22nd Nov 2017
BSES Rajdhani Power Ltd.
-
Agenda
• Delhi Solar Policy – Key Highlights
• Capacity Addition and RPO Targets
• BRPL- Net-Metering Status
• Business Models
-
Delhi Solar Policy – Key Highlights (1/2) • Notified dated: 27 Sept 2016
• Achieve aggressive rooftop solar growth in Delhi – 1.0 GW by 2020 (14% of peak load, 4.2% of total energy consumed)
– 2.0 GW by 2025 (21% of peak load, 6.6% of total energy consumed)
• Ensure fairness for all stakeholders in the solar ecosystem – Rooftop owners in all consumer segments, Discoms, investors, technology
and services providers, non-rooftop solar and non-solar power consumers & manufacturers.
• DISCOM Perspective: – The DISCOMS shall give priority and preference to sourcing at least 75% of
their RPO targets within the state of Delhi.
– All solar energy generated at a net metered connection site in a DISCOM’s territory shall count towards that DISCOM’s RPO target.
• Mandatory for all govt. buildings with rooftop area of 500 m2.
-
Delhi Solar Policy – Key Highlights (2/2)
• Generation Based Incentive (GBI)
– a limited-time GBI for existing and future Net Metered connections in the domestic/residential segment only.
– Variable domestic tariff structure (above fixed charge of INR 100 p.m.):
– GBI of INR 2/solar unit generated from 1100 kWh Upto 1500 kWh per KWp.
– On first come first serve basis for 3 yrs.
– This step will reduce payback time by 1-2 years and increase adoption.
Units 0-200 201-400 401-800 801-1200 1200+
Tariff (INR) 4 5.95 7.30 8.10 8.75
-
Capacity Addition and RPO Targets
GOI Targets NTP and
MoP Trajectory
Delhi Solar Policy
DERC
175 GW Renewable Energy Capacity Addition by March 2022 o 100 GW Solar -
60 GW from grid scale solar farm, 40 GW from rooftop Solar PV
o 60 GW Wind o 10 GW Bio mass
and 5 GW small Hydro
National Tariff Policy 2016
o Target of 8% Solar RPO (excl. Hydro from total generation)
about 7.2% of total generation from Solar
MoP - RPO targets
Target for rooftop solar by 2022 has been set at 1503 MW and by 2025 target is 1995 MW BRPL targets derived: o 600 MW by 2022 o 800 MW by 2025
Yet to adopt the targets formally through necessary Regulatory framework
Current RPO as per DERC Regulations for 2016-17 is: o Solar - 0.35%, o Non Solar - 9.0%, o Total - 9.35%
Long Term Trajectory 2016-17 2017-18 2018-19
Non-Solar 8.75% 9.50% 10.25%
Solar 2.75% 4.75% 6.75%
Total 11.50% 14.25% 17.00%
-
BRPL- Net-Metering Status
• 411 Installations Completed till date , 12.50 MWp
– Y1: 90 nos, 3.2 MWp, Y2: 143 nos, 3.38 MWp , Y3 : 178 Nos. 7 months , 5.92 MWp
• Another 17 MWp in process
• Interest from all segments
• Higher Participation from Residential (Nos.) & Institutions (Capacity)
6
-
BRPL Initiatives • Study with GIZ:
– Large scale Grid Integration study with GIZ
• Objective is to know the impact on Distribution Network by large scale integration of distributed PV plants in the electricity distribution system
• Study with TERI: – Impact Assessment Study of increasing Rooftop Solar PV penetration with
TERI:
• Objective is to know about conducting a load flow study for facilitation of a Solar PV rooftop
• System Augmentation / Planning with penetration of solar PV rooftop
• Study with USAID / NEXANT: • Implementing options of Customer Centric Business models & Consumer
Aggregation
-
11/24/2017 8
Utility Anchored Procurement: Facilitation Model - EPC
Consumers
BRPL Quality Equipments Vendor Assignment
Developer
Standard EPC agreement
EoI – vendor enrolment agreement
Customer Enrolment Aggregated customer list
-
Utility Anchored : Facilitation - RESCO Model
Consumers
Utility Customer aggregation
Facilitation Charges
RESCO
Power Purchase Agreement
Facilitation Agreement
Utility tariff
RESCO builds owns and operates SRTPV on consumer roofs
Contracted Tariff Contracted Tariff
-
11/24/2017 10
BSES Rooftop Outlook/Incentive
• Decongesting overloaded DT’s
• Augmenting Daytime peaks.
• Meeting RPO targets.
• Ensure robustness of grid, while adding DER
• Role model for DISCOM’s
• Undertake necessary handholding between consumers and vendors. – No Tendering
• Fall under guidelines and framework set by IPGCL, Govt of Delhi.
-
Dwarka Solar City Program
• Consumer outreach event
• RWA, and communities with shared meters
• Largest residential area in Delhi, amongst largest areas in Asia, most residential.
• Support from financing institutions.
11
-