Breakwater Drive Improvements · 2021. 6. 22. · Breakwater Drive Improvements City of New Orleans...
Transcript of Breakwater Drive Improvements · 2021. 6. 22. · Breakwater Drive Improvements City of New Orleans...
Breakwater DriveImprovementsCity of New Orleans
652 Papworth AvenueMetairie, Louisiana 70005
504-322-2783www.ascellc.com
Construction Staging
North Berm
Jetty
The Point
West Berm
Ornamental Wall
Boat Launch Parking
BreakwaterDrive
Project Scope
West Berm Rip Rap Cap (Existing Berm) – to 7’ Elevation
Rip Rap Cap & Slurry Topping (Along Launch Parking)
6’ Wide Concrete Walkway
West Parking Areas Drainage Repairs
Boat Launch Parking Base Repairs & Asphalt Overlay
New Lighting, Security Gates, Facility Signage
W. BreakwaterDrive
Asphalt Parking Repairs
Subsurface Drainage
Sidewalk
Sidewalk
Lighting
Gates
Rip Rap Breakwater
Asphalt Repair Mill & Overlay
Jetty Repair
Rip Rap Breakwater
7’ Elevation Rip Rap
Sidewalk
Drainage Repair
West Berm
5’-6’ Elevation Rip Rap
Walkway at Boat Launch Parking
Jetty Repair
Rap Armament
Launch Parking
and Jetty
Project Scope
North Berm Rip Rap Install – 8’ to 10’ Elevation
Additional Fill & Sidewalk Along Breakwater
The Point Parking and Day Use Area
6’ Wide Concrete Walkway
Facility Signage
Subsurface Drainage Inlet Basins, Drain Pipe & Outfall
(Greenspace to Point)
N. BreakwaterDrive
Dumpster and EnclosureSubsurface
Drainage
Sidewalk
Rip Rap Breakwater
Slope
Sidewalk
Day Use AreaParking
Sidewalk
Fill
8’ Elevation Rip Rap
Parking
10’ Elevation Rip Rap
Fill
North Berm
The PointRap Armament
Dumpster and Enclosure
Parking
Rap Armament
Day Use Area
Sidewalk
Project Schedule