Broadband Specialists Inc. - ISE...
Transcript of Broadband Specialists Inc. - ISE...
Attendee Announcements
Seminar Raffle – Be sure to drop your raffle ticket in the drum at today’s Keynote located in the Mile
High Ballroom. You have a chance to win a $250 American Express Gift Card. One winner will be drawn at the Opening Keynote and the Closing Keynote. You must be present to win.
Seminar Evaluations – All attendees will be receiving an email with regards to the seminar and we
encourage you to respond to the surveys. The survey results will be compiled by ISE EXPO team members, summarized, and will be shared with the seminar speakers. The seminar feedback is an important aspect of continually improving ISE EXPO.
Seminar Certificates – Attendees will be able to log into the Attendee Resource Center (ARC) using
their first name, last name, and their Badge ID (this number will appear on the badge and also on any registration confirmations) to view/print their seminar certificates. If a certificate is needed on-site, the attendee may visit the ISE EXPO registration counter between the hours of 1 PM – 3 PM September 21 & September 22 and ask for a certificate to be printed. Attendees will be able to access the ARC website up to 2 –3 months after the event to print CEC certificates.
Subscribe – ISE magazine is the most trusted educational and solutions resource for 21,000 professionals
across the ICT industry. Each month, ISE delivers 20+ educational articles and showcases leading technology solutions in an approachable and interesting format, available in both print and digital. Visit http://www.isemag.com/subscriptions/ to begin or renew your subscription.
Fiber Construction and Deployment
Copyright © 2016 BSI All rights reserved
FTTX INFRASTRUCTURE DEPLOYMENTS
FROM A CONTRACTOR PERSECTIVE
HARNESSING THE POWER OF TECHNOLOGY
Introduction
1. Broadband telecommunications continues to be a maturing industry
2. Business to Business Broadband is driving the worldeconomy
3. Broadband is one of largest growth industries in theworld
4. 75% of the fiber in U.S. has not yet been deployed if FTTXis to be achieved
5. Fiber Networks are “Future-Proof” and will be built out
Typical Outside Plant (OSP) Fiber Networks
• Backhaul, Middle Mile and Longhaul Fiber
• Fiber to the Premise (FTTP)
• Fiber to the Tower (FTTT)
• Fiber to the Home (FTTH)
• Fiber to the Curb (FTTC)
• Hybrid Fiber to Coaxial (HFC)
• Broadband Over Power Lines (BOPL)
1. Initial Processes
• Review of RFP, Scope of Work, Architecture
• Identify and Note all Client Critical Needs
• Pre-bid Ride-out, Route Analysis
• Subsurface and Overhead Analysis
• Labor and Equipment Cost Analysis
• Bidding and Awarding, Permits
2. Construction Deployment & Delivery
• Truck & Equipment Prep & Delivery, Consumables Acquisitions
• Team Selection, Mobilization
• White Line, Locates and Station Marks
• Construction of Structure, Redesigns
• Fiber Jetting, Blowing, Pulling
• Fiber Splicing and Optimization
• Final Restoration QC & Redlines
3. Successful Team Building Mission Critical
• Project Management
• Drillers and Locators
• Operators and Laborers
• Logistics and Materials Management
• Equipment Maintenance
• Back Office Support
• Subcontractors
• Project Closeout Specialist
4. OFF SITE SUPPORT
• CONTRACT EXECUTION
• BUDGETS AND PURCHASE ORDERS
• SAFETY
• TRAINING
• REGULATORY REQUIREMENTS
• PAYROLL
• ACCOUNTS PAYABLES PROCESSING TASKS
Co
nd
uit
Pla
cem
ent
Dat
e (P
rogr
ess
Dat
e)
Per
iod
En
din
g
AUS 135 Engineered
Map Station Begin
Map Station
End MAP
Length MAP AMOUNT
Length on Inspector Progress Report
BSI EPC (Constru
ction Type)
Product Type
INSPECTOR (Conduit
Placement) Vault Size
Vault Location (Station Mark)
Conduit in But Vault
Not Set Yet
Temp Vault Set
(Still pending
additional
product)
Permanent Vault
Set
Permanent Vault Set
Date
Vault Inspector
Field Approval
Date
Vault Inspector
EMAIL RECEIVE DATE for Vault Set
Vault Approval Inspector
NameDATE
Reported
INSPECTOR WHO
APPROVED EPC FOOTAGE
Inspector Approved EPC
Matching DOLLARS
(P/FT)
Inspector approved AMOUNT
BSI BILLING LENGTH
BSI EPC Matching DOLLARS
(P/FT) BSI AMOUNT OVER (UNDER)
01/20/15 01/22/15 M4-1-8 A32+28 A32+33 5 $262.50 5 4c 1-1" 2-2" John Doe 10x15 A32+33 N/A N/A 1 02/07/15 02/08/15 02/08/15 John Doe 0 $0.00 $ - 5 $52.50 $ 262.50 $ (262.50)
01/20/15 01/22/15 M4-1-8 A32+28 A32+33 5 $97.50 5 5b John Doe N/A N/A N/A N/A N/A N/A N/A N/A N/A 0 $0.00 $ - 5 $19.50 $ 97.50 $ (97.50)
01/20/15 01/22/15 M4-1-8 A32+28 A32+33 5 $3.75 5 4c/ed John Doe N/A N/A N/A N/A N/A N/A N/A N/A N/A 0 $0.00 $ - 5 $0.75 $ 3.75 $ (3.75)
01/20/15 01/22/15 M4-1-8 to Match A33+28 A33+70 42 $2,205.00 42 4c 1-1" 2-2" John Doe N/A N/A N/A N/A N/A N/A N/A N/A John Doe 02/05/15 John Doe 4c 42 $52.50 $ 2,205.00 42 $52.50 $ 2,205.00 $ -
01/20/15 01/22/15 M4-1-8 to Match A33+28 A33+70 42 $819.00 42 5b John Doe N/A N/A N/A N/A N/A N/A N/A N/A N/A 02/05/15 John Doe 5b 42 $19.50 $ 819.00 42 $19.50 $ 819.00 $ -
01/20/15 01/22/15 M4-1-8 to Match A33+28 A33+70 42 $31.50 42 4c/ED John Doe N/A N/A N/A N/A N/A N/A N/A N/A N/A 02/05/15 John Doe 4c/ED 42 $0.75 $ 31.50 42 $0.75 $ 31.50 $ -
01/20/15 01/22/15 Match to 4-1-9 A33+70 A34+58 88 $4,620.00 88 4c 1-1" 2-2" John Doe 12x30 A34+58 N/A N/A 1 01/21/15 01/03/15 01/30/15 John Doe 02/05/15 John Doe 4c 102.9 $52.50 $ 5,402.25 102.9 $52.50 $ 5,402.25 $ -
01/20/15 01/22/15 Match to 4-1-9 A33+70 A34+58 88 $1,716.00 88 5b John Doe N/A N/A N/A N/A N/A N/A N/A N/A N/A 02/05/15 John Doe 5b 102.9 $19.50 $ 2,006.55 102.9 $19.50 $ 2,006.55 $ -
01/20/15 01/22/15 Match to 4-1-9 A33+70 A34+58 88 $66.00 88 4c/ED John Doe N/A N/A N/A N/A N/ARiser
1-28-15N/A N/A N/A 02/05/15 John Doe 4c/ED 102.9 $0.75 $ 77.18 102.9 $0.75 $ 77.18 $ -
01/20/15 01/22/15 M4-1-9 A34+58 A36+10 152 $7,980.00 152 4c 2-2" Jane Doe N/A N/A N/A N/A N/A N/A N/A N/A N/A 02/05/15 Jane Doe 4c 152 $52.50 $ 7,980.00 152 $52.50 $ 7,980.00 $ -
01/20/15 01/22/15 M4-1-9 A34+58 A36+10 152 $2,964.00 152 5b Jane Doe N/A N/A N/A N/A N/A N/A N/A N/A N/A 02/05/15 Jane Doe 5b 152 $19.50 $ 2,964.00 152 $19.50 $ 2,964.00 $ -
01/24/15 01/29/15 M-1-4-9 to Match A37+34 A38+40 106 $5,565.00 106 4c 1-2" Jane Doe N/A N/A N/A N/A N/A N/A N/A N/A N/A 02/05/15 Jane Doe 4c 106 $52.50 $ 5,565.00 106 $52.50 $ 5,565.00 $ -
01/24/15 01/29/15 M-1-4-9 to Match A37+34 A38+40 106 $2,067.00 106 5b Jane Doe N/A N/A N/A N/A N/A N/A N/A N/A N/A 02/05/15 Jane Doe 5b 106 $19.50 $ 2,067.00 106 $19.50 $ 2,067.00 $ -
01/24/15 01/29/15 Match to M1-4-10 A38+40 A38+51 11 $577.50 11 4c 1-2" Jane Doe 24x36 A38+51 N/A N/A 1 01/28/15 01/05/15 01/05/15 John Doe 02/05/15 Jane Doe 4c 11 $52.50 $ 577.50 11 $52.50 $ 577.50 $ -
01/24/15 01/29/15 Match to M1-4-10 A38+40 A38+51 11 $214.50 11 5b Jane Doe N/A N/A N/A N/A N/A N/A N/A N/A N/A 02/05/15 Jane Doe 5b 11 $19.50 $ 214.50 11 $19.50 $ 214.50 $ -
01/24/15 01/29/15 M4-1-10 A38+51 A41+10 259 $13,597.50 259 4c 2-2" Jane Doe 24x36 A41+10 N/A N/A 1 01/29/15 01/05/15 01/05/15 John Doe 02/05/15 Jane Doe 4c 259 $52.50 $ 13,597.50 259 $52.50 $ 13,597.50 $ -
01/24/15 01/29/15 M4-1-10 A38+51 A41+10 259 $5,050.50 259 5b Jane Doe N/A N/A N/A N/A N/A N/A N/A N/A N/A 02/05/15 Jane Doe 5b 259 $19.50 $ 5,050.50 259 $19.50 $ 5,050.50 $ -
01/25/15 01/29/15 M4-1-6 A22+66 A23+65 99 $5,197.50 145 4c 2-2" Jane Doe 24+36 A23+65 1 01/26/15 02/02/15 02/02/15 John Doe 02/06/15 Jane Doe 4c 70.1 $52.50 $ 3,680.25 70.1 $52.50 $ 3,680.25 $ -
01/25/15 01/29/15 M4-1-6 A22+66 A23+65 99 $1,930.50 145 5b Jane Doe N/A N/A N/A N/A N/A N/A N/A N/A N/A 02/06/15 Jane Doe 5b 70.1 $19.50 $ 1,366.95 70.1 $19.50 $ 1,366.95 $ -
01/25/15 01/29/15 M4-1-9 A36+10 A37+34 124 $6,510.00 119 4c 2-2" Jane Doe N/A N/A N/A N/A N/A N/A N/A N/A N/A 02/05/15 Jane Doe 4c 118.1 $52.50 $ 6,200.25 118.1 $52.50 $ 6,200.25 $ -
01/25/15 01/29/15 M4-1-9 A36+10 A37+34 124 $2,418.00 119 5b Jane Doe N/A N/A N/A N/A N/A N/A N/A N/A N/A 02/05/15 Jane Doe 5b 118.1 $19.50 $ 2,302.95 118.1 $19.50 $ 2,302.95 $ -
01/27/15 01/29/15 M4-1-2 A2+72 A3+86 146 $7,665.00 159 4c 2-2" Jane Doe 24+36 A2+72 N/A 1 N/A 01/30/15 02/04/15 02/04/15 John Doe 02/07/15 Jane Doe 4a 159.3 $10.50 $ 1,672.65 159.3 $52.50 $ 8,363.25 $ (6,690.60)
01/27/15 01/29/15 M4-1-2 A2+72 A3+86 146 $2,847.00 159 5b Jane Doe N/A N/A N/A N/A N/A N/A N/A N/A N/A 02/07/15 Jane Doe 5b 159.3 $19.50 $ 3,106.35 159.3 $19.50 $ 3,106.35 $ -
01/27/15 01/29/15 M4-1-2 to Match A3+86 A5+60 142 $7,455.00 142 4c 2-2" Jane Doe 24x36 A3+86 N/A N/A 1 02/04/15 02/07/15 02/08/15 John Doe 02/07/15 Jane Doe 4a 142 $10.50 $ 1,491.00 142 $52.50 $ 7,455.00 $ (5,964.00)
01/27/15 01/29/15 M4-1-2 to Match A3+86 A5+60 142 $2,769.00 142 5b Jane Doe N/A N/A N/A N/A N/A N/A N/A N/A N/A 02/07/15 Jane Doe 5b 142 $19.50 $ 2,769.00 142 $19.50 $ 2,769.00 $ -
01/28/15 01/29/15 Match to M4-1-3 A5+60 A7+11 151 $7,927.50 223 4c 2-2" Jane Doe 24x36 N/A N/A N/A 1 01/30/15 01/30/15 01/30/15 John Doe 02/07/15 Jane Doe 4a 223 $10.50 $ 2,341.50 223 $52.50 $ 11,707.50 $ (9,366.00)
01/28/15 01/29/15 Match to M4-1-3 A5+60 A7+11 151 $2,944.50 223 5b Jane Doe N/A N/A N/A N/A N/A N/A N/A N/A N/A 02/07/15 Jane Doe 5b 223 $19.50 $ 4,348.50 223 $19.50 $ 4,348.50 $ -
01/29/15 01/29/15 M4-1-16 H2+58 H3+75 117 $2,749.50 4c 6-2" Jane Doe 24x36 H3+75 1 0 $0.00 $ - 117 $23.50 $ 2,749.50 $ (2,749.50)
01/29/15 01/29/15 M4-1-16 H2+58 H3+75 117 $2,106.00 5b Jane Doe N/A N/A N/A N/A N/A N/A N/A N/A N/A 0 $0.00 $ - 117 $18.00 $ 2,106.00 $ (2,106.00)
01/29/15 01/29/15 M4-1-16 H2+58 H3+75 468 $351.00 4b/ed Jane Doe N/A N/A N/A N/A N/A N/A N/A N/A N/A 0 $0.00 $ - 468 $0.75 $ 351.00 $ (351.00)
$0.00 $0.00 $ - $ - $ -
$0.00 $0.00 $ - $ - $ -
$100,707.75 1 2 6 $77,836.88 $105,427.73$
(27,590.85)
SAMPLE PROJECT LEVEL TRACKING MATRIX FOR BORE OPERATIONS
REPORT DATE December 31, 2014
Production through EOB December 31, 2014
VaultsTotal
Temp Vaults Conduit Ran TTL Temp
Package Invoicing Vaults Set Not Set Vaults Set To Risers Vaults/Risers
Total structure to date in AUS135 $ 105,427.73 6 1 7 2 7 9
Total structure to date in AUS50 $ 21,631.86 6 1 7 0 2 2
TTL Structure to Date $ 127,059.59 12 2 16 2 9 11
% of Vaults/Risers Set 68.75%
% of $$ to BSI to Date 28.47%
Payment 1 Payment 2 Payment 3
Gross $ 17,500.00 Gross $ 22,700.00 Gross $ -
3% 3% $0.00
10% $1,750.00 10% $2,270.00 10% $0.00
Net $ 15,750.00 Net $ 20,430.00 Net $ -
SAMPLE PROJECT LEVEL MATRIX QUICK REFERENCE SUMMARY PAGE
Revenue Generated $ 127,059.59
Gross Received to Date $ 36,180.00
10% Retainage $4,020.00
Other Deductions $ -
Net Processed to Date $ 40,200.00
Pending Receipt of Payment $ 90,879.59
Still Pending Sign Off $ (47,219.85)
Sample Team Staffing
Team can be enlarged or decreased
depending on the Critical Path Schedule
requirements on the project.
BSI Corporate Customer
Project
Superintendent
BSI
Quality Assurance
Quality Control
BSI On-Site
Project Manager
BSI Project
General
Foreman
BSI Plow Crew
Foreman/Operator
QA/QC
Loss Control
Safety
Inspector #1
BSI Safety
Inspector
#2
BSI Plow Crew
Laborer #2
BSI Lead
Operator
BSI Plow Crew
Laborer #1
BSI Plow Crew
Laborer #3
BSI Locates
Foreman
BSI Lead
Locator
BSI Locator 2 BSI Locator 3
BSI Field
Meets
Coordinator
BSI On-Site Project
Warehouse Operations
Coordinator
(one per project)
Warehouse
Laborer/Delivery
Logistics/CDL #1
Warehouse
Laborer/Delivery
Logistics/CDL #2
BSI Drop Crew
Foreman/Operator
BSI Drop Crew
Lead Operator
BSI Drop Crew
Laborer #1
BSI Drop Crew
Laborer #2
BSI Restoration
Crew Foreman
BSI Restoration
Crew Laborer
Directional Bore
Foreman/Operator
Locator
Directional Bore
Lead Operator
BSI Directional Bore
Crew Laborer
BSI DB Pot Hole &
Restoration Crew #1
Foreman
BSI Excavation
Crew #1 Laborer
BSI DB Pot Hole &
Restoration
Crew #2 Foreman
BSI Excavation Crew
#2 Laborer
BSI Trencher/Excavator
Crew Foreman/
Operator
BSI Trencher/Excavator
Crew Lead Operator
BSI Trencher/Excavator
Crew Laborer #1
BSI Trencher/Excavator
Crew Laborer #2
BSI
Project
Safety
Director
BSI Residential
Network Interface
Device Installer
BSI NID Support
Laborer/Installer #2
BSI Restoration
Crew Foreman
BSI Restoration
Crew Laborer
Sample Urban or Rural Environment Directional Bore Crew Staffing
Shared with Rural Crews
Team can be enlarged or decrease in
size depending on critical path
schedule requirements for the
project.
Shared with other Crews
BSI
Coporate
BSI On-Site
Project Manager
(one per project)
BSI On-Site
Safety Director
(one per project)
BSI Quality
Assurance
Quality Control
BSI Lead Locator
In Town
BSI Rural Town
General Foreman
BSI Vacumm Crew
#1 Laborer
BSI Vacumm Crew
#1 Foreman
BSI Directional
Bore Crew #1
Foreman/
Operator Locator
BSI Directional
Bore Crew #2
Foreman/
Operator Locator
BSI Vacumm Crew
#2 Foreman
BSI Vacumm Crew
#2 Laborer
BSI Excavation &
Restoration Crew
#1 Laborer
BSI Excavation
and Restoration
Crew #1 Foreman
BSI Directional
Bore Crew #1
Operator
BSI Directional
Bore Crew #1
Laborer
BSI Directional
Bore Crew #2
Operator
BSI Directional
Bore Crew # 2
Laborer
BSI Excavation &
Restoration Crew
#2 Foreman
BSI Excavation &
Restoration Crew
#2 Laborer
BSI On-Site Lead
Mechanic
Shared with other Crews
Sample Fiber Blowing or Fiber Pulling Crew Staffing
Could be shared
with town or rural crews
Team can be enlarged or
reduced in size
depending on the Critical
Path Schedule
requirements of the
project.
BSI
Coporate
BSI On-Site
Project Manager
(one per project)
BSI Project General
Foreman
(one per project)
BSI On-Site Project
Safety Director
(one per project)
BSI Rural Projects
Fiber Blow Crew Foreman
(one per project)
BSI Blow
Crew Lead
Operator
BSI Blow
Crew
Operator #2
BSI Blow
Crew
Operator #3
BSI Blow
Crew Laborer
#1
BSI Blow
Crew Laborer
#2
BSI S&R Crew
Laborer #2
BSI S&R Crew
Laborer #1
BSI Setup &
Restoration Crew
Foreman/Operator
BSI Safety Inspector
QA/QC Inspector
Sample Rural or Urban Aerial Fiber Crew/Team Staffing
Safety can be shared with other groups
QC & QA can be shared with other
groups
Team can be adjusted
depending on Critical
Path schedules for the
project.
BSI Aerial Construction
Coordinator
BSI
Safety Team
BSI
QA/QC Team
Ground Hand
Fiber Crew #1
Foreman
Lineman
LinemanGround Hand
Strand Crew
Foreman
Lineman
Ground Hand
Lineman
BSI Project Manager
(one per project)
BSI
Locator for
Anchoring &
Grounding
Fiber Crew #2
Foreman
Lineman
Lineman Ground Hand
Ground Hand
Anchoring
Grounding Crew
2-Person
Fiber Construction and Deployment
BROADBAND SPECIALISTS INC