BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

90
8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 1/90 | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | BRITISH STANDARD  BS EN 1536:2000 The European Standard EN 1536:1999 has the status of a British Standard ICS 93.020 NO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAW Execution of special geotechnical work Ð Bored piles p y p y ( )

Transcript of BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

Page 1: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 1/90

|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||

|||||||||||||||||||||||||

|||||||||||||||||||||||||||||||||||

BRITISH STANDARD   BS EN

1536:2000

The European Standard EN 1536:1999 has the status of a British Standard

ICS 93.020

NO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAW 

Execution of specialgeotechnical work Ð

Bored piles

py

py

()

Page 2: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 2/90

This British Standard, havingbeen prepared under thedirection of the Sector Committee for Building and CivilEngineering, was published under the authority of the StandardsCommittee and comes into effecton 15 January 2000

© BSI 01-2000

ISBN 0 580 32605 5

BS EN 1536:2000

 Amendments issued since publication

 Amd. No. Date Comments

National foreword

This British Standard is the English language version of EN 1536:1999.

The UK participation in its preparation was entrusted by Technical CommitteeB/526, Geotechnics, to Subcommittee B/526/5, Construction of piles, pile shafts and

boreholes, which has the responsibility to:

Ð aid enquirers to understand the text;

Ð present to the responsible European committee any enquiries on theinterpretation, or proposals for change, and keep the UK interests informed;

Ð monitor related international and European developments and promulgatethem in the UK.

 A list of organizations represented on this subcommittee can be obtained on requestto its secretary.

Cross-references

The British Standards which implement international or European publicationsreferred to in this document may be found in the BSI Standards Catalogue under thesection entitled ªInternational Standards Correspondence Indexº, or by using theªFindº facility of the BSI Standards Electronic Catalogue.

 A British Standard does not purport to include all the necessary provisions of a contract. Users of British Standards are responsible for their correct application.

Compliance wit h a British Standard does not of itself confer immunity 

from legal obligations.

Summary of pages

This document comprises a front cover, an inside front cover, the EN title page, pages 2 to 87 and a back cover.

The BSI copyright notice displayed in this document indicates when the documentwas last issued.

py

py

()

Page 3: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 3/90

 

py

py

()

Page 4: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 4/90

py

py

()

Page 5: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 5/90

 

py

py

()

Page 6: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 6/90

 

 

 

py

py

()

Page 7: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 7/90

 

 

   

   

 

     

     

         

   

 

   

   

   

   

 

py

py

()

Page 8: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 8/90

 

        

   

       

          

 

 

     

             

          

          

         

 

   

          

          

         

py

py

()

Page 9: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 9/90

       

      

   

     

   

     

  

 

 

py

py

()

Page 10: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 10/90

   

   

  

 

   

     

   

py

py

()

Page 11: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 11/90

   

   

   

 

       

 

 

py

py

()

Page 12: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 12/90

 

 

   

 

 

   

py

py

()

Page 13: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 13/90

 

 

  

   

 

 

 

 

   

 

py

py

()

Page 14: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 14/90

 

 

   

py

py

()

Page 15: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 15/90

 

   

 

 

   

   

   

   

   

   

   

     

   

   

   

   

  

 

    

py

py

()

Page 16: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 16/90

   

   

     

   

   

   

   

   

 

 

 

 

 

 

 

 

   

 

 

py

py

()

Page 17: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 17/90

 

 

 

 

 

 

 

   

 

 

   

 

 

   

 

 

 

 

   

 

   

 

 

py

py

()

Page 18: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 18/90

 

 

 

 

   

 

 

 

       

       

       

       

     

 

 

 

   

   

   

 

 

 

py

py

()

Page 19: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 19/90

 

 

 

 

 

 

 

 

 

 

   

   

   

 

 

   

   

       

 

 

 

py

py

()

Page 20: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 20/90

 

 

 

 

 

   

   

   

   

   

         

         

  

          

           

py

py

()

Page 21: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 21/90

              

     

              

         

   

    

 

 

 

 

   

 

 

 

 

 

 

 

py

py

()

Page 22: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 22/90

 

 

 

 

 

 

   

   

 

 

 

   

   

   

   

   

   

   

 

   

py

py

()

Page 23: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 23/90

 

 

 

 

   

 

   

 

 

 

   

     

   

   

 

 

 

 

   

 

py

py

()

Page 24: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 24/90

 

   

  

  

 

     

     

   

     

     

   

 

 

 

 

 

 

   

   

py

py

()

Page 25: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 25/90

 

 

 

       

   

     

   

     

   

     

 

 

   

   

   

 

   

   

 

   

   

   

   

     

   

   

 

py

py

()

Page 26: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 26/90

 

   

   

 

   

 

 

   

          

              

         

        

      

        

      

 

         

 

py

py

()

Page 27: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 27/90

       

 

   

       

   

py

py

()

Page 28: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 28/90

 

 

 

    

        

 

 

 

 

   

   

   

 

 

 

 

   

   

   

 

py

py

()

Page 29: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 29/90

 

 

 

 

 

 

 

 

 

 

 

 

 

   

   

     

 

 

  

    

        

       

      

    

  

          

 

py

py

()

Page 30: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 30/90

 

 

 

     

 

 

   

       

 

   

 

 

 

   

 

 

 

 

 

py

py

()

Page 31: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 31/90

 

 

 

      

       

 

     

   

   

   

   

 

 

 

 

 

 

 

 

 

 

py

py

()

Page 32: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 32/90

   

   

   

   

   

   

   

 

   

   

   

 

       

   

 

   

   

   

   

   

   

   

 

py

py

()

Page 33: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 33/90

 

 

 

 

   

   

   

 

   

   

 

 

   

   

 

 

 

 

 

 

py

py

()

Page 34: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 34/90

   

   

   

   

   

   

   

 

   

   

 

 

       

 

   

   

     

   

   

py

py

()

Page 35: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 35/90

 

   

   

   

   

 

 

   

   

   

   

   

 

 

 

 

 

 

py

py

()

Page 36: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 36/90

 

 

 

   

 

   

     

   

 

 

   

   

 

 

 

 

 

    

 

   

 

          

 

py

py

()

Page 37: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 37/90

 

 

              

     

   

     

 

   

   

 

 

   

   

   

   

 

 

 

py

py

()

Page 38: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 38/90

 

   

      

       

 

 

 

   

   

 

 

 

 

   

   

   

 

 

 

 

   

   

py

py

()

Page 39: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 39/90

 

 

 

 

 

  

 

 

 

   

   

 

   

   

   

 

   

   

   

 

   

   

   

py

py

()

Page 40: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 40/90

 

   

   

 

   

   

 

 

 

   

   

   

 

       

   

 

 

 

   

   

 

 

py

py

()

Page 41: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 41/90

 

 

 

 

 

 

 

   

   

 

 

 

 

    

 

 

 

 

 

 

py

py

()

Page 42: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 42/90

    

 

 

 

   

   

 

 

   

   

   

   

 

   

   

   

 

 

   

     

   

py

py

()

Page 43: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 43/90

   

 

 

 

 

 

 

   

   

 

 

 

   

 

 

 

   

 

   

   

py

py

()

Page 44: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 44/90

 

 

   

   

   

 

 

 

 

   

 

   

 

   

 

 

   

   

 

py

py

()

Page 45: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 45/90

 

 

   

   

 

 

   

   

 

 

 

 

 

   

 

 

 

 

 

py

py

()

Page 46: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 46/90

 

   

   

 

 

   

   

   

   

 

 

 

   

   

   

   

 

 

 

 

py

py

()

Page 47: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 47/90

 

   

   

   

   

 

 

 

 

 

 

 

   

   

   

 

 

py

py

()

Page 48: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 48/90

 

 

 

 

   

   

 

 

 

   

   

 

 

 

   

 

  

 

 

 

   

py

py

()

Page 49: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 49/90

 

 

 

 

   

   

   

 

 

 

   

   

   

   

   

   

   

   

   

       

   

   

   

   

   

   

   

   

py

py

()

Page 50: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 50/90

   

   

     

 

 

 

 

 

 

   

 

 

       

    

 

 

py

py

()

Page 51: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 51/90

   

   

 

 

  

 

 

     

       

 

 

 

 

 

 

 

   

 

 

   

 

 

   

 

 

 

     

py

py

()

Page 52: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 52/90

 

 

   

 

 

 

 

 

 

 

 

   

   

 

 

 

   

 

   

 

   

 

   

 

 

 

 

 

 

 

 

 

 

py

py

()

Page 53: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 53/90

 

 

 

 

 

 

 

 

 

 

 

 

   

   

 

  

    

 

 

 

 

    

 

 

 

   

 

 

 

 

py

py

()

Page 54: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 54/90

 

 

 

   

 

 

 

 

   

 

     

 

 

 

   

 

 

 

 

py

py

()

Page 55: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 55/90

 

 

   

 

     

 

   

   

 

 

 

   

 

 

 

py

py

()

Page 56: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 56/90

 

 

 

   

 

 

 

 

   

     

 

 

   

 

   

   

py

py

()

Page 57: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 57/90

 

 

   

 

   

 

 

   

 

 

 

 

 

 

 

 

   

 

py

py

()

Page 58: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 58/90

 

 

   

   

   

 

 

 

 

 

 

 

   

   

 

   

   

   

   

   

 

py

py

()

Page 59: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 59/90

 

 

 

 

 

       

     

   

 

 

 

 

 

 

 

 

 

py

py

()

Page 60: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 60/90

 

 

   

 

 

   

 

            

          

 

 

 

 

   

   

   

 

 

   

   

   

py

py

()

Page 61: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 61/90

   

 

py

py

()

Page 62: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 62/90

 

   

   

   

   

 

 

 

   

   

               

   

               

             

py

py

()

Page 63: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 63/90

     

   

         

     

 

       

   

   

   

   

   

         

     

       

       

               

         

 

    

py

py

()

Page 64: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 64/90

 

 

   

   

   

   

 

 

   

   

   

 

 

 

  

 

   

   

   

   

   

   

 

   

       

py

py

()

Page 65: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 65/90

 

   

   

py

py

()

Page 66: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 66/90

    

   

   

 

 

 

   

   

   

   

 

 

 

 

   

py

py

()

Page 67: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 67/90

   

 

 

 

 

 

 

     

   

 

 

 

 

 

 

 

 

 

 

 

py

py

()

Page 68: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 68/90

   

 

 

 

 

 

 

 

 

 

 

   

 

 

 

py

py

()

Page 69: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 69/90

       

       

         

       

       

         

         

         

       

           

py

py

()

Page 70: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 70/90

      

       

       

       

   

         

     

       

          

 

py

py

()

Page 71: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 71/90

py

py

()

Page 72: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 72/90

py

py

()

Page 73: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 73/90

py

py

()

Page 74: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 74/90

py

py

()

Page 75: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 75/90

py

py

()

Page 76: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 76/90

   

   

 

     

       

   

   

   

   

   

   

py

py

()

Page 77: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 77/90

   

 

 

   

 

 

   

         

         

 

 

   

 

 

py

py

()

Page 78: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 78/90

 

 

 

 

 

   

 

py

py

()

Page 79: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 79/90

py

py

()

Page 80: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 80/90

 

 

 

   

 

       

         

 

 

   

 

py

py

()

Page 81: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 81/90

 

 

 

 

 

   

 

py

py

()

Page 82: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 82/90

 

py

py

()

Page 83: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 83/90

 

 

 

   

       

 

 

             

         

     

 

   

 

 

py

py

()

Page 84: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 84/90

 

 

   

  

 

py

py

()

Page 85: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 85/90

   

 

 

 

 

 

py

py

()

Page 86: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 86/90

 

 

 

 

 

py

py

()

Page 87: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 87/90

   

   

 

 

 

 

 

 

 

py

py

()

Page 88: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 88/90

   

 

 

 

 

 

 

 

py

py

()

Page 89: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 89/90

 

 

 

         

 

 

 

py

py

()

Page 90: BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

8/19/2019 BSEN 1536-2000 Execution of Special Geotechnical Works-Bored Pile

http://slidepdf.com/reader/full/bsen-1536-2000-execution-of-special-geotechnical-works-bored-pile 90/90

BS EN

1536:2000|||||||||||||||||||||||||||||||||||||||||||

|||||||||||||||||||||||||

|||||||||||||||||||||||||||||

BSI Ð British Standards Institution

BSI is the independent national body responsible for preparing British Standards. It presents the UK view on standards in Europe and at the international level. It is

incorporated by Royal Charter.

Revisions

British Standards are updated by amendment or revision. Users of British Standardsshould make sure that they possess the latest amendments or editions.

It is the constant aim of BSI to improve the quality of our products and services. Wewould be grateful if anyone finding an inaccuracy or ambiguity while using thisBritish Standard would inform the Secretary of the technical committee responsible,the identity of which can be found on the inside front cover. Tel: 020 8996 9000.Fax: 020 8996 7400.

BSI offers members an individual updating service called PLUS which ensures thatsubscribers automatically receive the latest editions of standards.

Buying standards

Orders for all BSI, international and foreign standards publications should beaddressed to Customer Services. Tel: 020 8996 9001. Fax: 020 8996 7001.

In response to orders for international standards, it is BSI policy to supply the BSIimplementation of those that have been published as British Standards, unlessotherwise requested.

Information on standards

BSI provides a wide range of information on national, European and internationalstandards through its Library and its Technical Help to Exporters Service. VariousBSI electronic information services are also available which give details on all its

 products and services. Contact the Information Centre. Tel: 020 8996 7111.

Fax: 020 8996 7048.Subscribing members of BSI are kept up to date with standards developments andreceive substantial discounts on the purchase price of standards. For details of these and other benefits contact Membership Administration. Tel: 020 8996 7002.Fax: 020 8996 7001.

Copyright

Copyright subsists in all BSI publications. BSI also holds the copyright, in the UK, of the publications of the international standardization bodies. Except as permittedunder the Copyright, Designs and Patents Act 1988 no extract may be reproduced,stored in a retrieval system or transmitted in any form or by any means ± electronic,

 photocopying, recording or otherwise ± without prior written permission from BSI.

This does not preclude the free use, in the course of implementing the standard, of necessary details such as symbols, and size, type or grade designations. If thesed tail a t b d f a th tha i l tati th th i

py

py

()