BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION

on

04 NOVEMBER 2015, PARLIAMENT, Room S12A

concerns related to water supply of wards 24 – 27 and 34

Greater Tzaneen LM, Mopani District

Page 2: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

2

Presentation outline

Water Services – District Overview

MOPANI

Provision of water supply to wards 24 – 27 and 34

Page 3: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

3

Water Services – District Overview

MOPANI

Page 4: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

Background

• The five wards falls under Ritavi II / Tours and Thabina Regional Water Schemes

• They get their water from 3 Water Treatment Works with a total capacity of 40Ml/day and currently producing 38Ml/day as well as 108 boreholes.

Page 5: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

Water Resource

• Thabina Dam which is 41.2% full• Tours Dam which is 53% full• Groot Letaba River• Ground Water augmentation

Page 6: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

Current supply status

Ward

no.

Population Names of Villages Water supply Current

Intervention

24 14 752 Muhlava/ Sasekani/

Zangoma/

Petanenge

• Supplied from Nkowa Nkowa

Water treatment works.

• The plant has the capacity to

produce enough water for is

area of supply

• Bulk water no longer reaches

reservoirs due to illegal

connections

Areas with water

interruptions are

currently

serviced by 9

water tankers

25 9 473 Mafarana

Bourdeux

Ntsako / Bonn

Sedan

Mulati

26 11 767 Tours / Masona

Hoveni

Rhulani

Solani

Nyanyukani

Hweetsi / Sebela

• Supplied from Tours Water

Treatment Works which has

enough capacity for all the

villages.

• Huge no of illegal connection

Page 7: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

Current supply status

Ward

no.

Population Names of Villages Current status Current Intervention

27 22 472 Makhubidung

Mokgapeng

Shoromoni

Ezekhaya / Shilubane

Matshilapata

Serotutung

Hospitalview

Mineview

Senkwana

Malekeke

• Supplied from Tours

Water Treatment Works

which has enough

capacity for all the

villages.

• Huge number of illegal

connection

Areas with water

interruptions are

currently serviced by 9

water tankers

34 18 900 Khopo

Lephepane

Thabina (Mogoboya)

Rasebalane

Topanama

• Supplied from Thabina

Water Treatment Works

• Huge number of illegal

connections

Areas with water

interruptions are

currently serviced by 9

water tankers

Page 8: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

District profile

Municipality Population Wards

Current No. Villages

Current No. Urban Areas

GGM 244 217 30 93 1

GLM 212 701 29 80 3

GTM 390 095 34 125 5

BPM 150 637 18 23 4

MLM 94 857 14 33 3

MDM TOTAL 1 092 507 125 354 16

Page 9: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

• Mopani District Municipality depends largely on the Letaba, and the Olifant River

systems as well as ground water augmentation

• The Letaba catchment is over stressed.

• There are five large dams, namely, Ebenezer, Tzaneen, Magoebaskloof, Nsami,

Middle letaba which supply water across municipalities in Mopani.

9

Page 10: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

• Mopani DM has nine Regional Water Schemes with 24 Water Treatment Works

(WTW) with a total design of 234.42 Ml/d and currently producing 202, 08 Ml/d.

• Out of 24 WTW, 23 are operational and 1 not operational namely

o Metz Package Plant – Alternative supply from mountain spring

10

Page 11: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

BULK WATER PROVISION# PLANT Municipality MEGALIT

ERCLASS Population

SuppliedCapacity

1 GIYANI WATER WORKS

Greater Giyani 36.7 B 185 077 Adequate

2 MIDDLE LETABA WATER WORKS

Greater Giyani 36 B 39 638 Insufficient

3 MUYEXE WATER WORKS

Greater Giyani 1.08 D 3 228 Adequate

4 ZAVA WATER WORKS Greater Giyani 0.3 D 4 821 Adequate

5 MAPUVE WATER WORKS

Greater Giyani 4 C 15 196 Adequate

6 TZANEEN WATER WORKS

Greater Tzaneen

6 C 14 571 Insufficient

7 LETSITELE WATER WORKS

Greater Tzaneen

1.8 C 406 Adequate

8 NKAMBAKO WATER WORKS

Greater Tzaneen

12 C 99 152 Insufficient

9 SEMARELA WATER WORKS

Greater Tzaneen

1 E Part of Thapane

Insufficient

10 THABINA WATER WORKS

Greater Tzaneen

9 C 75 384 Reached the capacity of both the plant and the dam

11 GEORGE VALLEY WATER WORKS

Greater Tzaneen

9 C 423 Adequate

Page 12: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

BULK WATER PROVISION

# PLANT Municipality MEGALITER

CLASS

Population Deficit

12 THAPANE WATER WORKS

Greater Tzaneen

4.5 C 113 192 Insufficient

13 TOURS WATER WORKS Greater Tzaneen

4 C 52 216 Being upgraded

14 NKOWANKOWA WATER WORKS

Greater Tzaneen

24 C 99 676 Insufficient

15 MODJADJI WATER WORKS

Greater Letaba 12 C 71 519 Insufficient

16 POLITSI WATER WORKS Greater Letaba 5.5 C 11 994 To be upgraded in the current financial year

17 KURATA WATER WORKS Greater Letaba - - 1 664 Insufficient

18 PHALABORWA WATER WORKS

Ba-Phalaborwa

76 B 151 952 Adequate

19 NONDWENI WATER WORKS

Ba-Phalaborwa

4.7 D 21 581 Adequate

20 THE OAKS WATER WORKS

Maruleng 1 D 19 304 Insufficient

21 Mametja/Sekororo Water Works

Maruleng  15 C  94 857 Under construction

Page 13: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

HOT SPOTS

Municipality Community Challenge Intervention Required Progress to date

Greater Tzaneen

Relela Insufficient water from Thapane Water Works

Upgrading of the water treatment plant;

TR submitted to DWS for additional abstraction

Illegal connections along the bulk pipelines

Replacement of the existing PVC pipe with steel pipe;

Lack of reticulation infrastructure at village extensions

Provision of internal water reticulation

Awaiting the approval of the MWIG BP

Petanenge, Muhlava, Sasekani, Co-Op

Insufficient water from Nkowankowa Water Works

Review allocated quota and upgrade

Illegal connections along the bulk pipelines

Uprooting of the illegal connection along the bulk pipeline

Municipality team is on site for the uprooting of the illegal connections

Vandalised booster pump station

Repair of booster pump stations

Contractor appointed

Lack of reticulation infrastructure at village extensions

Provision of internal water reticulation

Awaiting the approval of the MWIG BP (Sasekani &Zangoma)

Page 14: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

HOT SPOTS

Municipality Community Challenge Intervention Required

Progress to date

Greater Tzaneen

Tickyline Insufficient internal water reticulation infrastructure

Extend reticulation to cover extension

Technical report finalised and is being assessed.

Greater Letaba

Hlohlokwe, Taulome and Mamanyowa

Insufficient bulk water supply

Extension of the Nkambako bulk pipeline

Designs are complete. This is part of DWS Phase 2 Intervention project

Four boreholes have been drilled, tested and equipped and there is supply of water

Kgapane Insufficient bulk water supply

Extension of Politsi WTW by LNW

Licence for additional water has been granted to LNW. Designs for extension for the plant are complete. Contract advertised.

Utilization of ground water

LNW is exploring a possibility of augmenting the system with ground water

Page 15: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

Major projects under implementation

• MAMETJA SEKORORO RWS – CONSTRUCTION OF 15ML WATER TREATMENT WORKS

AT THE OAKS

• UPGRADING OF WATER RETICULATION IN MARULENG

• HOEDSPRUIT BULK WATER SUPPLY

• KAMPERSRUS BULK WATER SUPPLY

• KAMPERSRUS SEWAGE PLANT

• THABINA WATER PROJECT

• LEPHEPANE WATER PROJECT

• TOURS WTW

• UPGRADING OF WATER RETICULATION IN BPM

Page 16: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

16

Provision of water supply to wards 24 – 27 and 34Greater Tzaneen Local Municipality

Page 17: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

STATUS OF WATER SUPPLY: BULK WATER: WARD 24

Community Name

Population

Water Supply Scheme

Challenge Planned Intervention

Timeframe

Progress

Muhlava Headkraal

1 768 Nkowankowa

Damaged pipeline during road construction

Contractor to reinstate the pipeline

30 November 2015

No progress

Sasekani 5 616 Nkowankowa

Partially receiving water due to illegal connection and the reticulation is vandalized

Removal of illegal connections along the bulk pipeline

30 November 2015

Booster pump station repaired. Contractor busy reinstating the rising main.

Petanenge 5 228 Nkowankowa

No bulk supply. Eskom to replace the stolen cable

Power supply cable stolen on Thursday, 29 October 2015 immediately after replaced.

Zangoma 2 202 Nkowankowa

No bulk supply as it is dependent on Petanenge booster pump station

Eskom to replace the stolen cable

Page 18: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

STATUS OF WATER SUPPLY: BOREHOLES: WARD 24

Community Name

No. of Boreholes

Operational

Non Operational

Challenge Planned Intervention

Timeframe

Progress

Muhlava Headkraal

5 2 2 Transformer, motor and cables stolen and power supply

Refurbishment of the borehole and application for electricity connection

Application has been made with Eskom and replacement of stolen equipment has been reported

1 Outlet pipe broken

Replacement of the pipe

6 Nov Maintenance team is on site

Sasekani 2 1 1 Vandalized immediately after completion

Refurbishment of the borehole

Reported to Eskom for the replacement of the stolen cables.

Petanenge 9 5 1 Motor stolen Replacement of the motor

15 Nov Procurement for a contractor is underway

1 Collapsed Re-drilling 30 Nov Procurement for a contractor is underway

Page 19: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

STATUS OF WATER SUPPLY: BOREHOLES: WARD 24

Community Name

No. of Boreholes

Operational

Non Operational

Challenge Planned Intervention

Timeframe

Progress

Petanenge 5 5 2 Motor stolen Replacement of the motor

15 Nov Procurement for a contractor is underway

1 Collapsed Re-drilling 30 Nov Procurement for a contractor is underway

1 Mechanical fault Loose drive shafts/rods

7 Nov Receiving attention from internal maintenance team

Zangoma 4 2 1 Diesel engine stolen

Replacement of engine

14 Nov Receiving attention from internal maintenance team

1 Motor stolen Replacement of the motor

15 Nov Procurement for a contractor is underway

Page 20: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

STATUS OF WATER SUPPLY: BULK WATER: WARD 25

Community Name

Population Water Supply Scheme

Challenge Planned Intervention

Timeframe Progress

Bonn 3 542 Nkowankowa Booster pump station at Coop is totally vandalized. Illegal between Co-op and Gabaza

Refurbishment of the booster pump station

Dependent on the availability of water at Co-op reservoir

Removal of illegal connections between Dan and Sasekani

Mafarana 2 808 Nkowankowa AC Pipeline via Mafarana to Bonn damaged during road construction

Contractor to be appointed to reinstate the pipeline as part of disruption of existing services

December 2015

Procurement of a service provider is underway

Mulati 2 830 Nkowankowa Booster pump station at Sedan vandalized

Refurbishment of the booster pump station

Dependent on the availability of water at Co-op reservoir

Removal of illegal connections between Dan and Sasekani

Page 21: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

STATUS OF WATER SUPPLY: BULK WATER: WARD 25

Community Name

Population

Water Supply Scheme

Challenge Planned Intervention

Timeframe Progress

Ntsako 1 166 Nkowankowa

Booster pump station at Coop is totally vandalized. Illegal between Co-op and Gabaza

Refurbishment of the booster pump station

Dependent on the availability of water at Co-op reservoir

Removal of illegal connections between Dan and Sasekani

Sedan 2 041 Nkowankowa

Booster pump station at Coop is totally vandalized. Illegal between Co-op and Gabaza

Refurbishment of the booster pump station

Dependent on the availability of water at Co-op reservoir

Removal of illegal connections between Dan and Sasekani

Page 22: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

STATUS OF WATER SUPPLY: BOREHOLES: WARD 25

Community Name

No. of Boreholes

Operational

Non Operational

Challenge Planned Intervention Timeframe

Progress

Bonn 13 2 4 Motor, panel and/or cables stolen

Replacement of stolen equipment

14 Nov Procurement for a contractor is underway

3 Dry and or collapsed

Drilling of new borehole Included in the 2015/16 approved MWIG BP

1 Mechanical fault Repairing of diesel engine and reconstruction of concrete slab

14 Nov Contractor on site as it is still under Defects Liability Period

3 Mechanical fault Repairing and/or replacement of broken equipment

14 Nov Procurement of spares is underway.

Mafarana 8 2 2 Mechanical fault Replacement of engine 14 Nov Contractor on site as it they are still under Defects Liability Period

3 Vandalized or dry Refurbishment Included in the 2015/16 approved MWIG BP

Page 23: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

STATUS OF WATER SUPPLY: BOREHOLES: WARD 25

Community Name

No. of Boreholes

Operational

Non Operational

Challenge Planned Intervention Timeframe

Progress

Mafarana 1 Mechanical fault Repairing or replacement of broken equipment

7 Nov Receiving attention from the maintenance team

Mulati 11 4 4 Mechanical fault Replacement of engine 14 Nov Contractor on site as it is still under Defects Liability Period

2 Vandalized Refurbishment 14 Nov Receiving attention from the internal maintenance team

1 No power supply Application for electricity connection

Awaiting for a quotation from Eskom

Ntsako 4 2 1 Motor and cables stolen

Replacement of stolen equipment

14 Nov Procurement underway

1 Collapsed Re-drilling of borehole 18 Dec Procurement of a contractor is underway

Page 24: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

STATUS OF WATER SUPPLY: BOREHOLES: WARD 25

Community Name

No. of Boreholes

Operational

Non Operational

Challenge Planned Intervention Timeframe

Progress

Sedan 3 1 1 Diesel engine stolen

Replacement of engine 18 Dec Procurement of a contractor is underway

1 Collapsed Re-drilling of borehole 18 Dec Procurement of a contractor is underway

Page 25: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

STATUS OF WATER SUPPLY: BULK WATER: WARD 26

Community Name

Population

Water Supply Scheme

Challenge Planned Intervention

Timeframe

Progress

Bourdeaux 217 Tours The stand pipes are vandalised and the existing infrastructure has not been working for some time

Refurbishment of the infrastructure an extension of the reticulation network..

Implementation is dependent on the approval of the technical report

Technical reports completed and being assessed by DWS to access MIG funds and the plant is being upgraded

Hoveni 1 564 Tours The stand pipes are vandalised and the existing infrastructure has not been working for some time

Refurbishment of the infrastructure an extension of the reticulation network..

As above As above

Hweetji 1 716 Tours The stand pipes are vandalised and the existing infrastructure has not been working for some time

Refurbishment of the infrastructure an extension of the reticulation network..

As above As above

Page 26: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

STATUS OF WATER SUPPLY: BULK WATER: WARD 26

Community Name

Population

Water Supply Scheme

Challenge Planned Intervention

Timeframe Progress

Masoma 4 192 Tours The stand pipes are vandalised and the existing infrastructure has not been working for some time

Refurbishment of the infrastructure an extension of the reticulation network.

Implementation is dependent on the approval of the technical report

Technical reports completed and being assessed by DWS to access MIG funds. The plant is being upgraded

Nyanyukani

885 Tours Part of the village is getting water from the illegal connection on the rising main

Refurbishment of the infrastructure an extension of the reticulation network..

As above As above

Rhulani 3 052 Tours Part of the village is getting water from the illegal connection on the rising main

Refurbishment of the infrastructure an extension of the reticulation network.

As above As above

Page 27: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

STATUS OF WATER SUPPLY: BULK WATER: WARD 26

Community Name

Population

Water Supply Scheme

Challenge Planned Intervention

Timeframe

Progress

Solani 510 Tours The stand pipes are vandalised and the existing infrastructure has not been working for some time

Refurbishment of the infrastructure an extension of the reticulation network.

Implementation is dependent on the approval of the technical report

Technical reports completed and being assessed by DWS to access MIG funds. The plant is being upgraded

Page 28: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

STATUS OF WATER SUPPLY: BOREHOLES: WARD 26

Community Name

No. of Boreholes

Operational

Non Operational

Challenge Planned Intervention Timeframe

Progress

Bourdeaux 4 4 0 Not applicable Not applicable N/A Not applicable

Hoveni 3 2 1 Broken pipes Replacement and or repairing of the pipes

14 Nov Receiving attention from the internal maintenance team

Hweetji Sabela

1 1 1 Not applicable Not applicable N/A Not applicable

Nyanyukani

2 0 2 Vandalized Replacement of stolen transformer and refurbishment of borehole

18 Dec Reported to Eskom for the replacement of the transformer and that procurement are underway for the re-equipping of the borehole

Rhulani 3 2 1 Vandalized Refurbishment of the borehole

18 Dec Procurement is underway for the appointment of a contractor

Page 29: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

STATUS OF WATER SUPPLY: BOREHOLES: WARD 26

Community Name

No. of Boreholes

Operational

Non Operational

Challenge Planned Intervention Timeframe

Progress

Solani 3 1 2 Vandalized and diesel engine stolen

Replacement of diesel engine and refurbishment of boreholes

N/A Procurement is underway for the appointment of a contractor

Tours 1 1 1 Not applicable Not applicable N/A Not applicable

Page 30: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

STATUS OF WATER SUPPLY: BULK WATER: WARD 27

Community Name

Population

Water Supply Scheme

Challenge Planned Intervention

Timeframe Progress

Makhubidung

6 020 Tours Part of the village is getting water from the illegal connection on the rising main

Refurbishment of the infrastructure an extension of the reticulation network.

Implementation is dependent on the approval of the technical report

Technical reports completed and being assessed by DWS to access MIG funds. The plant is being upgraded

Mogapeng 10 278 Tours They get water daily from the illegal connections that are made on the rising main

Refurbishment of the infrastructure an extension of the reticulation network.

As above As above

Page 31: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

STATUS OF WATER SUPPLY: BULK WATER: WARD 27

Community Name

Population

Water Supply Scheme

Challenge Planned Intervention

Timeframe Progress

Pharare 7 978 Tours Part of the village is getting water from the illegal connection on the rising main

Refurbishment of the infrastructure and extension of the reticulation network

Implementation is dependent on the approval of the technical report

Technical reports completed and being assessed by DWS to access MIG funds. The plant is being upgraded

Shiluvane 15 861 Tours Part of the village is getting water from the illegal connection on the rising main

Refurbishment of the infrastructure and extension of the reticulation network

Implementation is dependent on the approval of the technical report

As above

Page 32: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

STATUS OF WATER SUPPLY: BULK WATER: WARD 27

Community Name

Population

Water Supply Scheme

Challenge Planned Intervention

Timeframe Progress

Lephephane

1 226 Thabina The booster pump station has been discontinued and there is no bulk water in those villages they depend on mountain water stream which was community driven and upgraded by CSIR

Completion of the booster pump station and the damaged bulk pipeline

March 2016 Assessment report concluded.

Page 33: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

STATUS OF WATER SUPPLY: BOREHOLES: WARD 27

Community Name

No. of Boreholes

Operational

Non Operational

Challenge Planned Intervention Timeframe

Progress

Makhubidung

4 2 1 Vandalized Refurbishment of borehole

18 Dec Procurement is underway for the re-equipping of the borehole

1 Collapsed Fishing of pipes and rods

30 Nov Procurement is underway for the re-equipping of the borehole

Mineview 1 1 0 Not applicable Not applicable N/A Not applicable

Mogapeng 3 2 1 No power source Application for electricity connection

Application done. Awaiting for quotation from Eskom

Pharare 4 1 3 Vandalized and or motor and cable stolen

Refurbishment of boreholes

30 Nov Procurement is underway for the re-equipping of the borehole

Page 34: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

STATUS OF WATER SUPPLY: BOREHOLES: WARD 27

Community Name

No. of Boreholes

Operational

Non Operational

Challenge Planned Intervention Timeframe

Progress

Shiluvane 7 2 3 Collapsed Re-drilling 18 Dec Procurement is underway for the re-equipping of the borehole

Page 35: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

STATUS OF WATER SUPPLY: BULK WATER: WARD 34

Community Name

Population

Water Supply Scheme

Challenge Planned Intervention

Timeframe

Progress

Maake 3 371 Thabina Loss of water along the bulk pipeline through illegal

Replacement and upgrading of the bulk pipe

End of Feb 2016

A diversion pipeline is being constructed

Bokgaga 5 236 Thabina Loss of water along the bulk pipeline through illegal

Replacement and upgrading of the bulk pipe

End of Feb 2016

A diversion pipeline is being constructed

Mphame 3 269 Thabina Loss of water along the bulk pipeline through illegal

Replacement and upgrading of the bulk pipe

End of Feb 2016

A diversion pipeline is being constructed

Mogoboya 4 398 Thabina Loss of water along the bulk pipeline through illegal

Replacement and upgrading of the bulk pipe

End of Feb 2016

A diversion pipeline is being constructed

Rasebalane

1 226 Thabina Loss of water along the bulk pipeline through illegal

Replacement and upgrading of the bulk pipe

End of Feb 2016

A diversion pipeline is being constructed

Page 36: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

STATUS OF WATER SUPPLY: BULK WATER: WARD 34

Community Name

Population

Water Supply Scheme

Challenge Planned Intervention

Timeframe

Progress

Serare 1 489 Thabina Loss of water along the bulk pipeline through illegal

Replacement and upgrading of the bulk pipe

End of February 2016

Rehabilitation of the bulk pipeline is underway

Topanama 846 Thabina Loss of water along the bulk pipeline through illegal

Replacement and upgrading of the bulk pipe

End of February 2016

Rehabilitation of the bulk pipeline is underway

Page 37: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

STATUS OF WATER SUPPLY: BOREHOLES: WARD 34

Community Name

No. of Boreholes

Operational

Non Operational

Challenge Planned Intervention Timeframe

Progress

Lephephane Co-op

3 1 1 Vandalized Refurbishment 14 Nov Contractor on site

1 No Power source

Application for electricity connection

30 Nov Application done. Awaiting for quotation from Eskom

Bokgaga 2 1 1 Mechanical fault Replacement of a pumping unit (element)

15 Nov Procurement is underway for supply and delivery of the required element.

Maake Headkraal

2 0 1 No power source Application for electricity connection

Application done. Awaiting for quotation from Eskom

1 Transformer and cable stolen

Replacement of transformer and cable

Reported to Eskom

Mogoboya 1 0 1 Vandalized Refurbishment of boreholes

30 Nov Procurement is underway for the re-equipping of the borehole

Page 38: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

STATUS OF WATER SUPPLY: BOREHOLES: WARD 34

Community Name

No. of Boreholes

Operational

Non Operational

Challenge Planned Intervention Timeframe

Progress

Rasebalane 2 1 1 Damaged electrical cable

Replacement of the damaged cable

7 Nov Receiving attention from the internal maintenance team

Serare 3 0 3 Not applicable Not applicable N/A Not applicable

Page 39: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

CHALLENGES

Illegal Connections;

• The Bulk pipe lines, on the entire Bulk Water Schemes, have

a lot of leakages caused by illegal connections.

• The connections are done by communities on pipe lines from

water treatment works to various reservoirs.

• The extent of the illegal connections has resulted in high

water losses on bulk pipelines and thus water does not reach

existing reservoirs and the sections of distribution network.

Page 40: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

CHALLENGES

Supply System Below Standard

• Most villages within the scheme have water supply systems which are below

the minimum standard,

• There is no proper reticulation.

• Some people walk for long distances to fetch water

• Thabina Water Treatment works is drawing more water than the dam can

supply

Poor state of repair of the water system;

• The existing Bulk pipe lines are currently perforated with illegal connections.

• Most pipelines were built pre 1994 using Asbestos Cement (AC) pipes. This

type of pipes contributes to water losses since they are prone to cracks and

(Solid) settlements.

Page 41: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

CHALLENGES

Increase in water demand

• The design of most of infrastructures within the scheme was

based on the demand of 25l/c/d, which has been beyond doubt

proven to be an unrealistic figure.

• The consumption pattern has significantly changed since most of

the communities have illegally connected water into their yards.

This automatically rises to yard connection category with

consumption between 60-100l/c/d.

• Furthermore, the villages within the scheme have grown in

population resulting in increased water demand.

Page 42: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

Challenges and interventions

Challenges Intervention

Vandalism and theft of water services infrastructure. Public awareness on By-Laws and enforcement

Water allocations The review of the allocated quota to allow upgrades

Illegal connections that renders water supply

schemes inefficient.

Extension of water reticulation network and

uproot/remove illegal connections

Ageing water infrastructure Source more funds to replace it, e.g asbestos pipes

Demand higher than the supply capacity Upgrading of the water infrastructure

Ageing infrastructure resulting into high frequency in

services interruption

Develop replacement program and source funding

Physical condition of the water services infrastructure

(WWTP)

Refurbish and rehabilitate both water and waste

water plants

Page 43: BRIEFING TO THE PORTFOLIO COMMITTEE ON WATER AND SANITATION on 04 NOVEMBER 2015, PARLIAMENT, Room S12A concerns related to water supply of wards 24 – 27.

43

Thank You