BR100Ass Supplier Scheduling Application Setup
description
Transcript of BR100Ass Supplier Scheduling Application Setup
AIMBR.100ASS SUPPLIER SCHEDULING APPLICATION SETUP<Company Long Name><Subject>
Author: <Author>Creation Date: June 3, 1999Last Updated: June 10, 1999Document Ref: <Document Reference Number> Version: DRAFT 1A
Approvals:
<Approver 1>
<Approver 2>
BR.100Ass Supplier Scheduling Application Setup
Document Control
Change Record4
Date Author Version Change Reference
3-Jun-99 <Author> Draft 1a No Previous Document
Reviewers
Name Position
Distribution
Copy No.
Name Location
1 Library Master Project Library2 Project Manager34
Note To Holders:
If you receive an electronic copy of this document and print it out, please write your name on the equivalent of the cover page, for document control purposes.
If you receive a hard copy of this document, please write your name on the front cover, for document control purposes.
<Subject> File Ref: document.doc (v. DRAFT 1A )
Company Confidential - For internal use only
Document Control ii
Doc Ref: <Document Reference Number> June 10, 1999
BR.100Ass Supplier Scheduling Application Setup
Contents
Document Control............................................................................................
Application Set Up Control Sheet - Supplier Scheduling................................
SS: Define Supplier Statuses..........................................................................
SS: Define Approved Supplier List..................................................................
SS: Define Sourcing Rules..............................................................................
SS: Assign Sourcing Rules/Bill of Distribution................................................
SS: Define Bucket Patterns.............................................................................
SS: Define Schedule Options..........................................................................
SS: Define CUM Accounting Periods...............................................................
Open and Closed Issues for this Deliverable..................................................Open Issues................................................................................................Closed Issues.............................................................................................
<Subject> File Ref: document.doc (v. DRAFT 1A )
Company Confidential - For internal use only
Document Control ii
Doc Ref: <Document Reference Number> June 10, 1999
Application Set Up Control Sheet - Supplier Scheduling
Environment Name: Machine: Type (definition, execution, or both):
Workflow
Sub Workflow Name
Setup Task Responsibility Due Date QA Responsibility QA Due Date Signature Approval
Supplier Scheduling Setup
SS: Define Supplier Statuses
SS: Define Approved Supplier List
SS: Define Sourcing Rules
SS: Assign Sourcing Rules/Bill of Distribution
SS: Define Bucket Patterns
SS: Define Schedule Options
SS: Define CUM Accounting Periods
SS: Define Supplier Statuses
Manufacturing>Supplier Scheduling>Supply Base>Supplier Statuses<Customer Short Name> Process:
<Process Name>Business Area:
<Business Area>Date:
<Date>Control Number:
<Control Number>Priority(H, M, L):
<Priority (H, M, L)>Process Owner:
<Process Owner>Description: Use this form to create any number of Approved Suppler Statuses to describe the condition of the Approved Supplier. Each Approved Suppler Status can have Business Rules applied to manage the characteristics of the status.
Status Description Approved Supplier List Default
Inactive on
<Business Rules>Control Rule Rule Description
SS: Define Approved Supplier List
Manufacturing>Supplier Scheduling>Supply Base>Approved Supplier List<Customer Short Name> Process:
<Process Name>Business Area:
<Business Area>Date:
<Date>Control Number:
<Control Number>Priority(H, M, L):
<Priority (H, M, L)>Process Owner:
<Process Owner>
Type Commodity Item Description
<Suppliers>
Key Attributes Record DetailBusiness Name Site Status Supplier Item Manufacture
rReview By Glob
alOwing Organization
Created
AttributesGlobal
Local
Purchasing UOM
Release Method
Supplier SchedulingEnable Planning Schedules
Enable Shipping Schedules
Scheduler
<Enable Auto Schedule>Description Defaults
Plan Bucket Pattern
Ship Bucket Pattern
Plan Schedule Type
Ship Schedule Type
<Enable Authorizations>Sequence
Authorization Defaults
Sequence
Authorization Defaults
SS: Define Sourcing Rules
Manufacturing>Supplier Scheduling>Supply Base>Define Sourcing Rules<Customer Short Name> Process:
<Process Name>Business Area:
<Business Area>Date:
<Date>Control Number:
<Control Number>Priority(H, M, L):
<Priority (H, M, L)>Process Owner:
<Process Owner>Description: Use this form to define Sourcing Rules.
Name Description All Orgs
Org Planning Active
<Effective Date>From To
<Shipping Organization>Type Org Supplier Supplier Site Allocati
onRank
Shipping Method
SS: Assign Sourcing Rules/Bill of Distribution
Manufacturing>Supplier Scheduling>Supply Base>Assign Sourcing Rules<Customer Short Name> Process:
<Process Name>Business Area:
<Business Area>Date:
<Date>Control Number:
<Control Number>Priority(H, M, L):
<Priority (H, M, L)>Process Owner:
<Process Owner>Description: Use this form to Assign Sourcing Rules/Bill of Distribution.
Assignment Set Description
<Assignments>Assigned To Organizatio
nCustomer Customer Site Item/Category Description Type Sourcing Rule/
BoD
SS: Define Bucket Patterns
Manufacturing>Supplier Scheduling>Setup>Bucket Patterns<Customer Short Name> Process:
<Process Name>Business Area:
<Business Area>Date:
<Date>Control Number:
<Control Number>Priority(H, M, L):
<Priority (H, M, L)>Process Owner:
<Process Owner>Description: Use this form to define Bucket Patterns.
Name Description Days Weeks Months Quarters Total
SS: Define Schedule Options
Manufacturing>Supplier Scheduling>Setup>Schedule Options<Customer Short Name> Process:
<Process Name>Business Area:
<Business Area>Date:
<Date>Control Number:
<Control Number>Priority(H, M, L):
<Priority (H, M, L)>Process Owner:
<Process Owner>Description: Use this form to define Schedule Options.
Ship-To Organization Enable CUM Management
TRV Updates CUM
<Defaults>MRP Plan MPS Plan DRF PLAN
<Schedules Types>Planning Shipping
<Buckets Pattern>Planning Shipping
SS: Define CUM Accounting Periods
Manufacturing>Supplier Scheduling>CUM Periods<Customer Short Name> Process:
<Process Name>Business Area:
<Business Area>Date:
<Date>Control Number:
<Control Number>Priority(H, M, L):
<Priority (H, M, L)>Process Owner:
<Process Owner>Description: Use this form to define CUM Periods.
Organization
CUM Period Start
Date
End
Date
Supplier Supplier
Site
Category
Set
Category Item Description
Open and Closed Issues for this Deliverable
Open IssuesID Issue Resolution Responsibility Target Date Impact Date
Closed IssuesID Issue Resolution Responsibility Target Date Impact Date