Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky...

46
Briefing to the North Front Range MPO Planning Council October 5, 2017

Transcript of Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky...

Page 1: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

Brie

fing

to th

eN

orth

Fro

nt R

ange

MPO

Pla

nnin

g Co

unci

lO

ctob

er 5

, 201

7

Page 2: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

Exce

eds

fede

ral h

ealth

st

anda

rds

Air

qual

ity is

im

prov

ing

2017

“cle

an d

ata”

yea

rM

ore

dead

lines

com

ing

CDPH

E an

d pa

rtne

rs

are

wor

king

to r

educ

e oz

one

2

Page 3: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

2008

sta

ndar

d75

ppb

, bas

ed o

n 4t

h

max

day

at e

ach

mon

itor

SIPs

sub

mitt

ed to

EP

A20

17 is

a b

ench

mar

k ye

ar

2015

sta

ndar

d70

ppb

Des

igna

te

nona

ttai

nmen

t ar

ea 2

017-

2018

Atta

inm

ent

dead

line

2020

-20

21

3

Page 4: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

4

0.06

0

0.06

5

0.07

0

0.07

5

0.08

0

0.08

5

0.09

02000-2002

2001-2003

2002-2004

2003-2005

2004-2006

2005-2007

2006-2008

2007-2009

2008-2010

2009-2011

2010-2012

2011-2013

2012-2014

2013-2015

2014-2016

2015-2017

Parts per million

Year

Ozo

ne T

rend

Gra

dual

ly Im

prov

ing

Thre

e-ye

ar A

vera

ge o

f 4th

Max

DM

NFR

Key

Site

sH

ighl

and

Chat

field

Par

k

NRE

L

Rock

y Fl

ats-

N

Fort

Col

lins-

W

Rock

y M

tn N

P

Wel

d Co

Tw

r

Line

ar (N

REL)

2017

thru

9/30

Page 5: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

Mon

itor

Day

s >

75

ppb

With

/With

out

Exce

ptio

nal E

vent

s

4th

Max

With

/With

out

Exce

ptio

nal E

vent

sN

REL

5/2

days

76/7

5 pp

b

Fort

Col

lins

Wes

t3/

2 da

ys75

/75

ppb

Rock

y Fl

ats

Nor

th3/

2 da

ys75

/75

ppb

All o

ther

s 2

day

s 7

5 pp

b

5

*CD

PHE

will

ask

EPA

to e

xclu

de tw

o da

ys a

t NRE

L

Page 6: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

Prog

ress

Wor

k to

Do

“Cle

an d

ata”

yea

r…Ad

ditio

nal y

ear

to

atta

in 7

5 pp

bO

zone

fell

due

to:

Low

er e

mis

sion

sW

eath

erM

ore

emis

sion

re

duct

ions

com

ing

…. b

arel

yN

eed

clea

n da

ta

year

s in

201

8 an

d 20

19, o

r m

ay fa

ce

“ser

ious

” re

clas

sific

atio

nM

ust a

ttai

n 70

ppb

st

anda

rd n

ext

6

Page 7: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

Prop

osed

oil

& ga

s ru

les

Mor

e IR

cam

era

insp

ectio

nsCu

t VO

Cs a

bout

6,0

00 tp

yEl

ectr

ic v

ehic

le p

lan,

VW

, fe

dera

l car

sta

ndar

dsAd

opt m

ajor

sou

rce

RACT

Pa

int/

cons

umer

pr

oduc

tsFu

els

stud

yVo

lunt

ary

mea

sure

s

7

Page 8: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

8

Page 9: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

08-0

01-3

001

Wel

by71

07/2

468

07/0

668

07/2

268

08/2

267

07/0

108

-005

-000

2Hi

ghla

nd76

07/0

676

07/0

773

07/2

272

07/0

871

07/2

008

-005

-000

6Au

rora

Eas

t76

07/0

674

07/1

069

07/0

369

07/2

468

07/0

708

-013

-001

4Bo

ulde

r Res

ervo

ir78

08/0

474

07/1

474

07/2

373

07/0

573

07/2

708

-019

-000

6M

ines

Pea

k (n

on-r

egul

ator

y)82

04/2

280

04/2

371

06/0

470

07/2

470

09/0

408

-031

-000

2CA

MP

6909

/04

6807

/22

6707

/01

6709

/02

6607

/05

08-0

31-0

026

La C

asa

6907

/22

6909

/02

6909

/04

6807

/27

6607

/23

08-0

35-0

004

Chat

field

Sta

te P

ark

7807

/07

7607

/05

7507

/20

7407

/06

7407

/08

08-0

41-0

013

Colo

. Spg

s. -

USA

F Ac

adem

y73

04/0

970

09/0

469

06/2

969

07/0

569

07/2

108

-041

-001

6M

anito

u Sp

rings

7404

/09

7107

/05

7006

/29

7007

/09

6806

/13

08-0

45-0

012

Rifle

- He

alth

6404

/22

6106

/03

6006

/12

5905

/13

5804

/10

08-0

59-0

005

Wel

ch76

07/0

576

07/2

475

07/2

775

09/0

275

09/0

408

-059

-000

6Ro

cky

Flat

s - N

7809

/04

7707

/23

7607

/24

7507

/01

7507

/05

08-0

59-0

011

NRE

L81

07/2

778

07/2

477

08/1

876

09/0

276

09/0

408

-059

-001

3As

pen

Park

7209

/04

6907

/16

6804

/07

6807

/24

6606

/04

08-0

69-0

011

Fort

Col

lins -

Wes

t78

07/0

576

06/0

876

08/3

075

07/1

475

07/2

008

-069

-100

4Fo

rt C

ollin

s - C

SU70

07/0

566

06/0

866

07/1

466

07/2

365

06/0

408

-077

-002

0Pa

lisad

e - W

ater

6806

/03

6704

/22

6606

/12

6406

/30

6407

/01

08-0

81-0

003

Elk

Sprin

gs65

09/0

764

07/2

364

09/0

463

06/0

361

01/3

008

-083

-000

6Co

rtez

6204

/22

6207

/01

6105

/14

6105

/15

6005

/12

08-0

85-0

005

Para

dox

6306

/03

6306

/12

6204

/27

6106

/24

6005

/31

08-1

23-0

009

Gree

ley

- Wel

d To

wer

7607

/20

7507

/23

7407

/05

7408

/30

7207

/02

08-0

51-9

991

EPA

- Got

hic

CAST

NET

8204

/22

6605

/23

6606

/24

6504

/23

6504

/27

08-0

67-1

004

USF

S –

Sham

rock

(thr

u 6/

30)

7304

/22

7104

/21

7005

/23

6604

/09

6606

/03

08-0

67-7

001

SUIT

- Ig

naci

o74

05/2

373

04/2

271

06/0

369

05/2

869

05/2

908

-067

-700

3SU

IT -

Bond

ad72

05/2

372

06/0

371

04/2

269

04/2

169

05/2

908

-069

-000

7N

PS -

Rock

y M

tn. N

P74

09/0

670

04/2

368

09/0

467

04/2

267

07/0

108

-083

-010

1N

PS -

Mes

a Ve

rde

NP

7204

/22

6706

/24

6604

/20

6604

/23

6606

/03

08-0

93-0

002

USF

S/BL

M -

Fairp

lay

n/a

08-1

03-0

005

BLM

- M

eeke

r63

06/0

361

04/2

260

05/1

359

04/1

358

09/0

608

-103

-000

6BL

M -

Rang

ely

6906

/03

6601

/30

6407

/23

6408

/16

6306

/04

Colo

rado

Dep

artm

ent o

f Pub

lic H

ealth

and

Env

ironm

ent,

Air P

ollu

tion

Cont

rol D

ivisi

on, T

echn

ical S

ervi

ces P

rogr

am

NO

TE: D

ata

influ

ence

d by

nat

ural

eve

nt v

alue

s, if

any

, are

incl

uded

.N

OTE

: Val

ues a

bove

the

leve

l of t

he 7

0 pp

b 8-

hour

stan

dard

are

hig

hlig

hted

in y

ello

w, a

bove

the

75 p

pb st

anda

rd in

ora

nge.

3rd

Max

8-

Hour

(p

pb)

Date

3r

d M

ax

8-Ho

ur

4th

Max

8-

Hour

(p

pb)

Date

4t

h M

ax

8-Ho

ur

5th

Max

8-

Hour

(p

pb)

Date

5t

h M

ax

8-Ho

urAQ

S N

umbe

rSi

te N

ame

1st M

ax 8

-Ho

ur

(ppb

)

Date

1s

t M

ax

8-Ho

ur

2nd

Max

8-

Hour

(p

pb)

Date

2n

d M

ax

8-Ho

ur

***

DRAF

T DA

TA *

**

2017

8

-Hou

r Ozo

ne

(Upd

ated

thro

ugh

Sept

embe

r 30,

201

7)

Page 10: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

2015

2016

2017

(thr

u 9/

30)

2015

- 20

1720

1720

18

08-0

01-3

001

Wel

by69

6668

6777

7808

-005

-000

2Hi

ghla

nd---

7272

------

6808

-005

-000

6Au

rora

Eas

t68

6669

6778

7708

-013

-001

4Bo

ulde

r Res

ervo

ir---

---73

------

---08

-019

-000

6M

ines

Pea

k (n

on-r

egul

ator

y)69

6570

6878

7708

-031

-000

2CA

MP

6770

6768

7575

08-0

31-0

026

La C

asa

7169

6869

7275

08-0

35-0

004

Chat

field

Sta

te P

ark

8178

7477

5360

08-0

41-0

013

Colo

. Spg

s. -

USA

F Ac

adem

y67

6969

6876

7408

-041

-001

6M

anito

u Sp

rings

6566

7067

8176

08-0

45-0

012

Rifle

- He

alth

6860

5962

8493

08-0

59-0

005

Wel

ch75

7575

7562

6208

-059

-000

6Ro

cky

Flat

s - N

7779

7577

5658

08-0

59-0

011

NRE

L81

8376

8048

5308

-059

-001

3As

pen

Park

7073

6870

6971

08-0

69-0

011

Fort

Col

lins -

Wes

t75

7675

7561

6108

-069

-100

4Fo

rt C

ollin

s - C

SU69

7066

6873

7608

-077

-002

0Pa

lisad

e - W

ater

6563

6464

8485

08-0

81-0

003

Elk

Sprin

gs---

5963

------

9008

-083

-000

6Co

rtez

6164

6162

8787

08-0

85-0

005

Para

dox

---62

61---

---89

08-1

23-0

009

Gree

ley

- Wel

d To

wer

7367

7471

7271

08-0

51-9

991

EPA

- Got

hic

CAST

NET

6862

6565

8285

08-0

67-1

004

USF

S –

Sham

rock

(thr

u 6/

30)

6865

6666

7981

08-0

67-7

001

SUIT

- Ig

naci

o68

7169

6973

7208

-067

-700

3SU

IT -

Bond

ad66

7269

6974

7108

-069

-000

7N

PS -

Rock

y M

tn. N

P69

6967

6874

7608

-083

-010

1N

PS -

Mes

a Ve

rde

NP

6666

6666

8080

08-0

93-0

002

USF

S/BL

M -

Fairp

lay

6765

n/a

---80

n/a

08-1

03-0

005

BLM

- M

eeke

r64

5959

6089

9408

-103

-000

6BL

M -

Rang

ely

6661

6463

8587

Colo

rado

Dep

artm

ent o

f Pub

lic H

ealth

and

Env

ironm

ent,

Air P

ollu

tion

Cont

rol D

ivisi

on, T

echn

ical S

ervi

ces P

rogr

am

This

tabl

e pr

ovid

es in

form

atio

n on

the

4th

max

. val

ues f

or 2

015

and

2016

, the

cur

rent

4th

max

. val

ue fo

r 201

7, th

e cu

rren

t 3-y

ear a

vera

ge, a

nd th

e m

ax. p

ossib

le le

vel f

or 2

017

in o

rder

to

rem

ain

in a

ttai

nmen

t of t

he o

zone

stan

dard

. Ba

sed

on th

e cu

rren

t val

ues,

pro

ject

ed m

ax. p

ossib

le le

vels

for 2

018

are

also

incl

uded

.

The

8-ho

ur o

zone

stan

dard

is w

ritte

n su

ch th

at a

ttai

nmen

t is m

et if

the

3-ye

ar a

vera

ge o

f the

4th

max

. val

ue fr

om e

ach

of th

e 3

year

s is l

ess t

han

or e

qual

to 7

0 pp

b.

NO

TE: V

alue

s abo

ve th

e 3-

year

ave

rage

4th

max

imum

8-h

our s

tand

ard

of 7

0 pp

b ar

e hi

ghlig

hted

in re

d, a

bove

the

75 p

pb st

anda

rd in

ora

nge.

NO

TE: D

ata

incl

udes

val

ues t

hat m

ay b

e in

fluen

ced

by n

atur

al e

vent

s.

High

est A

llow

able

4t

h M

axim

um 8

-Hou

r Av

erag

e Va

lue

(ppb

)AQ

S #

Site

Nam

e

4th M

axim

um

8-Ho

ur A

vera

ge

Valu

e (p

pb)

4th M

axim

um

8-Ho

ur A

vera

ge

Valu

e (p

pb)

4th M

axim

um

8-Ho

ur A

vera

ge

Valu

e (p

pb)

3-Ye

ar A

vera

ge

4th M

axim

um

Valu

e (p

pb)

High

est A

llow

able

4t

h M

axim

um 8

-Hou

r Av

erag

e Va

lue

(ppb

)

Page 11: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

October 5, 2017 Director's Report Addendum

2017 CDOT Summit Planning Council and partners currently signed up for the October 23 CDOT Transportation Summit are: Julie Cozad, Sean Conway, Gerry Horak, Rob Casseday, Tom Donnelly, Barbara Koelzer, Kim Redd There are 2 seats remaining that will be filled with NFRMPO staff if Planning Council members do not fill the table

Fix N I-25The N I-25 Coalition meeting scheduled for October 4 at Southwest Weld from 6:30 – 8:00pm was cancelled At the September 1 N I-25 Funding Subcommittee there was consensus to apply to INFRA for Segment 6 and not Segment 5 The NFRMPO is still waiting for traffic analysis and confirmation of whether Segment 6 alone will compete The next N I-25 Funding Subcommittee meeting is scheduled for October 6 from 11:30 to 1:00 pm at Perkins at Crossroads

VanGo™ • Petersen delivered the two remaining VanGo vans • The VanGo™ program is maintaining 90 percent occupancy with 6 vans having 7

registered riders, and 10 percent of vans with waiting lists • VanGo has nearly completed the Toyota door recall fixes• All Dodge recalls have been completed • FTA accepted the VanGo National Transit Database (NTD) reporting on July 18.

This reporting provides the capital funding to purchase vans • The safety meeting was held on September 13 with 63 participants attending (a

10% increase compared to last year) • CDOT made presentation on Park and Rides, Cone Zone Awareness, and I-25

Project updates • The VanGo Coordinator met with the Vice President for Human Resources of

Golden Aluminum to discuss starting up to two company paid vanpools between Greeley and Fort Lupton possibly growing to 100 employees

NFRMPO Model Update The Request for Proposals for an update to the NFRMPO travel model was released on August 1 The NFRMPO received two proposals on September 26 The Model selection committee met October 4 and negotiations with the preferred consultant team will begin on October 6 The Consultant team is expected to start in January 2018

Land Use and Water Training The NFRMPO planning staff and Dawn Anderson from Evans, Kim Frick from Loveland, and Tom Parko from Weld attended a free two and a half day training (September 11-13) as a team learning to integrate land use and water resource planning sponsored by DOLA, the Sonoran Institute, Gates Foundation, Lincoln Land Institute and Keystone Policy Center Two NFRMPO staff will meet with the Fort Collins team on October 16 The NFRMPO team will meet on October 26 to formulate a plan

Page 12: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

Front Range Rail Becky Karasko is the staff member for the NFRMPO on the FRR Commission The Front Range Rail/SW Chief Commission met on September 8 with the next meeting planned for October 5 David Krutsinger, CDOT DTR will make a presentation on the Commission at the October Planning Council meeting

Mobility Committees The Larimer County Senior Transportation Coalition will meet on October 5, the Larimer Mobility Committee will meet October 19 from 1:30 -3:00 pm at the NFRMPO office and Weld Mobility Committee will meet October 24 from 1:30-3:00 at the Greeley Chamber of Commerce and the next meeting will occur on October 24 At the same time, the NFRMPO staff will have information on Air Quality and VanGo™ The NFRMPO has communicated with 1,625 residents and visitors at Fort Collins Earth Day, Johnstown BBQ Day, Berthoud Day, FC Open Streets, Bike to Work Day, Eaton Day, LaSalle Days, Beef N Bean Day, Johnstown Senior Center, Severance Days, Corn Road Festival, Windsor Harvest Festival and Evans Heritage Day

Page 13: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

FHWA Certification FHWA will provide the schedule for the NFRMPO Certification review at the October 11 CDOT/NFRMPO/FHWA/FTA Coordination meeting

VW Proposed Partial Consent Decree Please send any comments on the Colorado Implementation Plan for the VW settlement to [email protected] deadline for comments is October 13, 2017 For more information, https://www.colorado.gov/pacific/cdphe/VWAn updated letter with comments was sent out on October 5 The Update includes supporting Transfort’s electrification of the CSU routes

TAZ updates The NFRMPO met with Fort Collins on Monday September 18 They will meeting with Estes Park and RMNP, Loveland, Mead, Wellington and Larimer County in October The NFRMPO staff will also meet with the transit leadership from Estes Park and RMNP

NoCo Bike and Ped Collaborative The group discussed projects to use Non-motorized funds being returned to the NFRMPO at their September 13 meetingThey plan to make a recommendation to TAC at their October 11 meeting

StaffChristina will be offering two staff trainings in October “How to have influence” on October 9 “Get Stuff Done” on October 10

Travel Time collectors The MPO requested proposals to provide travel time collectors to cover the Regionally Significant Corridors as required by FHWA The responders were un able to meet the September 25 deadline for delivery The preferred supplier has agreed to extend pricing until March 31, 2018The project will need to be amended into the FY 2018 UPWP

Bike/Pedestrian Counters The NFRMPO purchased three additional bicycle and pedestrian counters - two permanent and one additional mobile for use in the region which arrived on September 25 The Town of Windsor is currently using the non-motorized counters Weld County and Ella Romero 4-8 Campus are interested in pedestrian counts along E 20th and Cherry Streets. There is no pedestrian infrastructure along either street currentlyFor more information on reserving the counters, contact Ryan Dusil at 970-224-6191 or by email [email protected]

Council/Board Presentations Please let me know if you would like me to make a presentation on MPO efforts underway to your board or council

Page 14: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

Planning Council Please let Renae know if you do not need a mailed packet to reduce paper

NFRMPO Documents available electronically or as printed copies To assist with public outreach, staff has designed and printed the following documents:

o NFRMPO and VanGo™ Brochures o 2016 Annual Reporto Updated 2040 RTP Brochureo Mobility Postcards o NFRMPO Public Involvement

Brochureo Mobility Rider’s Guide o Spanish Mobility Rider’s Guide o Quarterly Newsletter o VanGo Dashboard

Page 15: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o
Page 16: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

The North Front Range Transportation & Air Quality Planning Council is the designated Metropolitan Planning Organization for the North Front Range

419 Canyon Avenue, Suite 300 Fort Collins, Colorado 80521 (970) 221-6243(800) 332-0950 (VanGo)FAX: (970) 416-2406www.nfrmpo.org www.VanGoVanpools.org

MPO Planning CouncilMayor Kevin Ross- Chair Town of Eaton

Commissioner Tom Donnelly- Vice Chair Larimer County

Jennifer Baker Town of Berthoud

Mayor John Morris City of Evans

Mayor Pro-Tem Gerry Horak- Past Chair City of Fort Collins, Transfort

Town of Garden City Robb Casseday City of Greeley

Troy MellonTown of Johnstown

Paula Cochran Town of LaSalle

Joan Shaffer City of Loveland

Mayor Pro-Tem Linda Measner Town of MillikenMayor Don Brookshire Town of Severance

Aaron PearsonTown of TimnathCommissioner Sean ConwayWeld County

Mayor Kristie Melendez Town of Windsor

Chris ColclasureCDPHE- Air Pollution Control Division

Kathy GillilandTransportation Commission

MPO StaffTerri Blackmore Executive Director

Becky KaraskoRegional Transportation Planning Director

Renae Steffen Administrative Director

Crystal HedbergFinance and Operations Manager

October 5, 2017

Chris Colclasure Colorado Department of Pubic Heath and Environment (CDPHE) Air Pollution Control Division 4300 Cherry Creek S Drive Denver, CO 80246

Re: Volkswagen Settlement Proposed Mitigation Plan

Dear Mr. Colclasure:

The North Front Range Transportation and Air Quality Planning Council (NFRT&AQPC) is supportive of the Colorado Department of Public Health and Environment’s (CDPHE) efforts to bring the North Front Range and Denver Metro Area into compliance with the national Ozone standards.

The NFRT&AQPC would also like to thank CDPHE’s proactive preparation of the Proposed Mitigation Plan. As noted at the Public Hearing held on September 18, your efforts have put the State of Colorado in a position to use the Settlement funding as soon as it becomes available.

As noted in the Settlement, the funding is to be used to reduce Nitrogen Oxides (NOx) in areas most impacted by the noncompliant VW vehicles and to reduce pollution in the areas where Environmental Justice (EJ) populations are concentrated. Many of the comments made at the Public Hearing were from EJ populations requesting relief from public bus pollution.

The NFRT&AQPC supports spending the Settlement funds on projects that will benefit the area where the majority of the polluting vehicles were located – along the Front Range. Additionally, the NFRT&AQPC supports concentrating the fueling infrastructure along the corridors identified as Alternative Fuel Corridors by the Colorado Department of Transportation (CDOT) and local communities in 2016.

The transit agencies within the North Front Range all have buses within their fleets which are operating beyond their useful life. The NFRT&AQPC supports using 18 percent of the Settlement funds for transit. The NFRT&AQPC recommends CDOT take public comment on their process for allocating these transit funds. The NFRT&AQPC strongly recommends CDPHE track where projects awarded funding are located and to reallocate Settlement funds if the majority of the funds are not spent in Front Range communities.

Page 17: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

The North Front Range Transportation & Air Quality Planning Council is the designated Metropolitan Planning Organization for the North Front Range

The NFRT&AQPC supports electrification of transit vehicles in the Ozone Nonattainment Area to support efforts to meet the national Ozone Standards. Transfort, the City of Fort Collins transit provider, has submitted an application to the Federal Transit Administration (FTA) for electrification of the HORN route on the Colorado State University (CSU) campus, in partnership with CSU. Although, it was not awarded by FTA, Transfort is very interested in moving this project forward given the age (16 years) and pollution contribution by the current vehicles.

Lastly, given the fact that the Denver Metro and North Front Range are not in compliance with the national Ozone Standards for 2008 or 2015, the NFRT&AQPC recommends CDPHE and CDOT expedite the expenditure of the VW Settlement funds in the State.

Thank you for your consideration.

_______________________________Kevin Ross, NFRT&AQPC Chair and Mayor of the Town of Eaton

Page 18: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o
Page 19: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

Incr

easi

ng C

apac

ity

and

Redu

cing

Ris

k Th

roug

h In

nova

tion

NFR

MPO

Mee

ting

Oct

ober

5,

2017

Page 20: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

AirportB

ackgroun

d

•Airp

ortw

asconstructedin19

63throughafede

ralgrant

program

•Owne

rship&supp

ortisa

50/50split

betw

eenFortCo

llins

&Loveland

•1of

12commerciallycertified

airportsinCo

lorado

•Servesa

saregion

algateway

forcom

merce

andispartof

theregion

altransportatio

nsystem

•Isn

owthebu

siestairportinthestatewith

outa

nairtrafficcontrol

tower,according

toCD

OT

Page 21: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

Prob

lem:C

apacity

•Area

popu

latio

ngrow

thresults

inhigher

demandfora

llmod

esof

transportatio

n•Do

wntow

nFortCo

llins

Airport2

007closure–12

6aircraftdisplaced

•GreeleyAirportisthe

onlyothe

rpub

licairportinNorthernCo

lorado

•Aircraftdiversity

andtraffic

volumeelevatethene

edforA

TCat

FNL

•Aircraftrangefrom

smallsinglepilota

ircraftto

200passen

gera

irliners

•Traffic

volumeisapproxim

ately85

,000

–95

,000

takeoffs&land

ings

annu

ally

•Activ

itygrow

thcoup

ledwith

alack

oflocalA

irTraffic

Control(ATC)

increaseso

peratio

nalrisk

•Similartoavehicleintersectio

nrequ

iring

astop

light

•Asolutio

nisne

eded

toavoidcreatin

galessthan

desirableriskfora

ircraftop

erators

Page 22: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

Solutio

n:AirTrafficCo

ntrol

•Traditio

naltow

er•$8

millionestim

ated

constructio

ncostwith

O&M

averaging$200Kannu

ally

•Higher

elevationandlonger

runw

aylengthsincreasecost

associated

with

installingandop

eratingatower

•Tow

ersinthepastwerefund

edthrough

congressionalearmarks

•Co

ngressionalearmarks

wereelim

inated

in2011

•Fron

tRange

AirportE

asto

fDenverinstalledatower

in2005

atacostof

$7.2million(building&eq

uipm

ent)

Page 23: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

RemoteAirTrafficCo

ntrolTow

er=Inno

vatio

n

•CD

OTDivisio

nof

Aeronauticsh

asbe

eninno

vativeandisaleader

inthenatio

non

seekingandim

plem

entin

gen

hancem

entsto

theCo

lorado

aviatio

nsystem

•Mou

ntainAu

tomated

Weather

Observatio

nSystem

s•Im

plem

entatio

nto

aradarsup

plem

entin

gtracking

system

form

ountainairports

•Re

moteAirTrafficCo

ntrolTow

er(rTower)

•TherTow

erconcep

trep

lacesa

tallandcostlystructurewith

techno

logy

that

can

beop

timize

dfora

irportlayou

ts•Lowersc

ostfor

capitalinfrastructure,op

erations,and

mainten

ance

•Enhanced

safety

•Europe

anCo

untriesa

ndLeesbu

rgAirportinVA

istestingsim

ilarsystemsu

sing

vide

oon

lybasedtechno

logy

•NorthernCo

lorado

was

selected

tobe

partof

thefirstFAARe

moteTower

Project

with

thegoalof

beingthefirstcertified

system

toincorporatevide

oandradar

Page 24: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

RemoteAirTrafficCo

ntrolTow

erPartne

rs

Page 25: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

Concepto

fOpe

ratio

n

•Inorde

rtocertify

theRe

moteTower

System

,itm

ustsatisfyallofthe

crite

riathat

atradition

altower

provides

•Itise

xpectedthat

therTow

erwillinclud

een

hanced

capabilitiesthat

caneasilybe

mod

ified

toallowforinclusio

nof

morethan

justthe

basic

techno

logicalneed.

•Multip

lelocatio

nvide

ofeed

sfor

enhanced

surfacecond

ition

mon

itorin

g•Forw

ardLookingInfra

Red(FLIR)

Future

•Au

tomaticDe

pend

entS

urveillance

–Broadcast(AD

SB)

–Future

•Thissystem

willbe

installedon

siteat

theAirportfor

sake

ofsim

plicity

durin

gcertificatio

n.•Future

rTow

ercontrollerfacilitie

scan

belocatedoffsite

.

Page 26: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

Locatio

nsof

CameraMastInstallatio

ns

Page 27: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

ControllerInterface

Page 28: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

ConceptV

ideo

Page 29: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

ProjectT

imeline

Page 30: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

Q&A

Page 31: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

Colorado Road Usage Charge Pilot

NFR MPO Council MeetingOctober 5, 2017

• Why is an alternative funding mechanismneeded?

• What is a Road Usage Charge (RUC)?• The Colorado Road Usage Charge Pilot

Agenda

2

Page 32: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

Why is an alternative fundingmechanism needed?

3

4

Estimated a gap of $1 billion annually over thenext 25 years

Funding Shortfall

Page 33: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

• Lack of gas tax increase• Gas tax not indexed to inflation

5

Unsustainable Gas Tax Model

Increased Vehicle Fuel Efficiency

What’s the Problem

6

Declining purchasing power

Increasing Population

Page 34: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

7

• Increased Vehicle Fuel Efficiency Standards• New vehicles in 2016 have an average fueleconomy of 35.5 mpg

• 2025 that standard increases to 54.4 mpg

• Emerging fleet of alternative fuel vehicles

Increased Vehicle Fuel Efficiency

Increasing VMT Population

8

Page 35: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

Declining Purchasing Power

9

Declining Purchasing Power

10

Cost in 1991 Cost in 2016

Cost of a New Home $125,841 $366,900Cost of a New Car (average Size) $9,989 $34,846Cost of a Color Television $660 $1,997Cost of a Pound of Bacon $1.95 $4.99Cost of a Gallon of Milk $2.80 $3.43Colorado Gas Tax (per gallon) $.022 $.022

$1 in 2016 is worth approximately 56.5percent less than it was in 1991

Page 36: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

• Colorado Transportation Finance andImplementation Panel (2008)

• 39 Options Considered – 5 Final– Highway and Bridge User Fee– Vehicle Rental Fee– Motor Fuel Tax Increase/Indexed– Sales and Use Tax Increase– Severance Tax increase

• Vehicle Miles Traveled (VMT) Fee– Otherwise known as Road Usage Charging

(RUC)– Pilot VMT Program supported by Panel

Funding Mechanisms to Close the Funding Gap

11

What is a Road UsageCharge?

12

Page 37: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

What is a Road Usage Charge (RUC)?

• A user charge based on milestraveled

– Cents per mile driven as opposed to thecurrent excise tax on fuel consumed(cents per gallon)

– Treats roads like utilities (pay for whatyou use)

– Replaces the fuel tax

• Also called:– Road Usage Fee (RUF)– Mileage Based User Fee (MBUF)– Vehicle Miles Traveled (VMT Fee)

13

14

How will RUC Address the Problem?

All vehicles pay an equal amount forthe same miles traveled

Page 38: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

Common Misconceptions about RUC

• RUC is another tax charged by the government– Merely changes the mechanism

– Restores equity that all users pay, instead of only gasoline ordiesel vehicles

• Driver privacy is sacrificed– User has a choice of multiple methods for mileagemeasurement

• From basic mileage counting to advanced GPS devices to notechnology

– Regardless of the option selected, privacy can be protected

15

The Colorado Road UsageCharge Pilot Program (RUCPP)

16

Page 39: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

Colorado Road Usage Charge Pilot

• Pilot Program Purpose– Create a sandbox environment in whichlegislators, CDOT administrators, policymakers, can experience elements of anoperational RUC

– Identify and evaluate potential issuesrelated to implementation of a full system

– Test the feasibility and acceptability ofvarious mileage reportingmethods/technologies for Colorado

– Solicit feedback from pilot participants forfuture system design 17

Mileage Reporting Options

• Odometer Reading– Participants who select this option will report their vehicle’s

odometer reading via the account management website ormobile app.

• Non GPS Enabled Mileage Reporting Device– Participants who select this option will receive a device to plug

into their vehicle’s OBD II port. This method uses a non GPSdevice which counts distance traveled and gasoline consumed,but does not assess location.

• GPS Enabled Mileage Reporting Device– Participants who select this option will receive a device to plug

into their vehicle’s OBD II port. This method uses locationbased data to calculate total miles driven with differentiationbetween in state and out of state roads.

18

Page 40: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

Colorado Road Usage Charge Pilot

• 4 Month Statewide Pilot (December 2016 – April 2017)

• 100 participants consisting of transportation leaders,officials, media, and general public

• Geographic (Urban/Rural) and Vehicular (MPG)stratification

• Payments and associated revenues were simulated

19

• Enroll in the Pilot– Choose Mileage Reporting Option

– Create account/register vehicle withAccount Manager

• Install Mileage ReportingDevice (if applicable)

• Drive/Report Mileage

• Receive/Review invoices

• Submit “mock” payments(simulated for pilot)

• Complete surveys

• Closeout account/returndevice

20

Participant Activities during Pilot

Page 41: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

21

MRD Website/Mobile App

22

Colorado Road Usage Charge Pilot Enrollment

GPS70%

Non GPS17%

Odometer13%

Selected Mileage Reporting Options

GPS70%

Non GPS17%

Odometer13%

GPS70%

Non GPS17%

Odometer13%

Selected MileageReporting Options

GPS Option most popular 0

10

20

30

40

50

60

70

10 25 MPG 25 45 MPG >45 MPG Electric

61

34

3 3

Vehicle Stratification

Page 42: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

23

Colorado Road Usage Charge Pilot Enrollment

• 100 Participants/101vehicles enrolled (30stakeholders/71general public)

• GeographicStratification (27counties,urban/rural)

• VehicularStratification (Gas,Hybrids andElectrics)

Issues Identified to Address

• Improve Roadway Ownership Data• Address OBD II Port Competition• Include Multiple Fuel Types• Examine Operations

– Revenue Collection– Administrative Costs

• Identify Barriers to Public Acceptance– Urban/Rural Equity Perceptions– Data Privacy Concerns

24

Page 43: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

Next Steps

• Continue to Progress Research• Pilot with Farm Bureau for Agricultural Community• Coordination with Other State Agencies on NextLevel– Department of Revenue– Office of Information Technology

• Public and Stakeholder Focus Groups andEducation

• White Papers on Issues• Leverage RUC West on Regional or Industry Issues

25

Questions/Open Discussion

26

Page 44: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

North Front RangeMPO Area Project Status Updates (5 Oct 2017)

Roadway / Segment StatusSH14US287 PR at Ted’s Place Construction is underwayPoudre Canyon Guardrail Construction is underwayUS287 to I 25 Surface Treatment In DesignI 25Crossroads Blvd Interchange / Bridges Construction is underwayTruck Climbing Lane Construction is wrapping upDesign /Build Proposals under reviewFort Collins North Cable Rail In DesignRamp Metering

Harmony Rd SBSH392 NB/SB

Project is complete

US34Big Thompson Canyon Flood Repair Canyon is closed for Winter ConstructionUS34 Business in Greeley Surface Treatment In DesignPEL Study ProgressingSH60US287 to Milliken Resurfacing Construction is underwayWCR 40 Intersection Improvements In DesignSH257 PR (Milliken) – Little Thompson Structures Awarded to contractorUS85Eaton to Ault ADA ramps & Resurfacing Construction is underwayUS287SH1 to LaPorte Bypass Construction is underwayFoothills Parkway Signal Upgrade In designSH392US85 Intersection Construction is wrapping up mid Oct 2017

Page 45: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

Page 1

STAC Summary – September 22nd, 2017

1) Introductions & August Minutes – Vince Rogalski (STAC Chair)

a) August 2017 STAC Minutes approved without changes. 2) Transportation Commission Report – Vince Rogalski (STAC Chair)

a) Transportation Commission (TC) i) Commissioners discussed potential PD 14 and TIGER grant project submissions. ii) Discussion of Bustang Outrider program expansion.

3) TPR Reports – STAC Representatives 4) Federal and State Legislative Report – Herman Stockinger, Andy Karsian, & Ron Papsdorf (CDOT Office of

Policy & Government Relations) a) State

i) The TLRC discussed a number of large transportation projects across the state, including Central 70, some of which may be eligible for SB 267 funding.

ii) The Governor has called a special session to fix a drafting error in SB 267 that created unintended funding cuts for special districts, including RTD.

b) Federal i) The President has nominated a new FHWA Administrator, Paul Trombino III of Iowa. ii) Congress passed a continuing resolution to extend FY17 operations until December 8th. iii) FAA authorization expires on September 30th unless extended by Congress.

5) Central 70 Update – Tony DeVito (CDOT Central 70 Project Manager) a) Project overview: add one additional Express Lane in each direction, remove 53-year old viaduct,

lower interstate, construct 4-acre park over the interstate, and restripe from I-25 to Brighton Blvd. b) Two lawsuits currently underway by the Sierra Club and Kyle Zeppelin (local developer). c) Kiewit-Meridiam Partners (KMP) selected as the project vendor. d) Project budget of approximately $1.2 billion:

i) $850 million from Bridge Enterprise ii) $180 million from SB 228 iii) $50 million DRCOG contribution iv) $37 million Denver contribution

e) Financial close anticipated in Winter 2017 with construction to start in Spring 2018. f) STAC Discussion: Representatives expressed concern about the impact of the project on other Bridge

Enterprise needs, inquired about the specific commitment for local neighborhood training and employment, and asked about preparations for potential detours during the construction period.

6) Policy Directive 14 Update – Jeff Sudmeier & William Johnson (CDOT Division of Transportation Development) a) PD 14 establishes performance goals for CDOT and are assessed annually for progress and potential

changes. b) Safety challenges are continuing, in part due to growing VMT and in part based on increasing driver

distraction. c) Surface Treatment and Bridge Condition targets currently being met but longer-term trends indicate

that system condition will decline in the future. d) Areas in which CDOT is meeting current targets include: culverts, tunnels, and geohazards. e) Areas in which CDOT isn’t meeting current targets include: buildings, fleet vehicles, and walls.

Page 46: Briefing to the North Front Range MPO Planning Council ... · Highland Chatfield Park NREL Rocky Flats-N Fort Collins-W Rocky Mtn NP Weld Co Twr Linear (NREL) 2017 thru 9/30. M o

Page 2

f) STAC Discussion: Representatives asked about potential solutions to the distracted driving issue and expressed concerns about the geographic equity of surface treatments and bridge repairs. Staff promised to return with additional data to facilitate that discussion in the future.

7) IINFRA, TIGER, and SB 267 – Debra Perkins-Smith (CDOT Division of Transportation Development) and Herman Stockinger (CDOT Office of Policy & Government Relations) a) Applications for TIGER are currently open (with $500 million available nationwide) and due by October

16th. i) Potential projects include: Amtrak Southwest Chief, SH 13 Reconstruction, and US 160 Towaoc

Passing Lanes. b) Applications for INFRA are currently open (with $1.5 billion available nationwide) and due by

November 2nd. i) Potential projects include: I-25 Denver to Colorado Springs Connection, I-70 Westbound Peak

Period Shoulder Lanes, I-25 North: SH 56 to SH 402, US 85: Centennial Highway Improvements, and CDOT Connected Vehicle Ecosystem.

c) Applications are strengthened by higher local match levels, so CDOT is interested in boosting that element wherever possible.

d) STAC Discussion: Representatives discussed the best way to select competitive projects and estimate costs, while also expressing concern about overcommitting the available SB 267 funds. Staff shared lessons learned from previous competitive grants.

8) STIP Lessons Learned – Jamie Collins (CDOT Office of Financial Management & Budget) a) Survey sent to 80 people from STAC, CDOT, and partner agencies in early June and 10 responded. b) Key findings:

i) STIP should be easier to understand, provide more project detail, and be more easily searchable. Communication is critical, particularly around funding constraints, data-driven project selection, and transportation terminology.

c) STAC Discussion: No comments. 9) Other Business – Vince Rogalski (STAC Chair)

a) The next STAC Meeting will be held on October 27th at CDOT Headquarters in Denver. 10) STAC Adjourns