Bryan dairy progress 6-13-11
-
Upload
nathanwolf007 -
Category
Documents
-
view
201 -
download
0
description
Transcript of Bryan dairy progress 6-13-11
![Page 1: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/1.jpg)
March 1, 2011
1
Future Corporate Office & Production Facility For PrimeNet Direct Marketing Solutions
7320 Bryan Dairy Road, Largo, FL 33777
![Page 2: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/2.jpg)
March 9, 2011
Future Data Production
Future Production Floor
2
Future Home of Account Management Cubicles
Future Production Floor
Future Production Floor Future Data Center & Hand Assembly Areas
![Page 3: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/3.jpg)
March 29, 2011
Future Front Entrance
Front Office’s Have All Been Framed
Break Room
3
Parking Lot Break Room
Front Office’s Have All Been Framed
![Page 4: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/4.jpg)
March 29, 2011
Production Floor
Secure Storage Area/Fulfillment/Machine
Shop
Fire Alarms – Have Been Installed
4
Production Floor Production Floor
Secure Storage Area/Fulfillment/Machine
Shop
![Page 5: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/5.jpg)
March 29, 2011
Demolition Begins
Future Home of Receptionist Office
Future Home of Training Room – Front Office
5
Future Home of Prepress Department
Front Office Corridor – Seen From Lobby
Conference Room – Front Office
![Page 6: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/6.jpg)
March 29, 2011
Demolition Continues
Future Home of Data Processing & Laser Setup
Future Home of Art Department
6
Future Home of Account Management Cubicles
Front Lobby
Future Home of Art Department
![Page 7: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/7.jpg)
April 4, 2011
Future Home of ClientConference Room
Production Floor BuildBlocks for Data Center
7
Break Room Hallway leading to Prepress, Art Department, Laser Offices
& Production
Production Floor – Future home of
Heidelberg's
![Page 8: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/8.jpg)
April 4, 2011
The new building is hurricane category 3
(CAT 3) certified. Inside of the building, we
are using BuildBlock insulating concrete
forms to build the data center, which will
also be Cat 3 certified. It’s an enclosed
structure within the Brian Dairy facility. The
cement block walls and ceiling are reinforced
by rebar and filled with a special waterproof
material.
8
Our state of the art Data Center will be made with
![Page 9: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/9.jpg)
April 6, 2011
Future home of Heidelberg's
BuildBlocks for Data Center
New Heidelberg Offset Press
9
Production Floor Production Floor
BuildBlocks for Data Center
![Page 10: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/10.jpg)
April 6, 2011
Future Home of Data Processing & Laser Setup
Marking The Locations Of The New Heidelberg
Presses 10
Future Home of Heidelberg Presses
Production Floor Production Floor
Future Home of Laser Production – 4 HLC Lasers
![Page 11: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/11.jpg)
April 13, 2011
Double Checking The Location Of The Two Heidelberg Presses
11
The Cement Is Going To Be Cut To Put In Steel Rebar Footings To With Stand The Weight Of The Presses
![Page 12: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/12.jpg)
April 13, 2011
Beginning To Cut The Cement For The New Presses
12
Wetting The Cement For The Cut!
The First Cut Has been Made!
![Page 13: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/13.jpg)
April 19, 2011
The Cement Has Been Cut For The Future Home Of Our New Presses
13
![Page 14: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/14.jpg)
April 19, 2011
Data Center Walls Have Arrived
Lots Of BuildBlock For The Walls Of The Data Center
14
Unpacking Of The Walls 1st Five Feet Of Data Center Walls Are Going
Up!
![Page 15: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/15.jpg)
April 19, 2011
Account Management Cubicles
New Heidelberg Press
15
Steel Rebar Is In Place For The Footings Of The Cement For The Heidelberg Press
Entrance to Offices From Production Floor
![Page 16: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/16.jpg)
April 27, 2011
Future home for 2 Xerox iGen, 4 Xerox HLC printers
Steel Rebar Is In Place To Secure The BuildBlocks Used To Build The Walls Of The Data Center
Future Home of Data Center Offices
16
The Cement Has Been Poured For The Heidelberg Presses.
![Page 17: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/17.jpg)
April 27, 2011
Entrance To The Data Center
Receiving Dock
17
The 1st Five Feet Of The Data Center Walls Are Stabilized Until The Cement Is Dry
Laser
![Page 18: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/18.jpg)
April 29, 2011
Old Data Center – Future Storage
Inside Of The Data Center, The 2nd 5 Feet of BuildBlocks Have Been Installed And Are Stabilized Until The Cement Is Dry.
18
Account Management Data Center Offices
![Page 19: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/19.jpg)
April 29, 2011
See The Cement IN The Walls Of The Data Center?
Data Center Walls Data Processing & Laser Setup
19
Data Center Walls Are Stabilized Until Cement Is Dry
Laser Production – location of future HLC
Printers
![Page 20: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/20.jpg)
May 3, 2011
Data Center Interior
1st Shift Production Supervisor Office
Future Home of Hand Assembly Area
20
USPS & Production Offices Data Center Interior
Future Home of Hand Assembly Area
![Page 21: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/21.jpg)
May 4, 2011
Heidelberg Slabs waiting for cement pour for wiring
21
![Page 22: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/22.jpg)
May 11, 2011
View Of The Cement Data Center Walls
USPS & Production Offices
22
Getting The Ceiling Rods In Place To Finalized The Data Center
Data Center
![Page 23: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/23.jpg)
May 13, 2011
Account Management Cubicles
Future home of Account Management
Laser Department
23
Production Looking At Hand Assembly Area
Future Home of Training Room
Outside of Data Center
![Page 24: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/24.jpg)
May 13, 2011
Future Offices of Purchasing and
Accounting
24
Roof of Data Center
![Page 25: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/25.jpg)
May 16, 2011
Data Production & Laser Setup
Wood for Machine Shop Tables
Hand Assembly Area
25
Production Area Production Area
Hand Assembly & Staging Areas
![Page 26: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/26.jpg)
May 16, 2011
Outside of Data Room Next to Account
Management
Air Conditioning Duct Installation?
Future Home of Account Management
26
Data Center Construction Data Center Construction
Entrance To Data Center
![Page 27: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/27.jpg)
May 16, 2011
From Offices Corridor
27
Flooring Tiles
![Page 28: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/28.jpg)
May 17, 2011
Inside of Hand Assembly Area
Account Management Hand Assembly Area
28
Outside of Data Room before Hand Assembly
Built
Outside of Data Room before Hand Assembly
Built
Data Center Interior w/cuts for the UPC’s
![Page 29: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/29.jpg)
May 20, 2011
Building Supplies
Going Into Lettershop From Account Managers
Area
Hand Fulfillment AreaWalls & Floor In Process
29
Future Warehouse Area More Building Supplies
Heidelberg Press Slab before concrete pour for
wiring
![Page 30: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/30.jpg)
May 20, 2011
Handroom
Old Server Room Being Converted to Storage
30
Data Center Data Center
Account Management
![Page 31: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/31.jpg)
May 24, 2011
Break Room
31
Training Room
Hand Assembly Looking into the training room and IT
Installation of New Heidelberg Presses
![Page 32: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/32.jpg)
May 24, 2011
32
Pipe Drain For PressesData Center Training Room
![Page 33: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/33.jpg)
May 27, 2011
33
Laser Room
![Page 34: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/34.jpg)
June 1, 2011
New Heidelberg Press
Air Pump For Press Secured Storage Area
34
Wiring For Our House Compressed Air
Air Distribution In Room
Hallway Looking Into Laser
![Page 35: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/35.jpg)
June 3, 2011
Break Room
Front Entrance Accounting Office Getting Carpet
35
Account Services Installation Sound
Proofing The Ceiling
Data Center
Account Services
![Page 36: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/36.jpg)
June 3, 2011
Voltage converter for new Heidelberg press
Production
36
Hand Room Hand Room
Air Conditioning Into Data Center
High Ceiling In Hand Room
![Page 37: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/37.jpg)
June 3, 2011
Creative Services Pffice
Laser Room Pre Press
37
Production Floor Production Floor
Data Production
![Page 38: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/38.jpg)
June 3, 2011
Visitor Entrance
Front Office Hallway Sales Conference Room
38
Board Room Looking Into Visitor Lobby
Board Room
Data Production
![Page 39: Bryan dairy progress 6-13-11](https://reader036.fdocuments.us/reader036/viewer/2022062703/5555cc6dd8b42aaf158b4adc/html5/thumbnails/39.jpg)
June 3, 2011
Data Production
Heidelberg Press Ready To Go
President’s Office
39
Laser Room Training Room
Break Room