April 12, 2012
Vermelding onderdeel organisatie
1
Chapter 13: Construction methods for granular material
ct5308 Breakwaters and Closure Dams
H.J. Verhagen
Faculty of Civil Engineering and GeosciencesSection Hydraulic Engineering
![Page 2: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/2.jpg)
April 12, 2012 2
Elements to consider
• Bed fixation or bed protectionmattresses, etc.
• Shore connected and intermediate dam sectionssand fill/quarry; execution
• Abutmentssheetpile, caisson
• Breakwater core; dumped sills• Cover layer, armour
![Page 3: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/3.jpg)
April 12, 2012 3
Scour prevention
• Change of flow in course of time• Flow distribution over the vertical• Flow is not saturated with sediment• Turbulence intensity increases
![Page 4: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/4.jpg)
April 12, 2012 4
development of a scour hole
![Page 5: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/5.jpg)
April 12, 2012 5
length
![Page 6: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/6.jpg)
April 12, 2012 6
balance of material
![Page 7: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/7.jpg)
April 12, 2012 7
effective scour time
![Page 8: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/8.jpg)
April 12, 2012 8
development of a scour hole
![Page 9: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/9.jpg)
April 12, 2012 9
mattresses or granular filters
•limited construction height•applicable on steep slopes•difficult to remove•presence of structural joints•vulnerable to mechanical damage•restricted lifetime
•self healing after minor damage•absence of structural joints•simple to remove by dredging•no sudden change at the end; they can fade out gradually•absence of structural coherence•disintegration on steep slopes•considerable construction height
![Page 10: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/10.jpg)
April 12, 2012 10
stability downstream of a sill
increase load withuflow uniform u = K
c
cv
![Page 11: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/11.jpg)
April 12, 2012 11
Shields with corrections
2 2
2
1: 1
0.4
v c
s c
vt
K udK C
KIn Cress K
=Ψ Δ
−= +
Rectangular Abutments: Kv = 1.7 => Kt= 2.75
![Page 12: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/12.jpg)
April 12, 2012 12
example bed protection
• Bs = 2.5 * 20 = 50 km2
• depth = 10 m• B = 500 m• tidal difference = 3 m
![Page 13: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/13.jpg)
April 12, 2012 13
Bed protection in case of horizontal closurewidth u0 (max) D (cm) W(kg)
500 2,13 5 0 80/200450 2,35 6 0 80/200400 2,60 8 1 80/200350 2,90 11 2 80/200300 3,26 17 7 80/200250 3,68 23 20 10/60200 4,16 35 65 60/300150 4,63 50 192 60/300100 5,13 71 653 300/100050 5,47 90 1161 1/325 5,68 105 1794 1/310 6,27 158 6166 special
![Page 14: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/14.jpg)
April 12, 2012 14
Mixing layers (from ct4310)
5°
10°
![Page 15: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/15.jpg)
April 12, 2012 15
Jet equations (from ct4310)2
2
0.6930
0.6930
3.5 0.1
6.3 0.1
zb
m m
Rb
m m
uPlane jets : u = b = x u =u ex B
uCircular jets : u = b = x u = u ex D
⎛ ⎞⎛ ⎞⎜ ⎟− ⎜ ⎟⎜ ⎟⎝ ⎠⎝ ⎠
⎛ ⎞⎛ ⎞⎜ ⎟− ⎜ ⎟⎜ ⎟⎝ ⎠⎝ ⎠
x = distance from sillB = width of gap
![Page 16: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/16.jpg)
April 12, 2012 16
Bed protection in case of vertical closure
depth U0 u2 3*U2 D (cm) W(kg)10 2.13 2.13 2.13 5 0 80/2009 2.36 2.15 2.36 6 0 80/2008 2.64 2.18 2.64 8 1 80/2007 2.97 2.20 2.97 14 4 80/2006 3.38 2.20 3.38 21 14 10/605 3.86 2.18 3.86 27 32 10/604 4.33 2.07 4.33 39 97 60/3003 4.63 1.81 4.63 50 192 60/3002 4.64 1.41 4.24 37 79 60/3001 3.42 0.74 2.23 5 00 3.13 0.41 1.22 1 0
Conclusion: everywhere 60/300 is needed
![Page 17: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/17.jpg)
April 12, 2012 17
providing quarry material
• by road• by rail• by water• a combination
![Page 18: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/18.jpg)
April 12, 2012 18
subsequent working fronts
![Page 19: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/19.jpg)
April 12, 2012 19
Construction phases of the ZeebruggeBreakwater (1)
Unsustainable material in the location of the breakwater is removed by sea going cutter suction dredge
![Page 20: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/20.jpg)
April 12, 2012 20
Construction phases of the ZeebruggeBreakwater (2)
Split-hopper replaces material with sea sand and sea gravel
![Page 21: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/21.jpg)
April 12, 2012 21
Construction phases of the ZeebruggeBreakwater (3)
Willow mattresses are sunk with two sink pontoons and specialised stone barges
![Page 22: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/22.jpg)
April 12, 2012 22
Construction phases of the ZeebruggeBreakwater (4)
Lateral berms are constructed with quarried stones of 3-6 tons with specialised stone barges
![Page 23: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/23.jpg)
April 12, 2012 23
Construction phases of the ZeebruggeBreakwater (5)
The dam core is built with quarry stone using heavy duty earth moving equipment
![Page 24: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/24.jpg)
April 12, 2012 24
Construction phases of the ZeebruggeBreakwater (6)
The stones are faces with a layer of 1-3 tons stones plus filter construction with Poclain 600
![Page 25: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/25.jpg)
April 12, 2012 25
Construction phases of the ZeebruggeBreakwater (7)
The seaward side is protected by 25-30 ton concrete blocks with an American Hoist 11-310
![Page 26: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/26.jpg)
April 12, 2012 26
Construction phases of the ZeebruggeBreakwater (8)
Finishing: crown block, service road, lighting
![Page 27: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/27.jpg)
April 12, 2012 27
a breakwater under construction
![Page 28: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/28.jpg)
April 12, 2012 28
trucks waiting on the breakwater
![Page 29: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/29.jpg)
April 12, 2012 29
use of cheap local equipment
![Page 30: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/30.jpg)
April 12, 2012 30
build up of profiles
line dump
horizontal layers
![Page 31: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/31.jpg)
April 12, 2012 31
use of waterborne and land based equipment
![Page 32: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/32.jpg)
April 12, 2012 32
land based equipment
![Page 33: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/33.jpg)
April 12, 2012 33
tipper truck vs. dump truck
![Page 34: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/34.jpg)
April 12, 2012 34
space requirements for heavy equipment
![Page 35: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/35.jpg)
April 12, 2012 35
lifting capacity of a crane
![Page 36: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/36.jpg)
April 12, 2012 36
grab types
![Page 37: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/37.jpg)
April 12, 2012 37
Waterborne equipment
• Bulk• Pipeline• Floating
• flat deck barges• bottom door barges• split barges• tilt barges• side unloading vessels
• Individual placement
![Page 38: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/38.jpg)
April 12, 2012 38
closure by pumping sand
![Page 39: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/39.jpg)
April 12, 2012 39
barges for dumping material
![Page 40: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/40.jpg)
April 12, 2012 40
example of combined transport and crane vessel
![Page 41: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/41.jpg)
April 12, 2012 41
motion of a driven wheel
![Page 42: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/42.jpg)
April 12, 2012 42
temporary road on soft subsoil
![Page 43: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/43.jpg)
April 12, 2012 43
final closure with sand only
![Page 44: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/44.jpg)
April 12, 2012 44
closure with a cable car
![Page 45: Breakwaters and closure dams 13](https://reader034.fdocuments.us/reader034/viewer/2022051411/5470b175b4af9f9d0a8b4840/html5/thumbnails/45.jpg)
April 12, 2012 45
varying construction sequence