Status Report #2Food DIPTeam 11

Device that detects irregularities in perishable goods before distribution

Brandy AlgerTravis Ayers

Josue FigueroaJoaquin Labrado

Page 2: Brandy Alger Travis Ayers Josue  Figueroa Joaquin  Labrado

Overall Need for Design

• Prevention of food poisoning epidemic, recalls, and packaging money loss for packing bad food.

• Design Milestones– Proposals sent out to companies (02/01)– Materials Bought (02/08)– Rough Designs for Robotic Arm and Image

Processor done (02/08)

Page 3: Brandy Alger Travis Ayers Josue  Figueroa Joaquin  Labrado

Tasks Completed

• Robotic Arm and Image Processing teams meeting and starting rough draft for design

• Materials List drafted• Found Conveyor Belt• Acquired Southwest Research Institute Lab to

conduct design implementation• Access to multiple cameras through SwRI

Page 4: Brandy Alger Travis Ayers Josue  Figueroa Joaquin  Labrado

Ongoing Tasks

• Design for Robotic Arm and Image Processing• Ordering parts• Preparing proposals for company funding– Non-Disclosure Agreement

• Waiting for confirmation from entrepreneurial group

• Fixing Conveyor Belt

Page 5: Brandy Alger Travis Ayers Josue  Figueroa Joaquin  Labrado

Upcoming Tasks

• Start and test schematic/flow diagram of Robotic Arm and Image Processor

• Robotic Arm: Pick PID controller• Image Processor: Coding most efficient

segmentation process• Test Conveyor Belt

Page 6: Brandy Alger Travis Ayers Josue  Figueroa Joaquin  Labrado
Page 7: Brandy Alger Travis Ayers Josue  Figueroa Joaquin  Labrado

Project Schedule

Design phase Finalize Design

Manufacture phase

Analysis/and Test Phase

Finalize prototype

30% 0%