BS 2 Group assignment example Building services-bangsar-village-1

194
Page 1 of 187 Table of Contents Page 1.0 Introduction 1.1 Abstract------------------------------------------------------------------------------2 1.2 Acknowledgement------------------------------------------------------------------2 1.3 Project Objectives------------------------------------------------------------------3 1.4 Project Outcomes-------------------------------------------------------------------3 1.5 Project Requirements--------------------------------------------------------------3 2.0 Literature Review and Onsite Research Analysis 2.1 Chapter 1: Mechanical Ventilation and HVAC system 2.1.1 Introduction---------------------------------------------------------------5 2.1.2 Literature Review 2.1.2.1 Mechanical Ventilation--------------------------------------6 2.1.2.2 Air Conditioning---------------------------------------------8 2.1.3 Mechanical Ventilation System---------------------------------------10 2.1.3.1 Case Study Bangsar Village 1--------------------------10 2.1.4 Central Plant System/ Centralised Air Conditioning System 2.1.4.1 Case Study Bangsar Village 1--------------------------12 2.1.4.2 Bangsar Village 1 Refrigeration System Flowchart----13 2.1.5 Refrigeration Plant------------------------------------------------------14 2.1.6 Chiller---------------------------------------------------------------------16 2.1.7 Cooling Tower-----------------------------------------------------------22 2.1.8 Air Handling Unit (AHU)----------------------------------------------24 2.1.9 Fan Coil Unit------------------------------------------------------------28 2.1.10 Conclusion---------------------------------------------------------------31 2.2 Chapter 2: Electrical Supply System 2.2.1 Literature Review-------------------------------------------------------33 2.2.2 Introduction--------------------------------------------------------------35 2.2.3 High Tension Room----------------------------------------------------37 2.2.4 High tension room components and devices------------------------38 2.2.5 Analysis and observation based on observation of high tension room--------------------------------------------------------------39 2.2.6 Analysis and observation based on observation of low voltage room--------------------------------------------------------------40 2.2.7 Genset Room-----------------------------------------------------------49 2.2.8 Requirements of UBBL 2006----------------------------------------50 2.2.9 Conclusion---------------------------------------------------------------50

Transcript of BS 2 Group assignment example Building services-bangsar-village-1

Page 1: BS 2 Group assignment example Building services-bangsar-village-1

Page 1 of 187

Table of Contents Page

1.0 Introduction

1.1 Abstract------------------------------------------------------------------------------2

1.2 Acknowledgement------------------------------------------------------------------2

1.3 Project Objectives------------------------------------------------------------------3

1.4 Project Outcomes-------------------------------------------------------------------3

1.5 Project Requirements--------------------------------------------------------------3

2.0 Literature Review and Onsite Research Analysis

2.1 Chapter 1: Mechanical Ventilation and HVAC system

2.1.1 Introduction---------------------------------------------------------------5

2.1.2 Literature Review

2.1.2.1 Mechanical Ventilation--------------------------------------6

2.1.2.2 Air Conditioning---------------------------------------------8

2.1.3 Mechanical Ventilation System---------------------------------------10

2.1.3.1 Case Study – Bangsar Village 1--------------------------10

2.1.4 Central Plant System/ Centralised Air Conditioning System

2.1.4.1 Case Study – Bangsar Village 1--------------------------12

2.1.4.2 Bangsar Village 1 Refrigeration System Flowchart----13

2.1.5 Refrigeration Plant------------------------------------------------------14

2.1.6 Chiller---------------------------------------------------------------------16

2.1.7 Cooling Tower-----------------------------------------------------------22

2.1.8 Air Handling Unit (AHU)----------------------------------------------24

2.1.9 Fan Coil Unit------------------------------------------------------------28

2.1.10 Conclusion---------------------------------------------------------------31

2.2 Chapter 2: Electrical Supply System

2.2.1 Literature Review-------------------------------------------------------33

2.2.2 Introduction--------------------------------------------------------------35

2.2.3 High Tension Room----------------------------------------------------37

2.2.4 High tension room components and devices------------------------38

2.2.5 Analysis and observation based on observation of

high tension room--------------------------------------------------------------39

2.2.6 Analysis and observation based on observation of

low voltage room--------------------------------------------------------------40

2.2.7 Genset Room-----------------------------------------------------------49

2.2.8 Requirements of UBBL 2006----------------------------------------50

2.2.9 Conclusion---------------------------------------------------------------50

Page 2: BS 2 Group assignment example Building services-bangsar-village-1

Page 2 of 187

2.3 Chapter 3: Mechanical Transportation System

2.3.1 Literature Review--------------------------------------------------------52

2.3.2 Hydraulic Elevator (Cargo Lift) --------------------------------------52

2.3.3 Components--------------------------------------------------------------53

2.3.4 Operating Panel----------------------------------------------------------58

2.3.5 Machine Room Less Elevator (Passenger Lift)---------------------60

2.3.6 Components--------------------------------------------------------------63

2.3.7 Escalators-----------------------------------------------------------------69

2.3.8 Escalator Arrangement

2.3.8.1 Parallel Stacked Arrangement------------------------------------70

2.3.8.2 Crisscross Arrangement-------------------------------------------70

2.3.8.3 Components-------------------------------------------------71

2.3.8.4 Safety Features---------------------------------------------72

2.3.9 Travelator----------------------------------------------------------------73

2.3.9.1 Inclined Travelator-------------------------------------------------74

2.3.9.2 Components-------------------------------------------------75

2.3.10 Conclusion---------------------------------------------------------------75

2.4 Chapter 4: Fire Protection System

2.4.1 Chapter Introduction---------------------------------------------------77

2.4.2 Literature Review------------------------------------------------------77

2.4.3 Introduction To Fire---------------------------------------------------82

2.4.3.1 Science Of Fire--------------------------------------------84

2.4.3.2 Panic Behaviour-------------------------------------------89

2.4.3.3 Onsite Research and Analysis---------------------------91

2.4.3.3.1 Active Fire Protection System-------------92

2.4.3.3.2 Passive Fire Protection System-----------161

2.4.3.3.3 Potential Hazards---------------------------177

2.4.4 Conclusion-------------------------------------------------------------184

3.0 Final Conclusion-------------------------------------------------------------------------185

4.0 Reference List----------------------------------------------------------------------------186

Page 3: BS 2 Group assignment example Building services-bangsar-village-1

Page 3 of 187

1.0 INTRODUCTION

Bangsar Village offering over 110,000 square feet of retail space, Bangsar Village l &ll is a

boutique shopping centre catering to high-income residents in the Telawi area. Opened in

2004, the complex houses over 70 specialty stores mainly made up out of international

fashion labels and quirky cafes.

The twin buildings are connected via a sheltered pedestrian sky-bridge which is accessible

via the first floor. A family- friendly venture, this complex is a favourite haunt of the

city‟s young urbanites and expatriate community. Stores stocking luxury and household

items are spread across Bangsar Village‟s two wings and cover just about every

brand name imaginable, although the new wing houses the brunt of its fashion apparel

selections.

Page 4: BS 2 Group assignment example Building services-bangsar-village-1

Page 4 of 187

1.1 ABSTRACT

The research report will be looking into the workings of the services system in Bangsar

Village 1 such as the Mechanical Ventilation & Air Conditioning System, Electrical Supply

System, Mechanical Transportation System and Fire Protection System. The report will

aim at introducing the fundamentals of all the mentioned systems as well as an analysis

of the system that have been analyzed and synthesized to our own understanding and also

based on the regulations of buildings and its services such as Uniform Building By

Law (UBBL). Requirements and adherence will also be analyzed based on each services

respected controlling arm.

1.2 ACKNOWLEDGEMENT

We would like to thank Mr Yong to allow our team to visit Bangsar Village 1 building as

he brought us for a tour around the building through the prominent service rooms such as

electrical rooms, lift motor rooms, chiller room, fire fighting system room. Apart from

that, he provided us with all of the necessary information throughout the building including

statistics information and schematics drawing. We are grateful that he relentlessly explaining

the systems of each room and the machines within. Without his helps, we won‟t be able

to finish the project with the require information. Lastly, a special thanks we would like to

give to Mr Adib for guiding us through each tutorials and providing us with an aim to accomplish.

Page 5: BS 2 Group assignment example Building services-bangsar-village-1

Page 5 of 187

1.3 PROJECT OBJECTIVES

1. To introduce students to the basic principles, process and equipment of various building

services systems through real life project (experiential learning).

2. To expose students to the integration of various building services systems in a building.

3. To allow students to demonstrate their understanding of building services systems

4. To develop students‟ understanding and familiarity on the drawing conventions and standards

for different building services systems

1.4 PROJECT OUTCOMES

1. Identify and understand relevant information related to water and electrical supply,

sewerage, mechanical ventilation and air-conditioning as well as fire protection systems.

2. Understand how each building services functions including the connections and

position of different parts equipment.

3. Understand and explain the principles and systems as well as space implications

and regulations related to different building services

Page 6: BS 2 Group assignment example Building services-bangsar-village-1

Page 6 of 187

1.5 PROJECT REQUIREMENTS

Identify all the required building services components installed in the building.

Perform a thorough study on all the services systems;

i) mechanical ventilation and air conditioning system,

ii) electrical supply system,

iii) mechanical transportation system, and

iv) fire protection system

Obtain estimate dimensions and sizes of the spaces required for all the equipment and plant

rooms identified. Provide brief explanation on how the building services components function.

This explanation shall be in qualitative form and therefore no calculation is required.

Summarize the systems in diagrammatic form.

Page 7: BS 2 Group assignment example Building services-bangsar-village-1

Page 7 of 187

2.1 MECHANICAL VENTILATION AND AIR CONDITIONING

Page 8: BS 2 Group assignment example Building services-bangsar-village-1

Page 8 of 187

2.1 MECHANICAL VENTILATION AND AIR CONDITIONING

2.1.1 Introduction

Mechanical ventilation systems circulate fresh air with ducts and fans and make up for the

unreliability of natural ventilation systems. However, with the mechanical provision of

constant airflow from the outdoors, the admissible air quality has to be well sustained.

This can be achieved through the use of diffusers and more importantly, the placement of

inlet and outlet ducts in a building.

Air conditioning is basically the control of temperature, humidity, air quality, air movement

& heat radiation through mechanical systems in order to achieve human thermal comfort.

Human thermal comfort is define by ASHRAE the condition of mind that expresses satisfaction

with the thermal environment and is assessed by subjective evaluation (ANSI/ASHRAE

Standard 55). Heating, cooling, dehumidification, humidification, ventilation, and

sterilization are different methods for air conditioning in a building.

Page 9: BS 2 Group assignment example Building services-bangsar-village-1

Page 9 of 187

2.1.2 Literature Review

2.1.2.1 Mechanical Ventilation

Mechanical ventilation is the air movement from one space to another and the supply of

fresh air at the same into the air conditioned spaces. Mechanical ventilation is a way of

forced or induced ventilation by using mechanical air handling systems. It helps in controlling

the humidity, contaminants, air borne particles and general air quality.

For the intent of transporting and removing air from a space, a few components such as blowers,

fans, filters, and ducts are used in mechanical ventilation. A building ventilation system with

the usage of powered fans or blowers to provide clean air to rooms when the natural forces of air

pressure are not sufficient for the optimum air circulation in a building. Mechanical ventilation is

utilized to control indoor air quality, excess humidity, smells, and contaminants can often be

controlled via dilution or replaced them with the outside air.

PRESSURE SYSTEM is a system where the air pressure in the building is slightly greater than

that of the outer atmosphere to allow the air blown through the building by a fan or other blower

placed at the inlet.

VACUUM SYSTEM is a system where occurrence of an inrush of fresh air done by an

exhaust fan placed at the outlet to the vent flue or stack. The air pressure in the building is

slightly lower than that of the outer atmosphere.

Figure 2.3.1.1: Fresh air is introduced into the

building with mechanical air filter system while the

heat is distributed out from the building naturally

(through openings).

Source: www.new-learn.info

Figure 2.3.2.1: The hot air is vacuumed out from the space

with the help of the mechanical fan system installation in the

building and then, the hot air is moved out from the building

while the fresh air flows into the building naturally (through

opening).

Source: www.new-learn.info

Page 10: BS 2 Group assignment example Building services-bangsar-village-1

Page 10 of 187

BALANCE SYSTEM is a system consists the combination of pressure system and vacuum

system in order to supply fresh air and extract stale air at the same time using fan. The amendment

done in this system is to achieve slight pressurization of the air inside the building by using

an extract fan smaller than inlet fan, to prevent dust, draughts and noise. This combination is able

to help to provide sufficient fresh air into the space or building as well as extract the heat

efficiently

out from the building with the help of mechanical ventilation „balance system‟.

Installation of fan and fresh air filter system

together in a building helps to extract the heat out

from the exterior spaces and provide fresh air into

the building itself to achieve thermal comfort.

Source: www.new-learn.info

Page 11: BS 2 Group assignment example Building services-bangsar-village-1

Page 11 of 187

2.1.2.2 Air Conditioning

Air conditioning in a building primarily achieves five factors:

a) Thermal comfort (control air temperature and humidity)

b) Ventilation (control air circulation and quality)

c) Health (minimal smoke, dust, etc.)

d) Performance (improve workers‟ and machinery efficiency)

e) Equipment (lengthen machinery lifespan)

Two main cycles are involved in air conditioning, namely, the refrigerant cycle and the

air cycle. Refrigeration is a process that removes heat from an enclosed space in order to

lower and maintain room temperature. Heat inside a room is transferred through the

evaporator and removed to the outside air through a condenser. On the other hand, the

air cycle is a process of distributing conditioned air through ducts or chilled water pipes

into an enclosed space. Air or water can be used to absorb the heat where returning air

absorbed by the evaporator slowly removes latent heat from the enclosed space as the

internal air becomes cooler.

Basic principle behind the refrigerant cycle:

Page 12: BS 2 Group assignment example Building services-bangsar-village-1

Page 12 of 187

Basic principle behind the air cycle:

Page 13: BS 2 Group assignment example Building services-bangsar-village-1

Page 13 of 187

2.1.3 Mechanical Ventilation System

2.1.3.1 Case Study: Bangsar Village 1

Wall fans are part of the mechanical ventilation systems but they do not provide real ventilation

because they don‟t introduce fresh air into a space. The use of wall fans is to circulate air

within a room for the purpose of bringing down the perceived temperature by the method

of evaporation of perspiration on the skin of the occupiers. A wall fan is found at the entrance

of the stock placement store. It is installed above the door and provide ventilation to the workers

but the air circulation is limited.

The vacuum system is used in Bangsar Village 1 where stale and hot air is extracted by means

of fans to the building exterior. It creates an air pressure in the building that is slightly lower

than that of the outer atmosphere.

Wall Industrial Metal Fan found at the entrance

of the stock placement store.

Wall Industrial Metal Fan

Source: http://zsyonghua.en.made-in-china.com

Page 14: BS 2 Group assignment example Building services-bangsar-village-1

Page 14 of 187

An axial fan is installed in the Low Voltage (LV) Room, is located at the basement level

of Bangsar Village I. Axial fan can be differentiated from each other by the type of blades.

The blades force the air to flow parallel to the shaft and in linear direction. One of the

advantages of axial fan‟s usage is to allow both direction of the wind flow, either sucking

or blowing. The axial fan installed in LV room rotates in clockwise direction and directes

the air out of the way as the fan‟s specification is shown in Figure 2.4.1.2, which means that

the role of this axial fan is to vacuum the hot air out from this room, to optimize the room

temperature so that the electrical components in LV room can last longer.

Analysis:

Mechanical ventilation is clearly barely utilized in Bangsar village 1 except as backup systems.

This may be due to the harsh tropical climate especially in an urban setting such as Kuala Lumpur

where the building is located that negatively affects users and equipment in the building.

Figure 2.3.2.2: Axial Fan in

Low Voltage

Room

Figure 2.3.2.3: Specification of the Axial Fan

Page 15: BS 2 Group assignment example Building services-bangsar-village-1

Page 15 of 187

2.1.4 Central Plant System/ Centralised Air Conditioning System

2.1.4.1 Case Study: Bangsar Village 1

Bangsar Village 1 is centrally air-conditioned through an “air and water system.” The main

components of this system comprise of the refrigeration plant, cooling tower, air handling

unit (AHU) and fan coil unit (FCU). Refrigerant is water-cooled in the plant room and

distributed via piping to AHUs and FCUs located throughout the building.

In the air system, treated & cooled air is supplied from the AHU and distributed to rooms via

a network of air ducts based on a single zone ducting system where conditioned air is

delivered at a constant temperature at low velocity. On the other hand, the water system is

defined by the employment of FCUs which are independent units that each draw a mixture

of outdoor and indoor air over their coils of chilled water supplied through piping into

rooms and recirculates them.

Chiller System Overview:

Chillers employ either a vapor-compression cycle or an absorption refrigerant cycle to cool a fluid

for heat exchange. Nevertheless, both types rely on three common basic principles:

a) Liquid heated vaporises into gas, and gas when cooled will condense into liquid.

b) Pressure lowered above a liquid reduces its boiling point while pressured raised above a liquid

increases its boiling point.

c) Heat flows from hot to cold.

In Bangsar Village 1, the vapor compression cycle is used to cool water and thereafter, rooms in

the building. Using chilled water to cool a building is efficient and flexible. Chilled water also

provides accurate temperature control for rooms that are to be cooled. A vapor-compression

chiller consists of a compressor, evaporator, condenser and a metering device or valve that

circulates a refrigerant. The compressor is a very important component in a vapor-compression

chiller as it acts as a pump for the refrigerant.

Cooling Tower System Overview:

Cooling towers are used together with water-cooled chillers. They remove heat that is carried in

the water collected from the chiller. The cooled water is then pumped back to the chiller where it

works to cool the condenser coil. There are two common types of cooling towers, namely,

induced draft and forced draft. The ones used in Bangsar Village 1 are induced draft towers which

feature large propeller fans at the top of each tower (discharge end) to draw air counterflow to the

water. They are economical as they require smaller fan motors than forced draft towers for the

same capacity. Induced draft towers are also less susceptible to recirculation of exiting warm air,

which results in reduced efficiency.

Page 16: BS 2 Group assignment example Building services-bangsar-village-1

Page 16 of 187

2.1.4.2 Bangsar Village 1 Refrigeration System Flowchart

CT: Cooling Tower

FCU: Fan Coil Unit

AHU: Air Handling Unit

CDWP: Condensed Water Pump

CHWP: Chill Water Pump

Page 17: BS 2 Group assignment example Building services-bangsar-village-1

Page 17 of 187

2.1.5 Refrigeration Plant

The refrigeration plant or the chiller room in Bangsar Village 1 is on the basement level. It houses

the chillers, chilled water pumps, condenser water pumps, control panel and automatic

temperature controller. Its location is easily accessible as it is next to the building‟s major

entrance.

Equipment layout in chiller room:

Page 18: BS 2 Group assignment example Building services-bangsar-village-1

Page 18 of 187

Other observations:

- Ceiling height is measured to be 4000mm with ducting suspended at an average level of

2900mm.

- Loud noise emitted by the equipments obstructed any conversation attempted in the chiller room.

Nevertheless, the loud noise is isolated in the chiller room and does not affect public spaces.

- Natural and mechanical ventilation in the chiller room is provided via an air grille and ducting:

- The chiller room is cluttered with old and unused equipment piled up near the doorway:

- The chiller room is roughly more than 5% of f the total floor area of the rooms to be air-

conditioned in Bangsar Village 1.

Page 19: BS 2 Group assignment example Building services-bangsar-village-1

Page 19 of 187

2.1.6 Chiller

Chillers are usually the largest electricity consumers in a building. They can be water-cooled, air-

cooled or evaporatively cooled, typically classified according to their methods of compressing

refrigerants. Common compressors are reciprocating, screw, scroll, and centrifugal types.

Reciprocating compressors are usually for small applications up to 150 tons, whereas centrifugal

compressors are generally for large applications up to 2000 tons. The helical-rotary or screw

compressor is used in Bangsar Village 1 which is suitable for medium applications up to 1000

tons.

The three chillers used in Bangsar Village 1 are water-cooled screw chiller types which are

certified in accordance with ARI Standard 550/590 and are ASHRAE 90.1 compliant. They emit

consistent noise at levels above 80dBA when in operation. Five basic components of the chiller

used comprise of the compressor, evaporator, condenser, expansion valve and refrigerant.

Refrigerant:

The chillers in Bangsar Village 1 use the R-132A or HFC-134a refrigerant which is proven to be

an optimal refrigerant in chiller applications these days due to its absence of chlorine and and the

Page 20: BS 2 Group assignment example Building services-bangsar-village-1

Page 20 of 187

fact that it does not contribute to ozone depletion which was an issue with older types of

refrigerants.

Compressor:

The compressor in a refrigeration system functions to raise the pressure of the refrigerant vapor by

compressing it, thus causing it to heat up to as high as 200°F, then pumps it to the condenser.

Compressors used in Bangsar Village 1 are twin-screw, rotary-screw types. The compressor

housing is made of cast iron, precision machined to provide minimal clearance for the rotors. The

rotors is manufactured from forged steel.

The helical-rotary compressor basically employs two screw-like rotors to trap refrigerant vapor

and compress it by gradually reducing the volume of the refrigerant. Oil is used to seal the gap

between the two rotors, thus preventing a leak of compressed refrigerant vapor. One rotor is

driven by the compressor motor where its lobes would then engage and drive the other rotor,

causing the two parts to counter-rotate. This continued rotation of the meshed rotor lobes would

drive the trapped refrigerant vapor towards the discharge end of the compressor.

Condenser:

Based on the external fluid, condensers can be classified as air cooled condensers, water cooled

condensers and evaporative condensers. The condensers in Bangsar Village 1 are water cooled

horizontal shell and tube types where refrigerant flows through the shell while water flows

through the tubes in two passes.

The refrigerant enters the condenser in a superheated state and changes from vapor to liquid as

great amount of heat is rejected to an external medium. The condensed refrigerant collects at the

Page 21: BS 2 Group assignment example Building services-bangsar-village-1

Page 21 of 187

bottom of the shell where the coldest water indirectly contacts the now liquid refrigerant and goes

through sub-cooling as the liquid refrigerant is drained from the bottom to the receiver.

Valve:

Valves used in chillers can be categorised into fixed opening types where the flow area remains

fixed and into variable opening types where the flow area changes with changing mass flow rates.

The slide valve is used in chillers for Bangsar Village 1. The valve basically functions to modulate

the flow of liquid refrigerant to the evaporator according to evaporator load requirements so as to

prevent any liquid flood backs into the compressor.

Evaporator:

An evaporator, like condenser is also a heat exchanger. In an evaporator, the refrigerant

evaporates changing from liquid to vapor and in doing so absorbs great amounts of heat from the

passing water throught indirect contact.

Evaporators are classified depending upon the heat transfer process or refrigerant flow. The ones used in

Bangsar Village 1 are shell and tube, flooded types which are water cooled where refrigerant flows

through the tubes and water flows through the shell. The refrigerant enters the shell through a float valve,

which maintains a constant level of liquid refrigerant in the shell.

Page 22: BS 2 Group assignment example Building services-bangsar-village-1

Page 22 of 187

Basic principle behind the chiller system:

Maintenance:

- The compressor oil is replaced annually whereas its air filter is washed monthly.

- The refrigeration system shuts down at 10pm daily in Bangsar Village 1.

Page 23: BS 2 Group assignment example Building services-bangsar-village-1

Page 23 of 187

Analysis:

- Piping insulation reduces heat gain into the chilled water and therefore the efficiency of the

cooling system. Chilled water piping is insulated because the water in it is below the dewpoint

temperature. Otherwise, condensate would form on it and heat gain would occur. The goal of the

insulation is to minimize heat gain into the chilled water and maintain the outer surface above the

ambient air dewpoint. Any cooling effect that is lost due to heat gain is additional load on the

chiller plant. In order to make up for the temperature rise, the chilled water setpoint must be

lowered to provide the correct supply water temperature at the load.

- Jacketing of water pipes (picture on the right) with a type

of foam prevents condensation and heat loss to the

surroundings which improves system efficiency. Water

pipes are generally galvanized iron types, expected to last

for 10 years.

- Condenser water piping is typically not insulated in Malaysian climate since there will be

negligible heat gain or loss between the surrounding daytime temperature of an average 30 °C and

its water temperature of an average 32 °C.

According to MS 1525 code 8.4, “All piping installed to serve buildings and within buildings

should be adequately insulated to prevent excessive energy losses. Additional insulation with

vapor barriers may be required to prevent condensations under some conditions.”

Page 24: BS 2 Group assignment example Building services-bangsar-village-1

Page 24 of 187

According to MS 1525 code 8.11.1,

At the time of visit, the water from an evaporator in Bangsar Village 1 had a leaving temperature

of 44°F (6.67°C) and a return temperature of 54°F (12.22°C). On the other hand, water from the

condenser had a leaving temperature of 96.48°F (35.82°C) and a return temperature of 87°F

(30.56°C). It is clear that the evaporator‟s performance in Bangsar Village 1 is only slightly short

of the Malaysian standard as the chill water cooled is not cool enough by a mere difference of

0.025°C on average.

Page 25: BS 2 Group assignment example Building services-bangsar-village-1

Page 25 of 187

2.1.7 Cooling Tower

Cooling towers function to lower the water temperature in large chiller systems by removing heat

energy absorbed by the chiller into the atmosphere through evaporation. Consequently, they need

to be connected to a water tank to replace water lost by evaporation. They are usually located on

the top levels of buildings or an open space for optimum ventilation.

Basic principle behind the cooling tower system:

Page 26: BS 2 Group assignment example Building services-bangsar-village-1

Page 26 of 187

Analysis:

Cooling tower filtration

The service lifespan of the cooling tower may be lengthened with the use of a filtration system.

Over time, thick layer of solid contaminants would build up in the cold water basin which reduces

the benefit of treatment chemicals such as corrosion inhibitors for the basin surface. Filtration of

water would alleviate this issue besides reducing maintenance cost in the long run as the solid

buildup require removal. Furthermore, there would be less shut-down time for the manual

cleaning of cooling towers, thus improving overall efficiency of the system.

2.1.8 Air Handling Unit

AHUs function to condition and circulate air through

a network of ducts which distributes and returns

conditioned air. Each unit is usually equipped with

switches and a thermostat to control chilled water

flow and the temperature of its cooling coil.

An AHU is typically flexible due to its modular

assembly where individual components can be

Page 27: BS 2 Group assignment example Building services-bangsar-village-1

Page 27 of 187

assembled into one unit (usually a large metal box). Below are common components of an AHU:

a) Supply duct

b) Fan compartment

c) Vibration isolator (flexible joint)

d) Heating/cooling coil

e) Filter compartment

f) Mixed air duct

g) Blower

Page 28: BS 2 Group assignment example Building services-bangsar-village-1

Page 28 of 187

The diagrams below illustrate the dynamics between the air conditioning system and mechanical

ventilation system where air is distributed and collected through ducting with the aid of

mechanical supply and exhaust air fans:

Page 29: BS 2 Group assignment example Building services-bangsar-village-1

Page 29 of 187

7 of 8 AHUs are located on the first floor of Bangsar Village 1. The other one is located in the

basement level. This may be due to the convenience of location and the flexibility of a relatively

small building area. The total AHU room area is more than 3% of the floor area serviced by the

AHUs.

AHU

Page 30: BS 2 Group assignment example Building services-bangsar-village-1

Page 30 of 187

The photos above show diffusers installed on supply air ducts from AHU. According to the

maintenance person in charge, all diffusers on walls are installed on supply air ducts in Bangsar

Village 1, but not all ceiling diffusers are installed on exhaust air

ducts.

The photo on the right is an example of a round diffuser installed

on a supply air duct in the electrical room. It is of the single duct –

single zone system.

Page 31: BS 2 Group assignment example Building services-bangsar-village-1

Page 31 of 187

2.1.9 Fan Coil Unit

The Fan Coil Unit (FCU) is a part of HVAC systems commonly employed in buildings with space

constraints. Unlike Air Handling Units (AHUs), FCUs do not require ducting. Two types of

motors can be installed in a FCU, either the Direct Currect (DC) motor or the Electronically

Commutated (EC) motor.

FCUs installed in Bangsar Village I employ the DC motor due to its energy efficiency. FCUs aid

in air circulation within a room by supplying and extracting air at the same time. There is a total

of 24 FCUs in Bangsar Village 1. Most of the FCUs are found at the basement of the shopping

mall.

FCUs can be found in either residential, commercial or industrial building. It is a device

consisting of a heating or cooling coil and a fan. A typical FCU is not connected to ductwork. It

functions to control the temperature in a space, or multiple spaces. It can be controlled by manual

switch or by thermostat. The advantage of installing FCUs in a building is that it is more

economical to install than ducted or central heating systems with air handling units and FCUs

allow installation in a building with space constraint as well.

Page 32: BS 2 Group assignment example Building services-bangsar-village-1

Page 32 of 187

The chilled water is piped to the FCU which located within the space and the chilled water pipe is

connected to the cooling coil of FCU. The air in the space is drawn into FCU where it is cool or

dehumidified. The FCU has filter located at the fan to filter the air, with the purpose of reducing

the level of air borne contamination within the air condition space. Any change of air temperature

pressure in the room will cause the room thermostat to send signal to the automatic valve so that it

will be opened or closed to regular the chill water flow into FCU. This function is to able to

provide the right amount of cooing to the circulating air.

Diagram of Fan Unit Coil with Detailed Component

Source: www.tpub.com

Location of Fan Coil Units in Bangsar Village I

Diagram of connection between Chiller Pump and Fan Coil Unit

Source: http://www.oceanbreezeac.com/motor_coach.php

Page 33: BS 2 Group assignment example Building services-bangsar-village-1

Page 33 of 187

Analysis

Under UBBL 1984 Section 41: Mechanical Ventilation and Air Conditioning

1) Where permanent mechanical ventilation or air-conditioning is intended, the relevant building

by-laws relating to natural ventilation, natural lighting and heights of rooms may be waived at

the discretion of the local authority.

2) Any application for the waiver of the relevant by-laws shall only be considered if in addition

to the permanent air conditioning system there is provided alternative approved means of

ventilating the air-conditioned enclosure, such that within half-an-hour of the air-conditioning

system failing, not less that the stipulated volume of fresh air specified hereinafter shall be

introduced into the enclosure during the period when the air conditioning system is not

functioning.

3) The provisions of the Third Schedule to these By-laws shall apply to buildings which are

mechanically ventilated or air conditioned.

4) Where permanent mechanical ventilation in respect of lavatories, water closets, bathrooms or

corridors is provided for and maintained in accordance with the requirements of the Third

schedule to these By-laws, the provisions of these By-laws relating to natural ventilation and

natural lighting shall not apply to such lavatories, water closets, bathrooms or corridors.

Chilled Water pipe connection in Fan Coil

Unit

Source: https://www.youtube.com/watch?v=QI0O5xZ3liI

Air filter located at the bottom of the fan

to filter the air

Page 34: BS 2 Group assignment example Building services-bangsar-village-1

Page 34 of 187

2.1.10 Conclusion

The mechanical and air conditioning system in Bangsar Village 1 is fairly well designed and

maintained. Economy of space is utilized as seen in the refrigeration plant and steps were taken to

improve machinery efficiency such as for the water piping and cooling tower. Building laws are

generally conformed to and very little fault was to be found in the operating system.

Page 35: BS 2 Group assignment example Building services-bangsar-village-1

Page 35 of 187

2.2 Electrical Supply System

Page 36: BS 2 Group assignment example Building services-bangsar-village-1

Page 36 of 187

2.2 Electrical Supply System

2.2.1 Literature review

In Malaysia, Tenaga Nasional Berhad is the largest electrical utility company that are involved in

activities of generation, transmission and distribution of electricity. Supply of electricity is

connected with power from hydroelectric or thermal plants through a network of transmission

system which are made up of transmission networks, substations and distribution lines.

Above shows the national grid network of Malaysia, from the power station 25KV of

power is produced, but in order to transmit power supply to the whole country step-up

transformers steps up the voltage to 132KV or higher. Voltages in the national grid system have to

be maintained in a high level to prevent power loses. Step-down transformers will then step- down

the power to usable levels to the heavy industry 33KV, light industry 11KV and to homes 230V or

400V. In addition, transmission voltages that are provided by TNB networks are 500kV, 275kV

and 132kV, whilst the distribution voltages are 33kV, 11kV and 400/230 volts.

Substations provide necessary monitoring, protection and control of the circuits under

manual control or SCADA supervision. Substations are high- voltage system facility, it changes

AC voltages to other levels or to DC voltages. In general, elements within a substation are

primary breaking devices, transformer, switchgear, relays, meters, SCADA system, cables or bus

duct and communication cables.

Figure 3.1 shows the national grid network

Diagram 3.1 shows the overall electrical supply system to Bangsar Village I

Page 37: BS 2 Group assignment example Building services-bangsar-village-1

Page 37 of 187

Bangsar Village receives 11KV from the TNB distribution substation nearby that supply

11/33KV. This TNB distribution substation is larger compared to the indoor TNB substation and

it has rather larger transformer, more switches and equipment. Bangsar Village I have an indoor

TNB substation that receives power from the distribution substation and steps-down to usable

voltages. This TNB substation is not accessible by the management due to high voltage that is

hazardous.

z

Page 38: BS 2 Group assignment example Building services-bangsar-village-1

Page 38 of 187

2.2.2 Introduction

Bangsar Village I is a 3 storey building that has a monthly electrical bill of RM 303,000.

Electrical supply is critical in running the shopping centre; electricity is needed for many systems

such as ventilation, mechanical and other appliances (refrigerant).Below is the flow supply of

electrical supply system in Bangsar Village I.

Diagram 3.2 shows the electrical supply system in Bangsar Village I

TNB room, High tension room, Low voltage room and Gen-set room locate side by side to

reduce occurrence of voltage loss through travel distance, due to the resistance in the transmission

cable.

gh Tension Room Scale 1: 600 Diagram 3.3 shows the placement of the voltage rooms and gen-set room Scale 1:600

Page 39: BS 2 Group assignment example Building services-bangsar-village-1

Page 39 of 187

2.2.3 High Tension Room

High tension room is also known as the high voltage room, the components include TNB

meter, check meter, battery for mechanics, 2 transformers and vacuum circuit breakers. All the

components in HT room have to be checked every year by the government corporate Suruhanjaya

Tenaga (Energy commission of Malaysia) regulator to renew the licence.

Figure 3.2: Figure 3.3: Figure 3.4:

Placement of equipment in HT room Schematic diagram License

Page 40: BS 2 Group assignment example Building services-bangsar-village-1

Page 40 of 187

2.2.4 High tension room components and devices

Electrical metering

Figure 3.5 TNB electrical meter Figure 3.6 Electrical check meter

TNB meter measures the electricity consumption and demand of the building in (watt-hour)

meters. Figure 3.5 shows an electronic meter that is commonly used nowadays; it use current,

voltage transformer and microprocessors to record data. In addition, a check meter is added beside

the TNB meter for accurate billing of electrical demand and consumption.

Electrical battery

Figure 3.7 iSCADA system and DC distribution board Figure 3.8 24V DC supply battery bank

Battery is widely used in the industry for many purposes due to its affordability. There are

various kinds of battery but, the only limitation of it is the size and weight factor. To generate a

vast amount of power supply, larger storage space is required therefore, it is not suitable to be

used for long-term electrical supply. Battery generates electrical energy by the conversion of

chemical energy from the electrochemical cell. The electrical energy generated is called the direct

current that has electrical charges which only flows in one direction whereas alternating current

has electrical chargers that flow in reverses direction.

Batteries in high voltage room are used by the electrical protective devices and SCADA system.

Protective devices are also called as the secondary equipment, thus, in an overcurrent situation the

vacuum circuit breaker functions from the DC supply to the main power supply. Figure 3.7 shows

a DC distribution board that includes a charger which regulates and charges the battery. Figure 3.8

shows the 24VDC battery bank.

SCADA system (Supervisory Control and Data Acquisition) technology that provides monitoring

and control distributed systems from a central location. This system enables the manager to

monitor and control process of electrical distribution, once there is a fault in certain sections, the

system would analyse and isolate the faulty section and remain other energised sections. It

functions as a switch capacitor and operator.

Page 41: BS 2 Group assignment example Building services-bangsar-village-1

Page 41 of 187

Alternating current is supplied from TNB and is used for the heater within the units to

avoid condensation which triggers rusting and deterioration of equipment. Electrical battery

generates direct current and has to be replaced when it expires.

Vacuum circuit breaker

Vacuum circuit breaker is preferred in the high voltage room; it is an overcurrent

protective device that prevents conductors from high current by opening the circuit. Within the

VCB contains a fuse it functions as a fusible link that melts and opens when there is an

overcurrent condition. Figure VCBs are located in panel boards. VCBs can be used as

disconnects for installation and maintenance of other electrical devices.

Step-down transformers

In order to distribute power over long distances, voltage is raised to increase the efficiency.

Through increasing voltage current is reduced correspondingly. Utilities use transformers

throughout the grid system to step down voltages down to usable levels of loads.

Bangsar village I has 2 sets of transformers. These transformers step down high voltage

current to 415V and 2000A, 4000A of power supply for bangsar village 1 in the total of two

transformer.

Transformers of Bangsar village I have to conduct maintanance service in 2 year interval.

Temperature readings are shown though the digital panel in front of the panelboard for

referrencing and recording purposes. From our observation, transformer No.2 has a higher

Figure 3.9 VCBs Figure 3.10 exterior panel Figure 3.9 Manual switch

Figure 3.11 -2 Transformers within the panel boxes Figure 3.12 Temperature reading

Page 42: BS 2 Group assignment example Building services-bangsar-village-1

Page 42 of 187

temperature reading compared to transformer No.1; when electricity demand increases,

temperature within transformer increases.

Cable trench cover slab

There are many major cables under the floor of high tension room; the underfloor cables

are covered by the cable trench cover slab throughout the room. Sand is added as an insulator to

prevent over heating of cables.

Figure 3.13

Page 43: BS 2 Group assignment example Building services-bangsar-village-1

Page 43 of 187

2.2.5 Analysis and observation based on observation of high tension room

Precautions taken by Bangsar Village I:

Figure 3.14 Figure 3.15 Figure 3.16

Danger sign board on the door Air conditioned Air conditioning switching box

To maintain the safety of high tension room, air conditioner was added to maintain a

cooling environment for the equipment. This is because high room temperature damages the

equipment and will cause electrical and fore hazards.

Precautions that should be taken based on observation:

Figure 3.17 broken cable trench slab and little amount of sand

From the figure 3.17 above of the broken cable trench, the underfloor cables are exposed

and are very dangerous for the maintenance staff during work. As a suggestion, broken cable

trench should be replaced and the level of sand should be added till optimum amount.

Page 44: BS 2 Group assignment example Building services-bangsar-village-1

Page 44 of 187

3.5 Low voltage room

Figure 3.18 Low voltage room Figure 3.19 Low voltage room schematic diagram

Components in the Low voltage room include Main switchboards, bus bar coupler, air

circuit breaker, bus duct, MCCB capacitor bank, sub switchboards, distribution boards, panel

boards, earth leakage relay.

3.5.1 Low voltage room components and devices

Main Switch Boards

Figure 3.20 Main Switch board No.1 Figure 3.21 Main Switch board

No.2

A switchboard divides the power distribution system into units; in general it supplies

power to panel boards throughout the building. Each switchboards are protected and controlled by

electrical disconnect switches and circuit breaker. There are 2 main switch boards in the low

voltage room. The step down transformers distribute electricity through under floor cables to their

respective switch boards. In Bangsar Village I, each switch board has its own assigned zones of

distribution. Switchboard No.1 is for is assigned to the most of the tenants in Bangsar village I

and switchboard No.2 is assigned to mostly public areas, least tenants and the generator set.

Within the switchboards has a meter that records electrical supplied to the zones. Below is

the example of a comparison between the readings of the switchboards.

Readings of main switchboards:

Switch board No.1 (Tenants)

R: 950 Y: 870 B: 783

Page 45: BS 2 Group assignment example Building services-bangsar-village-1

Page 45 of 187

Switch board No.2 (Least tenants, public area facilities and generator set)

R: 1376 Y: 1400 B: 1375

Figure 3.22

The reading from switch board No. 2 is more than the readings of switch board No.1; the

sum of No 2 zones electrical usage is more than No 1 zone usage. This is because zone 2 consist

more areas of the building compared to zone 1. The main switchboards are under warranty and

maintenance services are done every two year to ensure that the switchboards are in good and safe

condition.

Figure 3.33 Maintenance service sticker from manufacturer

Bus bar Coupler

Bus bar coupler is a device that is used to couple one bar to the other without any interruption in

power supply. This device has conductor such as metal, it is usually supported by insulators covering the

bars while exposing the connection points. Bus bar coupler is positioned in the centre of main switch

board 1 and main switch board 2 for shorter route for the transmission of power.

Figure 3.34 Figure 3.35 BBC between MSBs Figure 3.36 ACB

In the bus bar coupler panel, it has two components which are bus bar distribute and air

circuit breaker. During electric break down, bus bar coupler has to be on manually or on through

SCADA system and it acts as a standby power transmitter between the two switchboards. Below

is a functional example of a bus coupler during a shutdown of transformer No.2.

Main Switch board No 1 Bus bar coupler Main Switch board No 2

Page 46: BS 2 Group assignment example Building services-bangsar-village-1

Page 46 of 187

Scenario: Maintenance services of Transformer No. 2

Figure 3.37 shows overhead current transmission cable from the main switchboard No. 1 to the feeders.

Essential Main switchboard

Figure 3.38

During emergency, essential main switchboard supplies power to equipment that are essential.

Air circuit breaker

Figure 3.39 Air circuit breaker Figure 3.40 Figure 3.41 Inspection tag from

manufacturer

Main Switch board No 1

Power source from

Transformer 1 =2000A;

Retain 1300A for electricity

supply to dominant zone.

Bus coupler

Transfers 700 A from

MSB 1 to MSB 2

Main Switch board No 2

Receives 700A from MSB 1

and supplies to the other

zone.

Page 47: BS 2 Group assignment example Building services-bangsar-village-1

Page 47 of 187

Air circuit breaker is commonly used in the low voltage room, it functions when there is

an over current. Overcurrent can be the result of ground fault, shot circuit and over load. Air

circuit breaker interrupts the current flow and condensed air becomes the medium of the arc of

disconnected circuit. Air contains oxygen; oxygen ignites sparkles during the manual setting.

After a power breakdown, precautionary actions should be taken during turning the manual open

button on; maintenance staff would stand by the side of the panel box and keep the door open for

escape. Figure 3.41 shows an inspection tag from the manufacturer, maintenance is required to

ensure a safe environment for maintenance staff.

Page 48: BS 2 Group assignment example Building services-bangsar-village-1

Page 48 of 187

Incoming supply from main switchboard

Figure 3.42 above shows the schematic diagram of incoming supply from main switchboard

Capacitor bank and moulded circuit breaker (MCCB)

Figure 3.43 Figure 3.44 Capacitor bank switching Figure 3.45 10 steps of single unit

To improve the quality of electrical supply, moulded circuit breaker acts as a protection

device to prevent explosion of capacitor bank. During an occurrence of over current, the switch

mechanism within MCCB will open and disconnect the current. In an electrical failure, MCCB

also protects the electrical system by shutting the connection of the faulty capacitor to prevent

explosion.

Isolated switch

Figure 3.46 Figure 3.47 – 9 sets of triple pole switches

Page 49: BS 2 Group assignment example Building services-bangsar-village-1

Page 49 of 187

The switching of electricity is the alternation between energized and de-energized states

by opening or closing of the conductor in a circuit. It can be summed as the complete interruption

or resumption of the electrical power to a device. Switching is accomplished with sets of contact

that make or break multiple contacts simultaneously. A pole term is a set of contacts that belong

to a single circuit. A throw term is a position that a switch can adopt. Figure 3.47 shows 9 sets of

triple pole switching which has to be reset manually after and overcurrent condition. In addition,

having multiple switching can be an advantage when identifying the problem of the faulty switch.

Earth leakage relay

Relays can function as an automatic switch which is also a separate electrical circuit. This

earth relay circuit has 13 components and every component have their own air circuit breaker.

There is a digital meter displaying digital data of the device. The mechanical manager of the

building has a check list on the readings from the relay device.

The setting of the meter was done by the mechanical manager, which is 0.3A in 1 sec. If the

electric power exceeds the reading the fuse in the air circuit breaker will open and cut the

electrical supply.

Panel board

Figure 3.51

A panel board functions as a distribution board, this elements is used to divide and supply

electricity with the collaboration with protective devices. It is made up of fuse links, bus bars,

switches and circuit breakers. Figure 3.51 shows the wall mounted power distribution cabinet

containing overcurrent protective devices for lighting, appliances, or power distribution branch

circuits.

Figure 3.48 Figure 3.49 Earth relay setting plate Figure 3.50

Figure 3.48 Figure 3.49 Earth relay setting plate Figure 3.50

Page 50: BS 2 Group assignment example Building services-bangsar-village-1

Page 50 of 187

Sub- panels

Figure 3.52 above shows several sub panels of chiller plants and the public toilet

Bus duct

Figure 3.53

Main cables that are assembled with insulators in grounded enclosures, it brings the main power

into the building.

Emergency light control panel

Figure 3.54 emergency lighting control panel in the LV room

Page 51: BS 2 Group assignment example Building services-bangsar-village-1

Page 51 of 187

Emergency lighting system provides lighting to the emergency situation, escape routes,

corridors and stairways, exit doors are lighten. This lighting system important during a fire, it

ensures the visibility of escape routes and increase the speed of evacuating people out of the

building. This emergency light panel operates when there is an electrical shortage, DC current

from the battery is supplied to this control panel and the emergency light throughout the building

will be lighted up.

Cable tray system

Figure 3.55 cable tray systems on the LG floor

Raceway cable-tray systems are preferred because of their accessibility and ability to

accommodate change. This kind of setting allows ease in changing cables and also facilitates the

inspection of cables. Current is supplied from the low voltage room through the cable tray system

and send it throughout Bangsar Village I shopping mall.

Page 52: BS 2 Group assignment example Building services-bangsar-village-1

Page 52 of 187

2.2.6 Analysis and observation based on observation of low voltage room

Precautions taken by Bangsar Village I:

Figure 3.56 shows the entrance of Low voltage room has a green

light indicating the room is under a safe condition. Furthermore, the room is air conditioned thus

the original louvered doors have to be covered with a piece of solid wood to prevent cool air from

escaping the room. Rubber mats are placed on the floor beside the main switch boards for safety

measures as above figure 3.57. It acts as a cushion that protects the maintenance crew from

becoming a conductor during leakage of high voltage current. Years before voltage rooms are not

equipped with air condition services, the rooms were heated up and stuffy when the maintenance

staffs conduct their check-ups and works. Due to mainly discomfort and damages to the

equipment, the maintenance manager decided to set up air condition services in the voltage rooms.

Figure 3.58 shows a thermometer showing temperature of low voltage room that is maintained at

24 Celsius degree, to ensure equipment is not heated up to have better efficiency.

Precautions that should be taken based on observation:

Figure 3.59 Figure 3.60

Above the figure 3.59 the cooling fan on the left was not functioning. It

should be fixed or replaced to prevent overheating of the equipment within the panel box. Used batteries

are left low voltage room figure 3.60; used batteries should be disposed properly to prevent the leakage of

the chemical within the cell

Figure 3.56 Figure 3.57 Figure 3.58

Page 53: BS 2 Group assignment example Building services-bangsar-village-1

Page 53 of 187

3.6 Electrical riser room

Figure 3.61 Figure 3.62 Figure 3.63

An electrical riser room figure 3.56 has distribution equipment such as switchgears and

distribution panels that supplies electricity AC current to a particular level in a building. Electrical

riser room is located in every floor of Bangsar Village I, electricity is distributed through a series

of cable try system to the risers around the building. Figure 3.63 shows series of switching of

tenant of the shopping centre, when there is an electric fault in one of tenant electrical supply can

be shut through the switches in this riser room.

Page 54: BS 2 Group assignment example Building services-bangsar-village-1

Page 54 of 187

2.2.7 Genset Room

Bangsar village I uses diesel generator as the secondary power source to generate power

during power failure. The generator set figure 3.64 has been used once last year, every year

supplier of the generator will conduct a maintenance service and issue a letter to prove the

functionality during emergencies. This Gen- set generates 600A and the diesel tank figure 3.65

has a capacity of 2000 litre.

This Gen-set has to go through a maintenance service every year to check on the efficiency

of the engines. Figure 3.67 shows the letter issued by the authority. The diesel generator is

connected to the switchboards of the low voltage room through cables as shown in figure 3.68 and

3.69.

When the Gen-set is on for emergency electrical supply, the engines of the Gen-set will

release heat and the room would be heated up. Figure 3.70 and 3.71 shows the ventilation specially

design to excrete the heated air and absorbs fresh air into the room.

Figure 3.64 diesel generator Figure 3.65 diesel tank Figure 3.66 control panel of Gen- set Figure 3.64 diesel generator set

Figure3.67 Maintenance services letter

Figure 3.67 maintenance letter

Figure 3.68 over head cable Figure 3.67 maintenance letter Figure 3.69 cable from gen-set to low voltage room

Figure 3.70 Figure 3.71 Gen-set room ventilation

Page 55: BS 2 Group assignment example Building services-bangsar-village-1

Page 55 of 187

2.2.8 Requirements of UBBL 2006

From our analysis, Bangsar Village I had fulfilled section 253 (1), (2), (3), (5 a&b).

Emergency power supply is provided from the diesel generator set that functions as the power

source during power failure. The generator set provides power during emergency, such as smoke

control system in the atrium, fire alarm system, fire pumps, public address systems and fire lifts.

In the high voltage room, there is a storage battery that provides DC voltages when is needed

during power failure.

2.2.9 Conclusion

Bangsar village is a well-known shopping mall that functions well every day to ensure a

happy visit to its shoppers. From this statement, I believe that the maintenance team has done a

great job in managing the systems in this building. The electrical supply system runs efficiently

due to minor modification for the rooms such as adding air conditioning system. Furthermore,

many precautions are taken by the management to ensure a safety working environments for the

maintenance team. Maintenance of the rooms and equipment are done frequently as they have log

books record of the services. On my own opinion, bangsar village I should introduce passive

designs and photovoltaic cells to generate power in the long run to reduce the amount of the

monthly electricity bill.

Page 56: BS 2 Group assignment example Building services-bangsar-village-1

Page 56 of 187

2.3 MECHANICAL TRANSPORTATION SYSTEM

Page 57: BS 2 Group assignment example Building services-bangsar-village-1

Page 57 of 187

2.3 MECHANICAL TRANSPORTATION SYSTEM

2.3.1 LITERATURE REVIEW

Mechanical transportation normally use in building to transport passengers from one vertical

floors to another inside a building. All buildings with more than one storey must have at least one

set of stairs and the provision of stairs is a very important consideration when designing building

in order to ensure all the occupant of the building can travel between different floors.

Mechanical transportation such as lift is advance vertical transportation which provides

convenience to passengers to travel between floors. Lift is an electrical apparatus for raising and

lowering people or goods to different floors of the buildings. A lift installation has an important

bearing on the efficient functioning of the building it serves, and to obtain different efficient

service the number and type of lifts must take into account several factors including the type of

building and nature of its occupancy.

On the other hand, escalators are moving stairs that designed to provide efficient vertical

conveyance of people. It transports the users adequately, instantaneously, safely as well as

continuously with consistent speed.

2.3.2 HYDRAULIC ELEVATOR (CARGO LIFT)

A hydraulic elevator's function is based on Pascal's law of the incompressibility of fluids: an

above-ground or in-ground piston mounted inside a cylinder is pressurized to raise and lower the

car. Hydraulic systems are commonly used in low-rise buildings up to five stories. Speeds rarely

exceed 150 feet per minute (fpm).

Page 58: BS 2 Group assignment example Building services-bangsar-village-1

Page 58 of 187

Figure 3.2.1 indicate the cargo lift at ground floor to the first floor

Page 59: BS 2 Group assignment example Building services-bangsar-village-1

Page 59 of 187

2.3.3 COMPONENTS

In lift machine room, there are four major components to the hydraulic system: a tank (fluid

reservoir); a pump powered by an electric motor; a valve between the cylinder and the reservoir;

and the cylinder.

Page 60: BS 2 Group assignment example Building services-bangsar-village-1

Page 60 of 187

1. Tank (fluid reservoir)

Page 61: BS 2 Group assignment example Building services-bangsar-village-1

Page 61 of 187

Originally the fluid used to drive the piston was water, hence the name hydraulic; today, the fluid is

typically an oil-based "hydraulic fluid."

2. Pump and Motor

Page 62: BS 2 Group assignment example Building services-bangsar-village-1

Page 62 of 187

The main function of the pump used in hydraulic elevator is constantly pushing fluid into the cylinder

to lift the elevator. As the fluid collects in the cylinder, it pushes the piston up, lifting the elevator car.

When the valve is opened, the pressurized fluid will take the path of least resistance and return to the

fluid reservoir. When the car approaches the correct floor, the control system sends a signal to the

electric motor to gradually shut off the pump and close the valve. With the pump off, there is no more

fluid flowing into the cylinder, but the fluid that is already in the cylinder can't flow backward

through the pump, and the valve is still closed. The piston rests on the fluid, and the car stays where it

is

Page 63: BS 2 Group assignment example Building services-bangsar-village-1

Page 63 of 187

3. Control Valve

Control Valve is the device on hydraulic elevators which controls the oil flow to and from the jack.

Hydraulic elevators only perform as well as the valve. The main functions of the Valve are lets

fluid out of the system; keeps the pressure low when open; increases pressure when closed. To

lower the car, the elevator control system sends a signal to the valve. When the valve opens, the

fluid that has collected in the cylinder can flow out into the fluid reservoir. The weight of the car

and the cargo pushes down on the piston, which drives the fluid into the reservoir. The car

gradually descends. To stop the car at a lower floor, the control system closes the valve again.

Page 64: BS 2 Group assignment example Building services-bangsar-village-1

Page 64 of 187

2.3.4 OPERATING PANEL

An alarm button or switch, which passengers can use to warn the premises manager that they have

been trapped in the elevator.

An elevator telephone, which can be used (in addition to the alarm) by a trapped passenger to call

for help.

Floor numbering with switch buttons to choose a floor.

Page 65: BS 2 Group assignment example Building services-bangsar-village-1

Page 65 of 187

Key Switch Panel

Key switch panel is located at the control room which allows admits to control the lift car when

emergency or breakdown happens. Besides, immediate answer when emergency happens from the

elevator and the system clearly stated the location of calls from which level and shaft of elevator.

Page 66: BS 2 Group assignment example Building services-bangsar-village-1

Page 66 of 187

Emergency Power Operation

In hydraulic elevator systems, emergency power will lower the elevators to the lowest landing and

open the doors to allow passengers to exit. The doors then close after an adjustable time period

and the car remains unusable until reset, usually by cycling the elevator main power switch.

Typically, due to the high current draw when starting the pump motor, hydraulic elevators are not

run using standard emergency power systems. Buildings like hospitals and nursing homes usually

size their emergency generators to accommodate this draw.

2.3.5 MACHINE ROOM LESS ELEVATOR (PASSENGER LIFT)

Page 67: BS 2 Group assignment example Building services-bangsar-village-1

Page 67 of 187

Machine room less elevators (M.R.L.) is a type of traction elevator which do not have a machine

room at the top of the hoistway, instead the traction hoisting machine is installed either on the top

side wall of the hoistway or on the bottom of the hoistway. Most machine room less elevators are

used for low to mid rise buildings. In mid-rise buildings, M.R.L. typically serves up to 20 floors.

Page 68: BS 2 Group assignment example Building services-bangsar-village-1

Page 68 of 187

Figure 3.3.1 indicate the passenger lift at lower ground floor to the first floor

Page 69: BS 2 Group assignment example Building services-bangsar-village-1

Page 69 of 187

2.3.6 COMPONENTS

1. Gearless Traction

All traction elevators are gearless traction. This design eliminates the need of a fixed machine

room and thus saves much building‟s space.

Page 70: BS 2 Group assignment example Building services-bangsar-village-1

Page 70 of 187

2. Hoisting Motor & Controller

While the hoisting motor is installed on the hoistway side wall, the main controller is installed on

the top floor next to the landing doors. This controller is situated behind a locked cabinet which

have to be unlocked using a key for maintenances, repair or emergency purposes. Most elevators

have their controller installed on the top floor but fewer elevators have their controller installed on

the bottom-most floor. Some elevators may have the hoisting motor located on the bottom of the

elevator shaft put, thus it is called as bottom drive „M.R.L.‟. Whereas, some elevators have the

controller cabinet installed within the door frame instead on the wall to save space.

Page 71: BS 2 Group assignment example Building services-bangsar-village-1

Page 71 of 187

3. Steel Cord Ropes

Like normal traction elevators, M.R.L. elevators use the conventional steel cord ropes used as the

hoisting cables. Some elevators are using flat steel belts instead of conventional ropes.

Manufactures using these technologies claimed that with flat steel belt ropes, it saves much space

on the hoistway and to allow a minimum size of the hoisting sheave. With flat steel belts also

allows 30% lighter than conventional steel ropes.

Page 72: BS 2 Group assignment example Building services-bangsar-village-1

Page 72 of 187

4. Waterproofing lift pits

Lift pits normally extend below ground or slab level and, therefore, like basements are susceptible

to water ingress under hydrostatic pressure. In new-build situations, lift pits are usually

waterproofed externally using the same methods employed to waterproof new build basements.

5. Emergency stop button

Elevators often have a red two-way button on the control panel which is either marked

"Emergency Stop" or "Run/Stop". Normally, the button is in the unpushed position, allowing the

elevator to run in normal service. When the button is pushed, the elevator comes to an immediate

stop. When the button is pulled back out, it resumes normal service, thus the reason for the use of

the phrase "Run/Stop". In some cases the switch is similar to a light switch with the switch being

in the up position for the elevator to "run" in regular service, and thrown down to "stop" the

elevator.

Page 73: BS 2 Group assignment example Building services-bangsar-village-1

Page 73 of 187

6. Sheave

The ropes are attached to the elevator car, and looped around a sheave. A sheave is just a pulley

with a groove around the circumference. The sheave grips the hoist ropes, so when rotate the

sheave, the ropes move too.

Page 74: BS 2 Group assignment example Building services-bangsar-village-1

Page 74 of 187

7. Counterweight

Counterweights are often used in traction lifts. The conventional steel cords rope that life the cars

are also connected to the counterweight, which hangs on the other side of the sheave. The

counterweight weighs about the same as the car filled to 40-percent capacity. In other words,

when the car is 40 percent full, the counterweight and the car are perfectly balanced. The purpose

of this balance is to conserve energy.

Page 75: BS 2 Group assignment example Building services-bangsar-village-1

Page 75 of 187

2.3.7 ESCALATORS

An escalator is a moving staircase which is a conveyor transport device for carrying people

between floors of a building.

Escalators have the capacity to move large numbers of people, and they can be placed in the same

physical space as one might install a staircase. They have no waiting interval (except during very

heavy traffic), they can be used to guide people toward main exits or special exhibits, and they

may be weatherproofed for outdoor use. A non-functioning escalator can function as a normal

staircase, whereas many other conveyances become useless when they break down.

Page 76: BS 2 Group assignment example Building services-bangsar-village-1

Page 76 of 187

Figure 3.4.1 indicate the escalator at ground floor to the first floor

2.3.8 ESCALATOR ARRANGEMENT

2.3.8.1 PARALLEL STACKED ARRANGEMENT

In Bangsar Village 1, they use parallel stacked arrangement for escalator. A parallel stacked

arrangement defines usage by the physical arrangement of the stairs. The essential difference

between the two basic arrangements is that in the crisscross arrangement, the upper and lower

terminal entrances and exits to the up and down escalators are separated by the horizontal length

of an escalator, whereas in either of the parallel arrangements the two escalators face in the same

direction.

2.3.8.2 CRISSCROSS ARRAGEMENT

This arrangement is rapid, pleasant, and very economical of space because the stairs nest into each

other. It can be used for as many as five floors without excessive annoyance to the rider.

Sometimes, this arrangement requires floor space around the escalators, which is used in stores to

display special sale merchandise. Indeed, this display purpose is the reason that stores force

passengers to endure the potentially annoying walk-around.

Page 77: BS 2 Group assignment example Building services-bangsar-village-1

Page 77 of 187

2.3.8.3 Components

Major components:

Truss- is a welded steel frame that supports the entire apparatus.

Track- is steel angles attached to the truss on which the step rollers are guided, thus controlling

the motion of the steps.

Handrail- is driven by sheaves powered from the top sprocket assembly to provide stability to

riding passengers and support for entering and leaving passengers.

Balustrade- is designed for maximum safety of persons stepping on or off the escalators.

Control cabinet- is normally located near the drive machine, contains malfunction indicators in

addition to the drive controls.

Page 78: BS 2 Group assignment example Building services-bangsar-village-1

Page 78 of 187

2.3.8.4 SAFETY FEATURES

Safety is a major concern in escalator design. Protection of passengers during normal operation is

ensured by a number of safety features associated with moving stairway:

Steps are large and steady and are designed to prevent slipping.

Handrails and steps travel at exactly the same speed (0.51 m/s) to ensure steadiness and balance

and to aid stepping on or off the comb plates.

Balustrade is designed to prevent catching of passengers‟ clothing. Close clearance provide safety

near the comb plates and step treads.

Step design and step levelling with the comb plates at each landing prevent tripping upon entering

or leaving the escalator. This is accomplished with 2 or 3 horizontal steps at either end of the

escalator.

Operation of an emergency stop button is wired to the controller and placed near or on the

escalator housing at both ends, stops the drive machine and applies the brake.

Page 79: BS 2 Group assignment example Building services-bangsar-village-1

Page 79 of 187

2.3.9 TRAVELATOR

There are two pairs of travelator in Bangsa Village 1 what connect the basement to the ground

floor. Travelator is a slow moving conveyor mechanism that transports people across a horizontal

or inclined plane over a short to medium distance. Moving walkways can be used by standing or

walking on them. They are often installed in pairs, one for each direction.

Travelator are built in one of two basic styles:

Pallet type- a continuous series of flat metal plates join together to form a walkway and are

effectively identical to escalators in their construction. Most have a metal surface for extra traction.

Moving belt- these are generally built with mesh metal belts or rubber walking surfaces over

metal rollers. The walking surface may have a solid feel or a „bouncy‟ feel.

Page 80: BS 2 Group assignment example Building services-bangsar-village-1

Page 80 of 187

Figure 3.5.1 indicate the travelator at lower ground floor to the ground floor

2.3.9.1 INCLINED TRAVELATOR

An inclined travelator is used in Bangsar Village 1 to move people from basement to the ground

floor with the convenience of an elevator and the capacity of an escalator. The shopping carts

that people can take along their suitcase have either a brake that is automatically applied when

the cart handle is released, strong magnets in the wheels to stay adhered to the floor, or

specially designed wheels that secure the cart within the grooves of the ramp, so that wheeled

items travel alongside the rides and do not slip away.

Page 81: BS 2 Group assignment example Building services-bangsar-village-1

Page 81 of 187

2.3.9.2 COMPONENT

Travelator is manufactured in only one design: a derivative of the escalator, which uses a flattened

pallet in place of a step. In all other respects, the drive mechanism, safeties, brake, handrails- the

unit is similar to an escalators.

2.3.10 CONCLUSION

Mechanical transportation plays an important role in shopping mall like Bangsar Village 1 which

able to bring convenience to the occupants and disable people. According to Uniform Building By

Laws (UBBL), Bangsar Village concerns on the human flow inside the building which provides 1

pair of escalator, 2 pairs of travelator and 1 group of lift. Proper maintenance check-up held

regularly ensure occupants use this services comfortable and convenience.

Page 82: BS 2 Group assignment example Building services-bangsar-village-1

Page 82 of 187

2.4 FIRE PROTECTION SYSTEM AND ANALYSIS

Page 83: BS 2 Group assignment example Building services-bangsar-village-1

Page 83 of 187

2.4 FIRE PROTECTION SYSTEM AND ANALYSIS Bangsar Village Shopping Mall

2.4.1 Chapter Introduction

This chapter contains the analysis explanation of the data of the fire protection system collected

at the selected site, Bangsar Village Shopping Mall as stated in the earlier Project

Introduction Page.

According to the analysis we have done, this chapter contains the fire protection systems that

applied in the stated shopping mall, based on our project group research and observation. The

data is collected through interviews, photographing, video recording, actual site measurement

and observation. The below explanation and comparison for the functioning system are based

on the technical information provided by the manager and data research that our group has

conduct.

Based on twice site visit to Bangsar Village Shopping Mall that conducted by our group in

September 2014, the following images contained in this chapter are mostly the site images

collected.

2.4.2 Literature Review

Active Fire Protection System Definition

1. Active system is the manual and automatic detection and suppression of fires. For example,

the use and installation of a fire sprinkler system or finding the fire (fire alarm) and/or

extinguishing it.

(retrieved from http://en.wikipedia.org/wiki/Fire_protection)

2. Active Fire Protective System is a system which will be activated by the surrounding

environment, which is in the event of fire by detecting smoke and temperature. They are

first to act in the case of fire. The focus of active system is to extinguish fire by:

a. Detecting the fire early and evacuate the building.

b. Alerting emergency services at an early stage of the fire.

c. Control the movement of fire and smoke.

d. Suppress and/or starve the fire of oxygen and fuel. (NAFFCO, 2004)

Passive Fire Protection System Definition

1. Passive system an integral component of the three components of structural fire

protection and fire safety in a building. PFP attempts to contain fires or slow the spread,

through use of fire-resistant walls, floors, and doors (amongst other examples). PFP

systems must comply with the associated Listing and approval use and compliance in order

to provide the effectiveness expected by building codes.

It is also ncludes compartmentalisation of the overall building through the use of fire-

resistance rated walls and floors. Organization into smaller fire compartments, consisting

Page 84: BS 2 Group assignment example Building services-bangsar-village-1

Page 84 of 187

of one or more rooms or floors, prevents or slows the spread of fire from the room of fire

origin to other building spaces, limiting building damage and providing more time to the

building occupants for emergency evacuation or to reach an area of refuge.

(retrieved from http://en.wikipedia.org/wiki/Passive_fire_protection)

Building Service Definition

1. Building services systems are the electrical and mechanical installations inside a

building that provide the internal infrastructure for the proper functioning of the building

(Audit Commission Hong Kong, Architectural Services Department Installing building services systems in government buildings,

25 October 2010, retrieved from http://www.aud.gov.hk)

2. Building services engineers are responsible for the design, installation, and operation and

monitoring of the mechanical, electrical and public health systems required for the safe,

comfortable and environmentally friendly operation of modern buildings. ... In India the

engineers are known as facilities planners. A Building Services Architect is an engineer

with experience in the integration of all Building Services.

(Retrieved from http://en.wikipedia.org/wiki/Building_services_engineering)

Fire Protection System (Definition)

1. Fire protection is the study and practice of mitigating the unwanted effects of potentially

destructive fires. It involves the study of the behaviour, compartmentalisation, suppression

and investigation of fire and its related emergencies, as well as the research and

development, production, testing, and application of mitigating systems. the owners and

operators are responsible to maintain their facilities in accordance with a design-basis that

is rooted in laws, including the local building code and fire code, which are enforced by

the Authority Having Jurisdiction. Buildings must be constructed in accordance with the

version of the building code that is in effect when an application for a building permit is

made.

(Retrieved from http://en.m.wikipedia.org/wiki/Fire_protection/)

2. The discussion of fire protection begins with basic design considerations for fire resistance.

Smoke management (for safe evacuation and for limited smoke damage) is considered next,

followed by fire-suppression systems such as sprinklers and non-water-based approaches. (Retrieved from Walter T. Grondzik, Alison, Benjamin, John S,Chapter 24 Mechanical and Electrical Equipment For Buildings,

eleventh edition, 2010)

Page 85: BS 2 Group assignment example Building services-bangsar-village-1

Page 85 of 187

Fire-fighting equipment or fire safety installation (Definition)

1. means anyequipment or installation for:

(a) extinguishing, fighting, preventing, or limiting a fire;

(b) giving warning of a fire;

(c) providing access to any premises or place or to any part

thereof for the purpose of extinguishing, fighting,

preventing, or limiting a fire;

(d) providing emergency power supply in the event of normal

power failure;

(e) providing emergency lighting for purposes of escape from

buildings;

(f) giving direction towards an escape route or place of refuge;

or

(g) providing adequate, safe egress for the purpose of

evacuation or exit of occupants in the event of fire

(LAWS OF MALAYSIA Act 341FIRE SERVICES ACT 1988)

Fire-hazard (Definition)

(a) any unlawful alteration to any building such as might render

escape from any part thereof in the event of a fire materially

more difficult or less easy than it would be if the alteration had

not been made;

(b) the overcrowding of any place of public entertainment or public

gathering such as might render escape from any part thereof in

the event of a fire difficult;

(c) any removal or absence from any building of any fire- fighting

equipment or fire safety installation that is required by law to be

provided in the building;

(d) the presence within or outside any building of any fire-fighting

equipment or fire safety installation or any facility, installed in

accordance with the requirement of any written law or as required

by the Fire Services Department, that is not in efficient working

order;

(e) inadequate means of exit from any part of a building to any place,

whether within or outside the building, that provides safety to

persons in the event of a fire; or

(f) any other matter or circumstance that materially increases the

likelihood of a fire or the danger to life or property that would

result from the outbreak of a fire, or that would materially hamper

the Fire Services Department in the discharge of its duties in the

event of a fire;

(LAWS OF MALAYSIA Act 341FIRE SERVICES ACT 1988)

Page 86: BS 2 Group assignment example Building services-bangsar-village-1

Page 86 of 187

Definition of high-rise buildings.

High-rise structure is one that extends higher than the maximum reach of available fire-fighting

equipment and it is between 75 ft and 100 ft. A particular building is deemed a high-rise

specified by the fire and building codes in the area in which the building is located (Craighead,

2003).

Terpak, (2003) defined high-rise building is any building exceeded 75 ft

where fire department operation cannot be considered ground based.

Encyclopaedia Britannica define high-rise building as a multi-story building with a height that

require the use of a system of mechanical vertical transportation such as elevators (Britannica

online).

A building is defined by the Uniform Building Codes as a high-rise building when it has floors

for human occupancy which are more than 75 ft above the lowest level of fire

department access. Second definition as stated in Uniform Building Codes is the

buildings meet the definition to be equipped with an automatic fire sprinkler system

designed in accordance with requirements in Uniform Building Codes (Patterson, 1993).

LAWS OF MALAYSIA Act 341 FIRE SERVICES ACT 1988 An Act to make necessary provision for the effective and efficient functioning of the Fire Services Department, for the protection of persons and property from fire risks and for purposes connected therewith. [Throughout Malaysia

—1 January 1989, P.U. (B) 701/1988]

Page 87: BS 2 Group assignment example Building services-bangsar-village-1

Page 87 of 187

Significance of Building Services

Building services systems has an important role for building where it has stands about 20% to 40% of the

total construction cost. Figure 1 shows the example of a cost breakdown of a typical government office

building.

(Retrieved from Audit Commission Hong Kong, Architectural Services Department Installing building services systems in government

buildings, 25 October 2010, retrieved from http://www.aud.gov.hk)

Page 88: BS 2 Group assignment example Building services-bangsar-village-1

Page 88 of 187

2.4.3 Introduction to Fire (Statistic)

According to research on ten years fire statistics in Malaysia (1990 to 1999), it shows that there were

154,987 fire cases in Malaysia. From 23,911 or 15.45% cases involved buildings, about more than 2000

fire cases annually involved buildings are significantly high. Among the types of building, residential

buildings are the highest i.e. 9,512 cases followed by shops 2,767

cases, plants 2,636 cases and stores 1,489 cases (Bomba, 2001). From this statistic, its how is that

residential buildings are the highest risks of possibility of fire break out. It includes high-rise

accommodation buildings i.e. flats buildings, apartment buildings and condominiums. At this moment the

recent statistics for the next ten years of fire statistics is not available and due to be compiled in the year

2010. Also, for most of the cases, the fire occurred not naturally but most of the cases were due to either

the human faults or human ignorance (retrieved from Yahya Mohamad Yatim, Fire Safety Models for High-Rise Residential

Buildings in Malaysia, June 2009)

By conclusion against the research above, it is important that precise consideration should be

taken into account during building design especially regarding the fire escape route in high-rise

residential buildings to speed out evacuation time, thus, to reduce the percentage of injury and death

during fire.

It is also important to study into the human behaviour during fire. i.e Panic Behaviour, to firmly

understand the basic reaction and needs of the building user.

Hence, there were several considerations should be taken into account during design, as below:

For every fire safety design, the following fire safety objectives should be met:

(a) Life Safety

Fire safety provisions should be provided for:

1. Protection of life of building occupants

2. Minimization of fire spread between fire compartments

3. Prevention of building collapse as a result of fire

4. Facilitation of fire fighting and rescue by fire services personnel

(b) Property Protection

Fire safety provisions should be provided for:

1. Minimization of fire spread between fire compartments

2. Prevention of building collapse as a result of fire

3. Minimization of fire spread between buildings

4. Facilitation of fire fighting and rescue by fire services personnel

Page 89: BS 2 Group assignment example Building services-bangsar-village-1

Page 89 of 187

Fire Safety Risk Analysis

Life Safety and property protection guidance framework (FPA, 2003)

Page 90: BS 2 Group assignment example Building services-bangsar-village-1

Page 90 of 187

2.4.3.1 Science of Fire

Fire Behaviour

Aspect: 1. Fire Triangle (Oxygen, Fuel and Heat)

Aspect: 2. Stage of Fire Development: Temperature Development, Burning Duration

Aspect: 3. Behaviour of Fully develop fire, role of ventilation

Aspect 1: Fire Triangle

(Retrieved from http://www.pslc.ws/fire/images/firetria.gif)

Fire triangle is the basic explanation of how does fire occurs with the present of three main

elements: fuel, oxygen and energy in the form of combustion heat, in a chemical reaction. The

absent of either one element will alter the either the rate of fire burning or even put off the fire.

Hence, to stop the fire, we need to elimate either one of the above elements.

Once the fuel is ignited, a fire will spreads across the fuel object almost instantly until it

reaches the stage where it is fully develop into uncontrollable fire. The main factors of how

fast the spread speed of fire across the surface of the material are the fuel composition,

orientation, surface to mass ratio, incident heat and air supply. The relationship of the fire and

the above elements can be explained with the following:

Page 91: BS 2 Group assignment example Building services-bangsar-village-1

Page 91 of 187

Fire normally develops through a consistent stages until it reaches the highest stage where it is

become fully develop. The increase in heat release rate against time is manipulated by the variables

of incident heat, air supply and fuel. There are basic three types of growth rates in fire, “slow

growing rate”, “medium growing rate” and “fast growth rate”. When the burning time is prolonged,

the burning rate will be controlled or limited by the decreasing in either one of the three main

elements. Once one of them is omitted, the burning will stop. This is a gradual process which is the

decaying process of fire.

[Type a quote from the document or the

summary of an interesting point. You can

position the text box anywhere in the

document. Use the Text Box Tools tab to

change the formatting of the pull quote

text box.]

Heat Release Rate for Office Module (Madrzykowski 1996)

Fire Growth Rates (from SFPE Handbook of Fire Protection Engineering

Page 92: BS 2 Group assignment example Building services-bangsar-village-1

Page 92 of 187

Aspect: 2. Stage of Fire Development: Temperature Development, Burning Duration

Smoke is produced at the instant of fire ignition on a fuel. The smoke is then being transported

by a smoke plume and became collection of smoke on the upper portion of the space, forming a

layer which will soon increase in depth and temperature. The high heat energy smoke layer is

then radiates the heat energy back onto unburned fuels in the space, thus causing the

surrounding materials, which the potential fuels to increase in temperature. “Flashover” is the

condition whereby the small unburned object surround the burning object suddenly ignited

simultaneously. Flashover usually happened in a compact or a small space where the heat

energy can be radiated at a higher speed. Hence, also the combustion is exothermic reaction.

Products of burning are carbon dioxide, carbon monoxide and water. Some of these products

cause death when inhaled at a considerable amount.

Fire Behaviour In Compartment (Mehaffey (b). 1987)

Major Factors Influencing Fire Growth

Major Factors Influencing Fire Growth

Page 93: BS 2 Group assignment example Building services-bangsar-village-1

Page 93 of 187

Aspect: 3. Behaviour of Fully develop fire and role of ventilation

The fully- developed fire is at a stable burning stage with a constant rate loss of mass. This is the

stage where fire and fuel are at a considerably equal stage, where equilibrium is reached by either

the limitation of air supply (in ventilation controlled fires) or the characteristic of the object being

burnt. Also, the heat release (temperature) is relatively stable with no further influx.

1. Fuel Controlled Fires

This is the stage where the supply of air and incident heat is abundance but the burning process is

limited by fuel mass or fuel characteristics. The amount of carbon in the material becomes the

factor that controls the whole burning process.

2. Ventilation Controlled Fires

This is the stage where the fuel mass and incident heat is abundance but the burning process is

limited by the supply of oxygen. The air supplied from openings or HVAC systems become the

factor that controls the whole burning process.

A standard fire curve in enclosed spaces (CIBSE, 2003)

Page 94: BS 2 Group assignment example Building services-bangsar-village-1

Page 94 of 187

Classes of Fire

In Europe and Australia, classes of fire are grouped into six groups as follows:

• Class A: Fires that involve flammable solids such as wood, cloth, rubber, paper,

and some types of plastics.

• Class B: Fires that involve flammable liquids or liquefiable solids such as

petrol/gasoline, oil, paint, some waxes & plastics, but NOT

cooking fats or oils.

• Class C: Fires that involve flammable gases, such as natural gas, hydrogen,

propane, butane.

• Class D: Fires that involve combustible metals, such as sodium, magnesium,

and potassium.

• Shock Risk Fire (formerly known as Class E) : Fires that involve any of the

materials found in Class A and B fires,

but with the introduction of an electrical

appliances, wiring, or other electrically

energized objects in the vicinity of the

fire, with a resultant electrical shock

risk if a conductive agent is used.

• Class F: Fires involving cooking fats and oils. The high temperature of the

Oils when on fire far exceeds that of other flammable liquids

making normal extinguishing agents ineffective

Comparison of Fire Classes Standard Between Australia, European and North America

Page 95: BS 2 Group assignment example Building services-bangsar-village-1

Page 95 of 187

2.4.3.2 Panic Behaviour

It is important that for a designer to consider the panic behaviour of the occupants during fire,

regarding the possible rational and irrational decisions that they might make and the route of

escape from the burning building as protection towards user. Definition of panic as below:

1. “panic” by original greek language “Panikos” have the meaning of a sudden uncontrollable fear

or anxiety, often causing wildly unthinking behaviour. (Retrieved from Wikipedia)

2. A sudden, overpowering terror, often affecting many people at once. (Retrieved from http://www.the freedictionary.com/panic/. The American Heritage Dictionary of the English Language, Fourth Edition copyright

2000 by Houghton Mifflin Company. Updated in 2009. Published by Houghton Mifflin Company. All rights reserved.)

3. A sudden overwhelming fear that produces hysterical behaviour and that can spread quickly

through a crowd. An instance, outbreak, a period of such fear. An anxiety disorder characterized

by feelings of impending doom and physical symptoms such as trembling and hyperventilation. (Random House Kernerman Webster‟s College University, copyrights 2010 K Dictionaries Ltd. Copyright 2005, 1997, 1991 by Random House,

Inc. All rights reserved.)

The Panic Phenomena. Retrieved from http://bp1.blogger/com/“

“Psychological crowd” as a group of people where individuals have lost their own

personality to share the same motivations and thoughts as the crowd, which is

composed of the lowest common denominator as “a crowd displays a singular

inferior mentality.”

Page 96: BS 2 Group assignment example Building services-bangsar-village-1

Page 96 of 187

“In other psychology and sociology literature also define the term “panic”.

Goldenson define panic as “reaction involving terror, confusion and irrational

behaviour precipitated by a threatening situation.”

Johnson wrote, “behavior involves selfish competition uncontrolled by social

and cultural constraints,” and “breaking of social order, competition

unregulated by social forces.”

Keating outlined four elements of panic:

a) hope to escape through dwindling resources;

b) contagious behaviour;

c) aggressive concern about one's own safety; and

d) irrational, illogical responses

Quarantelli describes panic as an acute fear reaction

marked by flight behaviour and the panic participant as no rational in his

flight behaviour. In the human behaviour literature, „panic‟ is usually

defined as some sort of irrational behaviour, and research findings

consistently show that people do not exhibit such irrational behaviour in

fires. In fact, altruistic behaviour is seen to be the norm in serious

fires.17 Human behaviour under stress is relatively controlled, rational

and adaptive.15 It is also found that cooperation rather than selfish behaviour

are predominant even among total strangers”

It is important to consider panic behaviour in space planning for Fire Protection System to

minimize the risk of death due to trampling or panic. (Case studies: Stardust Nightclub Fire, Ireland, February 13, 1981. Fahy,R.F.;Proulx, G. ,’Panic’ and human behaviour in fire, 13th July

2009)

In other hand, proper design planning for fire protection system might actually helps to protect

the user while wrong design decisions might kills many life.

(Case Studies: Gothenburg Discotheque Fire, Sweden, October 29, 1998; Fahy,R.F.;Proulx, G. ,’Panic’ and human behaviour in fire, 13th

July 2009)

Fahy,R.F.;Proulx, G. ,’Panic’ and human behaviour in fire, 13th

July 2009

Page 97: BS 2 Group assignment example Building services-bangsar-village-1

Page 97 of 187

2.4.4 Onsite Research and Analysis

This chapter will be further divided into sub-units of the elements of Active and Passive Fire

Protection System, also the potential hazards caused by human found in Bangsar Village Shopping

Mall, stated as below:

Active Fire Protection System:

1. Fire Detection and Alarm System

2. Sprinkler System and Breeching Inlet

3. Carbon Dioxide System

4. Smoke control System

5. Water Tank and Pump

6. Standpipe and hose system

(Standard Hose Compartment)

7. Portable Fire Extinguisher

8. Lightning Protection: Emergency Light

9. Circuit cutter

10. Fire Rated Door

11. Fire Hydrant and Drainage

12. Sign, Warnings

13. Fire Alarm Panel

Passive Fire Protection System:

1. Emergency Escape Corridor

2. Emergency Staircase

3. Stairwell and staircase design

4. Escape Route Floor plans and Gathering Space

(Assembly)

Potential Hazards:

1. Human Fault

Page 98: BS 2 Group assignment example Building services-bangsar-village-1

Page 98 of 187

2.4.4.1 Active Fire Protection System

1. Fire Detection and Alarm System

2. Smoke control System

3. Sprinkler System and Breeching Inlet

4. Carbon Dioxide System

5. Water Tank and Pump

6. Standpipe and hose system

(Standard Hose Compartment)

7. Portable Fire Extinguisher

8. Lightning Protection: Emergency Light

9. Circuit Breaker

10. Fire Rated Door

11. Fire Hydrant and Drainage

12. Fire Alarm Panel

Page 99: BS 2 Group assignment example Building services-bangsar-village-1

Page 99 of 187

1. Fire Detection and Alarm System: Smoke and Heat

The conventional Fire Alarm System is provided in the building. The system is designed to monitor

all the fire detection and warning devices located at various strategic locations as required by

Jabatan Bomba. The detecting devices are the manual call-points and the warning devices are the

alarm bells. Fire Alarm panel is located at Ground floor lift lobby. A mimic is provided to indicate

the various zoning and fire protection equipment on the various floors.

Fire Mode Conditions:

The following conditions are observed on fire conditions.

a. Alarm bells will ring continuously

b. Alarm zoning will be indicated at fire alarm panel

The Gent 7800 Series Detector Range

The comprehensive range of low profile smoke and heat detectors are deigned to comply with EN54

Part 7. With extra low quiescent current consumption and twin 360°C view angle fire LEDs, this

range benefits from state of the art electronic sensing technology incorporating smoke scatter

principles and manufactured from Vo grade flame resistant materials.

All models fit on a standard base with flush and surface wire base options available. Diode bases are

used to achieve head removal requirements with no additional end of line devices required.

The Gent 7800 series detectors will operate with the current range of GENT conventional type

control panels and GENT System 3400 or 34000 addressable interfaces.

(Image retrieved from http://www.firedetectionshop.co.uk/gent-s-quad-s4-711-st-vo-dual-optical-heat-detector-

with-voice-sounder-and-strobe-clone.html)

Page 100: BS 2 Group assignment example Building services-bangsar-village-1

Page 100 of 187

Photographed by Yong Yih Tyng at Bangsar Village Shopping Mall

7840 Optical Smoke Detector

It is particularly effective in detecting large visible smoke particles such as those produced by

smouldering wood, paper, PVC or polyurethane foam. It is also suitable for general use.

Inside the optical chamber there is an infra red “light” beam and a photo sensor unit, fitted at an

obtuse angle. Normally very little light from the beam reaches the sensor, but when smoke enters

the chamber, the beam is scattered and more light reaches the sensor, this triggering the alarm.

Pulsed light source keeps the power consumption low, and thus enabling more detectors to be used

per circuit. To reduce the risk of false alarms, inside each detector, 3 pulses from the light source

must reach the photo sensor before an alarm is activated. A built in microprocessor chip inside

monitors and compensates for any changes due to dust or other contaminants. This drastically helps

to reduce or minimise the risk of fake alarms.

(Image retrieved from http://img.directindustry.com/images_di/photo-m2/smoke-detector-55817-2393971.jpg)

Page 101: BS 2 Group assignment example Building services-bangsar-village-1

Page 101 of 187

7850 Fixed Temperature Heat Detector

Ideal for normal property protection purposes, and particularly suited to areas where temperature

can fluctuate for natural reasons – e.g where there are large windows or industrial heat producing

processes.

Present to trigger alarm when temperature reaches approximately 57°C therefore it is an excellent

way of avoiding continual false alarms in areas where the temperature changes rapidly.

Electronic thermistor type detector element guarantees high accuracy because there are no moving

parts. Excellent reliability as detector is automatically resettable when thermistor element state

cools down Factory calibrated sensitivity to BS 5445 Part 5 Grade 2.

(images retrieved from http://www.pennylaneelectrical.co.uk/images/fireline_Csd2.jpg)

Data collected from Fire Protection Operation Manual at Bangsar Village Shopping Mall.

Page 102: BS 2 Group assignment example Building services-bangsar-village-1

Page 102 of 187

7860 Rate Of Rise Heat Detector

Suitable for most normal property protection purposes and providing a high degree of protection in

areas where the temperature is normally fairly stable – useful for low ambient temperature areas

where the response of fixed temperature may be slower.

Rate of Rise heat detector respond to rises in temperature, but also include a fixed temperature

“backstop” circuit, present at approximately 57°C for even greater safety. Electronic thermistors

type detector elements guarantees high accuracy and, because there are no moving parts, give

excellent reliability. Sensitivity to BS5445 Part 5 Grade 1 allowing this detector to be used for

maximum ceiling heights as specified by BS 5839 Part 1, 1988.

(images retrieved from http://static.squarespace.com/static/5170401be4b00853b233dbd2/t/518d4f6be4b01d03877bac20/1368215404470/heat_fig1.jpg)

(Images retrieved from http://www.apollo-fire.co.uk/media/753732/heat.jpg)

Page 103: BS 2 Group assignment example Building services-bangsar-village-1

Page 103 of 187

2. Smoke Control System

Based on the operating manual of fire protection system of Bangsar Village Shopping Mall, it is

stated that, the smoke control system has been designed to provide emergency smoke and heat

exhaust ventilation in the event of fire to allow both safe evacuation of people and the entry of the

fire fighting services.

In case of fire, the system is designed to maintain a smoke free clear layer for 4m from floor level

unless the fire exceeds 3m X 3m with a heat output of 5MW. With the sprinkler system in operation

this fire size is not likely to be exceeded before evacuation is complete. The smoke control system

stated in the operating manual is designed for emergency use only.

The smoke control system activation is based on a “Double-Knock” detection system.

In an emergency event, the first line of detectors (usually smoke detector) will put the system into

standby mode. Upon confirmation of an emergency via a second line of detector (Sprinkler

activation, flow switch) the Fire Alarm Panel will then send a fire mode signal to the Master Smoke

Control Panel where the panel will then activate the smoke control equipment.

Once the system is activated, it can only be deactivated when the Fire Alarm Panel is normalized

and the “RESET” button on the Master Smoke Control Panel is press. This action will then reset all

the equipment to their normal condition, except the smoke extract fans. The fans can only be reset

from the Fan Starter Panel in the first floor AHU Room.

From the Master Smoke Control Panel, the individual group of equipment can be manually control

or isolated via a selector switch.

Should the control wiring be damage or disconnected prior to the activation of the signal, the

individual equipment can be activated from their respective control panel nearby. But once the

system is activated by the Fire Alarm Panel or the Master Smoke Control Panel and damage to the

control signal wiring will not reset or stop the system. They will then have to be individually reset

from their respective control panel.

In the event of power failure the compressor set retain sufficient air to close the ventilators twice

and hold them closed for a limited period. If power to the compressor is lost for a significant period

the ventilators will creep open as pneumatic pressure to build sufficiently to fully close all

ventilators.

In the event of power failure to the control panel the ventilators will go to failsafe open position.

Reset will be automatic when power is restored.

Page 104: BS 2 Group assignment example Building services-bangsar-village-1

Page 104 of 187

(images retrieved from http://www.idastech.com.sg/Images/Smoke_Control_Schematic.jpg)

UBBL Laws and Regulations on Smoke Control System

Under UBBL 1984 Section 153: Smoke Detectors for Lift Lobbies.

1. All lift lobbies shall be provided with smoke detectors.

2. Lift not opening into a smoke lobby shall not use door reopening devices controlled by light beam

or photo detectors unless incorporated with force close feature which after thirty seconds of any

interruption of the beam causes the door to close within a pre-set time.

According to the guidelines, the fire control room has to meet the requirement of the

building that has an effective height of more than 50 meters. It should be separated from the rest of

the building by two hour fire rated elements of structure.

Page 105: BS 2 Group assignment example Building services-bangsar-village-1

Page 105 of 187

UBBL 1984 section 238: Command and Control Centre

Every large premises or building exceeding 30.5 meters in height should be provided with a

command and control center located on the designated floor and should contain a panel to monitor

the public address, fire bridge communication, sprinkler, water flow detectors, fire detection and

alarm systems and with a direct telephone connection to the appropriate fire station by passing the

switchboard.

The general requirements for the fire control room are stated below:

1. Have a minimum floor area of 10m2, it can be larger depending on the equipment required.

2. Be sited near the main entrance to the building‟s main lobby in a designated room.

3. Preferably by adjacent to a fire lift lobby or any other location as designated by the relevant

authority.

4. Be accessible via 2 paths of travel. One from the front entrance and the other from a public place of

fire-isolated passageway, which leads to a public space and has two-hour fire rated door.

5. Have an independent air handling system if mechanical ventilation is provided throughout the

building.

6. Be adequately illuminated to not less than 400 lux.

7. Provide the ability to communicate (e.g. via telephones and loudspeakers) with all parts of the

building, and with the fire and other emergency services.

8. Be provided with insulation from ambient building noise.

9. Be under the control of the Chief Fire Warden (or similar appointed person).

A Fire Control Room must contain the following facilities stated below:

1. Automatic fire alarm and sprinkler indicator boards with facilities for sounding and switching off

alarms and visual status indication for all relevant fire pumps, smoke control fans, air-handling

systems, generators and other required fire safety equipment installed in the building depending on

the circumstances and the system present in the building.

2. A telephone connected directly to the external exchange.

3. The control console of the Emergency Warning and Intercommunication System (EWIS).

4. A blackboard or whiteboard not less than 1200mm.

5. A pin board not less than 1200mm wide x 1000mm high.

6. A ranked plan layout table of a size suitable for laying out the building plans.

7. A repeater panel of the lifts position indicator board.

8. A switch to isolate background music when required.

9. Remote switching controls for gas or electrical supplies.

10. Building security, surveillance and management systems if they are completely segregated from all

other systems.

Page 106: BS 2 Group assignment example Building services-bangsar-village-1

Page 106 of 187

Automatic Smoke Curtain and Smoke Extract Fan

Operation From Technical Data Sheet – Automatic Smoke Curtain

Colt automatic smoke curtains form a retractable barrier to prevent smoke at high level from

spreading outside the smoke reservoir or to control the spread of smoke. They comprise a 24v de

motorised roller assembly fitted with a coated glass fibre cloth at the bottom end of which a

weighted bottom bar is fitted. The roller assembly is contained within a galvanised steel casing. The

cloth is class „O‟ rated to the UK building regulations.

When power is applied the motor drives the curtain to the retracted position, set by limit switches

and holds it there. Upon loss of power the curtain drops under gravity at a controlled rate to its

deployed position.

The control system incorporates a battery backup system which will provide power to drive the

curtains in the event of a power failure.

Three typical applications of Smoke Curtains:

1. Void Edge – to contain smoke

2. Channelling –to guide smoke along set routes

3. Reservoir – to minimise smoke spread

The curtain material is a satin weave fibreglass fabric with a silver polyurethane coating on both

sides. It is 0.3-0.4mm thick and weighs approximately 550g/m2. The fabric has a Class 1 surface

spread of flame when tested to BS: 476: Part 7 and a fire propagation index I = 2.7 when tested to

BS: 476: Part 6. It is therefore rated Class 0 to the Building Regulations.

The fabric is manufactured in widths of approximately 1.5m, so curtains with a drop of greater than

1.5m will have horizontal stitched seams at 1.5m centres, using Kevlar thread.

Page 107: BS 2 Group assignment example Building services-bangsar-village-1

Page 107 of 187

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 108: BS 2 Group assignment example Building services-bangsar-village-1

Page 108 of 187

Data collected from Fire Protection Operation Manual at Bangsar Village Shopping Mall.

Colt Smokemaster has two modes of operation; either fully retracted or fully dropped. The curtain

will remain in the fully retracted position as long as electrical power is supplied to the motor.

The motor is constantly energised at a reduced voltage, supplying a constant torque to keep the

bottom bar retracted into the V-slot in the casing.

To drop the curtain to its operational position, power to the motor is disconnected. Gravity forces

acting upin the bottom bar will cause the curtain to drop. Drop speed is controlled by friction inside

the gearbox and DC regenerative braking applied by the electronics to the motor. The mass of the

bottom bar is set at the factory to a value with ensures that the Smokemaster will drop reliably in

temperature ranging from 0°C to 60°C. The curtain will continue to drop until the fabric has

completely unrolled from the roller tube.

Page 109: BS 2 Group assignment example Building services-bangsar-village-1

Page 109 of 187

Upon reconnection of power, the curtain will retract until the bottom bar hits an obstruction (i.e.the

V-slot in the casing). Electronics inside the drive motor monitor the current drawn by the motor,

when the bottom bar retracts into the casing V-slot, the motor stalls and current to the motor rises

sharply. The electronics sense this and apply a suitable voltage to keep the curtain retracted.

Method of operation:

The smoke curtains are controlled through a Master Power Unit (MPU) located inside the hose reel

cabinet on the corridor of every floor. On the MPU, there will be a key-switch selector.

To activate the curtains, turn the key to the right and the curtains will descend to their designed

condition. To reset the curtains, turn the key back to the normal position and the curtains will

automatically reset after 1 (one) minute.

The Master Smoke Control Panel can also remotely control the smoke curtains. To go this you will

need to turn the key-switch for the respective curtain group to the “ACTIVATE” position on the

Master Smoke Control Panel. Turn the key-switch to the normal position and press the “RESET”

button to retract the smoke curtain to their normal position.

Note: As the smoke curtains are powered to retract and held retracted by a small holding current,

Should the power supply to these panel are switched off, the smoke curtains will descend by gravity.

Failsafe Operation:

Failsafe operation is inherent in the design of Colt Smokemaster, and is similar to the general

operation. Removal of power to curtain (either accidental or deliberate) allows the curtain to fall to

its operational position. Rate of fall is not dependent upon electrical power being supplied to the

curtain; the curtain‟s rate of fall will still comply with the requirements stated in BS 7346: Part 3.

This feature arises from the simplicity of Smokemaster design. A relatively low number of moving

parts also improves reliability.

Page 110: BS 2 Group assignment example Building services-bangsar-village-1

Page 110 of 187

Operation From Technical Data Sheet – Smoke Extract Fan

The mechanical smoke extract fan‟s primary function of which is to provide smoke and heat

exhaust ventilation when connected to suitable ductwork system.

The ventilator comprises a cased axial fan and motor unit, rated at 250°C for 30mins.

The smoke extract fan is a powered-extract ventilation device which depends upon an electric

motor for its operation. When the appropriate electrical supply is connected and switched on, the

motor drives the impeller to draw air towards the base assembly and into the unit. The impeller is

an axial flow type with aerodynamically shaped blades. As well as exhausting foul air, in normal

conditions, the airflow through the unit provides cooling for the electric motor.

Method of Operation:

The smoke extract fans are controlled through a Fan Starter Panel located in the Level 1, AHU

Room.

The extract fans are automatically controlled by the Master Smoke Control Panel. It can also be

manually control from the Fan Starter Panel. To do this, the selector switch on the panel must be

turned to the manual mode. Then the press the “START” button on the panel. To stop, press the

“STOP” button.

Note: Remember to return the selector switch to the automatic position when done.

The extract fans can also be manually operated from the Fire Command Centre on the Ground Floor.

There is a Remote Fan Control Panel next to the Master Smoke Control Panel that is directly hard-

wired to the Fan Starter Panel. This control panel will only run the fans, only the Fan Starter Panel

can stop the fans, so you must go to the level 1, AHU Room and press the “STOP” button to stop

the fans.

The Master Smoke Control Panel can also manually run the fans via the key-switch. But as with the

Remote Fan Control Panel, you must go to the Fans Starter Panel in the Level 1, AHU Room to

stop them, after you pressed the “RESET” button on the Master Smoke Control Panel.

Page 111: BS 2 Group assignment example Building services-bangsar-village-1

Page 111 of 187

Operation From Technical Data Sheet - Colt Seefire Ventilator

The Colt Seefire is a clear opening louvred natural ventilator, suitable for inlet or extract use for

comfort ventilation and smoke and heat ventilation.

The ventilator is manufactured from aluminium (Colterra) with louvre blades manufactured from

UV resistant translucent double skin polycarbonate sections with aluminium edge trims and end

plates.

The ventilator is fitted with EPDM seals along the louvre edges and polypropylene pile seal

between the louvre sides and upstand to reduce energy losses when closed. All louvers are pivoted

on double black nylon bearings and connected at both ends by twin control channels to the

activating mechanism.

The ventilator is pneumatically controlled, pressure to close, and is sprung open on loss od pressure.

Normal operating pressure is 6-7 bar g. A fusible link is fitted which disconnects the pneumatic

cylinder in case of fire and allows the ventilator to spring open.

Photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 112: BS 2 Group assignment example Building services-bangsar-village-1

Page 112 of 187

The material used for manufacture is 100% Recycled Grade, Cold Rolled, Mill Finish Aluminium

to 3005 H14. The louvre blade is available in two material options: Aluminium or Translucent

Polycarbonate, Clear, UV protected, 9mm twinwall. The Seefire is fitted with lowloss louvers

which incorporate a weatherseal to reduce heat loss when closed. These can be omitted, if preferred.

The Seefire is available with the option of a Stoved Polyester Powder Paint Finish applied to the

principal components.

Photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Colt Seefire Natural Louvred Ventilator. Technical Data Sheet certified to EN 12101-2: 2003

Page 113: BS 2 Group assignment example Building services-bangsar-village-1

Page 113 of 187

Data collected from Fire Protection Operation Manual at Bangsar Village Shopping Mall

The ventilation through an open Seeefire Ventilator is entirely dependent upon natural phenomena.

A difference created across the unit by convection, wind or fan assisted inlet will cause air to pass

through the ventilator. The rate at which this will occur depends upon the prevailing ambient

conditions.

Mechanically the mode of operation is simple, utilising levers to overcome spring tension and

frictional resistance between moving parts.

Page 114: BS 2 Group assignment example Building services-bangsar-village-1

Page 114 of 187

Method of Operation:

The ventilators are pressured to close and sprung to open system. Therefore, to open the ventilators

the control panel will release the compressed air in the copper tubing and pneumatic cylinder to

allow the spring to open the louvre blades.

To do this, the key-switch selector on the Ventilator Control Panel need to be turned to the

“ACTIVATE” position to allow the valve to release the compressed air from the copper tubing and

pneumatic cylinder. The spring then will open the ventilator. To close the ventilators, return the

key-switch selector to the normal position and the pneumatic valve will then energize the copper

tubing and pneumatic cylinder in the ventilators to close the louvre blades.

As with the rest of the smoke control system equipment, the Ventilator Control Panel can be

controlled from the Master Smoke Control Panel in the Fire Command Centre by using the key-

switch selector as for the smoke curtains and fans.

Note: Because the ventilators are pressured to close it is important that the pressure in the receiver

tank below the compressor be kept charged at all time.

Page 115: BS 2 Group assignment example Building services-bangsar-village-1

Page 115 of 187

3. Sprinkler System

The sprinkler system is designed to Loss Prevention Council (LPC) UK and to Local Fire Authority

Requirements. Hazard classification for the sprinkler design for this building is Ordinary Hazard.

One set of sprinkler pump are provided and each of the pump-set comprising of Duty, Standby and

Jockey pump serving to different areas of the building based on the building height. All the

sprinkler pumps are located at Fire Pump Room and status of the pump-set is monitored to the main

fire alarm panel.

Sprinkler alarm control valves are provided after each individual stage of pump-sets to serve for the

particular area in the building.

Water supply to the sprinkler system is drawn from the Sprinkler storage tank located inside the fire

pump room and incoming water supply to the sprinkler tank is directly from JBA water mains.

An isolation valve complete with monitoring switch is provided for each specific zone, any valve in

close position will be monitored back to main fire alarm panel at fire control room.

Flow switch installed after each isolation valve is to sound the alarm should sprinkler is actuated

and flow of water is discharged. All flow switches alarm status is monitored to the main fire alarm

panel at fire control room.

Sprinkler head provided for entire building are rated at 68 degree C with orifice size of 15mm

diameter.

A 4-way breeching inlet is provided neat to Bomba access for the fire brigade to pump in water to

the system in-case sprinkler tank is empty.

The sprinkler piping is fully pressurised with water by sprinkler pump to the pre-set pressure. The

system operates automatically by means of pressure switch. Any fall in the systems pressure sense

by the pressure switch will automatically start the pump-set. At a pre-set pressure level of the

pressure switches, the jockey pump will cuts to drop further, the duty pump will cuts in. In the

event of duty pump failure or unable to maintain the pressure, the standby pump set will cut in.

There is no automatic cut off for the duty standby pump and the system can only be switched off

manually.

Cut-in Cut-Out

JOCKEY 85psi 100psi

DUTY 60psi manually

STANDBY 45psi manually

Page 116: BS 2 Group assignment example Building services-bangsar-village-1

Page 116 of 187

The system operates only when a sprinkler head breaks open either sensing element reaches the

operating temperature or other means. Water will be discharge from that particular sprinkler head.

At the same time the water alarm gong will give a continuous alarm and the pump-set operated.

Flow switches of the sprinkler zone will be energized with indications of the affected zone

indicated at the main fire alarm panel and alarm bell will be sounded.

Photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Sprinkler used: Automatic Sprinklers Model J BULB L.P.C Series Upright. Pendent. Conventional

Technical Data:

Temperature ratings - 135°F (57°C), 155°F (68°C), 175°F (79°C), 200°F (93°C), 286°F (141°C),

360°F (182°C)

Water Working Pressure Rating – 175psi (1207kPa)

Factory Tested hydrostatically to 500psi (3448kPa)

Maximum low temperature

Page 117: BS 2 Group assignment example Building services-bangsar-village-1

Page 117 of 187

Photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

(Images retrieved from http://www.idrc.ca/EN/Resources/Publications/openebooks/304-6/f0029-01.gif)

Page 118: BS 2 Group assignment example Building services-bangsar-village-1

Page 118 of 187

(Images retrieved from http://3.imimg.com/data3/RX/SD/MY-6428964/sprinkler-systems.jpg)

Photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 119: BS 2 Group assignment example Building services-bangsar-village-1

Page 119 of 187

Dry Riser System with A 4-way breeching inlet

Dimension of A 4-way breeching inlet (images retrieved from

http://www.naffco.com/product.php?prod_id=753&groups_id=434)

Dimension of A 4-way breeching inlet (images retrieved from

http://www.naffco.com/product.php?prod_id=753&groups_id=434)

Model No NBI 115 4-Way Breeching Inlet (Manufactured & comply

to BS 5041-3-1975)

Body Spheroidal Graphite Iron to BS EN 1563:1997

Inlet 4 no's Male instantaneous coupling with NRV to BS 336:

1989

Outlet 6" Flange

Working Pressure 10 Bar

Test Pressure 20 Bar

Page 120: BS 2 Group assignment example Building services-bangsar-village-1

Page 120 of 187

Page 121: BS 2 Group assignment example Building services-bangsar-village-1

Page 121 of 187

Fire sprinkler system was found in each floor of the building. It basically consist of a system water

supply system. The dimension between the two sprinkler head is 2.5m wide and 3m high, as shown

in the diagram below:

2.5m

2.5m 3m from the floor

Diagram 1: Dimension between sprinkler heads. Diagram 2: Dimension between

Sprinkler head and ground floor level.

Under UBBL 1984 Section 228: Sprinkler Valves

The distance between 2 sprinklers should be at a maximum distance of 4.6 metres. Distance

between sprinklers and floor level is about 3 metres. Therefore, Bangsar Village reached the

requirement of the fire protection according to UBBL law.

Bangsar Village has installed pendant type sprinkler which it is hanged from the pipeline, and its

water deflector is located at the bottom of it. When it is concealed, the pendant sprinklers hide

under a special cap that will falls away when the temperature of the surrounding environment rises

to an extreme level and eventually began to spray water in an adequate circumference. At the same

time, the fire control room will sound the alarm valve mechanical gong and affected zone flow

switch, then the fire alarm will be activated.

Page 122: BS 2 Group assignment example Building services-bangsar-village-1

Page 122 of 187

4. Carbon Dioxide System

Carbon Dioxide (CO2) is containing in the seamless high-pressure cylinder and pressurized to

1000psi and the pilot cylinder contain with Nitrogen gas with pressure of 550 psi. Extra precaution

should be taken to avoid exposing to Carbon Dioxide gas for extended periods of time in the event

of discharge.

The design concentration is based on 50% by volume and 60 sec. discharge time. Automatic

actuating is obtained by means of heat detectors and smoke detectors. The manual operation is by

means of mechanical pull cable. The Co2 system is maintained and controlled by the control panel.

After any discharge of Co2 gas, DO NOT ENTER THE ROOM IMMEDIATELY WITHOUT

ANY BREATHING APPARATUS. Allow gas to be dispersed from the room before entering the

room.

The panel consists of dual circuit system with volt meter, ammeter, indicators of A.C and D.C

supply, supply failure, battery failure, fuses, heat and smoke detector zone indicators, bell and

buzzer silenced and Co2 discharge indicator. This panel is designed and conforms to the

requirements of the Jabatan Bomba. The control panel operate in as 240V AC supply and a 24V DC

battery as a stand-by source. The voltmeter and ammeter is for voltage and ampere indication

respectively. Each zone consists of alarm indicator, fault indicator, isolate indicator and the selector

switch with indication of test alarm (T/A), test fault (T/F), normal (N) and circuit isolator (ISO).

A set of standby by battery with capacity for 72 hours supply is provided for in the event of any

power failure.

D.2 Co2 Panel Description

The panel consists of dual circuit system with volt meter, ammeter, indicators of A.C and D.C

supply, supply failure, battery failure, fuses, heat and smoke detector zone indicators, bell and

buzzer silenced and CO2 discharge indicator.

The panel is designed and conforms to the requirements of the Chief Inspectorate of Fire Services.

The control panel operate is as 240V AC supply and 24V DC battery as standby source. The

voltmeter and ammeter is for voltage and ampere indication respectively.

Each zone consists of alarm indicator, fault indicator, isolate indicator and the selector switch with

indication of test alarm (T/A), test failure (T/F), normal (N) and circuit isolator (ISO).

a. Test Alarm (T/A)

Before the test is carried out, have the CO2 isolate switch on. We can simulate a CO2 discharge

condition by firstly switching on the 1st zone to test alarm position, that particular CO2 zone will be

illuminated and the alarm bell ring intermittently. When the 2nd

CO2 zone is switched to the alarm

position, the zone illuminated, bell rings continuously and after a time delay of about 25 to 30 sec

the “CO2 Actuated” will light up which signifies the actuating of CO2 cylinder.

Page 123: BS 2 Group assignment example Building services-bangsar-village-1

Page 123 of 187

CARE SHOULD BE TAKEN AS NOT TO DISCHARGE THE CO2 GAS ACCIDENTALY.

b. Testing Fault (T/F)

By turning the selector switch position to T/P, the internal buzzer will sound and fault indicator will

illuminate. This is a simulation of a situation break in the external wiring.

c. Circuit Isolator (ISO)

In the event of alarm been actuated accidentally or faulty detectors, turn the selector switch position

ISO and press the alarm re-set button. The alarm will be silenced but internal buzzer will sound

continuously until the system is rectified and the set rotary switch to normal (N) position.

d. Normal (N)

The position of the selector switch must always be in the normal position otherwise the system is

not in operational condition.

e. System Healthy

The system is “healthy” when the monitoring system incorporated in the CO2 control panel is not

when the monitoring system incorporated in the CO2 control panel is not sensing any faults or

defects in the detectors‟ wiring. The only indicating bulbs illuminated on the panel during normal

operation are:-

1. “Main On”

2. “DC On”

All other indication lights or alarm off.

f. System Faulty

The system is faulty when the monitoring system incorporated in the CO2 control panel is sensing

fault or defects in the detector wiring failure of main power supply, battery supply and fault in

internal panel components.

If any faults occurs, the panel will indicates the followings

1. Fault buzzer is sounded

2. Fault indicator light is indicated

Page 124: BS 2 Group assignment example Building services-bangsar-village-1

Page 124 of 187

D.3 Operation of the System

The hazard room specified is under close surveillance by smoke/heat detectors. As required by the

Jabatan Bomba the control CO2 control panel is of dual circuit system. This means that it requires

more than one type of detectors to trigger off the discharge of the CO2 gas. This is to avoid

unwarranted false discharge due to false alarm. Upon detection by fire devices, the following events

ill occurs: -

a) The CO2 panel indicated the zone of the heat detectors activated.

b) Alarm Bell at the affected CO2 protected room will ring intermittently.

c) Upon a second detection of a detector, which must be of different type compared to zone

one detection, alarm bell will ring continuously and a signal is sent to the CO2 panel and after a

time delay of about 25-30 sec, the CO2 gas is discharge.

d) Warning light above the entrance of the room will flash and alarm bell rings continuously.

e) All exhaust/ventilation fan will be shut off

f) Fire curtain will be closed dropped

g) Signal received at the main fire alarm panel

Should any failure of automatic actuating system occur during a fire, a manual control actuating

switch is provided next to the control panel. Break the glass and switch on the key to discharge gas

immediately.

D.4 Isolation Alarm

In case where false alarm is actuated due to faulty detector or environmental conditioning and

unable to reset the alarm, follow the following instruction: -

1. Switch effect zone rotary switch to “ISO” – isolate position

2. Buzzer will sound

3. Replace faulty detector immediately

4. Press reset alarm button. Alarm light off

5. Turn rotary switch back to “N” - normal position

6. Buzzer off

D.5 Testing Procedure

a) Before testing is carried out ensure the actuator to the CO2 cylinder have disconnected.

b) Test CO2 panel

1) Bulb test – make sure all bulb are working

2) Switch off main AC supply –

check buzzer sound, change over to battery supply and record battery voltage

3) Manual test zone circuit by turning selector switch –

Page 125: BS 2 Group assignment example Building services-bangsar-village-1

Page 125 of 187

a) check alarm zone actuated and bell ring, fault line tested and buzzer sound, zone isolate

isolated buzzer sound and bell silence

b) Upon alarm on both alarm zone check –

CO2 discharge is actuated after time delay 30sec, warning discharge light lighted, bell rings,

exhaust fan trips

4) Turn manual discharge manual pull or key switch check –

CO2 discharge is actuated, warning discharge light lighted, bell rings

5) Turn isolate CO2 switch to “on” check –

CO2 discharge is not actuated

6) Switch selector to Normal position and pressed reset button check –

all bell and Buzzer silenced, DC on and AC on is only lighted

C) Fire Test Condition

1) Subject 1st detector with smoke/heat source (depending on type of detector)-

a) Check detector tested is monitored at the CO2 panel and bell ring

2) Subject 2nd

detector with smoke/heat source

Do note reset the system, go to step 3

3) After above 30sec –

Check Co2 actuated lighted up, warning light lighted, bell ring, exhaust fan trips, curtain trips (CO2

discharge monitored to Main Fire Panel)

4) Reset both detector zone at the CO2 panel –

Check all systems are in normal condition and bell are silenced

Page 126: BS 2 Group assignment example Building services-bangsar-village-1

Page 126 of 187

Outside the Carbon Dioxide System integrated High Voltage Room. Photograph by Yong Yih Tyng at Bangsar Village Shopping Mall.

Photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 127: BS 2 Group assignment example Building services-bangsar-village-1

Page 127 of 187

When the light is Red, indicates that the room is not accessible. Photograph by Yong Yih Tyng at Bangsar Village Shopping Mall.

Photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 128: BS 2 Group assignment example Building services-bangsar-village-1

Page 128 of 187

Carbon Dioxide System. Photograph by Yong Yih Tyng at Bangsar Village Shopping Mall.

Photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 129: BS 2 Group assignment example Building services-bangsar-village-1

Page 129 of 187

Photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

(images retrieved from http://www.ehsuniverse.com/wp-content/uploads/2014/04/firesupp.jpg)

Page 130: BS 2 Group assignment example Building services-bangsar-village-1

Page 130 of 187

Carbon Dioxide System Set Up:

(images retrieved from http://www.alarm.com.mv/product_CO2%20suppress.htm)

Page 131: BS 2 Group assignment example Building services-bangsar-village-1

Page 131 of 187

5. Water Tank and Pump

The fire water storage tank is located at the rooftop of the building. The wet riser system and

sprinkler system uses the same tank of water. The volume of water contained in the water tank

should be sufficient to supply enough water for firefighting system in the whole building.

Photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 132: BS 2 Group assignment example Building services-bangsar-village-1

Page 132 of 187

Photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 133: BS 2 Group assignment example Building services-bangsar-village-1

Page 133 of 187

Photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Data collected from Fire Protection Operation Manual at Bangsar Village Shopping Mall

Under UBBL 1984 Section 247(2) Water Storage

Main water storage tanks within the building, other than for hose reel systems, shall be located at

ground, first or second basement levels, with the brigade pumping inlet connections accessible to

fire appliances.

Under UBBL 1984 Section 247: Water Storage

1. Water storage capacity and water flow rate for firefighting system and installation shall be

provided in accordance with the scale as set out in the Tenth Schedule to these By-laws.

2. Main water storage tanks within the building, other than for the hose reel system, shall be

located at ground, first or second basement levels, with fire brigade pumping inlet connection

accessible to fire appliances.

3. Storage tanks for automatic sprinkler installation where full capacity is provided without

the need for replenishment shall be exempted from the restrictions in their location.

Page 134: BS 2 Group assignment example Building services-bangsar-village-1

Page 134 of 187

Range 32-150mm Discharge.

(Retrived from : http://www.psgdover.com/assets/ebsray-pump/downloads/brochures/brochure-streamline-centrifugal-

pump.pdf;

Esbay, streamline centrifugal pump range, publication number 1344)

Page 135: BS 2 Group assignment example Building services-bangsar-village-1

Page 135 of 187

6. Standpipe and hose system

The system is to the requirements of Jabatan Perkhidmatan Bomba Malaysia.

Two sets of existing hose reel pump sets are provided in the building. Where power supply to the

pump sets is from essential supply. The duty/standby pump set provided is electrical motor driven.

Hose reel drum complete with rubber hose and nozzles are strategically located at various locations

at the building. Duty and standby pump sets of the hose reel system are used to operate the hose reel

when operated.

Hose reel system is a first aid fire fighting equipment and should only be used for initial stage of the

fire.

Note: Under no circumstance shall the hose reel be used for cleaning and washing other than the

purpose of the fire aid fire fighting.

Manual of operation

a. Turn on supply valve below hose reel drum

b. Run out the rubber hose

c. Direct the spray nozzle at the base of fire

d. Turn on the spray nozzle at the base of fire

e. After used, shut off the nozzle and roll back the rubber hose

f. Turn off the supply gate valves

Operation of Pump Sets

The hose reel piping is fully pressurized with water to a set pressure of the hose reel pump sets. The

system operates automatically using pressure sensor to operate the pump sets. Any fall in the

system pressure; sense by the pressure switches will automatically starts the pump sets. At a pre-set

pressure level of the pressure switches, the duty pump will cuts in the boost the pressure back to the

set pressure and to the achieved the design discharges pressure at the hose reel. However should the

pressure drop further the standby pump set will cuts in. The duty pump starts and stops

automatically but the diesel engine pumps starts automatically and manually stop by pressing the

stop lever at the engine.

Cut In Cut Out

Duty 65 psi 70psi

Standby 45psi 70psi

Page 136: BS 2 Group assignment example Building services-bangsar-village-1

Page 136 of 187

Standard Hose Compartment

Photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 137: BS 2 Group assignment example Building services-bangsar-village-1

Page 137 of 187

Measurement of Standard Hose compartment collected along corridor on site:

Standard Hose Compartment

Page 138: BS 2 Group assignment example Building services-bangsar-village-1

Page 138 of 187

Fire Hose Reel is located along the corridors and provided with about 40m of reinforced rubber

hose, so that maximum 800m2 of floor area are covered by one installation. A minimum delivery of

24l/min is recommended at the hose reel most distant from the source of water.

Hose Reel Specification:

The standard hose is made of reinforced PVC, marking pressure 10 bar, however Rubber hose also

available. The hose reel drum can be made to accommodate 120ft/ 36m.

Page 139: BS 2 Group assignment example Building services-bangsar-village-1

Page 139 of 187

Page 140: BS 2 Group assignment example Building services-bangsar-village-1

Page 140 of 187

BESTOBELL, TYPE OR204 Pressure Regulator

Page 141: BS 2 Group assignment example Building services-bangsar-village-1

Page 141 of 187

7. Portable Fire Extinguisher

Two type of fire extinguisher are provided in the building. The 9kg. ABC dry powder type

extinguisher for all type of fire and the 2.2kg. Co2 gaseous type extinguisher for the electrical

switch room.

Manual of Operation

Operation of the extinguisher is as follows:

1. Lift up extinguisher and direct discharge nozzle at fire source

2. Disconnect safety pin from the extinguisher lever

3. Pressed lever to discharge

Maintenance Procedure For Portable Fire Extinguisher

1. Check the ABC Dry Powder pressure gauge pressure, if the pressure is lower than required,

the cylinder should be refill.

2. Dismantle the portable CO2 fire extinguisher cylinder and weight the cylinder. If the net

content of CO2 gas is less than 2.2kg, the cylinders should be refilled.

[NFPA-10] Periodic inspection of fire extinguishers shall include a check of at

least the

following items

1. Location in designated place.

2. No obstruction to access or visibility.

3. Pressure gauge reading or indicator in the operable range or position.

4. Fullness determined by weighing or hefting for self-expelling-type extinguishers,

Cartridge-operated extinguishers, and pump tanks.

5. Operating instructions on nameplate and facing outward

6. Safety seals and tamper indicators not broken or missing.

7. Examination for obvious physical damage, corrosion, leakage, or clogged nozzle.

Page 142: BS 2 Group assignment example Building services-bangsar-village-1

Page 142 of 187

Photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 143: BS 2 Group assignment example Building services-bangsar-village-1

Page 143 of 187

(retrieved from https://www.osha.gov/SLTC/etools/evacuation/images/cutaway.jpg)

Page 144: BS 2 Group assignment example Building services-bangsar-village-1

Page 144 of 187

Reference of Portable Fire Extinguisher Elements

(retrieved from http://amerex-fire.com/wp-content/uploads/2011/11/05602-Manual-for-hand-portable-dry-chemical-extinguishers.pdf)

Page 145: BS 2 Group assignment example Building services-bangsar-village-1

Page 145 of 187

8. Lightning Protection: Emergency Light

3 hours back up provided throughout all general office areas and routes to fire exit. Exit lights are

maintained type. Emergency lights are non-maintained type. Lights in fire escape staircase are on

Emergency supply.

Photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 146: BS 2 Group assignment example Building services-bangsar-village-1

Page 146 of 187

Photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 147: BS 2 Group assignment example Building services-bangsar-village-1

Page 147 of 187

9. Fire Circuit Breaker

(images retrieved from http://www.tpub.com/doeelecscience/electrical%20science2_files/image1240.jpg)

(images retrieved from http://www.globalspec.com/ImageRepository/LearnMore/20138/circuit-breaker-

diagram162b6177daad4c8098896e8c80339fee.gif)

Page 148: BS 2 Group assignment example Building services-bangsar-village-1

Page 148 of 187

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 149: BS 2 Group assignment example Building services-bangsar-village-1

Page 149 of 187

10. Fire Rated Door

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 150: BS 2 Group assignment example Building services-bangsar-village-1

Page 150 of 187

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 151: BS 2 Group assignment example Building services-bangsar-village-1

Page 151 of 187

(images retrieved from http://www.tsscuae.com/sites/tsscuae.com/files/images/Fire%20rated%20door%20drawing.jpg)

Page 152: BS 2 Group assignment example Building services-bangsar-village-1

Page 152 of 187

(images retrieved from http://www.naffco.com/products/pr08/images/large/PR080104.jpg)

(images retrieved from http://i01.i.aliimg.com/img/pb/443/422/887/887422443_791.jpg)

Page 153: BS 2 Group assignment example Building services-bangsar-village-1

Page 153 of 187

(images retrieved from http://www.schuham.com/architectural-wood-doors/fire-rated-graphic.gif)

Page 154: BS 2 Group assignment example Building services-bangsar-village-1

Page 154 of 187

11. Fire Hydrant and Drainage

Based on our on site research, there are total 4 fire hydrants with drainage system about less than 20meter

away from the Bangsar Village Shopping Mall building.

Below are the images of fire hydrants being collected on site:

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 155: BS 2 Group assignment example Building services-bangsar-village-1

Page 155 of 187

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 156: BS 2 Group assignment example Building services-bangsar-village-1

Page 156 of 187

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 157: BS 2 Group assignment example Building services-bangsar-village-1

Page 157 of 187

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 158: BS 2 Group assignment example Building services-bangsar-village-1

Page 158 of 187

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 159: BS 2 Group assignment example Building services-bangsar-village-1

Page 159 of 187

(images retrieved from http://www.naffco.com/images/uploads/gallery/PR041201.jpg)

(Images retrieved from http://www.madehow.com/images/hpm_0000_0004_0_img0081.jpg)

Page 160: BS 2 Group assignment example Building services-bangsar-village-1

Page 160 of 187

(Images retrieved from

http://www.mcscs.jus.gov.on.ca/stellent/groups/public/@mcscs/@www/@ofm/documents/webasset/~export/ECOFM000453~2~MCSCS_DCT~MCSC

S_Layout_Template/176873-3.jpg)

Fire Hydrants Laws and Regulations

Duty of water authority to notify the State Director of any action affecting the flow of water to

a fire hydrant

24. Where a water authority decides to take any action or do any act or carry out any work that will

or is likely to reduce or stop the flow of water to any fire hydrant, it shall be the duty of the water

authority to notify the appropriate State Director in writing of such decision as soon as possible

after it is made.

Power to fix fire hydrant location plates

25.

(1) Upon giving seven days‟ notice in writing to the owner of any property situated in the vicinity

of a fire hydrant, the Director General may cause a plate indicating the location of the fire hydrant

to be fixed to such part of the property as, in the opinion of the Director General, is best suited to

indicate such location.

(2) Any person who refuses to allow the fixing of any such plate as is referred to in subsection (1)

or obstructs any person in the course of the fixing thereof or removes or defaces any such plate after

it has been fixed shall be guilty of an offence.

Concealment and misuse of fire hydrants

26. Any person who covers up, encloses, or conceals any fire

hydrant so as to render its location difficult to ascertain, or tampers with any fire hydrant, or uses a

fire hydrant other than for fire fighting purposes shall be guilty of an offence.

Page 161: BS 2 Group assignment example Building services-bangsar-village-1

Page 161 of 187

12. Fire Alarm Panel

The Fire Alarm Panel is manufactured in accordance to MS 1404 Part 4 (1996) and to local CIFS

requirements. The panels can come in various ranges from 2 zones to over 200 zones depending on

building requirements. Usually MIMIC comes along with the panel to show the location of the

Alarmed Zones.

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 162: BS 2 Group assignment example Building services-bangsar-village-1

Page 162 of 187

(retrieved from http://www.wit-dvr.com/bosch/fire/manualcallpoint.pdf)

Manual Call Point

The surface mounting box and semi-flush pat tress box spacer are available as accessories.

Additional plastic test keys are available in packs of ten. Spare glasses for all units that require glass

are also available in packs of ten. A set of weather resistant gaskets is available separately to

facilitate installations of the 1195 range in external locations.

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 163: BS 2 Group assignment example Building services-bangsar-village-1

Page 163 of 187

Dimension of call point: 88mm X 88mm; Surface 55mm, Flush 20mm

Data collected from Fire Protection Operation Manual at Bangsar Village Shopping Mall

Page 164: BS 2 Group assignment example Building services-bangsar-village-1

Page 164 of 187

The Test Key

Inserted at base of call point, for easy testing

without breaking glass. Spare test keys available in

packs of 10.

(image retrived from http://thumbs2.ebaystatic.com/m/mwvZNnvLYEKvNlDzE7jOZMA/140.jpg)

A Weather Resistant Kit

Allowing 1195 to be used externally

providing weather resistance to IP54

(image retrived from http://thumbs2.picclick.com/d/w1600/pict/261175440885_/2-x-Manual-Call-Point-Surface-Weather-

Resistant.jpg)

4114 General Purpose Call Point

For other emergency systems such

as Poolside drowning alarms or

chemical Spillage warnings the plain

yellow 4114 actuation point is

available

(image retrived from

http://www.yesss.co.uk/images/products/related/1377190

262-03377300.jpg)

Page 165: BS 2 Group assignment example Building services-bangsar-village-1

Page 165 of 187

Gent Model 505 Dome Bell

The Gent bell with gong diameter 152mm (6‟‟) is designed and used to produce a loud, clear ring. It

is elegantly styled, high quality bells, rugged enough for most arduous conditions. The simple

fixing method, by means of a universal back plate reduces installation costs. This model has a black

polycarbonate base and cover with an enamel gong available in red as standard.

505 type bell is 24VDC type. When the bell is operated at the lower end of each range, it will take

the minimum current consistent with adequate volume. Alternatively, when operated at the upper

end of each range. It will provide the maximum volume.

The back plate is designed to be fixed and wired before the main body of the bell is attached to it.

Wiring entry is by 20mm dia. Entry in the centre of the back plate, knockouts are provided to suite

the majority of standard conduit box fixings. Cable connections are made to a shrouded socket

integral with the backplate. The socket automatically mates with a corresponding plug in the main

body of the bell when the two parts are assembled.

505 is designed to be used in weather resistant applications to without modifications; however, an

appropriate standard weather resistant conduit box should be used for mounting the bell.

Specifications:

Base and cover – Dust and dirt resistant. High impact resistant polycarbonate

Gong – Pressed steel

Size – 152mm(6‟‟)

Finish – Gong-stove enamelled red. Base and cover-moulded in black

Polycarbonate

Cable Entry – 20mm diameter hole in black plate

Terminals – To accommodate two 1.5mm2 cables with plug and socket

arrangement for base and bell body

Current

Consumption – 150mA at 24Vdc

Sound Output – 90dB (at 1M)

Page 166: BS 2 Group assignment example Building services-bangsar-village-1

Page 166 of 187

(image retrived fromhttp://www.edwards-signals.com/index.cfm?pid=235&level=92)

(image retrived from http://www.demcoalarm.com/images/dome%20bell_banner.jpg)

Page 167: BS 2 Group assignment example Building services-bangsar-village-1

Page 167 of 187

2.4.4.2 Passive Fire Protection System:

1. Emergency Escape Corridor

2. Emergency Staircase ,Stairwell and staircase design

3. Gathering Space (Assembly Space) and

Evacuate Circulation

4. Sign, Warnings

Page 168: BS 2 Group assignment example Building services-bangsar-village-1

Page 168 of 187

1. Emergency Escape Corridor

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 169: BS 2 Group assignment example Building services-bangsar-village-1

Page 169 of 187

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 170: BS 2 Group assignment example Building services-bangsar-village-1

Page 170 of 187

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 171: BS 2 Group assignment example Building services-bangsar-village-1

Page 171 of 187

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 172: BS 2 Group assignment example Building services-bangsar-village-1

Page 172 of 187

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 173: BS 2 Group assignment example Building services-bangsar-village-1

Page 173 of 187

2. Emergency Staircase ,Stairwell and staircase design

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 174: BS 2 Group assignment example Building services-bangsar-village-1

Page 174 of 187

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 175: BS 2 Group assignment example Building services-bangsar-village-1

Page 175 of 187

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 176: BS 2 Group assignment example Building services-bangsar-village-1

Page 176 of 187

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 177: BS 2 Group assignment example Building services-bangsar-village-1

Page 177 of 187

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

One good example can learnt from the site is that how does the management keeps the record of

the staircase condition with a staircase log book.

Page 178: BS 2 Group assignment example Building services-bangsar-village-1

Page 178 of 187

3. Gathering Space (Assembly Space) and Evacuate Circulation

Bangsar Village Shppping Mall Floorplan

Page 179: BS 2 Group assignment example Building services-bangsar-village-1

Page 179 of 187

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Fire Escape Route

Fire Escape Route

Page 180: BS 2 Group assignment example Building services-bangsar-village-1

Page 180 of 187

Assembly Place

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 181: BS 2 Group assignment example Building services-bangsar-village-1

Page 181 of 187

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Under UBBL 1984 Section 189: Enclosing means of escape in certain building.

1. Every staircase provided under these By-Laws in a building where the highest floor is more than

1200mm above the ground level, or in any place of assembly, or in any school when such staircase

is used as an alternative means of escape shall be enclosed throughout its length with fire resisting

materials.

2. Any necessary openings, except openings in external walls which shall not for the purpose of this

by-law include wall to air wells, in the length of such staircase shall be provided with self-closing

doors constructed of the fire resisting materials.

4. Signs and Warnings

Emergency Exit signage is responsible in showing the way to safety outdoor area or assembly area.

It is an effective guidance tool and helped to reduce panic of people behavioral during fire by

giving a clear directional system. These sign must always light in case of necessity. The letters are

standardized and sufficiently big to be seen and green in color to be more visible to people. In

Malaysia, the emergency exit signage is written in Malay “KELUAR”, which its meaning is EXIT.

Under UBBL 1984 Section 172:

1. Storey exits and access to such exits shall be marked by readily visible signs and shall not obscure

by any decoration, furnishings or other equipment.

Fire Escape Route

Page 182: BS 2 Group assignment example Building services-bangsar-village-1

Page 182 of 187

2. A sign reading “KELUAR” with an arrow indicating the direction shall be placed in every location

where the direction of the travel to reach the nearest exit is not immediately apparent.

3. Every exit sign shall have the word “KELUAR” in plainly legible letters not less than 150m high

with the principal stokes of the letters not less than 18mm wide. The lettering shall be in red against

a black background.

4. All exit signs shall be illuminated continuously during periods of occupancy.

5. Illuminated signs are provided with two electric lamps of not less than fifteen watts each.

Page 183: BS 2 Group assignment example Building services-bangsar-village-1

Page 183 of 187

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

2.4.4 Potential Hazards: Human Fault

Page 184: BS 2 Group assignment example Building services-bangsar-village-1

Page 184 of 187

Human Fault

According to our research at the selected site, we found out that the potential of fire hazards around

the building as shown in the images below:

Page 185: BS 2 Group assignment example Building services-bangsar-village-1

Page 185 of 187

photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 186: BS 2 Group assignment example Building services-bangsar-village-1

Page 186 of 187

Improper management of waste photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Objects become obstacles to the path. photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Most of the potential causes are the improper management of material and waste. The improper

placement of object at fire escapes corridor and staircases also considered as one of the potential

hazard to increase the difficulty of the user to escape from the building.

Page 187: BS 2 Group assignment example Building services-bangsar-village-1

Page 187 of 187

Improper management of material and waste photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 188: BS 2 Group assignment example Building services-bangsar-village-1

Page 188 of 187

Placement of material that easily ignited on fully filled diesel tank. photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Blockage of fire escape path. photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 189: BS 2 Group assignment example Building services-bangsar-village-1

Page 189 of 187

Misplacement of object around Fire Hose Compartment photographed by Yong Yih Tyng at Bangsar Village Shopping Mall.

Page 190: BS 2 Group assignment example Building services-bangsar-village-1

Page 190 of 187

Objects become obstacles to the fire escape path. Not enough space to pull out hose photographed by Yong Yih Tyng at Bangsar Village Shopping

Mall.

Page 191: BS 2 Group assignment example Building services-bangsar-village-1

Page 191 of 187

2.4.4 CONCLUSION

Fire is unavoidable and unpredictable event that it takes away precious life. Thus, at design decision

stage, designer, Architects or Engineer should take serious consideration in account of how to

reduce the risk of death by providing the user a survival route and equipment during emergency.

Fire protection system must be planned will before execute to ensure that the system is functioning

well or else it will be the waste of space, and at the worst, not able to save lives but become one of

the culprit of death in fire.

Most of the time, the causes of fire is due to human ignorance about the rules and regulation and

poor maintenance of the site. It is important to take in consideration of how to perform a well

maintenance system after the fire protection system is being designed.

Page 192: BS 2 Group assignment example Building services-bangsar-village-1

Page 192 of 187

3.0 Overall Summary

In conclusion, it is important for designers to understand well about the significance of Building

Service to provide a safety, comfortable and efficient environment to the users. Building services

function to accommodate the needs of the users. It is a network of systems working together in

unity to enhance the experience of the users within a building.

Page 193: BS 2 Group assignment example Building services-bangsar-village-1

Page 193 of 187

4.0 Reference List

1. MFS.SA.GOV.AU SAMFS :: Fire Fighting Systems and Equipment in Buildings

In-text: (Mfs.sa.gov.au, 2014)

Bibliography: Mfs.sa.gov.au, (2014). SAMFS :: Fire Fighting Systems and Equipment in

Buildings. [online] Available at:

http://www.mfs.sa.gov.au/site/community_safety/commercial/building_fire_safety/fire_fighting_sy

stems_and_equipment_in_buildings.jsp [Accessed 20 Sep. 2014].

2. ESSAYS, U. Analysing Fire Regulation In Malaysia Engineering Essay

In-text: (Essays, 2014)

Bibliography: Essays, U. (2014). Analysing Fire Regulation In Malaysia Engineering Essay.

[online] Ukessays.com. Available at: http://www.ukessays.com/essays/engineering/analysing-fire-

regulation-in-malaysia-engineering-essay.php [Accessed 20 Sep. 2014]

3. WBDG.ORG Fire Protection | Whole Building Design Guide

In-text: (Wbdg.org, 2014)

Bibliography: Wbdg.org, (2014). Fire Protection | Whole Building Design Guide. [online]

Available at: http://www.wbdg.org/design/fire_protection.php [Accessed 20 Sep. 2014].

4. Audit Commission Hong Kong, Architectural Services Department Installing building services

systems in government buildings, 25 October 2010

(Retrieved from http://www.aud.gov.hk) Retrieved October, 8th, 2014

5. Definition of Building Services http://en.wikipedia.org/wiki/Building_services_engineering Retrieved October, 8th, 2014

6. Definition of Fire Protectionhttp://en.m.wikipedia.org/wiki/Fire_protection/ Retrieved October,

8th

2014

7. http://bp1.blogger/com/ Retrieved October, 8th

2014

8. Lai, T. (2013, February 19). Air Conditioning 6 - Fan Coil Unit (FCU). Retrieved from

Youtube: https://www.youtube.com/watch?v=QI0O5xZ3liI

9. lhai_rn_2007. (2010, October 20). AHU vs FCU. Retrieved from

Scribd.:https://www.scribd.com/doc/39699597/AHU-vs-FCU

10. perfect-home-hvac-design. (2009-2013). HVAC FOR BEGINNERS. Retrieved from perfect-home-

hvac-design: http://www.perfect-home-hvac-design.com/hvac-for...

11. Wikipedia. (2014, October 1). Fan coil unit. Retrieved from Wikipedia, the free

encyclopedia: http://en.wikipedia.org/wiki/Fan_coil_unit#Areas_of_use 12. Malaysian Standard 1525. (2007). 1st ed. [ebook] Available

at:http://www.utm.my/energyma.../files/2014/07/MS-1525-2007.pdf [Accessed 10 Oct. 2014].

13. Parsnow, J. (2014). HFC-134a AN IDEAL REFRIGERANT. 1st ed. [ebook] Available

at: http://dms.hvacpartners.com/docs/1001/public/05/wp028.pdf[Accessed 3 Oct. 2014].

14. Shea, R. (2014). How does a chiller system work? - Automation Technology US - Siemens. [online]

Industry.usa.siemens.com. Available at:http://www.industry.usa.siemens.com/.../how-does-

a... [Accessed 5 Oct. 2014].

15. Thomas, V. (2002). Chiller Plant Design | Energy-Models.com. [online] Energy-models.com.

Available at: http://energy-models.com/chiller-plant-design[Accessed 2 Oct. 2014].

16. Vafusa.com, (2014). Cooling Tower Filtration Application. [online] Available

at:http://www.vafusa.com/app-cooling-tower.htm [Accessed 10 Oct. 2014].

Page 194: BS 2 Group assignment example Building services-bangsar-village-1

Page 194 of 187

Book and Journal

1. Walter T. Grondzik, Alison, Benjamin, John S,Chapter 24 Mechanical and Electrical Equipment

For Buildings, eleventh edition, 2010

2. LAWS OF MALAYSIA Act 341FIRE SERVICES ACT 1988

3. Random House Kernerman Webster‟s College University, copyrights 2010 K Dictionaries Ltd.

Copyright 2005, 1997, 1991 by Random House, Inc. All rights reserved.

4. Colt Seefire Natural Louvred Ventilator. Technical Data Sheet certified to EN 12101-2: 2003

5. Case studies: Stardust Nightclub Fire, Ireland, February 13, 1981. Fahy,R.F.;Proulx, G. ,‟Panic‟ and

human behaviour in fire, 13th

July 2009

6. Case Studies: Gothenburg Discotheque Fire, Sweden, October 29, 1998; Fahy,R.F.;Proulx,

G. ,‟Panic‟ and human behaviour in fire, 13th

July 2009

7. Fire Safety Risk Analysis Life Safety and property protection guidance framework (FPA, 2003)

8. Alternating current. (2014, July 10). Retrieved October 8th, 2014.

9. Battery (electricity). (2014, January 10). Retrieved October 8, 2014.

10. Bus bar. (n.d.). Retrieved October 8, 2014.

11. Bus coupler. (2014, March 9). Retrieved October 8, 2014.

12. Chapter 8. (n.d.). Retrieved October 8, 2014.

13. Distribution switchboards. (n.d.). Retrieved October 8, 2014.

14. Electrical Bus Duct Components. (2011, January 20). Retrieved October 8, 2014.

15. Electrical Power Transmission and Distribution System. (n.d.). Retrieved October 8, 2014.

16. Google. (n.d.). Retrieved October 8, 2014.

17. Hanson, K., & Fritsky, L. (2014, September 11). Retrieved October 8, 2014.

18. Introduction to Emergency Lighting. (n.d.). Retrieved October 8, 2014.

19. Jonathan, F. (2008). Electrical System. In Building automation: Control devices and applications.

Homewood, Ill.: American Technical.

20. (n.d.). Retrieved October 8, 2014.

21. Tenaga Nasional. (2014, September 24). Retrieved October 8, 2014.

22.

Other

1. Interviews

2. Fire Protection System Operation Manual at Bangsar Village Shopping Mall