Bridge Value Engineering

download Bridge Value Engineering

of 80

description

Bridge value engineering example

Transcript of Bridge Value Engineering

  • 5/23/2018 Bridge Value Engineering

    1/80

    Concessionaire:

    Projek Lintasan Sungai

    Besi -Ulu Klang Sdn. Bhd.

    Tingkat 3 Blok G, Excel la

    Business Park,

    Jalan Ampang Putra, Taman

    Ampang Hi l ir,

    55100 Kuala Lumpur.

    Main Consultant:

    Sepakat Setia Perunding Sdn.

    Bhd.

    Wisma SSP, Level 8-18 ,

    No 1, J ln SR 8/3 Serdang Raya,

    43300 Seri Kembangan,

    Selangor.

  • 5/23/2018 Bridge Value Engineering

    2/80

    3

    1INTRODUCTION

    2

    DESIGN ASSUMPTIONS

    4DESIGN PACKAGES

    DESIGN CONCEPTS

  • 5/23/2018 Bridge Value Engineering

    3/80

    SRI PETALING

    SG. BESI

    ALAM

    DAMAI

    CHERAS

    KAJANG

    CHERAS

    HARTAMAS

    BKT

    TERATAI

    PERMAI

    TASIK

    TAMBAHAN

    PKN

    AMPANG

    KOSAS

    BKT

    ANTARABANGSA

    AMPANG

    POINT

    TMN

    HILLVIEW

    ULU

    KELANG

    Main Line 24.6 km

    Interchanges 14 nos.

    Toll Plazas 3 nos.

    BUKIT

    ANTARABANGSA

    BUKIT

    BELACAN

    TMN

    KOSAS

    TMN

    PUTRA

    TMN BUKIT

    PERMAI

    PANDAN

    INDAH

    TMN BUKIT

    SEGAR

    CHERAS

    HARTAMAS

    BDR TASIK

    SELATAN

    TAMAN

    CONNAUGHT

    ALAM

    DAMAI

    BKT

    JALIL

    SRI

    PETALING

    TASIK

    PERMAI

    TASIK

    TAMBAHAN

    JALANLOKE YEW

    MIDDLE RINGROAD 2 (MRR2)

    AKLEH

    DUKE

    GRANDSAGA

    PLUS

    BESRAYA

    KESAS

    TAMAN

    DAGANG

    DBKL

    MPAJ

    MPKj

    92%

    8%

    Alignment Composition

    Elevated

    At-grade

    SECTION A SECTION B

  • 5/23/2018 Bridge Value Engineering

    4/80

    Overall Alignment (Section A)

    Sri PetalingInterchange

    Sg. BesiInterchangeAlam DamaiInterchange

    Cheras Kajang

    Interchange

    Cheras HartamasInterchange

    Toll Plaza No.1And

    Rest & Service

    MRR2 to Ampang

  • 5/23/2018 Bridge Value Engineering

    5/80

    Alignment on Geological Map (Section A)

    Granite

    Quartzite and phyllite

    Limestone

    Schist

    Vein quartz

    Phyllite lens

  • 5/23/2018 Bridge Value Engineering

    6/80

    3

    1INTRODUCTION

    2

    DESIGN ASSUMPTIONS

    4DESIGN PACKAGES

    DESIGN CONCEPTS

  • 5/23/2018 Bridge Value Engineering

    7/80

    1. Superstructure :-

    i. Span Configuration

    Short to medium span = 30.0m (U-Beam)

    Medium span = 40.0m (T-Beam)

    Special crossing = > 50.0m (Segmental B.G. & Balanced Cantilever B.G.)

    ii. Bridge Articulation

    1 module consist of 4 to 5 spans with continuous deck (link deck)concept

    Precast beams seated on elastomeric rubber bearings

    1 module consist of 4 to 5 spans

    Bridge Structure / Bridge Type

  • 5/23/2018 Bridge Value Engineering

    8/80

    1. Superstructure :-

    iii. Continuous Deck System (CDS)

    Continuity with structurally continuous top slab, short lengths of thetop slab are locally separated from the top of the beams (BA 57/01)

    Superstructure is constructed in the usual manner by simply supported

    ends of precast beams on separate bearings

    Span by span easy construction

    Continuity with structurally

    continuous top slab Proposed CDS

    Bridge Structure / Bridge Type

  • 5/23/2018 Bridge Value Engineering

    9/80

    (iv) Parapet

    - Reinforced concrete parapetdesigned to TL-4 impact

    - Aesthetic faade or shape can be

    designed to suit

    (v) Rain Water Down Pipe (RWPD)

    - uPVC RWDP class D to be used.

    - RWDP not to cast in the bridge pier.

    Bridge Structure / Bridge Type

  • 5/23/2018 Bridge Value Engineering

    10/80

    2. Substructure :-i. Pier type T-shape pier

    Portal pier

    Staggered portal pier

    Double decker pier

    ii. Cross head Precast segmental crosshead (post-tensioned)

    Cast in-situ cross head

    iii. Column shape

    Rectangle shape with emboss/grooves (H < 25.0m) Hollow core pier with emboss/grooves (H > 25.0m)

    iv. Foundation

    Bored piles (non-displacement piles)

    Caisson piles

    Bridge Structure / Bridge Type

  • 5/23/2018 Bridge Value Engineering

    11/80

    3

    1INTRODUCTION

    2

    DESIGN ASSUMPTIONS

    4DESIGN PACKAGES

    DESIGN CONCEPTS

  • 5/23/2018 Bridge Value Engineering

    12/80

    (i) Design Code & References

    13.BS5400 Part 9: 1983 Code of Practice for

    Design of Concrete Bridges Bridge Bearings, BSI14.BD28/87 Early Thermal Cracking15.BS6779 Parapets for Vehicle Containment on

    Highways16.BS5950 Structural Use of Steel17.BS8004:1998 Foundations18.BD30/87 Backfilled Retaining Walls and Bridge

    Abutments.19.BD31/01 The Design of Buried Concrete Box

    and Portal Frame Structures.20.BD52/93 The Design of Highway Bridge

    Parapets.21.BD57/95 Design of Durability22.BD74/00 Foundations23.BA24/87 Early Thermal Cracking of Concrete

    (Advice Note).24.BA26/94 Expansion Joints for use in Highway

    Bridge Decks

    25.CIRIA Guide 1: A Guide to the Design of AnchorBlocks for Post Tensioned Prestressed Concrete.

    26.AASHTO LFRD Bridge Design Specification 4thEdition, 2007

    27.Guide Specification for Design and Constructionof Segmental Concrete Bridges (AASHTO) 2003Interim Edition

    1. BD15/92 General Principles for the Design and

    Construction Bridges: Use of BS5400: PT1: 1998BD20/92 Bridge Bearing Use of BS5400: Part 9:1983 BD37/01 Loads for Highway Bridges,Department of Transport and Traffic Highwayand Traffic.

    2. BD58/94 Part 9 & 10 for the Design ofConcrete Highway Bridges and Structures withExternal and Unbonded Prestressing.

    3. BS5400 Part 1: 1998 for General Statement

    Steel, concrete and composite bridges, BSI4. BS5400 Part 4: 1990 Code of Practice for

    Design of Concrete Bridges Steel, Concreteand Composite Bridges, BSI

    5. BD24/92 The Design of Concrete HighwayBridges and Structures, Use of BS5400: Part 4:1990

    6. BD33/94 Expansion Joints for Use in HighwayBridge Decks.

    7. BD42/96 Design of Integral Bridge8. BD60/04 Vehicle Collision Load9. BS8006 Code of Practice4 for Reinforced Soil

    and Other Fills10.BS8002 Code of Practice for Earth Retaining

    Structures11.BS8110 Part 1 Structural Use of Concrete

    Code of Practice for Design and Construction

    12.BS 4449:1997 - Specification for carbon steelbars for the reinforcement of concrete.

    DESIGN ASSUMPTION

  • 5/23/2018 Bridge Value Engineering

    13/80

    (ii) Concrete Grade

    Structural Element Minimum Cube

    Strength (N/mm2)

    Aggregate Size

    (mm)

    Superstructure PrecastElement

    50/55/60 20

    In-Situ Superstructure 50 20

    In-Situ Continuity Stitches 40 20

    Parapet 40 20

    Bearing Plinth 50 20

    Pier Crosshead & Column 40/50 20

    Abutment, bases & PileCap

    40 20

    Bored Piles 40 20

    Precast Pile (Minimum) 60 20

    Caisson 40 20

    Blinding 20 20

    DESIGN ASSUMPTION

  • 5/23/2018 Bridge Value Engineering

    14/80

    (iii) Cover to Reinforcement and Exposure Condition

    Element Cover Detail(mm) ExposureCondition

    Piles (Bored Cast In-Situ) 75 Severe

    Pile caps 50/75 (soffit) Severe

    Columns, crosshead anddiaphragm

    50 Severe

    Abutment and approach slab 50 Severe

    Cast in-situ deck slab (soffit) 40 Severe

    Cast in-situ deck slab (top) 40 Severe

    Post-tensioned beam (sitecasting)

    45 Severe

    Pre-tensioned beam externalface

    35 Severe

    Pre-tensioned internal face 25 Moderate

    Bearing plinth 50 Severe

    Parapets 50 Severe

    DESIGN ASSUMPTION

  • 5/23/2018 Bridge Value Engineering

    15/80

    (iv) Class Categories of Prestressed Concrete Structure

    Class 1Under Load Combination 1 - HA load only Class 2Under Load Combination 2 to 5 HA or HA+30HB

    (v) Traffic Live Load

    HA & HB LoadingBridges shall be designed for HA loading combined with HB loadings and pedestrian live loadwhere appropriate in accordance with BD37/01and BD24/92. The following shall be adopted inthe analysis and design.

    I. Serviceability Limit StateSLS Load Combination 1:Type HA+KEL loading for prestress design Class 1 (zero tension) and crack width check forreinforced concrete section.SLS Load Combination 2 to 5:

    Type HA+KEL, or Type HA+KEL in combination with 30 units of HB to prestress design Class 2 for allbridge structures.

    II. Ultimate Limit StateULS Load Combination 1 to 5:Type HA+KEL, or Type HA+KEL in combination with 45 units of HB.

    DESIGN ASSUMPTION

  • 5/23/2018 Bridge Value Engineering

    16/80

    (v) Crack width

    The serviceability limit state of crack for the reinforced concrete components shallfollow the requirements as specified in Clause 6.3.2.4 of BS5400-Part 4. The maximumdesign crack width shall not exceed 0.25mmbased on the nominal / actual concretecovers whichever is more.

    (vi) Centrifugal force, longitudinal force, wind load, temperature load The above mentioned forces shall be designed in accordance with BD 37/01. Partial load

    factor shall be in accordance with BD 37/01.

    (vii) Creep & shrinkage The above mentioned forces shall be designed in accordance with BS 5400, Part 4. The

    relative humidity is to be assumed at 70%.

    (viii) Earthquake loading In view of the lack of standard and code of practice specifically available for Malaysia, it

    is recommended that a PGA of 0.03gbe adopted for this project. This is based on thevalues widely adopted by current construction industry.

    (viii) Vehicle collision load For collision force to piers within 4.5m of a carriageway shall design in accordance to BD

    60/04, The Design of Highway Bridges for Vehicle Collision Loads. For collision force to piers greater than 4.5m from the edge of a major carriageway with

    a safety fence shall design in accordance to BS 5400 Part2 Cl 6.9.

    DESIGN ASSUMPTION

  • 5/23/2018 Bridge Value Engineering

    17/80

    3

    1INTRODUCTION

    2

    DESIGN ASSUMPTIONS

    4DESIGN PACKAGES

    DESIGN CONCEPTS

  • 5/23/2018 Bridge Value Engineering

    18/80

    (Preliminary Alignment & Bridge GA)

  • 5/23/2018 Bridge Value Engineering

    19/80

    Item Package Name A1 A2 A3 A4 A5 A6

    1 Lead Consultant SSP

    2Detailed Design

    Consultant (DDC)SSP JURUTERAS PSCE SSP EDP AMIN & TEH

    3 Chainage (KM) 02.4 2.44.2 2.46.0 6.07.8 7.89.6 9.611.0

    4Scope of Preliminary

    DesignPreliminary Alignment & Bridge General Arrangement

    5Scope of Detailed

    Design

    1) Road Works (including widening of existing roads)2) Bridge & Structure

    3) Geotechnical (Bridge Foundation)

    4) Drainage (for bridge / viaduct)

    5) Relocation (or protection) of existing drainage, water pipe and sewer pipe

    6) Toll Buildings & Infra

    7) Toll Building & Toll Plaza (M & E Services)

    8) Street Lighting (for bridge / viaduct) (including soffit lighting & high mast lighting)

    9) Relocation of existing Street Lighting10) Relocation (or protection) of existing power and tele-communication cables)

    11) Relocation of TNB Overhead Transmission Cable

    6 Topographic Nature

    Built-Up

    Areas &

    Rolling

    Terrain

    Built-Up

    Areas &

    Rolling

    Terrain

    Built-Up Areas

    & Rolling

    Terrain

    Built-Up

    Areas &

    Rolling

    Terrain

    Built-Up Areas

    & Rolling

    Terrain

    Built-Up

    Areas & Hilly

    Terrain

  • 5/23/2018 Bridge Value Engineering

    20/80

    Item Package Name A1 A2 A3 A4 A5 A6

    7Traffic

    Management

    KESAS, MRR2,

    KLSH &

    BESRAYA

    MRR2

    Jalan 1/118B,Jalan Alam

    Damai &

    Persiaran Alam

    Damai

    Jalan AlamDamai, Persiaran

    Alam Damai &

    Jalan 1/144A

    CherasKajang

    Highway

    Jalan BandarBaru Segar

    Utama & Jalan

    Bukit Segar

    Jaya

    8Upgrading of

    Existing Road

    MAJOR

    (Widening of

    KESAS & MRR2

    for construction of

    piers at median &

    shoulder)

    MAJOR

    (Widening of

    MRR2 for

    construction of

    piers at median

    & shoulder)

    MAJOR

    (Existing Alam

    Damai will be

    modified tounderpass

    adjacent to Toll

    Plaza &

    construction of

    pier at median

    & shoulder of

    existing road)

    MAJOR

    (Existing Alam

    Damai will be

    modified tounderpass

    adjacent to Toll

    Plaza &

    construction of

    pier at median &

    shoulder of

    existing road)

    NOMINAL

    (Construction ofAcceleration &

    Deceleration on

    both side of

    CherasKajang

    Highway)

    NOMINAL

    (Traffic Light

    Junction at JlnBandar Baru

    Segar Utama &

    Jln Bukit Segar

    Jaya for ramp

    connection with

    SUKE)

    9

    Interfacing Issues

    between Packages

    & other Highways

    Sri Petaling

    Interchange & Sg.

    Besi Interchange

    (KESAS, MRR2,

    KLSH &

    BESRAYA)

    MRR2

    Jalan 1/118B,

    Jalan Alam

    Damai &

    Persiaran Alam

    Damai

    Alam Damai

    Interchange

    (Jalan Alam

    Damai &

    Persiaran Alam

    Damai)

    & Jalan 1/144A

    CherasKajang

    Interchange

    (Cheras

    Kajang Highway)

    Cheras

    Hartamas

    Interchange

    (Jln Bandar

    Baru Segar

    Utama & Jln

    Bukit Segar

    Jaya)

  • 5/23/2018 Bridge Value Engineering

    21/80

  • 5/23/2018 Bridge Value Engineering

    22/80

    Package A1 Layout Plan

    CHAINAGE CH.0 CH.2400

    PACKAGE A1LOCATION SRI PETALING I/C

    & SG.BESI I/C

    LEADCONSULTANT &PRELIMINARYDESIGNCONSULTANT

    SEPAKAT SETIAPERUNDING (SDN)BHD

    DETAILED

    DESIGNCONSULTANT

    SEPAKAT SETIA

    PERUNDING (SDN)BHD

  • 5/23/2018 Bridge Value Engineering

    23/80

    Package A1 Mainline Profile

    Crossing ERL,STAR LRT, KTM

    KESAS Hwy

    To Sg Besi

    To Ulu Kelang

  • 5/23/2018 Bridge Value Engineering

    24/80

    Elevated Viaduct Summary

    Package Alignment Chainage Superstructure

    Type

    Span

    Configuration

    Substructure

    Type

    A1

    Ch 0 -

    2400

    Mainline

    Ulu Kelang

    Bound

    Ch. 950-

    1330SBG

    60+100+100+6

    0+60+60

    TPier (Precast

    segmental x-

    head), Portal Pier,

    Single Pier

    Supporting SBG

    Structure &

    Special Crossing.

    Ch. 2045-

    2280

    Special

    Crossing65+105+65

    U-Beam & T-

    Beam

    U- (30m),

    T- (>30,30,

  • 5/23/2018 Bridge Value Engineering

    25/80

    Bridge Foundation Estimated Pile Length

    BH REF

    COORDINATESAPPROXIMATE

    BH CHAINAGE

    APPROXIMATE

    CHAINAGEPier ID

    PILE

    DIAMETER,

    D (mm)

    WORKIN

    G LOAD,

    WL (kN)

    ESTIMATED SOCKET

    LENGTH, (m)

    ESTIMATED

    PILE LENGTH,

    bcl (m)E N

    BH 18 146.851 -12125.972 CH 1500 CH1300 - 1600CH1225 - 1600 BP5BP13SP6SP15 2500 38000 65m in Hard Soil 95m

    BH 22 184.062 -12041.878 CH 1600 CH1600 - 1950CH1600 - 1900BP14BP22SP16SP23 2200 32000 16m in Limestone 36m

    BH36 724.736 -11770.507 CH2200CH2360

    AP1AP4 2200 23820 11.0 in Limestone 23.0

    JP1JP5 2200 24250 11.5 in Limestone 23.5

    Main Line:

  • 5/23/2018 Bridge Value Engineering

    26/80

    Sri Petaling Interchange

    Pile size, mm

    dia.Pile Type

    Estimated

    working load,

    kN

    BH REF

    ESTIMATED

    SOCKET LENGTH,

    (m)

    ESTIMATED PILE

    LENGTH, bcl (m)

    1 MS10 900 Bored pile 4250 BH317.0 in very hard

    soil41.0

    2 MS20 900 Bored pile 4250 BH25 4.0 in Limestone 22.0

    3 MS30 900 Bored pile 4250 BH1215.0 in very hard

    soil42.0

    4 MS40 1200 Bored pile 8500 BH424.0 in very hard

    soil46.5

    5 MS50 1200 Bored pile 8500 BH1925.0 in very hard

    soil47.5

    6 MS60 900 Bored pile 4250 BH13 4.5 in Limestone 28.5

    Sungai Besi Interchange

    Pile size, mm

    dia.Pile Type

    Estimated

    working load,

    kN

    BH REF

    ESTIMATED

    SOCKET LENGTH,

    (m)

    ESTIMATED PILE

    LENGTH, bcl (m)

    1 MB10 900 Bored pile 4250 BH32 5.0 in Limestone 17.0

    2 MB20 900 Bored pile 4250 BH30 4.5 in Limestone 12.0

    3 MB30 900 Bored pile 4250 BH34 5.0 in Limestone 17.0

    Bridge Foundation Estimated Pile Length

    Interchange:

  • 5/23/2018 Bridge Value Engineering

    27/80

  • 5/23/2018 Bridge Value Engineering

    28/80

    Main Line Ulu-Kelang Bound

    30m span U-12 Beams

    Main Line Both Bound

    Special Crossing

    Cast In-situ Box Girder(65m+105m+65m)

    Main Line Sg. Besi Bound30m span U-12 Beams

    Main Line Ulu-Kelang Bound

    Precast Segmental Box Girder

    60+60+60

    Main Line Ulu-Kelang Bound

    Precast Segmental Box

    Girder

    60+60+60

  • 5/23/2018 Bridge Value Engineering

    29/80

  • 5/23/2018 Bridge Value Engineering

    30/80

  • 5/23/2018 Bridge Value Engineering

    31/80

    CHAINAGE CH.2400 CH.4200

    PACKAGE A2

    LOCATION MRR2

    LEADCONSULTANT& PRELIMINARYDESIGNCONSULTANT

    SEPAKAT SETIAPERUNDING(SDN) BHD

    DETAILEDDESIGNCONSULTANT

    JURUTERASENGINEERS SDNBHD

    Package A2 Layout Plan

  • 5/23/2018 Bridge Value Engineering

    32/80

    Package A2 Mainline Profile

    Along MRR2To Sg BesiTo Ulu Kelang

  • 5/23/2018 Bridge Value Engineering

    33/80

    Package Alignment Chainage Superstructure

    Type

    Span

    Configuration

    Substructure Type

    A2

    Ch 2400

    4200

    Mainline

    Ulu Kelang

    Bound Ch. 2400-

    4200

    U-Beam & T-

    Beam

    U- (30m),

    T- (>30,

  • 5/23/2018 Bridge Value Engineering

    34/80

    BH REF

    COORDINATES

    APPROXIMATEBH CHAINAGE

    APPROXIMATECHAINAGE

    PIER ID

    PILE

    DIAMETER,

    D (mm)

    WORKING

    LOAD, WL

    (kN)

    ESTIMATED

    SOCKET LENGTH,

    (m)

    ESTIMATED

    PILELENGTH,

    bcl (m)

    E N

    BH37 711.250 -11522.108CH2360-

    CH2520

    AP5 2200 26560 13.0 in Limestone 26.5

    JP6JP10 2200 28500 14.0 in Limestone 27.5

    AP6AP9 2200 28500 14.0 in Limestone 27.5

    BH38 715.995 -11420.693CH2520

    CH3060

    AP10AP23 2200 30040 14.0 in Limestone 36.5

    JP11JP25 2200 30040 14.0 in Limestone 36.5

    BH40 1043.074 -10890.923CH3060

    CH3280

    AP24AP29 2500 38090

    15.5 in

    Siltstone/Sandston

    e

    56.0

    or 55.0 in hard soil 92.5

    JP26JP31 2500 38090

    15.5 in

    Siltstone/Sandston

    e

    56.0

    or 55.0 in hard soil 92.5

    BH41 1169.623 -10826.079CH3280

    CH3560

    AP30AP38 2200 30810 7.5 in Granite 44.0

    JP32

    JP40 2200 30810 7.5 in Granite 44.0

    BH43 1453.598 -10753.018CH3560

    CH3660AP39 - AP41 2200 27900 7.5 in Granite 21.0

    JP41JP43 2200 27900 7.5 in Granite 21.0

    BH44 1528.471 -10646.438CH3660CH

    3800

    AP42AP44 2500 3730013.0 in Granite 55.0

    59.5 in hard soil 94.0

    JP44JP47 2500 3730013.0 in Granite 55.0

    59.5 in hard soil 94.0

    BH45 1650.572 -10556.56

    CH3800

    CH4140

    AP45AP54 2200 28700 8.0 in Granite 30.5

    JP48

    JP57 2200 28700 8.0 in Granite 30.5

    Bridge Foundation Estimated Pile Length

    Main Line:

  • 5/23/2018 Bridge Value Engineering

    35/80

  • 5/23/2018 Bridge Value Engineering

    36/80

    Main Line Both Bounds30m span U-12 Beams

  • 5/23/2018 Bridge Value Engineering

    37/80

  • 5/23/2018 Bridge Value Engineering

    38/80

    P k A3 L t Pl

  • 5/23/2018 Bridge Value Engineering

    39/80

    CHAINAGE CH.4200

    CH.6000

    PACKAGE A3

    LOCATION ALAM DAMAI

    LEADCONSULTANT& PRELIMINARYDESIGNCONSULTANT

    SEPAKAT SETIAPERUNDING(SDN) BHD

    DETAILEDDESIGNCONSULTANT

    PRODUKIFSEPAKATCONSULTINGENGINEERINGSDN BHD

    Package A3 Layout Plan

    P k A3 M i li P fil

  • 5/23/2018 Bridge Value Engineering

    40/80

    Package A3 Mainline Profile

    To Sg Besi

    To Ulu Kelang

    El t d Vi d t S

  • 5/23/2018 Bridge Value Engineering

    41/80

    Package Alignment Chainage Superstructure

    Type

    Span Configuration Substructure Type

    A3Ch. 4200

    - 6000

    Mainline

    Ulu Kelang

    Bound Ch. 4200-

    6000

    U-Beam &

    T-Beam

    U- (30m),

    T- (>30,

  • 5/23/2018 Bridge Value Engineering

    42/80

    BH REF

    COORDINATESAPPROXIMATE

    BH CHAINAGE

    APPROXIMATE

    CHAINAGEPIER ID

    PILE

    DIAMETER,

    D (mm)

    WORKING

    LOAD, WL

    (kN)

    ESTIMATED SOCKET

    LENGTH, (m)

    ESTIMATED

    PILE LENGTH,

    bcl (m)E N

    BH46 1920.648 -10469.745 CH4140CH4220

    AP55AP58 2200 25000 7.0 in Granite 16.0JP58JP61 2200 25000 7.0 in Granite 16.0

    BH47

    2346.904

    -10434.779 CH4240

    CH4600 AP59AP70 165015000 5.0 in Granite 30.59000 3.0 in Granite 28.5

    BH48 2395.162 -10413.586 CH4600 -CH4940 AP71AP79 1650

    18500 7.0 in Granite 19.013000 5.0 in Granite 17.0

    BH49 2513.615 -10487.854 CH4940 -CH5320 AP80AP91 1650

    16000 5.5 in Granite 32.510000 3.0 in Granite 30.0

    Bridge Foundation Estimated Pile Length

    Main Line:

  • 5/23/2018 Bridge Value Engineering

    43/80

  • 5/23/2018 Bridge Value Engineering

    44/80

    Main Line Both Bounds

    30m span U-12 Beams

    40m span T Beams

  • 5/23/2018 Bridge Value Engineering

    45/80

  • 5/23/2018 Bridge Value Engineering

    46/80

    Package A4 Layout Plan

  • 5/23/2018 Bridge Value Engineering

    47/80

    CHAINAGE CH.6000 CH.7800 & TP1

    PACKAGE A4

    LOCATION ALAM DAMAI LEN SENG

    LEADCONSULTANT& PRELIMINARYDESIGNCONSULTANT

    SEPAKAT SETIAPERUNDING(SDN) BHD

    DETAILED

    DESIGNCONSULTANT

    SEPAKAT SETIA

    PERUNDING(SDN) BHD

    Package A4 Layout Plan

    Package A4 Mainline Profile

  • 5/23/2018 Bridge Value Engineering

    48/80

    Package A4 Mainline Profile

    Toll Plaza 1 To Sg Besi

    To Ulu Kelang

    Elevated Viaduct Summary

  • 5/23/2018 Bridge Value Engineering

    49/80

    Package Alignment Chainage Superstructur

    e Type

    Span

    Configuration

    Substructure Type

    A4

    Ch. 6000

    7800

    Mainline

    Toll PlazaCh. 6020 -

    6700U-Beam U- (20, 30)

    Double Decker,

    Toll Plaza Pier

    Ulu Kelang

    Bound

    Ch 6700

    7800U-Beam U-Beam

    Double Decker,

    Hollow Core Pier.Bkt Jalil Bound Ch 67007800

    Alam Damai

    I/CMA10, MA40 Ramps

    U-Beam & T-

    Beam

    U- (30m),

    T- (>30m,

  • 5/23/2018 Bridge Value Engineering

    50/80

    BH REF

    COORDINATES

    APPROXIMATE

    BH CHAINAGE

    APPROXIMATE

    CHAINAGEPIER ID

    PILE

    DIAMETER,

    D (mm)

    WORKING

    LOAD, WL

    (kN)

    ESTIMATED

    SOCKET

    LENGTH, (m)

    ESTIMATE

    D PILE

    LENGTH,

    bcl (m)

    E N

    Toll plaza CH6260- CH6780 TP1TP15

    BH57 4284.935 -11121.723 CH6780 - CH6860 AP127AP130 165016000 6.0 in Granite 18.0

    10000 3.5 in Granite 15.5

    BH58 4457.439 -11051.700 CH6920 - CH7580 AP132AP148 165018500 6.0 in Granite 24.0

    13000 4.0 in Granite 22.0

    BH64 5212.436 -10690.780 CH7880 CH74207900 AP144 -AP155 1200 7000 3.0 in Granite 30.0

    Bridge Foundation Estimated Pile Length

    Main Line:

    Bridge Foundation Estimated Pile Length

  • 5/23/2018 Bridge Value Engineering

    51/80

    Alam Damai Interchange

    Pile size, mm

    dia.Pile Type

    Estimated

    working load, kNBH REF

    ESTIMATED SOCKET

    LENGTH, (m)

    ESTIMATED PILE

    LENGTH, bcl (m)

    1 MA10 1500 Bored pile 10000 BH57 4.0 in Granite 16.04 MA40 1500 Bored pile 10000 BH58 3.5 in Granite 21.5

    Bridge Foundation Estimated Pile Length

    Interchange:

  • 5/23/2018 Bridge Value Engineering

    52/80

  • 5/23/2018 Bridge Value Engineering

    53/80

    Main Line / Toll Plaza

    30m span U-12 Beams

  • 5/23/2018 Bridge Value Engineering

    54/80

  • 5/23/2018 Bridge Value Engineering

    55/80

  • 5/23/2018 Bridge Value Engineering

    56/80

    PROPOSED REALIGMENT BY PUBLIC - MANDARINA

    Proposed East West Link EWL) Expressway by Taman BukitMandarina 2 Residence : on 18thOct. 2012; Selangor State appointed UTM Prof. Dr.

    Othman Che Puan as independent cosultant to carry outcomparative study on the alignment,

    on 07thFeb. 2013; the report was presented to UPEN, it was concluded that the original SUKE alignment is a better

    option compared to EWL.

    EAST WEST LINK

  • 5/23/2018 Bridge Value Engineering

    57/80

    PROPOSED ALAM DAMAI INTERCHANGE

    ALAM DAMAI

    TOLL PLAZA &INTERCHANGE

    RAMPS TOPERSIARAN

    ALAM DAMAI

  • 5/23/2018 Bridge Value Engineering

    58/80

    PROPOSED REALIGMENT BY PUBLIC ALAM DAMAI

    DAMAI 23(2 storeys Shop Lots

    4 storeys Shop Lots

    (Under Construction)

    (With 2 lanes Ramp Toll)To acquire: 28 shop lots (2 storeys) 21 nos. of terrace houses 1 construction areas Damai 23

    Shop Lots under construction

    PROPOSEDRAMPS TO

    JALAN ALAMDAMAI WITHRAMP-TOLL

  • 5/23/2018 Bridge Value Engineering

    59/80

    Package A5 Layout Plan

  • 5/23/2018 Bridge Value Engineering

    60/80

    CHAINAGE CH.7800 CH.9600

    PACKAGE A5

    LOCATION CHERAS KAJANG I/C &FORESTRESERVE

    LEADCONSULTANT& PRELIMINARY

    DESIGNCONSULTANT

    SEPAKAT SETIAPERUNDING(SDN) BHD

    DETAILEDDESIGNCONSULTANT

    EDPCONSULTINGGROUP SDN BHD

    Package A5 Layout Plan

    Package A5 Mainline Profile

  • 5/23/2018 Bridge Value Engineering

    61/80

    Package A5 Mainline Profile

    Crossing Cheras Kajang Hwy

    Forest Area

    To Sg Besi

    To Ulu Kelang

    Elevated Viaduct Summary

  • 5/23/2018 Bridge Value Engineering

    62/80

    Package Alignment Chainage Superstru

    cture

    Type

    Span

    Configuration

    Substructure Type

    A5 Ch. 7800 -9600

    Mainline

    Ulu Kelang

    Bound -U-Beam &

    T-Beam

    U- (30m),

    T- (>30m,

    30m,

  • 5/23/2018 Bridge Value Engineering

    63/80

    BH REF

    COORDINATES APPROXIMATE BH

    CHAINAGE

    APPROXIMATECHAINAGE

    PIER ID

    PILEDIAMETER, D (mm)

    WORKING LOAD,WL (kN)

    ESTIMATEDSOCKET

    LENGTH, (m)

    ESTIMATED PILELENGTH, bcl

    (m)E N

    BH64 5212.436 -10690.780 CH7880 CH7420 7900 AP144 -AP155 1200 7000 3.0 in Granite 30.0

    BH 67 5195.718 -10602.625 CH 7980 CH7900 8020 BCP1 BCP2 1200 7000 4.0 in Granite 19.0

    BH 70 5156.615 -10515.240 CH 8100 CH8020 8120 BCP3-BCP4 1200 7000 3.5 in Granite 15.5

    BH 72 5174.268 -10434.413 CH 8140 CH8120 8180 AP156 1200 7000 3.5 in Granite 24.0

    BH 74 5216.026 -10361.218 CH 8200 CH8180 8220 AP157 1200 7000 3.5 in Granite 12.5BH 75 5256.393 -10317.487 CH 8240 CH8220 8260 AP158 1200 7000 3.5 in Granite 9.5

    BH 76 5256.448 -10252.312 CH 8320 CH8260 8300 AP159 1200 7000 3.5 in Granite 13.0

    BH 77 5140.376 -10221.072 CH 8400 CH8300 8520 AP160- AP165 1200 7000 3.0 in Granite 31.5

    BH 79 5029.842 -10080.072 CH 8560 CH8520 8820AP166 - AP

    1721200 7000 2.0 in Granite 33.5

    BH 81 4990.014 -9808.321 CH 8900 CH8820 8980 AP 173 1200 7000 2.5 in Granite 34.0

    BH 84 5056.787 -9747.469 CH 9200 CH8980 9380 AP174- AP183 1200 6500 3.5 in Granite 20.0

    BH 88 5445.465 -9489.165 CH 9520 CH9380 9680 AP184 AP191 1200 6500 2.0 in Granite 30.2

    Bridge Foundation Estimated Pile Length

    Main Line:

  • 5/23/2018 Bridge Value Engineering

    64/80

  • 5/23/2018 Bridge Value Engineering

    65/80

    Main Line

    40m span T Beams

    30m Span U12-Beam

    Main LineSpecial Crossing

    Cast In-situ Box Girder(60m+100m+60m)

    Ramp

    30m span Voided Deck30m Span U12-Beam

  • 5/23/2018 Bridge Value Engineering

    66/80

  • 5/23/2018 Bridge Value Engineering

    67/80

  • 5/23/2018 Bridge Value Engineering

    68/80

    PROPOSED ACQUISITION OF JBTN HUTAN DAERAH , SELANGOR

    JBTN. HUTAN

    OFFICE &QUARTERS

    EXISTINGROAD TO

    BKT SEGAR

    PROP. NEWROAD TO

    BKT SEGAR

    Proposed affected forestry assets to be acquire due to: the existing access road will not have sufficient clearance heightto occomadate new ramp by SUKE, The proposes new road will utilise acquired forest.

  • 5/23/2018 Bridge Value Engineering

    69/80

    CONSTRUCTION OF HIGH MAIN LINE &RAMPS

    HIGH MAIN LINE

    SPANING OVERCHERAS KAJANG

    HIGHWAY

  • 5/23/2018 Bridge Value Engineering

    70/80

    CONSTRUCTION OF HIGH MAIN LINE &RAMPS

    MRT

    To Sg Besi

    To Ulu Kelang

  • 5/23/2018 Bridge Value Engineering

    71/80Package A6 Layout Plan

  • 5/23/2018 Bridge Value Engineering

    72/80

    CHAINAGE CH.9600 CH.11000

    PACKAGE A6

    LOCATION FORESTRESERVE

    LEADCONSULTANT& PRELIMINARYDESIGNCONSULTANT

    SEPAKAT SETIAPERUNDING(SDN) BHD

    DETAILED

    DESIGNCONSULTANT

    AMIN & TEHSDN

    BHD

    Package A6 Mainline Profile

  • 5/23/2018 Bridge Value Engineering

    73/80

    Forest Area

    Join to Section B

    To Sg Besi

    To Ulu Kelang

    Elevated Viaduct Summary

  • 5/23/2018 Bridge Value Engineering

    74/80

    Package Alignment Chainage Superstruc

    ture Type

    Span

    Configuration

    Substructure Type

    A6 Ch. 9600

    11000

    Mainline

    Ulu KelangBound -

    U-Beam &T-Beam

    U- (30m),T- (>30m,

    30m,

  • 5/23/2018 Bridge Value Engineering

    75/80

    BH REF

    COORDINATES

    APPROXIMATE

    BH CHAINAGE

    APPROXIMATE

    CHAINAGEPIER ID

    PILE DIAMETER,

    D (mm)

    WORKINGLOAD, WL

    (kN)

    ESTIMATEDSOCKET LENGTH,

    (m)

    ESTIMATE

    D PILE

    LENGTH,

    bcl (m)

    E N

    BH 89 5665.037 -9435.858 CH 9700 CH96809860AP192-

    AP1931200 6500 2.5 in Granite 20.5

    BH 92 5700.877 -9285.679 CH 9860 CH98609960 1200 6500 2.5 in Granite 22.0

    BH 94 5803.094 -9189.076 CH 10000 CH996010150 1200 6500 1.5 in Granite 33.0

    BH 96 5922.150 -9034.422 CH 10180 CH10150

    10200 1200 6500 3.0 in Granite 10.5

    BH 97 6005.887-9007.

    690CH 10260 CH1020010300 1200 6500

    19.0 in very hard

    soil34.0

    BH 98 6019.469 -8917.643 CH 10320 CH1030010540 1200 6500

    21.5m in very

    hard

    soil

    32.0

    BH 99 5991.049 -8724.717 CH 10540 CH1054010780 1200 6500 2.5 in Granite 17.5

    BH 100 6044.784 -8548.463 CH 10720 CH1078011120AP194-

    AP203

    1200 7000 3.0 in Granite 27.0

    Main Line:

    Bridge Foundation Estimated Pile Length

  • 5/23/2018 Bridge Value Engineering

    76/80

    Cheras Kajang Interchange

    Pile size, mm

    dia.Pile Type

    Estimated

    working load, kNBH REF

    ESTIMATED SOCKET

    LENGTH, (m)

    ESTIMATED PILE LENGTH,

    bcl (m)

    1 MK10 1200 Bored pile 8500 BH77 3.5 in Granite 32.0

    1a MK10 1500 Bored pile 10000 BH69 3.5 in Granite 21.5

    2 MK20 1500 Bored pile 10000 BH68 4.0 in Granite 14.5

    3 MK30 1500 Bored pile 10000 BH64 3.5 in Granite 29.0

    4 MK40 1500 Bored pile 10000 BH64 3.5 in Granite 29.0

    4a MK40 2000 Bored pile 20000 BH64 5.5 in Granite 31.0

    5 MK50 1500 Bored pile 10000 BH78 4.5 in Granite 19.5

    Interchange:

  • 5/23/2018 Bridge Value Engineering

    77/80

    Main Line

  • 5/23/2018 Bridge Value Engineering

    78/80

    Main Line

    40m span T Beams30m Span U12-Beam

    Main LineSpecial CrossingCast In-situ Box Girder(60m+100m+60m)

    Ramp30m span Voided Deck30m Span U12-Beam

    At Grade

  • 5/23/2018 Bridge Value Engineering

    79/80

  • 5/23/2018 Bridge Value Engineering

    80/80