9 Guntur Sattenapalli BT Renewal to Road from SAP-NRT

road to Paludevaralapadu

17.00

10 Guntur Tadikonda BT Renewal to R/f Vemuluripadu to

Ameenabad

16.00

11 Guntur Tadikonda BT Renewal to R/f MG R&B road to

Lingayapalem

25.00

12 Guntur Tadikonda BT Renewal to R/f MR R&B road to

uddandarayunipalem road to

Uddandarayudupalem

16.00

13 Guntur Tenali BT Renewal to R&B Road to South

Dalithawada of Nandivelugu

13.00

14 Guntur Vemuru BT Renewal to Tenali-Cherukupalli R&B

road @16/8km to yelavarru

15.00

15 Guntur Vinukonda BT Renewal to R&B road to

Brahmanapalli

20.00

Brahmanapalli

16 Guntur Vinukonda BT Renewal to Bandlamotu to

Malapadu

10.00

PMGSY

Roads Total

324.60

1 Guntur Bapatla BT Renewal to NH 216 to Ramnagar

(Via) Putchakurthivaripalem

32.00

2 Guntur Bapatla BT Renewal to Khajipalem - P.V.palem

R&B road to Kothapalem (via)

Parisavaripalem

30.00

3 Guntur Chilakaluripet BT Renewal to Solasa to

Sankuratripadu

60.00

4 Guntur Mangalagiri BT Renewal to TM R & B road at Km

11/8 to

Kolakaluru(via)Manchikalapudi,KR

Konduru

70.00

5 Guntur Narasaraopet BT Renewal to Rompicherla Muppalla

R&B Road to Ramireddypalem

34.00

6 Guntur Narasaraopet BT Renewal to Nrt- Rompicherla R&B

Road to Thungapadu

5.00

7 Guntur Pedakurapadu BT Renewal to R/f Pedakurapadu to

Kannegnadla via Lagadapadu

30.00

8 Guntur Pedakurapadu BT Renewal to Velpur-Madipadu R&B

Road to Zattupalli thanda

30.00

9 Guntur Ponnur BT Renewal to Ponnur - Chnadolu R &

B road at Km 2/8 to Komali via Jadavalli

74.00

B road at Km 2/8 to Komali via Jadavalli

10 Guntur Prathipadu BT Renewal to R/f GBC Road to PV

Road

20.00

11 Guntur Repalle BT Renewal to Road from PV Palem -

Nizampatnam R&B Road to

Gattuvaripalem (via)

Satyanarayanapuram,Pedapalli &

Srinagar in Nagaram(M)

88.00

12 Guntur Repalle BT Renewal to Road from 4/7 Gullapalli-

Nagaram R&B road to Pudiwada

46.30

7

Page 10: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

13 Guntur Sattenapalli BT Renewal to Mupulla to Narnepadu

(via) L.Kurapadu

60.00

14 Guntur Sattenapalli BT Renewal to Road from Golllapadu ot

Dondapadu (via) K.V.Palem

50.00

15 Guntur Tadikonda BT Renewal to GNT - NRT R&B Road

@ Km 26/8 to Kandrika

32.00

16 Guntur Tadikonda BT Renewal to R/F Nudurupadu to

Kandriga, Phirangipuram Mandal

30.00

17 Guntur Tenali BT Renewal to Road from Athota to

Yadavapalem

48.00

18 Guntur Tenali BT Renewal to G.H road to G.H road

(via) Ganganamma temple in Khajipet

17.00

19 Guntur Vemuru BT Renewal to Tenali-Vellaturu R&B

road @13/4 to Penamarru via

Ravikampadu

30.00

Non-PMGSY

Roads Total

786.30

Roads Total

Guntur Total 1110.90

1 Kadapa Badvel BT Renewal to NBB road to C

Boyanapalli

25.60

2 Kadapa Badvel BT Renewal to NBB Road to

Kothacheruvu

52.40

3 Kadapa J.Madugu BT Renewal to Providing BT to the road

from NBB road to Thorrivemula of

Mylavaram Mandal

29.00

4 Kadapa Kamalapuram BT Renewal to CT road to

Venkateswarapuram

19.50

5 Kadapa Kamalapuram BT Renewal to C.P. road to Machunur

via Konayapalli Chennamrajupalli

10.56

6 Kadapa Mydukur BT Renewal to Road from

Bhoomayapalli to Thimmayapalli via

Krishnapuram

23.00

7 Kadapa Rajampet BT Renewal to BT road from Mandapalli

to Adavirachapalli

14.00

8 Kadapa Rayachoty BT Renewal to RV road to Kurnoothala

(Via) Kakulavaram 5/0 to 11/0

34.00

9 Kadapa Rayachoty BT Renewal to Chinnamandem -

Kalibanda road to Chinna Nerusupalli

16.00

PMGSY

Roads Total

224.06

1 Kadapa Badvel BT Renewal to CP Road to Bhakrapeta 23.001 Kadapa Badvel BT Renewal to CP Road to Bhakrapeta 23.00

2 Kadapa Kamalapuram BT Renewal to Bayanapalli to

Balasinganapalli

10.00

3 Kadapa Kamalapuram BT Renewal to CK road to Sugar factory 10.00

4 Kadapa Kamalapuram BT Renewal to CT road to

Thollaganganapalli

11.54

5Kadapa Kodur

BT Renewal to P.C.Road to

Ketharajupalli24.00

6 Kadapa Kodur BT Renewal to C.K.Road to

Thimmayapalem

36.00

8

Page 11: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

7 Kadapa Mydukur BT Renewal to Sunkesula to Miduthur 86.00

8 Kadapa Proddatur BT Renewal to Proddatur-Yerraguntla

main road to Nanganurpalli

35.00

9 Kadapa Pulivendula BT Renewal to R.V.Road to

Varikuntapalli, Chakrayapeta (M)

70.00

10 Kadapa Rajampet BT Renewal to Providing BT to the road

from Naramrajupalli to Mandanapalli in

Km 0/0 to 2/6 of Rajampet (M)

21.00

Non-PMGSY

Roads Total

326.54

Kadapa Total 550.60

1 Karimnagar Choppadandi Road from Vilasagar to PR Road

Vemulawada Boinpally Via Desaipally,

Ratnampet, Ramannapet ( i.e.

20.00

Ratnampet, Ramannapet ( i.e.

Desaipally to ZP Road limits )2 Karimnagar Dharmapuri BT Renewal to Road from Ayacut road

to Bathikepally

30.00

3 Karimnagar Husnabad BT Renewal to Road from Ghanpur to

Aknoor.

10.00

4 Karimnagar Karimnagar BT Renewal to PWD road to Nagnoor 15.00

5 Karimnagar Manakondur BT Renewal to 8/0 Km of T02 to

Devampally

26.00

6 Karimnagar Manakondur BT Renewal to R/F PWD road

Maddikunta, Kalleda

30.00

7 Karimnagar Manthani BT Renewal to R/F PWD T02 to

Brahmanpally, M.P.Mahadevpur

34.00

8 Karimnagar Manthani BT Renewal to R/F T02 to Besthapally,

M.P.Manthani

14.00

9 Karimnagar Manthani BT Renewal to R/F PWD Road

Yamanpally T01 to Konampet via

Mutharam, M.P.Mahadevpur

18.00

10 Karimnagar Manthani BT Renewal to R/F PWD Road to

Ramakistapur ZP Road via Madipally,

M.P.Manthani

7.50

11 Karimnagar Manthani BT Renewal to R/F Siripuram to

Besthapally, M.P.Manthani

5.00

12 Karimnagar Sircilla BT Renewal to R/F Kothapalli to

Sirigadha

50.00

13 Karimnagar Vemulawada BT Renewal to R/F Approach Road to 12.0013 Karimnagar Vemulawada BT Renewal to R/F Approach Road to

Ootupalli-M.P.Kathalapur

12.00

14 Karimnagar Vemulawada BT Renewal to R/F ZP Road to

Kondapur-M.P.Konaraopet

15.00

15 Karimnagar Vemulawada BT Renewal to R/F Rudarangi to

Harizanawada-M.P.Chandurthy

7.50

PMGSY

Roads Total

294.00

1 Karimnagar Choppadandi Boinpally to Vemulawada 90.00

2 Karimnagar Husnabad BT Renewal to ZP Road Akunur to

Sarvaipet via Perkapalli

44.80

9

Page 12: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

3 Karimnagar Husnabad BT Renewal to R/F Kurella to Koheda 7.50

4 Karimnagar Husnabad BT Renewal to R/F R&B road to

Mustafapoor vai Gollapally,

Bheemadevarapalli

25.00

5 Karimnagar Huzurabad BT Renewal to Jammikunta to Uppal

(via) Bheempali

100.00

6 Karimnagar Huzurabad BT Renewal to Kothapalli to kamalapur 100.00

7 Karimnagar Jagtial BT Renewal to R&B Road to BB Rao

Palli (via) Jabithapur,

58.00

8 Karimnagar Karimnagar BT Renewal to PWD road to PWD road

via Gopalpur

45.00

9 Karimnagar Korutla BT Renewal to Mogilpet to Mallapur 60.00

10 Karimnagar Manakondur BT Renewal to Molangur CADA road to

Rajapur

20.00

Rajapur

11 Karimnagar Manthani BT Renewal to R/F Keshanpalli to

Edulapur via Mydambanda, Machupet,

Lakkaram, Sarvaram, M.P.Muthram

(MNT)

144.00

12 Karimnagar Peddapalli BT Renewal to R/F PWD Road Nittoor

to Kodurpaka, M.P.Peddapalli

30.00

13 Karimnagar Ramagundam BT Renewal to Road from Kukkalagudur

to Potyal

90.00

14Karimnagar Sircilla

BT Renewal to R/F PWD Road to

Chandrampet, M.P.Sircilla25.00

15 Karimnagar Sircilla BT Renewal to Almaspur to Gollapalli 60.00

16Karimnagar Vemulawada

BT Renewal to R/F Vemulawada to

Laxmipur, M.P.Laxmipur20.00

17 Karimnagar Vemulawada BT Renewal to PWD Road to Rudraram 42.00

Non-PMGSY

Roads Total

961.30

Karimnagar

Total

1255.30

1 Khammam Aswaraopeta BT Renewal to R/F Aswaraopeta to

Naramvarigudem

30.00

2 Khammam Bhaddrachalam BT Renewal to R/F Cherukuru to Peruru 83.40

3 Khammam Kothagudem BT Renewal to R/F Yanambile to 43.203 Khammam Kothagudem BT Renewal to R/F Yanambile to

Prabathnagar

43.20

4 Khammam Kothagudem BT Renewal to R/F PWD road to

Rampuram

10.80

5 Khammam Madhira BT Renewal to R/F Nagulavancha to

patharlapadu

24.00

6 Khammam Madhira BT Renewal to R/F Pandillapalli to

Ananthasagar

24.00

7 Khammam Palair BT Renewal to R/F R&B road to

Kasnathanda

22.50

8 Khammam Pinapaka BT Renewal to R/F PWD road to

Ramachandrapuram

55.40

10

Page 13: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

9 Khammam Sathupalli BT Renewal to R/F PWD road to

Ganeshpadu

20.00

10 Khammam Sathupalli BT Renewal to R/F Kuppenakuntla to

Janakipuram

18.00

PMGSY

Roads Total

331.30

1 Khammam Khammam BT Renewal to R/F R&B road to

Kodumuru via Rudramkota & Puttakota

80.00

2 Khammam Khammam BT Renewal to Approach road to

Manchukonda

10.00

3 Khammam Madhira BT Renewal to R/F Yerrupalem Rly.

Station to Jayanthi

95.00

4 Khammam Palair BT Renewal to R/F R&B road to Beerole

via Kakaravai, Erragadda and

Thallachervu

125.00

5 Khammam Pinapaka BT Renewal to R/F Krishnasagar Jr. 27.005 Khammam Pinapaka BT Renewal to R/F Krishnasagar Jr.

College to ST Colony

27.00

6 Khammam Wyra BT Renewal to R/F Relakayalapalli to

Tekulapalli

60.00

7 Khammam Yellandu BT Renewal to R/F

Satyanarayanapuram R & B Road to

Chinna Krishnapuram, Garla (m)

100.00

Non-PMGSY

Roads Total

497.00

Khammam

Total

828.30

1 Krishna Avanigadda BT Renewal to Road from Narapalam to

Pittalanka

46.00

2 Krishna Gudivada BT Renewal to Link road to Pedalingala

to Chinalingala from MNK road

55.00

3 Krishna Jaggaiahpeta BT Renewal to Road from Chittela to

Singavaram

19.20

4 Krishna Jaggaiahpeta BT Renewal to R/C NH9 to

Katchavaram(via) Takkellapadu.

15.00

5 Krishna Kaikaluru BT Renewal to Atapaka to

Varahapatnam

57.60

6 Krishna Machilipatnam BT Renewal to M.E Road to

Borrapathupalem

24.00

7 Krishna Mylavaram BT Renewal to Road from NH9 to

Tummalapalem.

9.60

Tummalapalem.

8 Krishna Mylavaram BT Renewal to Road from MNK VV road

to Patha Naguliuru

9.60

9 Krishna Mylavaram BT Renewal to R/F I.T.road to

Gurrajupalem

20.40

10 Krishna Nandigama BT Renewal to Road from NH 9 Kesara

to S.Amaravaram

18.00

11 Krishna Nandigama BT Renewal to Road from CAD R&B

Road to Munnaluru

16.80

12 Krishna Nandigama BT Renewal to Road from Gudimetla to

Krishna river

18.00

11

Page 14: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

13 Krishna Pamarru BT Renewal to Veeranki Lock to

Peanamakuru bridge

25.00

14 Krishna Pedana BT Renewal to Kaza R & B road to

Mutrasipalem

49.68

15 Krishna Pedana BT Renewal to V.S R&B road to

Guruvindagunta

9.00

16 Krishna Pedana BT Renewal to PBG(R & B) road to

Atchayyavaripalem

18.00

17 Krishna Pedana BT Renewal to PBG Road to

Nageswararaopeta

9.90

18 Krishna Pedana BT Renewal to PBG Road to

Manimeswaram

25.02

19 Krishna Pedana BT Renewal to Garsipudi R&B road to

Chandala Domlagondi

36.00

20 Krishna Tiruvuru BT Renewal to MNK road to Jeellakunta 10.00

21 Krishna Tiruvuru BT Renewal to Meduru to Kotha 60.0021 Krishna Tiruvuru BT Renewal to Meduru to Kotha

Arlapadu

60.00

PMGSY

Roads Total

551.80

1 Krishna Gannavaram BT Renewal to Kalavapamula to

Vemanda

44.00

2 Krishna Machilipatnam BT Renewal to R&B Road to Tavisapudi 36.00

3 Krishna Machilipatnam BT Renewal to Machilipatnam to

Chittipalem road

35.00

4 Krishna Nuzvidu BT Renewal to Gogulampadu to East

Digavalli

50.40

5 Krishna Pamarru BT Renewal to R&B Road to

Matlamalapalli

45.00

6 Krishna Pamarru BT Renewal to R&B Raod to

Vemulamadamalapalli

30.00

7 Krishna Penamaluru BT Renewal to Penamaluru to Vanukuru 70.00

8 Krishna Penamaluru BT Renewal to Vuyyuru - Valluru road to

Vuyyuru H/w

20.00

9 Krishna Penamaluru BT Renewal to Improvements to the BT

road from KM 53/0 of VM road to

Ventrapragada (via) Jabarlapudi and

Mudunuru

46.00

Non-PMGSY

Roads Total

376.40

Roads Total

Krishna Total 928.20

1 Kurnool Alur BT Renewal to Providing BT surface to

the road from Karidiguddam to

Muddanageri

23.50

2 Kurnool Banaganapalli BT Renewal to Yerragudi to

Hussainapuram.

42.00

3 Kurnool Kodumur BT Renewal to Providing BT surface to

road from Varkur to Kallaparri

67.00

4 Kurnool Mantralayam BT Renewal to Providing BT surface

approach road to Ramapuram

14.00

12

Page 15: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

5 Kurnool Mantralayam BT Renewal to Providing BT surface

approach road to Arlabanda 0/0 to 1/6

17.00

6 Kurnool Nandikotkur BT Renewal to Providing BT surface to

the road from Kadumur to Chowtkur

30.00

7 Kurnool Panyam BT Renewal to Providing BT surface

approach road to Durvesi.

15.00

8 Kurnool Pathikonda BT Renewal to Providing BT surface to

the road from Pagidiroy to

Ramalingayapalli

23.50

9 Kurnool Srisailam BT Renewal to Providing BT surface

road from Ernapadu to G. Singavaram

17.75

10 Kurnool Srisailam BT Renewal to BT road from KG road to

Indereswaram.

42.85

11 Kurnool Srisailam BT Renewal to Seetharamapuram to

Mothkulapalli.

16.80

Mothkulapalli.

12 Kurnool Srisailam BT Renewal to O.N. road to

Nandimpalli.

7.90

13 Kurnool Yemmiganur BT Renewal to Providing BT surface to

the road from Parlapalli to Guvvaladoddi

28.00

14 Kurnool Yemmiganur BT Renewal to Providing BT surface to

the road from R&B road to Bapuram

13.00

PMGSY

Roads Total

358.30

1 Kurnool Adoni BT Renewal to GPA road to Sadapuram 21.00

2 Kurnool Allagadda BT Renewal to R/F Chagalamarri to

Mundrallapalli in Km 0/0 to 1/1 of

Chagalamarri Mandal

20.00

3 Kurnool Alur BT Renewal to Chippagiri to Yerur 70.00

4 Kurnool Banaganapalli BT Renewal to Road from Perusomala

to Peddaventurla via Kammavaripalli in

Km 0/0 to 5/0 upto Kadapa district

border

65.00

5 Kurnool Dhone BT Renewal to Kurnool Bethamcherla

R&B road to Seetharampuram

72.00

6 Kurnool Nandikotkur BT Renewal to KG road to

P.Lingapuram via., Tharigopula

30.00

P.Lingapuram via., Tharigopula

7 Kurnool Nandyal BT Renewal to Road from Pasurupadu

to Jillella in Km 0/0 to 4/9

80.00

8 Kurnool Panyam BT Renewal to R/f Gadivemula to

Regadiguduru road in Gadivemula(M)

116.00

9 Kurnool Pathikonda BT Renewal to Jonnagiri to Peapuly 30.00

Non-PMGSY

Roads Total

504.00

Kurnool Total 862.30

13

Page 16: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

1 Mahabubnagar Alampur BT Renewal to Narayanpur to Pedda

Amudalapad

15.00

2 Mahabubnagar Alampur BT Renewal to R&B Road to Konkal 16.00

3 Mahabubnagar Alampur BT Renewal to R&B Road to Pedda

Dhanwada via Tanagala Mandoddi

40.00

4 Mahabubnagar Devarkadra BT Renewal to PWD road to Fareedpur 27.00

5 Mahabubnagar Devarkadra BT Renewal to ZP Road to Thatikonda 35.00

6 Mahabubnagar Kalwakurthy BT Renewal to PWD road to Kotra (V.R) 26.00

7 Mahabubnagar Kalwakurthy BT Renewal to PWD Road to

Charikonda (via) Mudvin

80.00

8 Mahabubnagar Kodangal BT Renewal to R/F. PWD road to

Angadiraichur (via) Chitlapally

66.00

9 Mahabubnagar Kollapur BT Renewal to R/F PWD road Singotam 60.009 Mahabubnagar Kollapur BT Renewal to R/F PWD road Singotam

to Korlakunta (via) Badugadinne

60.00

10 Mahabubnagar Kollapur BT Renewal to Tellarallapalli to

Rajapoor

28.00

11 Mahabubnagar Mahabubnagar BT Renewal to ZP.Road to Gundyal 13.00

12 Mahabubnagar Makthal BT Renewal to R/F. Maganoor to

Warkoor

13.00

13 Mahabubnagar Makthal BT Renewal to R/F. Neredigam to

Neredigamdoddi

30.00

14 Mahabubnagar Nagarkurnool BT Renewal to R/F PWD road to

Polepally

25.00

15 Mahabubnagar Nagarkurnool BT Renewal to R/F Chinnamuddanur to

Karvanga via Thallapally

50.00

16 Mahabubnagar Narayanpet BT Renewal to R/F. PWD road to

Gunmukla to Yermonipally

22.00

17 Mahabubnagar Wanaparthy BT Renewal to R/F Nagapur to

Bandaraipakula

15.00

PMGSY

Roads Total

561.00

1 Mahabubnagar Achampet BT Renewal to Polishetty Palli PWD

road to Golagundam

(via)Chennur,Kondaredypally

100.00

2 Mahabubnagar Gadwal BT Renewal to R&B Road to

Penchikalpad, Ghattu(M)

36.00

Penchikalpad, Ghattu(M)

3 Mahabubnagar Gadwal BT Renewal to R&B Road to Palvai,

Dharur(M)

36.00

4 Mahabubnagar Gadwal BT Renewal to R&B Road to

Sindhanoor (via) Induvasi

72.00

5 Mahabubnagar Jadcherla BT Renewal to Road from PWD Road

at Boinpally to Mudharam via

Mallapur,Gudiganipally

100.00

6 Mahabubnagar Mahabubnagar BT Renewal to R/F Hanwada to

Kothlabad via Vepur

80.00

7 Mahabubnagar Makthal BT Renewal to PWD Road to

Motlampally Atmakur(M)

18.50

14

Page 17: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

8 Mahabubnagar Makthal BT Renewal to PWD Road to Kollur 7.00

9 Mahabubnagar Narayanpet BT Renewal to PWD road to Putpak via

Eklaspur Narayanpet(M)

15.00

10 Mahabubnagar Narayanpet BT Renewal to PWD Road to

Kollampally, Narayanpet(M)

7.00

11 Mahabubnagar Narayanpet BT Renewal to PWD Road to Gadapah

via Vitalapur, Damargidda(M)

20.00

12 Mahabubnagar Shadnagar BT Renewal to R/F Shadnagar to

J.P.Darga (via) Dooskal

120.00

Non-PMGSY

Roads Total

611.50

Mahabubnaga

r Total

1172.50

1 Medak Andole BT Renewal to PWD road Uppariguda . 20.00

2 Medak Andole BT Renewal to Shivampet PWD road to

Chakriyal .

12.00

3 Medak Andole BT Renewal to PWD road to

Masanpally.

20.00

4 Medak Dubbak BT Renewal to R/F Makthamasanpally

to Begumpet via.Bangla

Venkatapur,Yelkal (2/0 - 4/0Km)

60.00

5 Medak Dubbak BT Renewal to R/F Dubbak to

Dumpalapally (0/0-1/0Km)

11.50

6 Medak Medak BT Renewal to R/F Nagsanpally PWD

road to Yedupayal temple (0/0-1/2 km)

50.00

7 Medak Narsapur BT Renewal to PWD road to Kistapur 6.00

8 Medak Patancheru BT Renewal to R/F PWD road to

Chennapur via Nallavally, Kothapally

85.00

9 Medak Sangareddy BT Renewal to SNT PWD road to

Kulabgoor .

23.40

10 Medak Siddipet BT Renewal to R/F PWD road to

Cherlankireddipally

18.00

11 Medak Siddipet BT Renewal to R/F PWD road to

Ensanpally

9.50

PMGSY

Roads Total

315.40

1Medak Andole

BT Renewal to PWD road to

Mansapally20.00Medak Andole

Mansapally20.00

2 Medak Andole BT Renewal to Khammampally to

Chinnachelmeda

40.00

3 Medak Andole BT Renewal to Neredigunta to

Makthagudem

40.00

4Medak Dubbak

BT Renewal to R&B road to R&B road

via Khangal27.00

5 Medak Dubbak BT Renewal to R&B road Yellareddipet

to Thadkapally via Peddamasanpally

(M)

30.00

15

Page 18: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

6

Medak Gajwel

BT Renewal to BT Renewal on R/F

Duddeda Road to Ankireddypally in MP

Kondapak

15.00

7 Medak Gajwel BT Renewal to R/F Gajwel to Rajiv

Rahadari via Muthrajpalli in MP Gajwel

20.00

8 Medak Gajwel BT Renewal to R/F Mulugu to

Narsampalli in MP Mulugu

20.00

9 Medak Gajwel BT Renewal to R/F Meenajipet to

Thunki Khalsa MP Wargal

20.00

10 Medak Medak BT Renewal to R/F PWD road to SC

Colony, Kothapally

5.00

11 Medak Narayankhed BT Renewal to R/F. PWD road to

Magdoompoor via Panchagaon,

Ranapur, Thumnur

120.00

12Medak Narsapur

BT Renewal to road from Potharam to

Palata24.00Medak Narsapur

Palata24.00

13 Medak Narsapur BT Renewal to PWD Road at

Amsanpally to Kulcharam

60.00

14 Medak Narsapur BT renewals road from SNT PWD road to

Chinnaguttimukkala to Sinkindalapur

44.00

15 Medak Narsapur BT renewals SNT PWD road to

Pothulabogada X road of Yeldurthy road

65.40

16 Medak Patancheru BT Renewal to Road from Kodakanchi

to Indresham

30.00

17 Medak Sangareddy BT Renewal to R/F Ismailkhanpet NH9

to Erdanur

20.00

18 Medak Sangareddy BT Renewal to Ananthasagar PWD

road to Sadasivapet via.Rejinthal

18.00

19 Medak Sangareddy BT Renewal to Improvements of BT

road from Nizampur to pottipally via

Kollkur(Kolkur Limits)Nizampur to Kolkur

40.00

20 Medak Siddipet BT Renewal to R/F Narmetta to

Nangnoor (via) Ramchandrapur

44.00

21 Medak Siddipet BT Renewal to R/F PWD road to

Konaipally (via) Velkatur

36.00

22 Medak Zaheerabad BT Renewal to NH-9 to Edakulapally 60.00

23 Medak Zaheerabad BT Renewal to PWD road to Ramthirth

via Husselly

50.00

24 Medak Zaheerabad BT Renewal to Arjun naik Thanda to 60.0024 Medak Zaheerabad BT Renewal to Arjun naik Thanda to

anegunta

60.00

Non-PMGSY

Roads Total

908.40

Medak Total 1223.80

1 Nalgonda Alair R/F Raigiri - Mothkur Road to

Athmakur Village

18.00

2 Nalgonda Devarakonda BT Renewal to R/F Devarakonda to

Kamepally via Thatikole Telugupally

173.00

3 Nalgonda Huzurnagar BT Renewal to R/F PWD road to

Sarvaram via Abbireddygudem

51.00

16

Page 19: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

4 Nalgonda Huzurnagar BT Renewal to R/F Palakeedu to

Sajjapuram Thanda

42.00

5 Nalgonda Huzurnagar BT Renewal to R/F Nakkagudem to

Kistapuram

28.00

6 Nalgonda Huzurnagar BT Renewal to R/F LB Nagar to

Ramachandrapuram via Kondandaram

Puram

27.00

7 Nalgonda Kodad BT Renewal to R/F Bethole to

Acharyulagudem

42.00

8 Nalgonda Kodad BT Renewal to R/F Madjaram (NH9) to

Nelamarry

52.00

9 Nalgonda Kodad BT Renewal to R/f Hussainabad to

Burkacherla Thanda

40.00

10 Nalgonda Miryalaguda BT Renewal to R/F Miryalaguda to

Iylapur (via) Nandipahad

72.00

11 Nalgonda Munugod BT Renewal to R/F Kondapur to

Nermatte

42.00

Nermatte

12 Nalgonda Munugod BT Renewal to R/F NH 9 to

Dharmojigudem

16.20

13 Nalgonda Munugod BT Renewal to PWD Road to

Udthalapally

24.00

14 Nalgonda Nagarjuna Sagar BT Renewal to R/F Borraipalem R&B

Road to Thimmapuram (via)

Harijathanda,kanyathanda

71.00

15 Nalgonda Nagarjuna Sagar BT Renewal to R/F Chepur to

Theratigudem

25.00

16 Nalgonda Nagarjuna Sagar BT Renewal to R/F Kannekal to

Dharmapuram

40.00

17 Nalgonda Nakrekal BT Renewal to R/F NH9 to Kurumarthy

via Chervuannaram

60.90

18 Nalgonda Nakrekal BT Renewal to R/F Narketpally to

Mandra

23.00

19 Nalgonda Nakrekal NH9 to Pittampally 58.80

20 Nalgonda Nakrekal R/F Urumadla to Nereda 3.50

21 Nalgonda Nalgonda BT Renewal to Addanki road to

Dacharam

48.00

22 Nalgonda Nalgonda BT Renewal to R/F PWD road to

Cherlagowraram via Darveshpur

15.60

23 Nalgonda Nalgonda BT Renewal to R/F PWD road to

Anneparthy

30.00

24 Nalgonda Nalgonda Sagar PWD Road to Chinnamadaram

via Chetlachennaram

50.00

via Chetlachennaram

25 Nalgonda Suryapet BT Renewal to Dupahad to Mukundapur 100.00

26 Nalgonda Suryapet BT Renewal to R/F shanti Nagar to

Kusumavarigudem via Dasaigudem,

Kesaram

72.00

27 Nalgonda Thungathruthy PWD road to Monsingtanda via

Thallasingaram,Somla tanda

86.25

28 Nalgonda Thungathruthy PWD road to Uyyalawada 60.00

17

Page 20: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

29 Nalgonda Thungathruthy BT Renewal to Donabanda x road to

Shaligowraram

zp road

18.23

30 Nalgonda Thungathruthy BT Renewal to BT R/F R&B Road to

Itukalapahad

45.00

PMGSY

Roads Total

1434.48

1 Nalgonda Alair BT Renewal to R/F Alair to

Ammanabole road to Motakondur via

Dilawarpur

72.00

2 Nalgonda Alair BT Renewal to R/F RM Road at

Athmakur to Anantharam via Koratikal

36.00

3 Nalgonda Bhongir BT Renewal to Anantharam to

Hanumapuram (balance work)

10.00

4 Nalgonda Bhongir BT Renewal to NH 9 to Saibrindavanam

(via) Deshmukh

70.00

5 Nalgonda Devarakonda BT Renewal to R/f Devarakonda- 10.005 Nalgonda Devarakonda BT Renewal to R/f Devarakonda-

Mahaboob Nagar PWD road to

Seripally road

10.00

6 Nalgonda Huzurnagar BT Renewal to R/F Merlllacheruvu to

Vepala Madharam

26.00

7 Nalgonda Huzurnagar BT Renewal to R/F PWD Road to

Karakkayalagudem via

Madhavarayanigudem

35.00

8 Nalgonda Miryalaguda BT Renewal to R/F Miryalaguda to

Dilawarpur (via) Chinthapally

40.00

9 Nalgonda Munugod BT Renewal to R/F Nagaram PWD

Road to Nagaram (via) Turupugudem

76.80

10 Nalgonda Munugod BT Renewal to R/F Donipamula to

Thummalapalli (via)

Thimmareddygudem

30.00

11 Nalgonda Nagarjuna Sagar BT Renewal to B/W R/F pulicherla to

Peddagummadam (via) Gemyanaik

thanda

29.00

12 Nalgonda Nagarjuna Sagar BT Renewal to R/F Nagarjunasagar

PWD Road to Marlagadda (via)

Pulimamidi

55.00

13 Nalgonda Nagarjuna Sagar BT Renewal to R/F Kompally PWD road

to Yellapuram

16.00

14 Nalgonda Nagarjuna Sagar BT Renewal to R/F PWD road to

Palem

3.00

15 Nalgonda Nagarjuna Sagar BT Renewal to R/F Thimmapur to 15.0015 Nalgonda Nagarjuna Sagar BT Renewal to R/F Thimmapur to

Kachavarigudem

15.00

16 Nalgonda Nagarjuna Sagar BT Renewal to R/F MLG DVK PWD

road to Anumula

12.00

17 Nalgonda Nagarjuna Sagar BT Renewal to R/F LNG MBNR PWD

road to Pittalagudem

15.00

18 Nalgonda Nagarjuna Sagar BT Renewal to R/F Tripuraram to

Bejjikal

15.00

19 Nalgonda Nagarjuna Sagar BT Renewal to R/F Velmagudem to

Sirsangandla via Basireddypally

32.00

20 Nalgonda Nagarjuna Sagar BT Renewal to R/F Pothunur to

Pulicherla

50.00

18

Page 21: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

21 Nalgonda Nagarjuna Sagar BT Renewal to R/F Kanekal PWD road

to Yerraballi

25.00

22 Nalgonda Nagarjuna Sagar BT Renewal to R/F Nagarjuna Sagar

PWD road to Chintalapalem

7.00

23 Nalgonda Nalgonda BT Renewal to Constn. Of Cause way

across Kanagal Vagu at Thimmannguda

33.18

Non-PMGSY

Roads Total

712.98

Nalgonda

Total

2147.46

1 Nizamabad Armoor BT Renewal to Baduguna to Ch

Kondoor Crosing

10.00

2 Nizamabad Armoor BT Renewal to ROAD FROM PIPRI TO

MANTHANIUPGRADATION

14.10

3 Nizamabad Balkonda BT Renewal to Manal toGairigutta

thanda

35.00

thanda

4 Nizamabad Banswada BT Renewal to PWD Road to Borlam

Near Bus depot

22.00

5 Nizamabad Banswada BT Renewal to R/F Birkur Pothangal

road to Barengedgi

20.00

6 Nizamabad Bodhan BT Renewal to R/F: PWD Road to

Bagepally vai Kunepally

30.00

7 Nizamabad Bodhan BT Renewal to Approach Road to

Jamalam

5.00

8 Nizamabad Bodhan BT Renewal to PWD road to Posani

Kunta Ootpalli

10.00

9 Nizamabad Jukkal BT Renewal to PWD road to Koma

lancha

22.00

10 Nizamabad Jukkal BT Renewal to SNA PWD road to

Rajula Via Bich kunda

25.00

11 Nizamabad Kamareddy BT Renewal to N.H.7 to Jangampally 9.00

12 Nizamabad Kamareddy BT Renewal to Janagam Marry to

Mohammada poor

14.60

13 Nizamabad Kamareddy BT Renewal to N.H. Way 7 to

Kyasampally

14.00

14 Nizamabad Kamareddy BT Renewal to PWD road to

Bhagirthpally

10.00

15 Nizamabad Nizamabad

Rural

BT Renewal to PWD Road to Mallapur 22.00

16 Nizamabad Nizamabad

Rural

BT Renewal to PWD Road to Lolam

(via) Yellareddypalli

28.00

Rural (via) Yellareddypalli

17 Nizamabad Nizamabad

Rural

BT Renewal to R/f Mailaram to

Chintaloor

20.00

18 Nizamabad Nizamabad

Rural

BT Renewal to PWD Road to

Ansanaplly

10.00

19 Nizamabad Yellareddy BT Renewal to Yellareddy to Somarpet 11.50

20 Nizamabad Yellareddy BT Renewal to PWD road to Pothangal

Kalan

10.00

21 Nizamabad Yellareddy BT Renewal to ZP road to Mathu

Sangem

13.50

19

Page 22: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

PMGSY

Roads Total

355.70

1 Nizamabad Armoor BT Renewal to Ch.Kondur to Badguna 54.00

2 Nizamabad Balkonda BT Renewal to Konasamudram X Road

to Ameernagar via Dammannapet and

Narsapur

70.00

3 Nizamabad Banswada BT Renewal to R/F:Strengthening R/F

Bakarfarm to Sunkini road via Digu

Farm

40.00

4 Nizamabad Bodhan BT Renewal to Balance work Road from

Nizampoor to Naleshwer

8.00

5 Nizamabad Bodhan BT Renewal to Approach Road Bodhan

to Mosra Road via Anil Talkies

10.00

6 Nizamabad Bodhan BT Renewal to PWD Road to Pandu

Form via Achenpally

10.00

Form via Achenpally

7 Nizamabad Bodhan BT Renewal to R/F: Bandarpally X Road

Chinna Mavandi via Pedda Mavandi

32.00

8 Nizamabad Kamareddy BT Renewal to NH - 44 to Anthampally 20.00

9 Nizamabad Nizamabad

Rural

BT Renewal to PWD road to Kulaspoor

thanda

16.00

10 Nizamabad Nizamabad

Rural

BT Renewal to ZP road Gundaram to

Sastrinagar

20.00

11 Nizamabad Nizamabad

Rural

BT Renewal to Approach road to

Tanakurd

8.00

12 Nizamabad Yellareddy BT Renewal to NH-7 to Thirmanpally via

Markal

30.00

Non-PMGSY

Roads Total

318.00

Nizamabad

Total

673.70

1 Prakasam Addanki BT Renewal to Uppumagulur to

Somavarappadu.

35.00

2 Prakasam Darsi BT Renewal to Rajampalli East

Gayavaram R&B Road to T.S.Puram

20.00

3 Prakasam Darsi BT Renewal to R&B Road to Polavaram 20.00

4 Prakasam Kondepi BT Renewal to R/f Ankarlapudi to

Mupparajupalem

30.00

Mupparajupalem

5 Prakasam Markapur BT Renewal to Road from Rayavaram

to Kethagudipi (via) Goguladinne

15.00

6 Prakasam Ongole BT Renewal to Road from

Vengamukkapalem - Konijedu (via)

Survereddypalem.

50.00

7 Prakasam Parchur BT Renewal to Eddanapudi to

Vinjanampadu.

45.00

8 Prakasam Parchur BT Renewal to NH5 to Ananthavaram 45.00

9 Prakasam S.N.padu BT Renewal to Road from

Ammanabrolu to Pamidipadu

(Ommivaram to old Madras Road).

20.00

20

Page 23: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

PMGSY

Roads Total

280.00

1 Prakasam Addanki BT Renewal to Sajjapuram to

Karumanchi (via) Elchuru

15.00

2 Prakasam Darsi BT Renewal to Talluru to Kunkupadu 40.00

3 Prakasam Darsi BT Renewal to Dosakayalapadu to

Lakkavaram

15.00

4 Prakasam Giddaluru BT Renewal to Komorole to

Chintalapally (via) Purushothampalli,

K.Bonthapally

90.00

5 Prakasam Kandukur BT Renewal to Road from Gudlur to RC

Agraharam

100.00

6 Prakasam Kanigiri BT Renewal to OV road to

Rangampeta R&B road

70.00

7 Prakasam Kondepi BT Renewal to R/f Konijedu to Ponduru 25.00

8 Prakasam Markapur BT Renewal to Markapuram to

Gajjalakona Via Naidu pally

30.00

9 Prakasam S.N.padu BT Renewal to OK road to Busarapalli 35.00

10 Prakasam Y.Palem BT Renewal to Yerragonda Palem R&B

Road to Pullalacheruvu

80.00

Non-PMGSY

Roads Total

500.00

Prakasam

Total

780.00

1 Ranga Reddy Chevella BT Renewal to R/M & BT on R/F PWD

Road to Yetla Erravelly

20.00

2 Ranga Reddy Maheshwaram BT Renewal to R/F Ameerpet to

Manikyamguda,Maheswaram (M)

20.00

PMGSY

Roads Total

40.00

1 Ranga Reddy Chevella BT Renewal to R/F Shankerpally PWD

Road to Tangutur

20.00

2 Ranga Reddy Chevella BT Renewal to R/F PWD Road to

Yellakonda (Via) Lingampally

20.00

3 Ranga Reddy Chevella BT Renewal to R/F PWD Road to

Gopularam

15.00

4 Ranga Reddy Ibrahimpatnam BT Renewal to R/F Mangalpally

Patelguda to Sahebguda

25.00

5 Ranga Reddy Ibrahimpatnam BT Renewal to R/F Nerapally to 20.005 Ranga Reddy Ibrahimpatnam BT Renewal to R/F Nerapally to

Majeedpur

20.00

6 Ranga Reddy Ibrahimpatnam BT Renewal to R/f Polkampalli to

Dhandimyalaram (via) Narapally of

Ibrahimpatnam mandal

30.00

7 Ranga Reddy Ibrahimpatnam BT Renewal to Peddaamberpet to

Pasumanula of Hayatnagar Mandal

30.00

8 Ranga Reddy Ibrahimpatnam BT Renewal to Adibatla to Nadergul 10.00

9 Ranga Reddy Maheshwaram BT Renewal to R/F Kandukur X Road to

Meerkhanpet

50.00

21

Page 24: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

10 Ranga Reddy Maheshwaram BT Renewal to R/F PWD Road to

Gudur

35.00

11 Ranga Reddy Maheshwaram BT Renewal to R/F PWD Road to

Jalpally, Saroornagar (M)

20.00

12 Ranga Reddy Maheshwaram BT Renewal to Agalmiyaguda to

Thimmapur road, Kandukur (M)

35.00

13 Ranga Reddy Maheshwaram BT Renewal to Maheswaram to

Kavalanibavithanda, Maheswaram (M)

25.00

14 Ranga Reddy Medchal BT Renewal to S/R to R/F CRPF Gate-II

to ZP Road at Jawaharnagar of

Shameerpet mandal

81.00

15 Ranga Reddy Pargi BT Renewal to R/F PWD Road to

Enkepally

20.00

16 Ranga Reddy Pargi BT Renewal to R/F PWD Road to

Kankal via Pedda Ummental

70.00

17 Ranga Reddy Pargi BT Renewal to PWD Road to 16.0017 Ranga Reddy Pargi BT Renewal to PWD Road to

Dharmapuram

16.00

18 ranga Reddy Pargi BT Renewal to Mahammadabad PWD

Road to Ramalayam

3.00

19 Ranga Reddy Quthbullapur BT Renewal to R/F Dulapally to

Jeedimetla Industrial Area

36.00

20 Ranga Reddy Quthbullapur BT Renewal to R/F Narsapur PWD

Road to Nuthankal PWD Road via D.P.

Pally, Dundigal, Nagloore

90.00

21 Ranga Reddy Rajendranagar BT Renewal to R/F PWD Road to

Sultanpally

36.00

22 Ranga Reddy Rajendranagar BT Renewal to R/F PWD Road Famaish

Hotel to Hydershakote janda X Road

12.00

23 Ranga Reddy Tandur BT Renewal to Renewal BT on R/F

Peddemul to Siddana madugu tanda up

to Nagulapally for 3.50 laid in the Year

2001 from 0/0-2/8&3/9-4/6s

72.00

24 Ranga Reddy Vikarabad BT Renewal to Renewal BT on R/F

PWD Road Kerelly to Nagaram via

Zaidpally Tharigoppula

120.00

Non-PMGSY

Roads Total

891.00

Ranga Reddy

Total

931.00

1 SPSR Nellore Atmkur BT Renewal to NB road to Thikkavaram 60.001 SPSR Nellore Atmkur BT Renewal to NB road to Thikkavaram 60.00

2 SPSR Nellore Atmkur BT Renewal to R&B road to Pallipalem

of Annareddypalem

9.00

3 SPSR Nellore Gudur BT Renewal to Road from MC Road tod

G-Y Road (Via) Potupalem

35.00

4 SPSR Nellore Kavali BT Renewal to RI Road to Allur

Galidibbalu

35.00

5 SPSR Nellore Sullurupeta BT Renewal to N.D Road to Nellorepalli 50.40

22

Page 25: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

6 SPSR Nellore Survepalli BT Renewal to Venkatachalam-

Kasumuru road to N.P road via

kandalapadu, Pullatheegalapadu and

Siddavarappadu

40.00

7 SPSR Nellore Survepalli BT Renewal to MC Road to Pidur 40.00

8 SPSR Nellore Udayagiri BT Renewal to Chinannalur to

Krishnareddy palem (via) Thoguru

vanaipalem T.Malapalem

23.30

9 SPSR Nellore Udayagiri BT Renewal to KU road to

Lakshmipuram (via) Kammavari palem

32.00

10 SPSR Nellore Venkatagiri BT Renewal to V-R road to Chapalapalli 26.15

PMGSY

Roads Total

350.85

1 SPSR Nellore Kovur BT Renewal to Providing B.T.Renewal 21.50

road from Chowkacherla to Pallipalem

in Vidavalur Mandal.2 SPSR Nellore Nellore Rural BT Renewal to Nellore to Mutkur road

(via) Rajupalem, Chintareddypalem &

Vaviletipadu

100.00

3 SPSR Nellore Sullurupeta BT Renewal to Road from M-M road to

IT road (via) Manganellore and SM

Tageli

30.00

4 SPSR Nellore Survepalli BT Renewal to Providing B.T. Renewal

road from Macherlavaripalem branch

road in T.P.Gudur Mandal

25.00

5 SPSR Nellore Survepalli BT Renewal to Providing B.T.Renewal

to Koverapalem branch road in

T.P.Gudur (M)

16.00

6 SPSR Nellore Survepalli BT Renewal to Providing B.T.Renewal

to Kothapalem branch road (via)

Potlapudi in T.P.Gudur (M)

35.00

7 SPSR Nellore Venkatagiri BT Renewal to Utukur to Perumallapadu 51.60

Non-PMGSY

Roads Total

279.10

SRSP Nellore

Total

629.95

1 Srikakulam Amadalavalasa BT Renewal to Kintali to Kajipeta 13.00

2 Srikakulam Ichapuram BT Renewal to Road from Innisupeta to 16.002 Srikakulam Ichapuram BT Renewal to Road from Innisupeta to

Rajapuram

16.00

3 Srikakulam Palakonda BT Renewal to A.B.Road to Keesari 50.00

4 Srikakulam Pathapatnam BT Renewal to P.T.Road to Thampa 20.00

5 Srikakulam Pathapatnam BT Renewal to T.G.Road to Karajada 6.00

6 Srikakulam Pathapatnam BT Renewal to A B Road to Miriapalli

via Turakapeta

13.00

7 Srikakulam Pathapatnam BT Renewal to A.B.Road to Irapadu 10.00

8 Srikakulam Rajam BT Renewal to VP Road to AV Puram

via Sirlam

28.00

23

Page 26: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

9 Srikakulam Rajam BT Renewal to U/G to the road from

M.S. puram to Peddimpeta (Via)

Kopparavalasa and Polinaiduvalasa.

(VR)

68.00

10 Srikakulam Srikakulam BT Renewal to Mittannapeta to

Balarampuram

26.00

11 Srikakulam Srikakulam BT Renewal to C.S.P road to NH5 (via)

Gudem,Chapuram

66.00

12 Srikakulam Tekkali BT Renewal to NH5 to Badagam 30.00

PMGSY

Roads Total

346.00

1 Srikakulam Amadalavalasa BT Renewal to Road from CSP road to

Dusi R&B road via Vanjangi and

Vanjagipeta

42.00

2 Srikakulam Etcherla BT Renewal to NH5 to Kuppili Road 56.00

3 Srikakulam Ichapuram BT Renewal to NH5 to Jagati Silagam

road via Dasariputtuga silagam

50.00

4 Srikakulam Narasannapeta BT Renewal to NH5 to Potayyavalasa 20.00

5 Srikakulam Palasa BT Renewal to BT road Yerramukkam

to Ratti via Marripadu

42.00

6 Srikakulam Srikakulam BT Renewal to Road from Killipalem to

Kunduvanipeta

56.00

Non-PMGSY

Roads Total

266.00

Srikakulam

Total

612.00

1 Visakhapatna

m

Anakapalli BT Renewal to Providing BT road to

Rajupalem to Gorlevanipalem via.

Valluru

21.00

2 Visakhapatna

m

Anakapalli BT Renewal to Atcherla to

Gokivanipalem

28.00

3 Visakhapatna

m

Anakapalli BT Renewal to Tumpala to AKP-CDM

road via Dibbapalem

36.80

4 Visakhapatna

m

ArakuVally BT Renewal to R/f Bakuru to Patigaruvu 15.00

5 Visakhapatna

m

ArakuVally BT Renewal to R & B road to Kilagada 16.00

6 Visakhapatna

m

Bheemili BT Renewal to R/f NH5 to

Kummaripalem via. Yathapeta

24.96

7 Visakhapatna

m

Bheemili BT Renewal to Vijayanagaram-Sontyam

road to Buddivalasa(Nerallvalasa)

24.00

m road to Buddivalasa(Nerallvalasa)

8 Visakhapatna

m

Chodavaram BT Renewal to Chodavaram to

Damanapalli

38.40

9 Visakhapatna

m

Chodavaram BT Renewal to R.E.C. Road to

P.Bheemavaram

8.00

10 Visakhapatna

m

Madugula BT Renewal to K.Kotapadu to

Medicharla

20.00

11 Visakhapatna

m

Madugula BT Renewal to Jaithavaram to

Dibbapalem

25.60

12 Visakhapatna

m

Narsipatnam BT Renewal to NRPM- Tuni road to

Manyapu-ratla

24.00

24

Page 27: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

13 Visakhapatna

m

Narsipatnam BT Renewal to Makavarapalem R&B

road to PP Agraharam & Adduruwada

22.40

14 Visakhapatna

m

Narsipatnam BT Renewal to Narsipatnam-

revupolavaram R& B road to

Dharmasagaram

12.80

15 Visakhapatna

m

Narsipatnam BT Renewal to Narsipatnam-Tuni R&B

road to MB Patnam

12.80

16 Visakhapatna

m

Narsipatnam BT Renewal to Narsipatnam-Tuni R&B

road tomanyapuratal( Balance reach)

4.80

17 Visakhapatna

m

Paderu BT Renewal to R&B road to Gopavaram 16.00

18 Visakhapatna

m

Paderu BT Renewal to PL Road to Vanjari 14.80

19 Visakhapatna

m

Payakaraopeta BT Renewal to Approach road to

Vemagiri

16.00

m Vemagiri

20 Visakhapatna

m

Pendurthi BT Renewal to R/f AKP-SBM to Iruwada 17.60

21 Visakhapatna

m

Pendurthi BT Renewal to R/f SBM-

Venkannapalem road to

Pedayathapalem via. A.Sirasapalli

15.40

22 Visakhapatna

m

Yellamanchili BT Renewal to Kattubolu to Murakada 20.00

23 Visakhapatna

m

Yellamanchili BT Renewal to R/f AKP-Pudimadaka

road to Arabupalem

8.00

PMGSY

Roads Total

442.36

1 Visakhapatna

m

Anakapalli BT Renewal to Providing BT to the road

from Nh-5 to Valluru via Rajupalem

(Balance length other than PMGSY)

28.00

2 Visakhapatna

m

Bheemili BT Renewal to BN road to Kothavalasa

via Ramavaram BD Palem

36.80

3 Visakhapatna

m

Paderu BT Renewal to Koyyuru to Revalla 48.00

4 Visakhapatna

m

Paderu BT Renewal to Pentapadu to

Damanapalli

8.00

5 Visakhapatna

m

Payakaraopeta BT Renewal to NH-5 to Devavaram 19.00

6 Visakhapatna Pendurthi BT Renewal to BN road to Sabbavaram- 50.006 Visakhapatna

m

Pendurthi BT Renewal to BN road to Sabbavaram-

AKP road via Nallaregulapalem,

Balijapalem & Ammulapalem

50.00

7 Visakhapatna

m

Yellamanchili BT Renewal to PNR Peta to

Mulakalapalli, Etikoppaka ring road

45.00

Non-PMGSY

Roads Total

234.80

Visakhapatna

m Total

677.16

1 Vizianagaram Bobbili BT Renewal to NH43 to Kottakki 20.00

25

Page 28: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

2 Vizianagaram Cheepurupalli BT Renewal to GB road to Sivaramparla

road (via) Devada and Nadipenapeta

60.00

3 Vizianagaram Cheepurupalli BT Renewal to GG road to

Ippalavalasa

40.00

4 Vizianagaram Cheepurupalli BT Renewal to Garividi Garbham road

to Pedabantupalli via Routhupeta (MP)

30.00

5 Vizianagaram Cheepurupalli BT Renewal to R/f Alugolu to Konuru via

Ragolu (MP)

30.00

6 Vizianagaram Cheepurupalli BT Renewal to Puthikapeta to

Chintalapeta

27.00

7 Vizianagaram Cheepurupalli BT Renewal to G.G.Road to

Chinabantupalli

8.00

8 Vizianagaram Gajapathinagara

m

BT Renewal to NH43 to Keratam (via)

Billalavalasa (2/0 to 4/0)

20.00

9 Vizianagaram Nellimerla BT Renewal to Nellimarla-Moida R&B 20.009 Vizianagaram Nellimerla BT Renewal to Nellimarla-Moida R&B

road to Garikivalasa (via)

Kondagumpam

20.00

10 Vizianagaram Parvathipuram BT Renewal to Road from SH 36 to

Yegotivalasa

80.00

11 Vizianagaram Salur BT Renewal to Kothavalsa to

Mirthivalasa

35.00

12 Vizianagaram Vizianagaram BT Renewal to V.K.road to Pedavemali

Jn (via) Korukonda & Korukondapalem

55.00

PMGSY

Roads Total

425.00

1 Vizianagaram Cheepurupalli BT Renewal to CPP Laveru road to

Ardivalasa

45.00

2 Vizianagaram Gajapathinagara

m

BT Renewal to V.B.road to PSR puram

(via) Korlam

50.00

3 Vizianagaram Gajapathinagara

m

BT Renewal to NH43 to Donkinavalasa

(via) Chowdantivalasa

12.00

4 Vizianagaram Kurupam BT Renewal to DL Puram to Jumbiri. 15.00

5 Vizianagaram Nellimerla BT Renewal to Munginapalli to

Nellimarla (via) Saripalli

50.00

6 Vizianagaram Salur BT Renewal to NH43 to Gadivalasa 40.00

Non-PMGSY

Roads Total

212.00

Roads Total

Vizianagaram

Total

637.00

1 Warangal Bhupalpally BT Renewal to Chinnakodepaka to

Gollapalli via Balaiahpalli

19.00

2 Warangal Bhupalpally BT Renewal to R&B Road to

Vellampally

17.60

3 Warangal Ghanpur (Stn) BT Renewal to Raghunathpally to Veldi 28.50

4 Warangal Jangaon BT Renewal to Thallathanda to

Machupahad

18.75

26

Page 29: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

5 Warangal Jangaon BT Renewal to PWD Road to Obula

Keshavapur

33.25

6 Warangal Mulug BT Renewal to ZP Road to Ramnagar

(Koyagudem)

9.50

7 Warangal Narsampet BT Renewal to PWD Road to

Gundlpadh

19.00

8 Warangal Palakurthy BT Renewal to Thorrur to Chintalapally 4.75

9 Warangal Palakurthy BT Renewal to ZP Road to

Sirisannagudem

7.60

10 Warangal Parkal BT Renewal to Elugur Rangampet to

Nallabelly via Mondrai

29.35

11 Warangal Wardhannapet BT Renewal to Somidi to Subbayyapalli 15.77

PMGSY

Roads Total

203.07

1 Warangal Bhupalpally BT Renewal to Vasanthapur to 40.00

Gorikothapally

2 Warangal Bhupalpally BT Renewal to PWD Road to

Subbakkapally

8.00

3 Warangal Dornakal BT Renewal to Pagidipally to

Bavojithanda

70.00

4 Warangal Ghanpur (Stn) BT Renewal to Komatigudem to

Kanchanpally

50.00

5 Warangal Ghanpur (Stn) BT Renewal to PWD Road to Chilpur 40.00

6 Warangal Jangaon BT Renewal to R&B Road Komuravelli

to Rajiv Rahadari Khaman

48.00

7 Warangal Jangaon BT Renewal to Solipur to Ankushapur 12.00

8 Warangal Mahabubabad BT Renewal to Kesamudram PWD road

to Nellikudur PWD Road via

Kalwala,Narayanpur

130.00

9 Warangal Mulug BT Renewal to R&B Road Mangapet to

Kothur

51.30

10 Warangal Palakurthy BT Renewal to Nellutla to Nanchari

Madur from Km 18/0 to 49/0

80.00

11 Warangal Parkal BT Renewal to Kamaram to Neerukulla 35.20

12 Warangal Wardhannapet BT Renewal to SH-7 to Madipally 58.43

13 Warangal Wardhannapet BT Renewal to PWD Road to Madipalli 35.0013 Warangal Wardhannapet BT Renewal to PWD Road to Madipalli

(via) Anantasagaram

35.00

Non-PMGSY

Roads Total

657.93

Warangal

Total

861.00

1 West Godavari Denduluru BT Renewal to Maheswarapuram to

Manuru

25.00

2 West Godavari Denduluru BT Renewal to Katlampudi village road 33.00

3 West Godavari Gopalapuram BT Renewal to Gopalapuram to Bhimole 62.00

27

Page 30: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

4 West Godavari Narasapur BT Renewal to R&B road to

Lakkuvarithota H/o Ramannapalem

15.00

5 West Godavari Nidadavole BT Renewal to Kanuru Agraharam to

Nadupalli kota

110.00

6 West Godavari Palakol BT Renewal to Mattaparru to

Penumadam

45.00

7 West Godavari Polavaram BT Renewal to R&B Road to

T.Narsapuram

22.00

8 West Godavari Tanuku BT Renewal to Tanuku -Bhimavaram

R&B road to Indira Nagar of Relangi via

kethavaripalem

25.00

9 West Godavari Undi BT Renewal to Gollalakoderu to

Mahadevapatnam

20.00

10 West Godavari Unguturu BT Renewal to Bhimadole to

Lingampadu

16.00

PMGSY

Roads Total

373.00

Roads Total

1 West Godavari Achanta BT Renewal to Penugonda Deva

Z.P.Road

125.00

2 West Godavari Bhimavaram BT Renewal to Road from Konithiwada

to Rayakuduru in Veeravasaram (M)

35.00

3 West Godavari Bhimavaram BT Renewal to Dirusumarru Village

Road in Bhimavaram(M)

15.00

4 West Godavari Bhimavaram BT Renewal to Road from Balepalli R&B

Road to NREGS Road in Veeravasaram

(M)

10.00

5 West Godavari Chintalapudi BT Renewal to Jeelakarragudem to

Kamavarapukota (via) K.S.Ramavaram

50.00

6 West Godavari Chintalapudi BT Renewal to Jangaraddygudem to

Pangidigudem

30.00

7 West Godavari Denduluru BT Renewal to Road from Duggirala to

Chuttugunta

21.00

8 West Godavari Eluru BT Renewal to road from NH5 to

Satrampadu

35.00

9 West Godavari Kovvuru BT Renewal to Pasivedala to Arikirevula 27.00

10 West Godavari Narasapur BT Renewal to Road from Mogaltur to

Rajugarithota

25.00

11 West Godavari Palakol BT Renewal to Abbirajupalem to

Doddibatla road

47.00

Doddibatla road

12 West Godavari T.P.gudem BT Renewal to Jatlapalem Palem to

Mongipadu

40.00

13 West Godavari T.P.gudem BT Renewal to Navabpalem to

Pattempalem (12/4-17/4)

75.00

14 West Godavari Tanuku BT Renewal to R/F Pekeru to R.

Khandrika

45.00

15 West Godavari Undi BT Renewal to Road from R&B road to

Komatigunta Village

10.69

16 West Godavari Unguturu BT Renewal to Bhimadole to

Kurellagudem via Vadlapatla

85.00

28

Page 31: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

Sl

No.District Constituency Name of the work

Amount in

Rs.Lakhs

BT Renewals for PMGSY & Non-PMGSY Roads Under MRR Grant for Year 2012-13

Non-PMGSY

Roads Total

675.69

West

Godavari

Total

1048.69

State Total 20865.12

PRINCIPAL SECRETARY TO GOVERNMENT

//FORWARDED::BY ORDER//

SECTION OFFICER

C.R. BISWAL

29

Page 32: BT RENEWLAS AP GO RT NO 1840 DT 05-10-2012

No of

works

Amount No of

works

Amount No of

works

Amount

1 Adilabad 3 56.00 15 649.80 18 705.80

2 Anantapur 12 295.40 11 643.58 23 938.98

3 Chittoor 24 548.75 26 709.70 50 1258.45

4 East Godavari 17 452.53 17 579.50 34 1032.03

5 Guntur 16 324.60 19 786.30 35 1110.90

6 Kadapa 9 224.06 10 326.54 19 550.60

7 Karimnagar 15 294.00 17 961.30 32 1255.30

8 Khammam 10 331.30 7 497.00 17 828.30

9 Krishna 21 551.80 9 376.40 30 928.20

10 Kurnool 14 358.30 9 504.00 23 862.30

11 Mahabubnagar 17 561.00 12 611.50 29 1172.50

12 Medak 11 315.40 24 908.40 35 1223.80

13 Nalgonda 30 1434.48 23 712.98 53 2147.46

14 Nizamabad 21 355.70 12 318.00 33 673.70

15 Prakasam 9 280.00 10 500.00 19 780.00

16 Ranga Reddy 2 40.00 24 891.00 26 931.00

17 SPSR Nellore 10 350.85 7 279.10 17 629.95

18 Srikakulam 12 346.00 6 266.00 18 612.00

19 Visakhapatnam 23 442.36 7 234.80 30 677.16

20 Vizianagaram 12 425.00 6 212.00 18 637.00

21 Warangal 11 203.07 13 657.93 24 861.00

22 West Godavari 10 373.00 16 675.69 26 1048.69

309 8563.595 300 12301.52 609 20865.12

Abstract of BT Renewals Under MRR Grant

District Total For Non -PMGSY

Roads

For PMGSY RoadsS.No.

Amount Rs.in Lakhs