Breakdowns Happen: Factoring Downtime Into Your Simulation

21
Breakdowns Happen: How to Factor Downtime into your Simulation Simulation expert Brian Harrington explains the key learning points simulation modelers should consider when working with downtime.

description

Wednesday March 5 2014, 11am (Eastern) Due to the popularity of our recent whitepaper on factoring downtime in to your simulation, we're holding a FREE Webinar on how to factor downtime into your simulation. Led by Brian Harrington, former Ford Motor Company employee and SIMUL8 expert, Brian is passionate about this subject and is keen to share his knowledge and discuss any questions you may have. The Webinar will expand on the topics covered in the whitepaper including; questions to consider when working with downtime, capturing at station or line level, associated distributions and accounting for the lockout procedure. In addition, we'll look at simultaneous breakdowns, skill trades to handle your breakdown and more.

Transcript of Breakdowns Happen: Factoring Downtime Into Your Simulation

Page 1: Breakdowns Happen: Factoring Downtime Into Your Simulation

Breakdowns Happen:

How to Factor Downtime

into your Simulation

Simulation expert Brian Harrington explains the key learning points simulation modelers should consider when working with downtime.

Page 2: Breakdowns Happen: Factoring Downtime Into Your Simulation

SIMUL8 Corporation | SIMUL8.com | [email protected]

Introductions

Brian Harrington, CSSBB

- 20 years in simulation at

Ford Motor Company

- Experienced Six

Sigma Blackbelt and

SIMUL8 Manufacturing Consultant

- Director of MTN-SIM, a

simulation specialist consulting firm

Page 3: Breakdowns Happen: Factoring Downtime Into Your Simulation

SIMUL8 Corporation | SIMUL8.com | [email protected]

MTBF & MTTR

1. How often does a machine fail (MTBF)?

2. How long does it take to repair it (MTTR)?

These two questions may seem simple, however

are often abstracted within the forest of machinery

and clouded by human behavior.

Page 4: Breakdowns Happen: Factoring Downtime Into Your Simulation

SIMUL8 Corporation | SIMUL8.com | [email protected]

One of the most debatable pieces of data

that goes into a simulation is the stochastic

behavior of machine downtime.

• Introducing new equipment • Collecting downtime data • Summarizing downtime data • Catastrophic downtimes • Lock-out procedures • Time to react, travel, and repair • Distributions to represent downtimes • Limited skilled trades • Simultaneous faults • Protective capacity • Equations (MTBF, MTTF, MTBC, MTTR, etc…)

Plants perspective

Designer’s perspective

Page 5: Breakdowns Happen: Factoring Downtime Into Your Simulation

SIMUL8 Corporation | SIMUL8.com | [email protected]

Availability

Page 6: Breakdowns Happen: Factoring Downtime Into Your Simulation

SIMUL8 Corporation | SIMUL8.com | [email protected] 6

SIMUL8 Efficiency… Prove it

MTBF

MTTR

Availability

Efficiency

Go to MTBF MTTR Defined.S8

Page 7: Breakdowns Happen: Factoring Downtime Into Your Simulation

SIMUL8 Corporation | SIMUL8.com | [email protected]

Capture downtime at station or line level?

Page 8: Breakdowns Happen: Factoring Downtime Into Your Simulation

SIMUL8 Corporation | SIMUL8.com | [email protected]

Math behind the Spreadsheet

Page 9: Breakdowns Happen: Factoring Downtime Into Your Simulation

SIMUL8 Corporation | SIMUL8.com | [email protected]

Equivalent Results

Page 10: Breakdowns Happen: Factoring Downtime Into Your Simulation

SIMUL8 Corporation | SIMUL8.com | [email protected]

Advantages of Aggregate Values

• Used for predicting station/cell level

downtime based on components

• Reduces large data files

• Ease of communicating downtime figures

• Aligned with scope of model

Page 11: Breakdowns Happen: Factoring Downtime Into Your Simulation

SIMUL8 Corporation | SIMUL8.com | [email protected]

Distributions for MTBF & MTTR?

Exponential

Erlang

Page 12: Breakdowns Happen: Factoring Downtime Into Your Simulation

SIMUL8 Corporation | SIMUL8.com | [email protected]

Stat::Fit (View your data!)

• Data tables (Input data)

• Input Graph

• Descriptive Statistics

• Auto::Fit

• Distribution Viewer

Go to View Dist.S8

Page 13: Breakdowns Happen: Factoring Downtime Into Your Simulation

SIMUL8 Corporation | SIMUL8.com | [email protected]

Time to React & Travel?

Named Distributions and the Combination Distribution can capture some of this behavior.

Page 14: Breakdowns Happen: Factoring Downtime Into Your Simulation

SIMUL8 Corporation | SIMUL8.com | [email protected]

Lock-out Procedure

A safety protocol which protects skilled trades when entering a station or work cell. Each skilled trade will have a named-lock, which will be “locked” on an electrical panel before entering a work cell for a repair. The protocol will have several required steps to assure that all power is off, assuring no machinery, robot, etc. movement.

A typical lock-out procedure might take 3 to 7 minutes to complete!

Page 15: Breakdowns Happen: Factoring Downtime Into Your Simulation

SIMUL8 Corporation | SIMUL8.com | [email protected]

How do we account for the Lockout

Procedure?

A lockout procedure might be assumed to be followed on the lengthier repairs

such as repair times that take 10 minutes or more.

Page 16: Breakdowns Happen: Factoring Downtime Into Your Simulation

SIMUL8 Corporation | SIMUL8.com | [email protected]

VL for creating a Bimodal Distribution

Page 17: Breakdowns Happen: Factoring Downtime Into Your Simulation

SIMUL8 Corporation | SIMUL8.com | [email protected]

Skilled Trades on Repairs

Page 18: Breakdowns Happen: Factoring Downtime Into Your Simulation

SIMUL8 Corporation | SIMUL8.com | [email protected]

TimeView

Improve Performance

Downtimes cause Performance issues!

(Wait & Blocks)

Page 19: Breakdowns Happen: Factoring Downtime Into Your Simulation

SIMUL8 Corporation | SIMUL8.com | [email protected]

Design Facilities to Absorb Downtime

• Protective Capacity

– Resides in an over-speed (Push)

– Resides in buffers

– Preventative maintenance

– Skilled trades available

– Material handling systems

• Power & Free

• Electric Monorail Systems

• Power Friction

Page 20: Breakdowns Happen: Factoring Downtime Into Your Simulation

SIMUL8 Corporation | SIMUL8.com | [email protected]

Questions

Page 21: Breakdowns Happen: Factoring Downtime Into Your Simulation