Risk model in eustream, a.s. and its real behaviour (2009-2013) Branislav Reťkovský

Transcript of Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf ·...

Page 1: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

Risk model in eustream, a.s. and its real behaviour (2009-2013)

Branislav Reťkovský

Page 2: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

Instead of agenda

(Dave Adler, NiSource Gas and John Beets, Willbros Engineering, Pipeline & Gas Journal, March 2012, Vol. 239 No. 3)

For many years the management of risk on NGT&S pipelines was driven by resource allocation and boiled down to who could do the best job of describing why their project was most important to the company’s future.

Page 3: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

ProbabilityXConsequences(ASME B31.8s, K. Muhlbauer, eustream know-how)

Transit system of eustream

Page 4: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

What does it mean „Risk“

ProbabilityXConsequences(ASME B31.8s, K. Muhlbauer, eustream know-how)

Page 5: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

Integrity management – risk management

Risk factors identifying (P,C),Setting of factors value,Integrated database,Dynamic segmentation

Page 6: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

Corrosion (ILI, cathodic protection..), Construction (coating, pipe material...), 3th parts, Geo – factors (soil type, landslide potential...)

Risk factors identifying

Page 7: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

People,Economy,Environment...

Risk factors identifying

Page 8: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

Risk model

34 probability factors,13 consequences factors,4 time related factors...

Page 9: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

Riziko (R)R = P x D

Erf DNV (t)

3th parts

Cathodic protection

Dynamic segmentation

Page 10: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

Risk management

Drill down analyses,Critical factors Identification,Mitigation...

Page 11: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

Risk management is not playing with numbers

Integrity management – risk management

Page 12: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

1026,7 km1291,6 km

11,01 km

Page 13: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

Analyses of the 3th risk level

61% of all 3th level risks segments (8213 m)21 km long section, Dificcult natural conditions

Page 14: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

Analyses of the 3th risk level

Page 15: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

Why is the 4th line bad?

ILI is only one of the risk factors,The same environment (conditions),The same impacts...

Page 16: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

Why is the 4th line bad?

ILI is only one of the risk factors,The same environment (conditions),The same impacts...

Page 17: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

+ 9507 m

-8870 m-637 m

The 1st line

Page 18: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

+ 1370m

-1312 m+41,5m

The 2nd line

Page 19: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

+ 4480 m

-4912 m+432 m

3th line

Page 20: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

- 32719m

+30781m+1938m

The 4th line

Page 21: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

...even ILI has its „best before“...

Why is the 4th line bad?

Page 22: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

-6326m

+6166m

+98m

-9017m

+8716m

+285m

-8837 m

+8228m

+576 m

-10613m

+10596m

+17m

Page 23: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

New ILI (L1,L2,L3)New data , new corrosion findingsTime related factors

Why all lines goes bad?

Page 24: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

+20 122m

-19 925m

-1007m

+13178m

-12581m

-1427m

+5436 m

-4843m

-1381m

+405m

-903m

-1403m

-37%

Page 25: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

Mitigation focused on critical sectorMitigation covers all area (new CP station)Feedback (external inspection of all section)

Why goes all lines nice?

Page 26: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

- 3187 m

+ 3156 m

-7 m

- 12284 m

+ 11856 m

+ 413 m

- 4662 m

+ 4384 m

+ 279 m

-1047 m

+ 882 m

+ 163 m

Page 27: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

Time is ticking:„Virtual“ growing of corrosionInspections are getting old

ILI is like the Holy BibleRepairing of corrosion based on It is localPlaning is not enoug corelated wit risk model

Time to review the model?

What happens? (Again)

Page 28: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

Conclusions

100000

120000

140000

160000

180000

200000

220000

240000

260000

1

2

3

4

150000

200000

250000

300000

350000

400000

1

2

3

4

0

1000

2000

3000

4000

5000

6000

1

2

3

4

Page 29: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

Risk model works and reflects activitys in terrainIt is neccesary to involve risk model more into process of maintenance, The way how to significant reduce risky segments is applying areal mitigations (e.g. fresh inspection)

Conclusions

Page 30: Branislav Reťkovský - Marcogazmarcogaz.org/downloads/PIMF2014/3A.2 - Branislav_Retkovsky.pdf · Probability X Consequences (ASME B31.8s, K. Muhlbauer, eustream know-how) Transit

Thank you for your attention