BRVFD & RS Training Facility Proposal

05/07/2009

Page 2: BRVFD & RS Training Facility Proposal 05/07/2009.

Current Problem

• The BRVFD & RS does not have adequate facilities to properly deliver a training program worthy of our membership.

– The current practice of utilizing existing facilities is not practical nor cost effective.

Page 3: BRVFD & RS Training Facility Proposal 05/07/2009.

Training Facility Proposal

• To enhance the BRVFD & RS training program by converting the existing Rental House to a Training Facility that can be utilized for classroom instruction, practical evolutions and office space.

Page 4: BRVFD & RS Training Facility Proposal 05/07/2009.

Needed Repairs / Remodeling Inside

• Walls– Remove wall coverings

throughout

– Remove wall between Bedroom 1 and Living Room

– Insulated, Drywall, Finished, Painted

Page 5: BRVFD & RS Training Facility Proposal 05/07/2009.

Needed Repairs / Remodeling Inside

• Floors– Commercial Grade

Tile Glued

Page 6: BRVFD & RS Training Facility Proposal 05/07/2009.

Needed Repairs / Remodeling Inside

• Bathroom– Remove Tub, New

Toilet, Urinal

Page 7: BRVFD & RS Training Facility Proposal 05/07/2009.

Needed Repairs / Remodeling Inside

• Kitchen– New sink, counter top,

and 2 new wall cabinets

– Hot water heater

Page 8: BRVFD & RS Training Facility Proposal 05/07/2009.

Needed Logistics

• 25 classroom chairs

• Projector screen

• 6 folding tables

• Lighting– Install 3’x4’ fluorescent lights in classroom area

Page 9: BRVFD & RS Training Facility Proposal 05/07/2009.

• Remove trees and shrubs

• Remove fence between station and training facility

• Install sidewalk between station parking lot and training facility

• Install 30’ x 30’ x 6” concrete pad for extrication drills.

Needed Repairs / RemodelingOutside

Page 10: BRVFD & RS Training Facility Proposal 05/07/2009.

Concept Upon Completion

Page 11: BRVFD & RS Training Facility Proposal 05/07/2009.

Before and After

• Trees and shrubs removed• Fence Removed• Sidewalk to Station Parking Lot• Concrete Pad in rear for extrication drills

Page 12: BRVFD & RS Training Facility Proposal 05/07/2009.

Cost / Budget Request

• Various rough estimates indicate that approximately $20,000.oo is needed to complete this project.

• Work would begin immediately upon approval and required bid submissions.

• Some work would be done in-house.

Page 13: BRVFD & RS Training Facility Proposal 05/07/2009.

Questions / Comments ?