Brookfield Commercial Operations Work Health and Safety ...

26
Revision Date: June 2015 Page 1 of 26 14.SC.RC.Contractor Induction Handbook - Bishops See Brookfield Commercial Operations Work Health and Safety Induction Handbook All contractors must complete the Brookfield Corporate Induction Online via SASSI prior to commencing the site specific induction. Prepared by: Gary Samuel Date: 12 June 2015 Approved by: Amanda Vella Version: 1.3

Transcript of Brookfield Commercial Operations Work Health and Safety ...

Revision Date: June 2015 Page 1 of 26 14.SC.RC.Contractor Induction Handbook - Bishops See

Brookfield Commercial Operations Work Health and Safety

Induction Handbook

All contractors must complete the Brookfield Corporate Induction Online via SASSI prior to commencing the site

specific induction.

Prepared by: Gary Samuel Date: 12 June 2015 Approved by: Amanda Vella Version: 1.3

14.SC.RC.Contractor Induction Handbook - Bishops See

Revision Date: June 2015 Page 2 of 26 14.SC.RC.Contractor Induction Handbook - Bishops See

Table of Contents 1.  INTRODUCTION ........................................................................................................................................... 4 

1.1.  Welcome .................................................................................................................................................. 4 2.  FACILITY DESCRIPTION .......................................................................................................................... 4 

2.1.  Description of Facilities ....................................................................................................................... 4 3.  ACCESS AND SECURITY ......................................................................................................................... 4 4.  HOURS OF OPERATION .......................................................................................................................... 4 5.  HOUSE RULES ............................................................................................................................................. 5 6.  PERMIT PROCEDURES ............................................................................................................................ 5 

6.1.  Work Request ........................................................................................................................................ 5 6.2.  Authority to Dig or Core ...................................................................................................................... 6 6.3.  Building Maintenance Unit ................................................................................................................. 6 6.4.  Confined Space Entry.......................................................................................................................... 6 6.5.  Fire Impairment ..................................................................................................................................... 7 6.6.  Hot Work and/ or Dust Work Permit ............................................................................................... 7 6.7.  Working at Heights and Risk of Fall ................................................................................................ 7 6.8.  Lock out Tag out Register .................................................................................................................. 9 

7.  DELIVERY AND REMOVAL OF EQUIPMENT AND MATERIALS ........................................... 10 7.1.  Materials Deliveries ............................................................................................................................ 10 7.2.  Cleaning Up and Removal of Debris ............................................................................................ 10 

8.  EMERGENCY EVACUATION PROCEDURES ................................................................................ 11 8.1.  General ................................................................................................................................................... 11 8.2.  Personal Emergency Evacuation Plans ...................................................................................... 11 8.3.  Emergency Alarm Response .......................................................................................................... 12 8.4.  Reporting an Emergency or Incident ............................................................................................ 12 8.5.  First Aid .................................................................................................................................................. 12 8.6.  Spill Response ..................................................................................................................................... 12 

9.  OCCUPATIONAL HEALTH AND SAFETY ....................................................................................... 13 9.1.  Brookfield Commercial Operations Risk Register .................................................................... 13 9.2.  Contractor Obligations ....................................................................................................................... 13 9.3.  Worksite Control .................................................................................................................................. 13 9.4.  Hazardous Substances ..................................................................................................................... 13 9.5.  Light and Power .................................................................................................................................. 14 9.6.  Residual Current Devices ................................................................................................................ 14 9.7.  Manuals .................................................................................................................................................. 14 

10.  ENVIRONMENTAL RESPONSIBILITIES ........................................................................................... 14 11.  SITE SPECIFIC RISK REGISTER ........................................................................................................ 16 12.  SITE SPECIFIC RISK REGISTER ........................................................................................................ 20 14.  CONFINED SPACE _ RESTRICTED ACCESS REGISTER ........................................................ 25 

14.SC.RC.Contractor Induction Handbook - Bishops See

Revision Date: June 2015 Page 3 of 26 14.SC.RC.Contractor Induction Handbook - Bishops See

Contact Details

235 St Georges Terrace Address: 235 St Georges Terrace, Perth WA 6000 Telephone: +61 8 9486 8826 Facsimile: +61 8 9486 1316

Name: Position: Email: Phone: Gary Samuel

Adam New

Facilities Manager

Senior Facilities Manager

[email protected]

[email protected]

Mob: +61 407 380 631

Mob: +61 404 621 279

Head Office Brookfield Commercial Operations Pty Ltd Address: Level 22, 135 King Street, Sydney NSW 2000 Telephone: +61 2 9322 2000 Facsimile: +61 2 9322 2001

14.SC.RC.Contractor Induction Handbook - Bishops See

Revision Date: June 2015 Page 4 of 26 14.SC.RC.Contractor Induction Handbook - Bishops See

1. INTRODUCTION

1.1. Welcome Welcome on behalf of Brookfield Commercial Operations to the site induction for 235 St Georges Terrace. A general list of instructions and rules that must be observed at all times follow in this document. Non-compliance with these instructions and rules may leave the contractor subject to a stop work order and/or liability for costs incurred. All instructions and rules are set out for the protection of stakeholders, who may be placed at risk by any failure to observe the requirements of this induction.

2. FACILITY DESCRIPTION 2.1. Description of Facilities

Brookfield Commercial Operations and Hawaiian are very pleased to welcome your company to 235 St Georges Terrace, Perth (the Property). The Property comprises a nine storey office tower set amongst the historic Bishops See Gardens. The property fronts St Georges Terrace and Spring Street and is easily accessible by public transport. The Property has been awarded a 5 Star Green Star Office V2 Design rating by the Green Building Council Australia, the first 5 star awarded for a new building in Western Australia. This document will explain how you as a building user can assist to maximise occupant wellbeing and reduce the environmental impact of tenants and their operations within the building.

3. ACCESS AND SECURITY Contractors are only granted access to the site on the condition that they meet and abide by all OHS&E requirements for the site at all times. All contractors are required to complete the site access safety sign in (SASSI) induction prior to gaining entry to the site and log out prior to disembarking from the site. The SASSI terminal is located outside the Building Management office located at the loading dock on Basement Level 4. Contractors are only to enter and/or exit the site from Spring Street and report via the Building Management office located adjacent the loading dock on Basement 4. At all times contractors are to display valid identification as issue via the SASSI management system. Identification shall include but is not limited to general identification, OHS inductions, trade certificates & qualifications. Contractors may also require police clearance before accessing this site. Should access through the SASSI system be denied the contractor is required to report to the Facility Manager to resolve any discrepancy. The Facility Manager is located on Basement level 4 in the Loading Dock area. Security can provide assistance in the absence of the Facilities Manager.

4. HOURS OF OPERATION Business hours for 235 St Georges are between 07:30 and 18:00 Monday to Friday, excluding public holidays. If access is required outside of these hours, the contractor is required to ensure approval is obtained from the Brookfield Commercial Operations Facilities Manager prior the date; ensure all permit requests (e.g. access, hot work, etc.) are submitted to the Brookfield Facilities Manager two business days before the work is due to commence; and ensure permits, work orders, etc., are collected from the Brookfield Commercial Operations Facilities Manager prior to commencing any work on site.

14.SC.RC.Contractor Induction Handbook - Bishops See

Revision Date: June 2015 Page 5 of 26 14.SC.RC.Contractor Induction Handbook - Bishops See

5. HOUSE RULES

The contractor must not in any way obstruct or permit the obstruction of the pavement, forecourt, entry, arcade, vestibules, corridors, passages, halls, elevators, stairways, landings, fire doors and escape doors relating to the Building or use them or any of them for any other purpose than for ingress and egress. Where work is being carried out this will be cordoned off in conjunction with the JSA and by liaison with the site facilities manager or security supervisor.

All rubbish created by the contractor must be removed from site. The contractor is not permitted to use the waste bin facilities on site.

Smoking is not permitted within the premises and the immediate vicinity of the Building. No music is to be played whilst working on site. All contractors must be courteous and polite to all tenants, members of the public and the

management. Any issues which may occur must be reported to the facilities manager. The goods lift must be booked in advance for bulky deliveries and can only be used between

07:00 – 08:30, 09:30 – 12:00, and 14:00 – 16:00. All goods (materials, tools, equipment, substances and debris) must be delivered and removed

from 235 St Georges Terrace in a safe manner. Contractors must be responsible for the safety and security of their equipment and materials. No goods are to be left unattended or be left in a manner that could pose a safety or environmental concern

The Contractor must ensure that damage to the building, fixtures and fittings is avoided during the handling of any goods or materials. The Contractor is responsible for any damage arising from their handling of any goods or materials.

The loading dock is controlled by the management office and concierge from 07:00 to 18:00 - Monday to Friday. Access to the loading dock outside these hours may be arranged by providing 48 hours’ notice. Large deliveries must be scheduled in advance, the time and procedure approved by Building Management. There is a maximum waiting time of 15 minutes. If the delivery is expected to take longer, then permission must be obtained from Building Management.

All deliveries are to be made via the loading dock and goods lift. Passenger lifts may not be used for deliveries.

The goods lift size is 2600 x 1500 x 2400mm high with door opening 1400mm. Maximum load capacity is 2000kg. The roof can be removed to the goods lift and extend the height to 3400mm. No deliveries (other than hand held items) are to be made through the main door. Trolleys are not permitted in these areas under any circumstances.

Loading dock height clearance is 3.2 metres with restrictions applied, and drivers are required to check prior to driving their vehicles into the building.

6. PERMIT PROCEDURES

6.1. Work Request Contractors, and their workers, are required to complete a Work Request Form and the appropriate permits (e.g. Hot Work Permit, as witnessed within the Online Induction) before commencing work within the site. This documentation will be provided to Contractors on site by the Facilities Manager. Contractors are to ensure that a minimum notice period of two business days applies to requests for the following permits and MUST provide all required documentation prior to commencement: 1. Authority to dig or core in designated area 2. Building Maintenance Unit 3. Confined Space Entry 4. Fire Impairment

14.SC.RC.Contractor Induction Handbook - Bishops See

Revision Date: June 2015 Page 6 of 26 14.SC.RC.Contractor Induction Handbook - Bishops See

5. Hot and / or Dust Work 6. Working at Heights ALL CONTRACTORS MUST PROVIDE SAFE WORK METHOD STATEMENTS (SWMS) PRIOR TO WORK IN ANY OF THE ABOVE AREAS

6.2. Authority to Dig or Core The contractor is to submit a completed Authority to Dig or Core in Designated Area application (to the Brookfield Commercial Operations Facilities Manager) 48 hours before the work task is due to commence. The contractor is responsible for gaining approval for all external works

6.3. Building Maintenance Unit Access and use of High Access equipment should only be by persons with the appropriate license. The equipment should only be used on firm stable surfaces with outriggers in place, if the height to base ratio is exceeded. Barricades and signage must be established to prevent injury to persons passing as with appropriate means to secure tools and debris. All users must wear appropriate harnesses and be connected to lanyards or securing points when on the platform.

6.4. Confined Space Entry

A ‘confined space’ means an enclosed or partially enclosed space that; Restricted Access Restricted access areas are defined as areas where hazards or potential hazards exist for untrained or unauthorised persons. Restricted access areas include: Moving machinery, switch rooms, plant rooms, high areas, Roofs, lift maintenance areas, workshops, ladders, electrical cabinets, cooling towers, radio frequency devices. Confined Space For a location to be determined as a confined space it must meet the following criteria. A yes answer must be obtained for all of the following 5 elements:

1. Is the space is intended to be or likely to be entered by a person and 2. Is the area not at atmospheric pressure or not intended to be at atmospheric pressure

during occupancy; and 3. Is the space not intended or designed primarily as a place of work; and 4. Does the space have or may have restricted means of entry and exit; and 5. Does the space contains or is likely to contain:

An atmosphere with potentially harmful levels of contaminant; or An atmosphere that does not have a safe level of oxygen; or Any stored substance that may cause engulfment, or Contaminants, including airborne gases, vapours and dusts that may cause injury from

fire or explosion.

Examples of confined spaces could include storage tanks, tank cars, process vessels, boilers, pressure vessels, silos and other tank-like compartments, open-topped spaces such as pits or degreasers, pipes, sewers, shafts, ducts and similar structures. If the worker declares that the area is a confined space through their own formal risk analysis then the confined space entry procedures must be adhered to.

14.SC.RC.Contractor Induction Handbook - Bishops See

Revision Date: June 2015 Page 7 of 26 14.SC.RC.Contractor Induction Handbook - Bishops See

These areas will require special consideration and work requirements. All contractors are to provide correct licensing prior to work within these areas, safety management plans and safe work method statements. Emergency management planning MUST be included in these documents

6.5. Fire Impairment All isolations associated with smoke detectors, EWIS and sprinklers are to be undertaken in accordance with the relevant fire safety standards and codes; all efforts are taken to prevent the likelihood of any dusty or smoky work activating EWIS systems or dust/smoke detection devices; workers working in areas to be isolated must have immediate access to the appropriate fire extinguisher for the fire risk in that area. All fire System Isolations will be charged at the current fire maintenance subcontractors’ isolation rates and may incur a call out charge.

6.6. Hot Work and/ or Dust Work Permit Prior to welding or cutting operations or other activities in common area rooms, which use or generate heat, flame, sparks, or dust a “Hot Work and/or dust Permit” must be obtained from the Facilities Manager and completed. All Contractors must comply with the “Hot Work and/or dust Permit” form which requires the use of authority approved non-flammable shields, dust suppression mechanisms and all necessary equipment in case of fire, including, fire extinguishers securely attached to each electric, oxyacetylene or oxy LPG welding plant brought into the complex. The contractor must maintain a fire watch for 60 minutes after the hot work activities have ceased and undertake additional intermittent patrols for an additional three hours and advise the Facilities Manager on completion.

6.7. Working at Heights and Risk of Fall

The risks associated with working at heights must be controlled. Risks must be controlled through the use of stable and securely fenced work platforms (such as scaffolding or other forms of portable work platform). Guardrails should only be used in situations when it is not reasonably practicable to use temporary work platforms. Fall arrest systems should only be used in situations when it is not reasonably practicable to use either temporary work platforms or guardrails. Ladders should be in good working order complying with AS 1892 and secured at their head and base, fibreglass ladders should be used near electrical cabling and equipment hoisted up separately. All tools should be accounted for by contractors prior to working at heights and any unnecessary items should be removed from person. Access to the roof is only permitted once a Working at Heights permit has be issued and based on the provision of Safe Work Method Statements, current harness (with appropriate double lanyard) and certificates of currency. Until all these items have met the satisfaction of the Brookfield Commercial Operations Facilities Manager, access will not be permitted. Fall Arrest Systems a) Ensure that fall arrest systems such as anchor points and safety line systems are used

when required. Anchor points and Safety line systems are fixed systems on a building part of a height safety/fall arrest system.

b) Ensure that only appropriately trained and qualified persons use the anchor points/ safety line system.

14.SC.RC.Contractor Induction Handbook - Bishops See

Revision Date: June 2015 Page 8 of 26 14.SC.RC.Contractor Induction Handbook - Bishops See

c) Ensure that if the anchor point or any part of the safety line system is damaged or the load-bearing capacity is impaired in any way, the anchor point or line system is made immediately inoperable to prevent its use and tagged to indicate that it is not to be used.

d) Ensure that the fall-arrest systems, devices and all anchorage points comply with AS 1891 Industrial fall-arrest systems and devices; AS 4626 Industrial fall-arrest devices - Selection, use and maintenance. In the event a fall arrest system or device is used to arrest a fall, it shall be taken out of use, tagged appropriately and inspected by a competent person before being returned to service.

Elevated Work Platform (EWP’s) e) Ensure the appropriate use of elevated work platforms. Elevated work platforms include

equipment that is used to gain height; there are various types of platforms including Scissor Lifts, Boom Lifts and Cherry Pickers

f) Display equipment safe working load capacities on the equipment and ensure that they are adhered to at all time.

g) Ensure that only persons trained and /or licensed in the use of the equipment shall complete work using the equipment.

h) Ensure the area where the EWP is to be used is inspected prior to use for suitability and hazards that may affect operation. If the work area is near live power cables then contact must be made to the provider to determine the safe working distances. This includes external factors such as adverse weather conditions.

i) Ensure all appropriate safety equipment is present and used in operation including, harnesses, protective edge guard-rails, toe-boards and safety barriers preventing access on the ground level.

j) Ensure all safety devices such as levelling mechanisms are in working order to ensure that the equipment is only used in a safe upright position and in an appropriate manner. All safety devices are to be used in accordance with the manufacturer’s instructions at all times.

Scaffolding k) Ensure the appropriate use of scaffolding. Scaffolding includes fixed and free standing

platforms. All scaffolding used onsite is to be of Australian Standard and is to meet all relevant codes and regulations.

l) Ensure that all scaffolding is; a. Erected to the manufacturers or suppliers specifications. b. Erected, altered and dismantled by suitably qualified competent persons. c. Erected only in areas where the foundations are adequate to carry the load. d. Has edge protection such as guard rails, mid rails and toe boards at every open

edge, and all working platforms must be fully decked out. e. Has a safe means of access and egress, only designated ladders or steps are to

be used to access the scaffolding. No person is to use the scaffold frames for access.

f. inspected and marked by a competent person before use, after any alteration or at intervals no greater than 30 days.

g. not moved while any worker or equipment is still on the platform (pertains to mobile scaffolding). Castor wheels must be locked whenever the scaffold is in use.

Ladders m) Ensure that all ladders are inspected before each use for any damage to the rungs, side

rails or fittings. Any un-serviceable ladders are to be tagged appropriately and removed from service immediately.

n) Ensure that all portable ladders shall comply with the Australian Standard AS/NZS 1892 Portable Ladders.

o) Ensure that no Portable ladder shall be used as a work platform when above two metres in height.

14.SC.RC.Contractor Induction Handbook - Bishops See

Revision Date: June 2015 Page 9 of 26 14.SC.RC.Contractor Induction Handbook - Bishops See

p) Ensure that no ladder is to be used as a horizontal platform or scaffolding (unless specifically designed to be).

q) Ensure that no equipment or materials are to be carried by a person while ascending or descending a ladder of any type. Whilst moving up or down a ladder it is recommended that 3 points of contact are maintained at all times (2 hands and a foot, 2 feet and a hand etc.).

r) Ensure that when in use, portable ladders are: a. Placed so that the distance from the base of the ladder to the support wall is a ratio

of ¼ of the height of the ladder. If the ladder is 4 metres tall then the foot of the ladder should be approximately 1 metre from the base of the wall.

b. Located on firm footing with a second person footing the ladder whenever a person is on the ladder.

c. Secured into position to prevent slipping and sideways movement where possible. d. Placed so that the top of the ladder extends at least 1 metre past the stepping-off

point. e. No ladder should be placed in doorways, leaning on a window or in a thoroughfare

without appropriate signage, barricades or supervision. s) Ensure that permanent (fixed) ladders shall comply with AS/NZS 1657 Fixed platforms,

walkways, stairways and ladders – Design, construction and installation and shall have a method of fall protection installed if over 6m in height, e.g. safety cage

Cone of Safety t) Ensure that the cone of safety is implemented where balustrades / railings / parapets are

installed to protect falls greater than 2 meters, i.e. nothing stored within a 900 mm radius from the top of the railing. This is to ensure that the integrity of the balustrade/ railing / parapet at all times. Examples include; internal drop over’s, balconies, roof areas.

Depicts the “Cone of Safety

6.8. Lock out Tag out Register

The Contractor (or worker) carrying out the isolation work is to ensure tags are placed on the isolated equipment; the WHS procedures to be implemented are to be fully detailed in writing to the Brookfield Commercial Operations Facilities Manager. The Contractor must use approved lockout devices.

900mm

Balustrade

14.SC.RC.Contractor Induction Handbook - Bishops See

Revision Date: June 2015 Page 10 of 26 14.SC.RC.Contractor Induction Handbook - Bishops See

All workers and contractors are responsible to:

a) Be aware of any safety tags in their work environment. b) Fit safety tags if they intend to operate or repair mechanical or electrical equipment c) Use commercially branded safety tags at all sites. As a minimum, these tags shall

include out of services tags, danger tags and lock out devices. d) Fit Danger Tags when:

a. Machinery/plant is undergoing repairs b. Building work may affect electrical supplies or switchgear c. Any person may be in danger of injury from exposure to energy sources or

stored energies during a maintenance operation or due to equipment faults. e) Fit Out of service tags when:

a. Machinery/plant requires repairs b. Work is incomplete, and the person working has a change of shift or similar

circumstances and removes their ‘danger tag’ c. Any fire detection and protection system is impaired

f) Ensure that safety tags are only removed by the person/s or with the permission of all signatories of the tags. Where this is not possible, only the signatories’ immediate supervisor can remove the tag.

g) Ensure Circuit breakers, switches and combined fuse switch units are locked out where possible as well as tagged out.

h) Ensure the safety of personnel in the immediate area and area of the work on the removal of the safety tag if they are the person responsible for its removal. The tag is to be destroyed or wiped clean once removed.

7. DELIVERY AND REMOVAL OF EQUIPMENT AND MATERIALS

7.1. Materials Deliveries When authorised to park within the site, the contractor is to be mindful of other users and must abide by applicable parking areas and time limits. To assist in scheduling of bulk delivery of goods, the Contractor is to provide 72 hours’ notice to the Brookfield Commercial Operations Facilities Manager. The Facilities Manager is to provide appropriate facilities for the Contractor to be able to work safely. Goods must not be stored in exits, fire stairs and plant rooms. Brookfield Commercial Operations staff will not accept any deliveries for Contractors. Any goods delivered to site for Contractors, or their employees are the responsibility of the Contractor. The Contractor is responsible for ensuring all goods delivered to 235 St Georges Terrace are correctly addressed.

7.2. Cleaning Up and Removal of Debris In relation to work performed under the Services Agreement, the Contractor is to clean up and remove all rubbish and surplus materials. The Contractor is to provide suitable containers for removal of rubbish, surplus materials and shall empty the containers off site, with rubbish being disposed of in an appropriate manner. Maximum recycling or reuse of materials is encouraged. The Contractor shall remove all containers promptly from the site at the completion of the work task. At the completion of each working day all areas where the Contractor has been working are to be left in clean and tidy state and free of any fire or safety hazards.

14.SC.RC.Contractor Induction Handbook - Bishops See

Revision Date: June 2015 Page 11 of 26 14.SC.RC.Contractor Induction Handbook - Bishops See

8. EMERGENCY EVACUATION PROCEDURES

8.1. General Brookfield Commercial Operations sites house smoke or other detectors and sprinkler systems. Wardens and Deputy Wardens have been appointed to supervise emergency evacuations from the building. Wardens are entrusted with ensuring the quick and safe evacuation of the building during an emergency. Contractors commencing work at 235 St Georges Terrace have responsibility to: Identify the location of the nearest emergency exits in the area where you will be working; Identify the nearest assembly area. Follow all Instructions issued by Chief Fire Warden or Floor Wardens Follow all alert alarms Note: The building fire emergency exits are not to be used for routine access to and exit from the building. They must be kept clear of materials at all times. This will not be tolerated

8.2. Personal Emergency Evacuation Plans A Personal Emergency Evacuation Plan (PEEP) needs to be developed for any occupant or visitor with a disability. This is to ensure that an assessment has been completed of any additional requirements before an emergency occurs. A copy of the Personal Emergency Evacuation Plans should be kept up-to-date and retained in the fire control room for reference by Emergency Services. Tenant representatives involved in the ECO will be responsible for ensuring that PEEPS are established and maintained.

14.SC.RC.Contractor Induction Handbook - Bishops See

Revision Date: June 2015 Page 12 of 26 14.SC.RC.Contractor Induction Handbook - Bishops See

8.3. Emergency Alarm Response On hearing the evacuation siren, the following steps shall be taken: All staff and Contractors will proceed out of the building to the emergency evacuation

assembly point; No person is to use the lift. If you notice that other individuals have not heard the evacuation signal, make them aware

the evacuation is in progress; When you are out of the building do not re-enter the building until the all clear has been

given; It is essential that all personnel be accounted for at the evacuation assembly areas immediately;

At the assembly point all Brookfield Commercial Operations staff and Contractors will assemble in the Brookfield Commercial Operations group and will remain there while the Facilities Manager and/or Chief Fire Warden accounts for each person;

NOTE: All Brookfield Commercial Operations staff and Contractors are to remain at the designated assembly area until instructed to do otherwise by the Chief Warden.

Emergency Tones to be aware of 1st alarm Beep Beep informs you to prepare to evacuate 2nd alarm Whoop Whoop Whoop informs you that you must evacuate the building

8.4. Reporting an Emergency or Incident

If you encounter an emergency situation, a hazard that could lead to an emergency situation or are involved in an incident at 235 St Georges Terrace you are to immediately advise the Brookfield Commercial Operations Facilities Manager on 9486 8826 (or the Site Help Desk on phone number.) Any other incidents or potential hazards which cause or have the potential to cause injury to any party, or the environment, or that could sustain legal or industrial action, or may impact on Brookfield Commercial Operations must be reported to the facilities manager

8.5. First Aid First aid kits for the 235 St Georges Terrace is located in the Management office on B4 and at the concierge desk on the ground floor. Should you require the use of the first aid kit for any reason the Facilities Manager must be contacted. Other site requirements for first aid are as follows. There is an AED located on the podium level within the Fire Control cupboard in the lobby.

8.6. Spill Response Should a spill occur you will be required to contain the spill and prevent substances entering the storm water system. The general response to a fuel spill is to switch off any pumps using the automatic cut off, keep persons away from the spill area and contact the Facilities Manager immediately. Contact should be made to the Fire Brigade on 000 should a major spill occur. Spill kits are located in the generator room, fire pump room and outside the lift on level 9.

14.SC.RC.Contractor Induction Handbook - Bishops See

Revision Date: June 2015 Page 13 of 26 14.SC.RC.Contractor Induction Handbook - Bishops See

9. OCCUPATIONAL HEALTH AND SAFETY

9.1. Brookfield Commercial Operations Risk Register A risk register developed by Brookfield Commercial Operations staff identifying potential hazards and site risks is available. Contractors are expected to identify where the OHS risk identified may impact on their scope of work and address this in their own health and safety plan and documentation.

9.2. Contractor Obligations Contractors are reminded of their obligations under Occupational Health and Safety (OHS) Legislation and National Standards detailing competency standards for users and operators. Contractors and their staff must comply with all relevant regulations, standards and codes of practice. Contractors must identify the hazards associated with their works, assess the risks and develop appropriate control measures. The risk assessment should be undertaken and provided for review by the Brookfield Commercial Operations Facilities Manager. At the commencement of the Services Agreement, the Contractor must submit an OHS policy, an OHS Plan, all relevant safe work method statements (SWMS), and their insurances. For contractors that could present an environmental impact, an Environmental Policy and Environmental Management plan must also be provided.

9.3. Worksite Control Contractors must place appropriate signage, safety barriers and, where applicable, hording around the work area restricting access into the work area for any work being undertaken. Safety barricades are to be supplied by the Contractor and not Brookfield Commercial Operations. Failure to properly restrict and control access to the work area may result in the Brookfield Commercial Operations Facilities Manager suspending work until appropriate signage and safety barriers are provided.

9.4. Hazardous Substances Contractors must provide Material Safety Data Sheets (MSDS) for all chemicals proposed to be used during the course of the work at 235 St Georges Terrace. This information is to be provided for assessment and approval by the Facilities Manager 48 hours before delivery of chemicals to the site. Current MSDS are to be displayed at the worksite. Contractors must not use any hazardous substances until the safety precautions outlined in the Material Safety Data Sheets are reviewed. Contractors are responsible for ensuring their employees have the correct procedures, training and necessary protective equipment to handle the Hazardous Materials. Material Safety Data Sheets (MSDS) must be provided to Brookfield Commercial Operations Facilities Manager and kept at the work place. All liquids or hazardous substances that are brought on site are to be stored correctly and contained within appropriate bunding. There will be no exceptions. Should a spill occur you will be required to contain the spill, prevent it from entering the storm water system and notify the facilities manager. No substances are to be stored within the plant room at any time

14.SC.RC.Contractor Induction Handbook - Bishops See

Revision Date: June 2015 Page 14 of 26 14.SC.RC.Contractor Induction Handbook - Bishops See

9.5. Light and Power Contractors are responsible for their own electrical safety and are to ensure that all leads, sockets, plugs and equipment are in good and safe working condition and have the appropriate tool check tag attached in accordance with ASNZS 3760- 2001. All temporary installations shall comply with the requirement of AS/NZS 3000: 2000, Wiring Rules local electricity and water regulations.

9.6. Residual Current Devices Residual Current Devices (RCD) also known as Earth leakage devices are designed to prevent serious injury or death from an unintended flow of power should a short circuit in the electrical system occur. A RCD can be fixed or portable and must be used; Where construction work supply is obtained from a permanent wiring outlet, then an earth

leakage device must be fitted at the power outlet. Portable generators must be fitted with an earth leakage device All common area outlets of the site must be protected by RCD’s. All Hostile environments

must be fitted with RCD’s.

9.7. Manuals An Operating and Maintenance Manual (O&MM) is to be prepared, where applicable, for each installation. For major fit outs, individual manuals are to be prepared for each service (mechanical, hydraulic, electrical, fire protection etc.). Where services are of a minor nature, with the approval of the Brookfield Commercial Operations Facilities Manager, manuals may be combined into a common document.

10. ENVIRONMENTAL RESPONSIBILITIES

Contractors must: Be aware of the environmental conditions, risks and priority areas at the site and take

reasonable steps and due care to minimise environmental impacts from their activities

Work in accordance with relevant statutory requirements, standards and industry codes of practice, and in accordance with contractor licences and/or permits to work

Prepare an Environmental Management Plan to document environmental hazards, risks, mitigation measures and emergency procedures when a contractor’s activities may have an environmental impact

Avoid, where possible, the use of hazardous chemical & materials, and have the appropriate training, PPE and spill containment and clean up equipment with them

Handle and store all liquids and materials in accordance with relevant Australian Standards to avoid spills and potential land, air and water contamination

Not allow any materials to enter a storm water drain or natural water course, other than storm water – it is an offence to pollute any waters

Take all reasonable steps to minimise the creation of dust and noise

Minimise the use of equipment (such as diesel generators & blowers) which cause noise and air pollution, and make sure equipment is services regularly

Not disturb or harm any flora or fauna or any heritage listed structure or area at the site

Not enter or disturb areas thought to contain asbestos containing materials, unless authorised

14.SC.RC.Contractor Induction Handbook - Bishops See

Revision Date: June 2015 Page 15 of 26 14.SC.RC.Contractor Induction Handbook - Bishops See

Keep work areas tidy, free of litter as reasonably practical and remove all wastes

Dispose of hazardous and non-hazardous wastes at appropriate facilities

Ensure vehicles entering and leaving site are as clean as practical, are maintained to prevent spills, loads are secured and comply with site traffic and parking rules

Be aware of site emergency procedures

Report all environmental incidents or near misses to the site Manager and their Supervisor

If Contractors or their employees take shortcuts, which could cause an environmental risk, the Contractor could be held personally liable.

14.SC.RC.Contractor Induction Handbook - Bishops See

Revision Date: June 2015 Page 16 of 26 14.SC.RC.Contractor Induction Handbook - Bishops See

11. SITE SPECIFIC RISK REGISTER

Level Description of Consequence or Impact Consequence

Likelihood / Probability – 12 Month Period

A. Almost Certain

B. Likely

C. Possible

D. Unlikely

E. Rare

1. Extraordinary

Major incident involving fatalities or permanent disability, environmental disaster, bankruptcy, shareholder losses, public image. An environmental impact that is severe and likely to spread beyond the immediate site and will remain a serious problem over a prolonged period

1.Extraordinary

1 2 4 7 11

2. Major Extensive and severe risk of economic and financial loss, legal or industrial action, serious injury or disease to Brookfield Services staff or the general public. An environmental impact that is severe and likely to impact beyond the immediate site and remain a problem in the medium term.

2. Major

3 5 8 12 16

3. Moderate Medical treatment required, loss of production capability, off-site releases with no detrimental effects, medium financial loss, environmental impact that may be significant. Environmental impact will be localised and have short term effects.

3. Moderate

6 9 13 17 20

4. Minor First aid treatment required, on-site release immediately contained, minor financial loss, a minor and transient environmental impact.

4. Minor 10 14 18 21 23

5. Insignificant

No injuries, low or zero financial loss, no environmental impact occurring.

5. Insignificant 15 19 22 24 25

Level Likelihood / Probability Risk Category Rectification Period A. Almost Certain

The event/impact is common and expected to occur in most circumstances

High 6 Weeks

B. Likely The event/impact has happened before and will probably occur again

Medium 3 Months

C. Possible This event/impact could occur at some time

D. Unlikely This event/impact is not likely to occur Low 6 Months

E. Rare This event/impact may occur in exceptional circumstances only

14.SC.RC.Contractor Induction Handbook - Bishops See

Revision Date: June 2015 Page 17 of 26 14.SC.RC.Contractor Induction Handbook - Bishops See

ID Hazard Identified

(Provide Details)

Co

nse

qu

ence

Lik

elih

oo

d

Ris

k S

core

Controls (Describe the control implemented to minimise the

risk)

Co

nse

qu

ence

Lik

elih

oo

d

Ris

k S

core

Dat

e

Sig

n O

ff

Risk Rating Residual Risk 1 Confined space – Storm water

detention tank – B3 2 C 8 Area is restricted access.

Permit is required to access area

Signage is in place

2 D 12 2013 IH

2 Falls from heights 1 B 4 All roof access points to be controlled. All anchorage points are certified and access to certification will be provided to/by the Facilities Manager of the site where requested and when required.

No roof access or height access will be provided to sites without a Request to Work heights

No height work is permitted without Request to Work. No height work permit provided without authorisation from a BCO staff member. No height work to be completed without WHS Management plans and SWMS to be obtained from all contractors

SWMS are to be checked for every contractor for the work to be conducted.

Access points, fall arrest systems and other items are to be certified on a regular basis by a competent body.

Identified as restricted areas. Only authorised personnel are permitted into these areas after completing on-line induction, site induction and

1 E 11 7/13 IH

14.SC.RC.Contractor Induction Handbook - Bishops See

Revision Date: June 2015 Page 18 of 26 14.SC.RC.Contractor Induction Handbook - Bishops See

ID Hazard Identified (Provide Details)

Co

nse

qu

ence

Lik

elih

oo

d

Ris

k S

core

Controls (Describe the control implemented to minimise the

risk)

Co

nse

qu

ence

Lik

elih

oo

d

Ris

k S

core

Dat

e

Sig

n O

ff

Risk Rating Residual Risk Request to Work request.

3 Fire 1 C 4 No hot works to be conducted without a permit. Fire systems are not to be isolated without FM knowledge and a permit provided by the BCO staff.

Access to the site is to be managed at all times by the BCO staff. There is to be no authorised access to the site where site access is not freely available

Fire safety equipment checked and tested regularly

Regular evacuation drills will be maintained in conjunction with fire safety regulation and Australian standards.

Hot works equipment is to be checked and secured prior to the commencement of any work that will be undertaken.

Fire evacuation procedures in place. Emergency warning and intercommunication system,

All personnel require access passes to enter & leave the building. Building fitted with security monitoring. Security Officers are on site.

1 D 7 7/13 IH

4 Electrical energy – shock, fire, explosion

2 C 8 No work to be performed unless person holds an electrical certification, licensing, SWMS outlining what is to be completed is produced.

Request to Work are required for all electrical work.

Facilities inspections will check electrical boards to

2 D 7 7/13 IH

14.SC.RC.Contractor Induction Handbook - Bishops See

Revision Date: June 2015 Page 19 of 26 14.SC.RC.Contractor Induction Handbook - Bishops See

ID Hazard Identified (Provide Details)

Co

nse

qu

ence

Lik

elih

oo

d

Ris

k S

core

Controls (Describe the control implemented to minimise the

risk)

Co

nse

qu

ence

Lik

elih

oo

d

Ris

k S

core

Dat

e

Sig

n O

ff

Risk Rating Residual Risk ensure no tampering has occurred

All sites are to have established electrical safety switch boards or a method of electrical safety in place to minimise the threat of shock

No live Electrical Works on site.

5 Hazardous materials 3 C 13 Authorisation required to bring in and store hazardous substances on site

Where possible, hazardous substances are to be removed from site or at very least replaced with non-hazardous substance based products.

Hazardous Substance Register and all MSDS required for the site. First Aid kit provided on the site.

3 D 17 7/13 IH

6 Work conducted within confined spaces

2 C 8 Request to Work required for all work to be conducted on site within a confined space.

Signage on all confined space and authorised access only. Contractors must also undertake their own assessment of potential Confined spaces.

Specific Risk Assessments are also available.

2 D 7 7/13 IH

14.SC.RC.Contractor Induction Handbook - Bishops See

Revision Date: June 2015 14.SC.RC.Contractor Induction Handbook - Bishops See

12. SITE SPECIFIC RISK REGISTER No asbestos was used in the construction of this building.

13. SAFETY INFORMATION 13.1. Fire Extinguisher Classification

FIRE EXTINGUISHER USE

Water – Red This is designed for use on wood, paper, rubbish or textiles. This extinguisher must not be used on fires involving live electrical equipment.

Carbon Dioxide – Red with a Black Band This is designed for use on fires involving flammable liquids and live electrical equipment

Foam – Red with a Blue Band This is designed for use on flammable liquid fires such as petrol and oils. This extinguisher must not be used on fires involving live electrical equipment

Dry Chemical – Red with a White Band This is designed for use on fires involving flammable liquids and live electrical equipment

Wet Chemical – Red with a Gold Band This is designed for use within kitchens on fires involving fat and cooking oils. This extinguisher must not be used on fires involving live electrical equipment

FIRE CLASSIFICATION

CLASS A Class A - Ordinary Combustible Solids Example: Wood, paper, cloth, plastics, rubber, coal, carbon based compounds

CLASS B Class B - Flammable & Combustible Liquids Petrol, oil, paint, thinners, kerosene, alcohol

CLASS C Class C - Flammable Gases L.P.G., Butane, Acetylene, Hydrogen, natural gas and Methane

CLASS D Class D - Combustible Metals Magnesium, aluminium, sodium or potassium

CLASS E Class E - Electrical Fires Computers, switchboards, power-boards

CLASS F Class F - Cooking Oils and Fats Cooking oils and fats usually found in industrial kitchens

14.SC.RC.Contractor Induction Handbook - Bishops See

Revision Date: June 2015 14.SC.RC.Contractor Induction Handbook - Bishops See

13.2. Classes of Dangerous Goods

Dangerous Goods are grouped in nine classes, according to common dangers. All classes, except infectious substances (Class 6.2) and radioactive substances (Class 7), are controlled by the Dangerous Goods Act 1985. Each class has a distinctive diamond-shaped symbol with the class number at the bottom of the diamond. These symbols appear on the labels of containers and as signs on vehicle loads. The internationally recognised symbols clearly identify the type of substance and the main danger.

Class Diamond System

Symbol Class Main Danger

1 Substances or articles used to produce explosions. (gunpowder, gelignite)

2.1 Can ignite in air on contact with a source of ignition. (LPG, hydrogen, acetylene)

2.2 Non-flammable and non-toxic, but may accelerate combustion. (carbon dioxide, nitrogen, compressed air) or Oxidising gases (nitrous oxide)

2.3 May cause death or serious injury if inhaled. (chlorine, ammonia)

3

Vapours from these liquids can ignite in air on contact with a source of ignition. (petrol, kerosene) Must have a flash point less than or equal to 60.5 Celsius

4.1 May cause fire through friction, heat or other source. (sulphur, matches)

4.2 Capable to heat or combust spontaneously and ignite. (activated carbon, white phosphorus, fish meal)

14.SC.RC.Contractor Induction Handbook - Bishops See

Revision Date: June 2015 14.SC.RC.Contractor Induction Handbook - Bishops See

Class Diamond System

Symbol Class Main Danger

4.3 Can become spontaneously combustible, flammable or toxic when contacted with water. The heat from this reaction may cause these gases to spontaneously ignite. (calcium carbide, sodium)

5.1 Can contribute or accelerate combustion of other materials. (calcium hypochlorite, ammonium nitrate, hydrogen peroxide)

5.2 Thermally unstable and likely to react dangerously with other substances. (benzoyl peroxide, MEKP)

6 May cause death or serious injury if swallowed, inhaled or brought into contact with skin. (sodium cyanide, many pesticides)

7 Materials or combinations of materials that emit harmful radiation. (uranium, radium)

8 Solids or liquids that can damage living tissue, and may react with many other materials. (hydrochloric acid, caustic soda)

9 Substances and articles that present a danger and not covered by other classes (dry ice, asbestos)

10 Mixed Class Label (for road transport)

14.SC.RC.Contractor Induction Handbook - Bishops See

Revision Date: June 2015 14.SC.RC.Contractor Induction Handbook - Bishops See

13.3. Emergency CPR (Approval sourced and received from St John Ambulance Australia)

14.S

Revisio14.SC.

13

SC.RC.C

on Date: June 20RC.Contractor In

3.4. WHS R

Contract

015 nduction Handbo

Rules

A

coobtconworor d

s

P

a

Do susp

Isaut

w

PeEqu

bewi

Immide

tor Indu

ook - Bishops Se

Authorisation tobtained befoommencing ataining roof acnducting hot wrking with elecdisabling any safety equipm

Permits are toobtained an

authorised prioenter

not walk undpended or ove

loads

solations are tthorised befor

work commen

ersonal Proteuipment (PPEe worn at all twhen workingidentified in y

SWMS

mediately stontified unsafe

practices

ction Ha

e

to be ore

a dig, ccess, works, ctricity critical

ment

o be nd or to

er any erhead

to be re any ces.

ective E) must imes

g as our

op any e work

andbookk - Bisho

S

hause

SSar

a

hepr

eqan

Nus

No

Re

ops See

A current MaSafety Data S(MSDS) mussupplied for

azardous subed and stored

Safe Work MeStatements (Sre to be providall tasks and m

available whrequested

When workineights, implemrevention stra

Ensure all fquipment is cend in good co

No alcohol or se whilst work

site

o smoking peon site

eport all near and inciden

e

terial Sheet st be any

bstance d on site

ethod WMS) ded for made hen d

ng at ment fall ategies. fall ertified

ondition

drugs king on

ermitted

misses nts

14.SC.RC.Contractor Induction Handbook - Bishops See

Revision Date: June 2015 14.SC.RC.Contractor Induction Handbook - Bishops See

14. CONFINED SPACE _ RESTRICTED ACCESS REGISTER

Confined Space and Restricted Access Register - Bishops See

This register has been developed to identify confined spaces and areas which are deemed to be considered as restricted access at Bishops See.

Location Space Type Hazard Action Required

Level 11 Roof Restricted Access Trips, Slips, Falls Access to this area is restricted to staff which have completed Working at Heights training.

Roof Access Permit to be submitted 48 Hours prior to works being carried out and authorised by Facilities Management.

Security to issue two-way radio and periodically check welfare of staff working on the roof.

JSA to be received and authorised by Facilities Management.

Level 9 Roof Restricted Access Trips, Slips, Falls Access to this area is restricted to staff which have completed Working at Heights training.

Roof Access Permit to be submitted 48 hours prior to works being carried out and authorised by Facilities Management.

Security to issue two-way radio and periodically check welfare of staff working on the roof.

JSA to be received and authorised by Facilities Management.

Level 9 AHU cells

Confined Space Entrapment Security and Facilities Management must be informed when staff enter the cells of the AHUs.

Security to issue two-way radio and periodically check welfare of staff working on the roof.

JSA to be received and authorised by Facilities Management.

Electrical Risers on each level

Confined Space / Restricted Access

Electrocution in confined space

When working in electrical risers, door must remain open.

Security staff to be notified of entry to the risers.

Security to issue two-way radio and periodically check welfare of staff working on the roof.

14.SC.RC.Contractor Induction Handbook - Bishops See

Revision Date: June 2015 14.SC.RC.Contractor Induction Handbook - Bishops See

Location Space Type Hazard Action Required

Basement 4 Grey Water Room

Restricted Access Sensitive equipment

Qualified staff to enter room only.

JSA to be received and authorised by Facilities Management.

Security to be notified prior to entry to this area and upon completion of works.

Housekeeping to be in place in this area.

Basement 3 Chiller Plant Room

Restricted Access Sensitive equipment

Qualified staff to enter room only.

JSA to be received and authorised by Facilities Management.

Security to be notified prior to entry to this area and upon completion of works.

Housekeeping to be in place in this area.

Basement 2 MDF room

Restricted Access Sensitive equipment

Qualified staff to enter room only.

JSA to be received and authorised by Facilities Management.

Security to be notified prior to entry to this area and upon completion of works.

Housekeeping to be in place in this area.

LV Switch room Basement 2

Restricted Access Sensitive equipment

Qualified staff to enter room only.

JSA to be received and authorised by Facilities Management.

Security to be notified prior to entry to this area and upon completion of works.

Housekeeping to be in place in this area.

At least two people must be in the room when carrying out work.