BRE: BIM in Wales

34
Part of the BRE Trust BRE: BIM in Wales Dan Rossiter BIM Team, BRE Wales 26 th of September, 2014

description

BRE: BIM in Wales. Dan Rossiter BIM Team, BRE Wales 26 th of September, 2014. Agenda. About me What is BIM The Origins of BIM Egan, Latham, Construction Strategy BIM Level 2 Requirements BS1192, BS1192-2 and other documents BIM in Wales Welsh Construction Strategy, CLAW Toolkit - PowerPoint PPT Presentation

Transcript of BRE: BIM in Wales

Page 1: BRE: BIM in Wales

Part of the BRE Trust

BRE: BIM in Wales

Dan RossiterBIM Team, BRE Wales26th of September, 2014

Page 2: BRE: BIM in Wales

– About me

– What is BIM

– The Origins of BIM– Egan, Latham, Construction Strategy

– BIM Level 2 Requirements– BS1192, BS1192-2 and other documents

– BIM in Wales– Welsh Construction Strategy, CLAW Toolkit

– How the BRE can help– Education– Certification– Consultancy

Agenda

Page 3: BRE: BIM in Wales

About Me

Page 4: BRE: BIM in Wales

??

Dan Rossiter

Page 5: BRE: BIM in Wales

What is BIM

Page 6: BRE: BIM in Wales

BIM (Building Information Modelling)

–It’s not just 3D CAD

–It’s not just a new technology application

–It’s not next generation, it here and now!

BIM is essentially value creating collaboration through the entire life-cycle of an asset, underpinned by the creation, collation and exchange of shared 3D models and intelligent, structured data attached to them.

http://www.bimtaskgroup.org/bim-faqs/

BETTER

INFORMATION

MANAGEMENT

What is BIM

Page 7: BRE: BIM in Wales

What is BIM?

Page 8: BRE: BIM in Wales

The Origins of BIM

Page 9: BRE: BIM in Wales

The Origins of BIM

Latham Report1994

Egan Report1998

Never WasteA Good Crisis

2009

AcceleratingChange

2002

Page 10: BRE: BIM in Wales

The Origins of BIM

Quiz Time

Based on the last eleven years of KPI’s:

What percentage of projects come in on time and no budget? ~50%

Wolstenholme, 2009

Page 11: BRE: BIM in Wales

CostThe Origins of BIM

BIM was seen as a way to

Improve:

Carbon

Page 12: BRE: BIM in Wales

The Origins of BIM

“Production Information is generally, incorrect, incomplete, uncoordinated and ambiguous”

Page 13: BRE: BIM in Wales

“Information is Uncoordinated…”

Page 14: BRE: BIM in Wales

“Information is ambiguous… or why we need Standards”

Page 15: BRE: BIM in Wales

“Information may be incomplete…”

Page 16: BRE: BIM in Wales

“Information is uncoordinated…”

Page 17: BRE: BIM in Wales

“Information is also geospatially incorrect…”

Page 18: BRE: BIM in Wales

The Origins of BIM

– There is a detailed programme of measures Government will take that will reduce costs by up to 20% by the end of this parliament.

– Government will require fully collaborative 3D BIM (with all project and asset information, documentation and data being electronic) as a minimum by 2016. A staged plan will be published with mandated milestones showing measurable progress at the end of each year.

ConstructionStrategy

2011

Page 19: BRE: BIM in Wales

The Origins of BIM

BIS BIM Strategy2011

– The Government as a client can derive significant improvements in cost, value and carbon performance through the use of open sharable asset information.

Page 20: BRE: BIM in Wales

BIM Level 2 Requirements

Page 21: BRE: BIM in Wales

BIM Maturity Levels – Strategy Paper 2011

0 - Unmanaged CAD probably 2D, with paper (or electronic paper) as the most likely data exchange mechanism.

1 - Managed CAD in 2 or 3D format using BS 1192:2007 with a collaboration tool providing a common data environment, possibly some standard data structures and formats. Commercial data managed by standalone finance and cost management packages with no integration.

2 - Managed 3D environment held in separate discipline “BIM” tools with attached data. Commercial data managed by an Enterprise Resource Planning System (ERP). Integration on the basis of proprietary interfaces or bespoke middleware could be regarded as “pBIM” (proprietary). The approach may utilise 4D Programme data and 5D cost elements.

3 - Fully open process and data integration enabled by IFC / IFD. Managed by a collaborative model server. Could be regarded as iBIM or integrated BIM potentially employing concurrent engineering processes.

Page 22: BRE: BIM in Wales

UK Standards for BIM

BS1192:2007 PAS1192-2:2013 PAS1192-3:2014 BS1192-4:2014(COBie)

BS 8541 Series

Page 23: BRE: BIM in Wales

BIM Industry Documentation

PI For BIM(CIC)

BIM Protocol(CIC)

Uniclass(CPIC)

Digital Plan of Work(BIM Task Group)

CPIx Online(CPIC)

Page 24: BRE: BIM in Wales

BIM in Wales

Page 25: BRE: BIM in Wales

BIM in Wales

CEWales BIM Task Group

Working Paper2012

Recommendations:

–Alignment with UK Government with all Welsh Government funded projects at level 2 by 2016 and all Welsh Government Department Projects to lead at level 2 by 2015.

–A value or threshold for Wales could not be established in the timescales allowed. Collaborative working arrangements and internal business development should still be encouraged until such a value is set. Pilot projects are expected to inform the thresholds based on value and complexity by 2014/15.

–The following improvement areas are proposed: i. Added Value ii. Cost Predictability iii. Carbon Intelligence

Page 26: BRE: BIM in Wales

BIM in Wales

Welsh Construction Procurement Strategy

2013

Key Objectives and Milestones:

–Alignment with the UK Government Building Information Modelling (BIM) strategy, with all Welsh Government funded projects at level 2 by 2016 and all Welsh Government Department projects to lead at level 2 by 2015.

Page 27: BRE: BIM in Wales

BIM in WalesContains:–Introduction

–Setting the BIM Scene

–Business Case IT Investment

–Employer Information Requirements Template

–Employer Information Requirements Example

–Glossary of Terms

–Procurement Guide

–BIM and GSL Guide

–Collaborative Maturity Assessment Tool

–Standards and Protocol Reference

The CLAW All Wales BIM Toolkit2014 (Draft)

Page 28: BRE: BIM in Wales

How BRE Can Help

www.bre.co.uk/BIM

Page 29: BRE: BIM in Wales

BIM Level 2 Training Course

– BIM Foundation Course (AP)Covering BIM processes, procedures, information models, management and collaboration

– BIM Level 2 PAS1192-2

Project Information Manager (PIM)

Task Information Manager (TIM)

– BIM Level 2 PAS1192-2

Project Delivery Manager (PDM)

Page 30: BRE: BIM in Wales

BIM Level 2 Certification Schemes

BRE BIM Certificated Professional Schemes– Task Information Manager– Project Information Manager– Project Delivery Manager

BRE BIM Business System Certification Scheme– Audited BIM Capability Assessment

Page 31: BRE: BIM in Wales

Business Certificate Scheme Benefits

– PAS 91 (Working towards UKAS accreditation )

– BRE Certificated

– Audited Business Evaluation

– Defined Industry Benchmark

– Lean Process– Reduced Employers Effort / Cost– Reduced Supply Chain Effort / Cost

– Checked by Industry Specialist and Supported by BuildingSMART UKI

Page 32: BRE: BIM in Wales

BIM Checking Service

Documentation

–Employers Information Requirements (EIRs)

–BIM Execution Plans (BEP)

Models (BS 1192:2007. PAS 1192-2:2013, BS 1192-4, BS8541 Series)

–Naming Conventions

–Spatial Co-ordination

–Model Definition

–Volume Strategy

–Level of Definitions

–Data Segregation

–Annotations & symbology

Page 33: BRE: BIM in Wales

– About me

– What is BIM

– The Origins of BIM– Egan, Latham, Construction Strategy

– BIM Level 2 Requirements– BS1192, BS1192-2 and other documents

– BIM in Wales– Welsh Construction Strategy, CLAW Toolkit

– How the BRE can help– Education– Certification– Consultancy

Summary

Page 34: BRE: BIM in Wales

Any Questions?

Dan Rossiter

BIM Consulting / Training Manager

[email protected]