Welcome by Deborah Dicker Chairman Doddinghurst Parish Council.
Bradbury Dicker Group Architects Project Managers Interior Designers Landscape Designers Bradbury...
-
Upload
braulio-cregg -
Category
Documents
-
view
227 -
download
3
Transcript of Bradbury Dicker Group Architects Project Managers Interior Designers Landscape Designers Bradbury...
Bradbury Dicker Group
ArchitectsProject ManagersInterior Designers
Landscape Designers
Bradbury Dicker Group
ArchitectsProject ManagersInterior Designers
Landscape Designers
Pt Lonsdale Primary SchoolJuly, 2006
ENVIRONMENTAL SUSTAINABLE ATTRIBUTES
Bradbury Dicker Group
ArchitectsProject ManagersInterior Designers
Landscape Designers
Building Automation System
Lighting
Heating
Thermal Chimney
Rain Water Harvesting
Security System
Con
ten
tsE
NV
IRO
NM
EN
TA
L S
US
TA
INA
BL
E
DE
SIG
N A
TT
RIB
UT
ES
Bradbury Dicker Group
ArchitectsProject ManagersInterior Designers
Landscape Designers
Building Automation System
ENGINEERING SERVICES –
TERMINOLOGY: “BUILDING AUTOMATION SYSTEM”
• Clipsal “CBUS” system• $21,000 Over & Above, Lighting Heating controls
7 Year payback period on ENERGY SAVINGS
• MOTION SENSOR• INFRA-RED (with Modulating Output)
• Lighting 300 LUX at the working plane• Heating Natural Gas Units Rinnai with
modified Computer Control Chips• Window Opening at high level by motorized
winders with limit controls • Automated Dampening Controls to Thermal Chimney• Security Proximity Card readers at primary access points 5NO
* Activates various programmes within computer controlled outputs.
Computer
Motion Sensor
Heater
Windows
Lights
Legend
Dampners
Bradbury Dicker Group
ArchitectsProject ManagersInterior Designers
Landscape Designers
LightingT5 FRI PHOSPHOROUS TUBES (ENERGY EFFICIENT)
• They come with Electrical Ballast• Hence dimmable by INFRARED MOTION SENSOR with
modulating output. i.e.1. Movement Activates – No movement (15 min.) Deactivation2. In active mode – modulates output to set LUX levels
300 LUX @ Working Plane3. Touch Control Override (i.e. Audio Visual Presentation)4. Time Variable / Ease of change – Preset Key Criteria
ESTIMATED COST / SAVINGS
• 1800 M2 say 2000M2
UFA GROSS• 500 Lights - 400 on @ any time
400 x 60 WATTS (Double Tubes)24 kw / hr (15 cents an hour)$3.60 / hr
Operation 1500 hrs a year
$5400 / annumAnnual Lighting Bill (Electrical)At 300 LUX – and not running when not needed
$2052 per Annum.
SAVE BETWEEN 25 – 50 % (38%)
Bradbury Dicker Group
ArchitectsProject ManagersInterior Designers
Landscape Designers
HeatingBUILDING AUTOMATIONS SYSTEM
1. Computer allows heater to function2. Requires MANUAL activation but only
allows within pre-set time limits3. Will run for selected time:
.5 hr1.0 hr1.5 hr2.0 hr
4. No MOVEMENT within room (15 min.) computer will shut off heater
4. System will self modulate to internal preset thermostat, set 21DEGREES +-0 .5DEGREES
$1000 PER ANNUM.
(conservative)
Natural gas is cheap
Increments
Computer
Motion Sensor
Heater
Tempreture (DEGREES)
Legend
Bradbury Dicker Group
ArchitectsProject ManagersInterior Designers
Landscape Designers
Thermal ChimneyNIGHTIME PURGING
1. T1 / T2
Differential Thermostats (Inside / Outside)
Ambient Temperature Comparisons
IF: exceeds 21 DEGREES + tolerance
Opens DAMPNERS to thermal chimney
Open WINDOWS – if Rain Gauge indicates rain,
windows automatically close, and rely on greater time.
Will NOT allow heater, To engage self modulating thermostats
Computer ThermostatLegend
Dampners
Rain Gauge
Heater
Windows
1. 12:00 Midnight to 2:00 AM
Requires natural air / Pressure to
cause movement
DAYTIME CONTROL
Bradbury Dicker Group
ArchitectsProject ManagersInterior Designers
Landscape Designers
RA
IN W
ATER
HA
RV
ES
TIN
G$1
5,00
0 IN
VEST
MEN
TWATER EFFICIENCY DIVICES
• Tap Timers
EQUATION
15 LITRES / PER DAY / PER PERSON
2 Drinking
2 Washing
12 Flushing
---
15 LITRES x 250 STUDENTS
---
3750 LITRES (say 3500)
Multiply 200 days per year
---
700,000 LITRES / YEAR
Bradbury Dicker Group
ArchitectsProject ManagersInterior Designers
Landscape Designers
RA
IN W
ATER
HA
RV
ES
TIN
G$1
5,00
0 IN
VEST
MEN
T EQUATION
25 YEAR RAINFALL – AVG. 600 mm / PER YEAR
TANK SIZE – 2.4 H x 3.0 D
15 LITRES x 2 = 40,000 LITRES
30,000
---
700,000
30,000
23 Times. (Hence, needs to rain every fortnight)
---
1800m2 Floor Area Available
1000m2 Collection Area (Roof)
X
600 mm
0.6 / m2
---
$1.0833 cents per 1000 LITRES
$0.9026 cents per 1000 LITRES
1st of July $1.98 (Say $2.00)
---
240,000 LITRES @ 1 year
---
$480 / Year (Say $500 Year)
INVESTMENT $15,000
30 YEAR PAYBACK
Bradbury Dicker Group
ArchitectsProject ManagersInterior Designers
Landscape Designers
Access Control
1. 5 PRIMARY door sites – CBUS interface, plus Master Key
Action Plan – Environmental Sustainable Design
1. Schools Responsibility - Make a commitment to this system, to achieve the ideal ECOLOGICAL sustainable outcomes.
Make sure processors are put into place, so as the school community play vital role in achieving ECOLOGICAL results.
Upon occupancy a management training process will be required, to inform and educate the users of the buildingxs ESD attributes, this shall empower the users to take ownership and future management responsibilities.
2. Close windows / Lock Doors, generally
3. recyclable opportunities
4. Waste management
5. Air pollution
6. More effective use of energy resources
ORIENTATION
1. South Facing Light and appropriate shading provided by overhangs and verandahs
2. Material Selection / Thermal Mass / Low embodied energy
7. Alternative forms of energy
8. Use high quality natural materials, minimise chemically treated and
or synthetic materials.
9. Insulation (Thermal and Acoustically)