Transcript of Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar...
![Page 1: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/1.jpg)
Brian StoneResearch Support Manager
NSF/Office of Polar Programs
Research Support PlanningResearch Support Planning
Polar Research Support Section
Al SutherlandOcean Projects Manager
NSF/Office of Polar Programs
![Page 2: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/2.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
OPP FundingOPP Funding
• Differs from most “traditional” NSF grants• OPP Science Section funds direct researcher
support• OPP Research Support section funds field support
and activities in the field• Direct research support through prime contractor
![Page 3: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/3.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
NSF Support ConceptNSF Support Concept
• Provide the researcher with the basic tools needed to do research in Antarctica
• Efforts on pre-planning to minimize time on-ice. Maximize throughput
• Allow researchers to focus on achieving scientific objectives
![Page 4: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/4.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
BudgetingBudgeting
NSF Supplies
• Multi-user equipment
• Travel / ticketing
• All subsistence on ice
• Cold weather clothing
• Consumables
Research Budget
• Specialized equipment
• Unique field gear
• Lodging & food
![Page 5: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/5.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
HelicoptersHelicopters
McMurdo Station
• 2 Bell 212
• 2 AS-350-B2 A-Star
• 2 US Coast Guard
Vessels
• As required
![Page 6: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/6.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
Light AircraftLight Aircraft
• Twin Otter
• Basler-Turbo 67
• Medium to short range
![Page 7: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/7.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
LC-130 HerculesLC-130 Hercules
• Deep field work
• Extended Range
• Outsize cargo capability
• Airdrop
![Page 8: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/8.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
Dry Valleys Field CampsDry Valleys Field Camps
![Page 9: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/9.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
Dry Valleys Tent CampDry Valleys Tent Camp
![Page 10: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/10.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
Deep Field CampDeep Field Camp
Siple Dome Field Camp
![Page 11: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/11.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
South Pole ObservatoriesSouth Pole Observatories
Degree Angular Scale Interferometer (DASI)
![Page 12: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/12.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
Palmer StationPalmer Station
![Page 13: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/13.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
Boating at Palmer StationBoating at Palmer Station
![Page 14: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/14.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
Research Support Capabilities Research Support Capabilities set U.S. Program Apartset U.S. Program Apart
• Ability to put researchers on almost any part of Antarctic continent
• Focused, short-duration efforts which maximize observing time for researcher
• Flexibility to accommodate academic commitments
• Time investment on the part of the researcher
![Page 15: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/15.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
Proposal ReviewProposal Review
• OPP requires the proposer to complete an Operational Requirements Worksheet
• Research Support Section conducts operational support assessment– Separate from merit review
• Not every project is supportable.
![Page 16: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/16.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
The ORWThe ORW
Operational Requirements Worksheet (ORW)• Electronic form contained in Electronic Support
Planner (ESP)• High-level requirements document which frames
the general operational needs of the project• Some operational knowledge required
– Advice & assistance is available
• Used to determine operational support assessment of project
![Page 17: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/17.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
The SIPThe SIP
Support Information Packet (SIP)• More detailed requirements document• Researcher completes prior to deployment• Annual requirement - reviewed by NSF• Must be consistent with ORW
![Page 18: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/18.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
The RSPThe RSP
Research Support Plan (RSP)• Summary of support to be provided during
deployment• NSF-approved support• Keys into contractor performance metrics• Most important document for on-ice support
![Page 19: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/19.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
Support Planning ProcessSupport Planning Process
Support InformationSupport InformationPacketPacket
OperationalOperationalRequirementsRequirementsWorksheetWorksheet
Research SupportResearch SupportPlanPlan
Support inSupport inthe Fieldthe Field
![Page 20: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/20.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
General Support “Flags”General Support “Flags”
• Work in dangerous locations
• Diving
• Explosives use
• Work which requires ACA permits
• Radioactives
• Cryogenics
• Cargo requirements
• Major equipment needs
• Construction requirements
• Computer & communications needs
• Lab/office square footage
• Power consumption
• Aircraft usage
• Vehicle/Boating use
• Numbers of personnel
• Dates/time on ice
![Page 21: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/21.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
USAPUSAPMarine Science SupportMarine Science Support
![Page 22: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/22.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
Marine Science SupportMarine Science SupportWho Does What?Who Does What?
• RPSC - Marine Science• Edison Chouest Offshore• At-Sea “Triad of Leadership”
![Page 23: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/23.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
Marine Science SupportMarine Science SupportOrganizationOrganization
• RPSC– Science Support Division
• Marine Science Support
Assign POC (Project Support Manager). Work with you on SIP and planning. Procure consumables and common use equipment. Ship all equipment. Provide shipboard technician support force and Marine Projects Coordinator (MPC).
![Page 24: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/24.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
Marine Science SupportMarine Science SupportOrganizationOrganization
• Edison Chouest Offshore (ECO)– Subcontract to RPSC. Own and operate the two
research vessels
Provide Master and Marine crew. Operate winches, cranes and all shipboard (non-scientific) equipment.
![Page 25: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/25.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
““Triad” of LeadershipTriad” of Leadership
• Chief Scientist• RPSC Marine Projects Coordinator (often
POC/PSM)• Captain (ECO)
![Page 26: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/26.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
USAPUSAPMarine Science SupportMarine Science Support
![Page 27: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/27.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
Nathaniel B. PalmerNathaniel B. Palmer
![Page 28: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/28.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
NBPNBP
• Larger vessel (308 ft)• Scientific Party of 39• Greater Ice breaking Capability (all but harshest
winter Antarctic Sea Ice)• Ranges the entire Southern Ocean
![Page 29: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/29.jpg)
NBPNBPLength 94 m (308 ft) Breadth 18 m (60 ft) Design Draft 6.9 m (22’ 6”) Displacement 6900 MT (6800 LT ) Horsepower 12,720 SHP from four mains
1,500 HP Bow thruster 800 HP Stern Thruster
Propellers 2 – Variable pitch in Kort Nozzles Rudders 2 – High Lift Berthing 39 Science and support technicians Ice Class ABS-A2 (nominally break 1 m of ice at 5.6
k/hr (3ft of ice at 3kts)) Winches Markey, DUSH-5, (Baltic Rm)
10,000m .818cm E-M (33,000ft, .322”) Markey, DUSH-5-5WF, 10,000m .818cm E-M & 10,000m .635cm 3x19 WR (33,000ft, .322”; 33,000ft, ¼”) Markey, DUSH 9-11, 10,000m 1.72cm E-M & 10,000m 1.43cm 3x19 WR (33,000ft, .680”; 33,000ft, 9/16”
A-Frames Stern – 11.8 MT, 9m clearance (12 ton, 30’) Starboard –11.8 MT, 6.1m clearance (12 ton, 20’) Baltic Room – Boom – 5.4 MT (6 ton)
Workboat 7.9m (26ft) steel hull Compressors 2 @ 566 ltr/sec, 140kg/cm2 (1200-scfm, 2000
psi) Lab Space 548 m2 (5,900 ft2)
![Page 30: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/30.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
NBPNBP
![Page 31: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/31.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
Laurence M. GouldLaurence M. Gould
![Page 32: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/32.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
LMGLMG
• Smaller vessel (230ft)• Scientific Party of 28• Lighter Icebreaking. Typically works in
Peninsula.• Coupled to Palmer Station for logistics. Stop at
Palmer very likely.
![Page 33: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/33.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
LMGLMGLength 70 m (230 ft) Breadth 14 m (46 ft) Max Draft 5.8 m (19 ft) Displacement 3411 LT (3468 MT) (1599 GRT) Horsepower 4575HP from two mains
800HP Bow thruster Propellers 2 Variable Pitch in Kort Nozzles Rudders 2 High lift Berthing 28 Science and support technicians
plus10 more short term in berthing vans Ice Class ABS-A1 (nominally 1 ft of ice at continuous forward
motion) Winches Markey, DUSH 5, (in Baltic Room)
10,000m, .818cm E-M (33,000ft, .322”) Markey, DUSH 6 interchangeable drums, 6,000 m 1.27cm 3x19 WR & 2,800m, 1.72cm E-M (19,700ft, ½” WR & 9,200ft, .680 E-M) Markey, DUSH 4, interchangeable drums 6,300 m, .818cm E-M & 7, 000m .635cm 3x19 WR (20,700ft, .322” E-M & 23,000ft, ¼” WR)
A-Frames Stern: 10MT, 7.5 M clearance (11 ton, 24’7” ) Starboard: 5MT, 19’6” clearance (5.5 ton, 19’6” ) Baltic Room Boom: 5MT (5.5 ton)
Compressors 118 ltr/sec, 149kg/cm2 (250cfm, 2000psi) Lab Space 225m2 (2425 ft2 )
![Page 34: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/34.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
LMGLMG
![Page 35: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/35.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
Ship SupportShip SupportUnique things to think about on ORWUnique things to think about on ORW
Schedule– Port to Port time?– Flexibility in dates?
Location/Track line– Be specific– Provide Chartlets
![Page 36: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/36.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
Ship Scheduling CycleShip Scheduling Cycle
• June - Proposals Due• Jul-Aug - OPS Review: Strawman Schedule• Sep-Oct - Science-OPS Meetings (yes, no, maybe)
- PM Notifications (Declines)• Nov-Dec - RPSC Detailed Schedule Development• Jan-Apr - Final Decisions on Maybes
- RPSC public schedule; Web (iterative)• May - Final(?) Schedule
![Page 37: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/37.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
Ship SupportShip SupportWhere to get adviceWhere to get advice
• WEB Site – http://www.polar.org/science/marine/index.html
– Schedules, Equipment, Pictures, Contacts
• RPSC – Jim Holik ([email protected]) 303-790-8606
– Other POC/PSM’s
• NSF– Al Sutherland ([email protected]) 703-292-7457
– Or Your Science Program Manager
![Page 38: Brian Stone Research Support Manager NSF/Office of Polar Programs Research Support Planning Polar Research Support Section Al Sutherland Ocean Projects.](https://reader035.fdocuments.us/reader035/viewer/2022070409/56649e905503460f94b94799/html5/thumbnails/38.jpg)
23 – 24 August 2004U.S. Antarctic Program, New Investigators workshop
Ship SupportShip SupportWhere to get adviceWhere to get advice
• Other– Previous P.I.’s - on Ship’s Cruise History web site.
http://www.polar.org/science/marine/index.html
– Antarctic Research Vessel Oversight Committee (ARVOC) at http://www.polar.org/science/marine/arvoc/arvoc.htm
– Science Planning Summaries (all but current year) at: http://www.polar.org/science/sciprosu.htm
– Videos, Participants Guide, Field Manual, NSF Web (O/D)